CN110173119A - A kind of pumping of concrete construction is vibrated integrated equipment - Google Patents

A kind of pumping of concrete construction is vibrated integrated equipment Download PDF

Info

Publication number
CN110173119A
CN110173119A CN201910569558.4A CN201910569558A CN110173119A CN 110173119 A CN110173119 A CN 110173119A CN 201910569558 A CN201910569558 A CN 201910569558A CN 110173119 A CN110173119 A CN 110173119A
Authority
CN
China
Prior art keywords
delivery pipe
pumping
vibrated
concrete
spray head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910569558.4A
Other languages
Chinese (zh)
Other versions
CN110173119B (en
Inventor
张振
金国建
陈建平
林悦
李剑伟
陈金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNNC Huachen Construction Engineering Co Ltd
Original Assignee
CNNC Huachen Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNNC Huachen Construction Engineering Co Ltd filed Critical CNNC Huachen Construction Engineering Co Ltd
Priority to CN201910569558.4A priority Critical patent/CN110173119B/en
Publication of CN110173119A publication Critical patent/CN110173119A/en
Application granted granted Critical
Publication of CN110173119B publication Critical patent/CN110173119B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0418Devices for both conveying and distributing with distribution hose
    • E04G21/0436Devices for both conveying and distributing with distribution hose on a mobile support, e.g. truck
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/06Solidifying concrete, e.g. by application of vacuum before hardening
    • E04G21/08Internal vibrators, e.g. needle vibrators

Abstract

It vibrates integrated equipment the invention discloses a kind of pumping of concrete construction, including mobile platform, across mobile platform and upwards the delivery pipe that lifts, the tamping equipment in delivery pipe, the driving device for driving tamping equipment mobile on mobile platform, the tamping equipment includes vibrate motor, flexible transfer tube and the vibrating spear positioned at transmission pipe end, and the vibrating spear is moved up and down along the direction that conveying pipe end extends.The present invention pumps the concrete stirred evenly by delivery pipe, while pouring, vibrating spear rises according to the speed of setting, determine the height of mixed mud in column, it to effectively control the dosage of material, reduces and is wasted caused by being trickled down because of concrete, be based on mobile platform, one is completed at the same time the operation that pours and vibrate, and achievees the effect that liberate labour, saves the construction time.

Description

A kind of pumping of concrete construction is vibrated integrated equipment
Technical field
The invention belongs to concreting component technology fields, and in particular to a kind of pumping of concrete construction is vibrated one Equipment.
Background technique
When the concreting component mixed and stirred with concrete agitator, it is necessary to exclude wherein bubble, be made firm by ramming, make to mix Phenomena such as coagulating the closely knit combination of soil, eliminating the voids and pits of concrete, to improve its intensity, guarantees the quality of concrete component.It passes Vibrating and pouring necessary more than two people for system cooperates completion, and a people is responsible for pouring, and a people is responsible for vibrating, and the quality of operation is complete By the experience of worker, it is difficult to guarantee the quality poured.
Patent CN201710383168.9 discloses a kind of concrete automatic pouring and tamping equipment, including device noumenon, Described device ontology includes chassis, pours case and mobile mechanism, pours case, concrete vibrating mechanism and mobile mechanism by setting, so that Device can be poured and be vibrated in the process of moving, and structure is simple, can one man operation, greatly improved speed of application and Efficiency greatly reduces labor intensity, while concrete vibrating mechanism quantity can be changed according to demand, so that the width that vibrates can It adjusts, is very suitable in large-area construction operation.
But the device be only applicable to plane pour operation, when pouring column for needing to move up and down, due to can not It is effectively moved in depth direction, it is difficult to guarantee the pouring quality of entire column.
Summary of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of concrete constructions poured suitable for column Pumping vibrate integrated equipment.
The purpose of the present invention is achieved through the following technical solutions:
A kind of pumping of concrete construction is vibrated integrated equipment, including mobile platform, is lifted across mobile platform and upwards Delivery pipe, the tamping equipment in delivery pipe, the driving device for driving tamping equipment mobile on mobile platform, it is described Tamping equipment include vibrate motor, flexible transfer tube and positioned at transmission pipe end vibrating spear, the vibrating spear along The direction that conveying pipe end extends moves up and down.
Further, the driving device includes driving motor, screw rod, the spiral shell on screw rod for connecting driving motor Support base female and positioned at screw both end, the nut are connect with the motor that vibrates.
Further, support device is provided in the delivery pipe, the support device is multiple support rods, the branch Pulley is provided on strut, the transfer tube is located on pulley.
Further, it is provided between the support device by the adjusting rod of hydraulic or air pressure driving.
Further, the delivery pipe includes steel construction hard tube and the hose for connecting steel construction hard tube, the steel knot The junction of structure hard tube and software is provided with flusher, and the flusher includes towards the spray head a of steel construction hard tube, direction Spray head b, the water tank of setting on a mobile platform and the control valve for controlling spray head a and spray head b opening and closing of hose.
Further, the control valve includes hollow pipe column, the return spring in hollow pipe column and connects back to The piston plate of position spring, the hollow pipe column are provided with water inlet, hollow pipe column side point far from the end of return spring side Be not provided with the water outlet a for leading to spray head a and lead to the water outlet b, the water outlet b of spray head b compared to water outlet a close into The mouth of a river.
Further, the delivery pipe is provided with opening in the bottom of inlet side, and the overthe openings are provided with gear Plate, the baffle hinged, other end on the inside of close delivery pipe inlet end and delivery pipe are provided with limit spring, the opening Lower section is provided with the collecting tank comprising filter layer.
The beneficial effects of the present invention are:
(1) present invention is arranged in delivery pipe while pouring by the concrete that delivery pipe pumping stirs evenly Tamping equipment rises under the action of driving device according to the speed of setting, and the speed is big by the speed that pours and column The factors such as small determine that the position by observing tamping equipment end vibrating spear is assured that the height of mixed mud in column, from And the dosage of material is effectively controlled, it reduces wasting caused by trickling down because of concrete, is based on mobile platform, one not only can be same When complete to pour and operation of vibrating, have the function that liberate labour, save the construction time, can also manipulate setting complete it is vertical It is moved at next column and is poured at once after the pouring of column, significantly improve the efficiency of construction.
(2) present invention drives screw rod rotation by driving motor, and the rotation of screw rod drives moving up and down for nut, to be Moving up and down for tamping equipment provides stable control, and structure is simple, and control is accurate.
(3) present invention is respectively rinsed hose and steel construction hard tube, by two spray heads of setting when hydraulic pressure is low It waits and only rinses a hose, for the simple flushing after completing the pouring of column, prevent concrete adhesion on hose from influencing The conveying of subsequent concrete rinses hose and steel construction hard tube simultaneously when hydraulic pressure is big, for completing pouring for stage After building, entire delivery pipe is rinsed comprehensively, structure is simple, facilitates control.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment one;
Fig. 2 is the partial enlarged view of Fig. 1;
Fig. 3 is the structural schematic diagram of embodiment two;
Fig. 4 is the structural schematic diagram of flusher in embodiment two;
Fig. 5 is the structural schematic diagram of embodiment three;
In figure, 1- mobile platform, 2- delivery pipe, 3- transfer tube, 4- support rod, 5- nut, 6- vibrating spear, 7- vibrates electricity Machine, 8- screw rod, 9- support base, 10- driving motor, 11- pulley, 12- adjusting rod, 13- spray head a, 14- spray head this b, 15- baffle, 16- water tank, 17- limit spring, 18- collecting tank, 19- filter layer, 20- water inlet, 21- water outlet b, 22- piston plate, 23- are returned Position spring, 24- hollow pipe column, 25- water outlet a, 2.1- steel construction hard tube, 2.2- hose.
Specific embodiment
Below in conjunction with embodiment, technical solution of the present invention is clearly and completely described, it is clear that described Embodiment is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field Technical staff's every other embodiment obtained under the premise of not making the creative labor belongs to what the present invention protected Range.
Embodiment one:
As shown in Fig. 1~2, a kind of pumping of concrete construction is vibrated integrated equipment, including mobile platform 1, passes through movement Platform 1 and the delivery pipe 2 lifted upwards, the tamping equipment in delivery pipe 2 drive tamping equipment on mobile platform 1 Mobile driving device, the tamping equipment include vibrate motor 7, flexible transfer tube 3 and positioned at 3 end of transfer tube Vibrating spear 6, the vibrating spear 6 are moved up and down along the direction that 2 end of delivery pipe extends.
The working principle of the present embodiment: the concrete stirred evenly in delivery pipe 2 by being pumped to below 2 end of delivery pipe In column mold, the 7 electric vibrating stick 6 of motor that vibrates while pouring vibrates to concrete, eliminates the gas in concrete Bubble, as concrete constantly pours, vibrating spear 6 is driven by the driving device to be moved up, to keep to concrete Persistently vibrate.
The concrete stirred evenly is pumped by delivery pipe 2, and the dress that vibrates in delivery pipe 2 is set while pouring Set under the action of driving device, according to setting speed rise, the speed by the speed poured and the size of column etc. because Element determines that the position by observing tamping equipment end vibrating spear 6 is assured that the height of mixed mud in column, thus effectively Control material dosage, reduce because concrete it is unrestrained caused by waste, be based on mobile platform 1, one not only can be complete simultaneously At pouring and operation of vibrating, have the function that liberate labour, save the construction time, can also manipulate to be arranged in and complete column It is moved at next column and is poured at once after pouring, significantly improve the efficiency of construction.
As specific driving structure, the driving device includes driving motor 10, the screw rod for connecting driving motor 10 8, the nut 5 on screw rod 8 and the support base 9 positioned at 8 both ends of screw rod, the nut 5 are connect with the motor 7 that vibrates.
Screw rod 8 is driven to rotate by driving motor 10, the rotation of screw rod 8 drives moving up and down for nut 5, thus to vibrate Moving up and down for device provides stable control, and structure is simple, and control is accurate.
As specific connection type, support device is provided in the delivery pipe 2, the support device is multiple Strut 4 is provided with pulley 11 on the support rod 4, and the transfer tube 3 is located on pulley 11.Transfer tube 3 slides on pulley 11 To drive the vibrating spear 6 of 3 end of transfer tube to move up and down, implementation is simple, facilitates control.
For the moving range for optimizing vibrating spear 6, it is provided between the support device by hydraulic or air pressure driving Adjusting rod 12.By control pressure or hydraulic, to control the spacing between support device, reach mobile vibrating spear 6 indirectly The purpose moved in transverse direction, it may be convenient to which the position for adjusting vibrating spear 6 prevents from frequently moving the reduction of mobile platform 1 The efficiency poured.
Embodiment two:
It as shown in figs. 34, is the cleaning for keeping delivery pipe 2, the delivery pipe 2 includes steel construction hard tube 2.1 and connects The hose 2.2 of steel construction hard tube 2.1 is connect, the junction of the steel construction hard tube 2.1 and software is provided with flusher, the punching Cleaning device includes the spray head a13 towards steel construction hard tube 2.1, the spray head b14 towards hose 2.2, is arranged on mobile platform 1 Water tank 16 and the control valve being opened and closed for controlling spray head a13 and spray head b14.
Control valve controls the open and close of spray head a13 and spray head b14, to after the completion of pouring or pour the break period The too long stage is rinsed the concrete in delivery pipe 2, prevent concrete stick in delivery pipe 2 solidify after, be blocked in In delivery pipe 2, the conveying capacity of delivery pipe 2 is reduced.
To optimize the flushing to delivery pipe 2, the control valve includes hollow pipe column 24, returning in hollow pipe column 24 Position spring 23 and the piston plate 22 for connecting return spring 23, the hollow pipe column 24 are set far from the end of 23 side of return spring It is equipped with water inlet 20,24 side of hollow pipe column is respectively arranged with the water outlet a25 for leading to spray head a13 and leads to going out for spray head b14 Mouth of a river b21, the water outlet b21 is compared to water outlet a25 close to water inlet 20.
Water outlet b21 is only opened when hydraulic pressure is low, spray head b14 connection only rinses hose 2.2, for complete at this time At the simple flushing after the pouring of column, prevent concrete adhesion on hose 2.2 from influencing the conveying of subsequent concrete, when Water outlet a25 and water outlet b21 are opened simultaneously when hydraulic pressure is big, are rinsed hose 2.2 and steel construction hard tube 2.1 respectively, are used for After completing the pouring of stage, entire delivery pipe 2 is rinsed comprehensively, structure is simple, facilitates control.
Embodiment three:
As shown in figure 5, the delivery pipe 2 is provided with opening in the bottom of inlet side for convenience of the filtering after flushing, The overthe openings are provided with baffle 15, and the baffle 15 is hinged, another close to 2 inlet end of delivery pipe and 2 inside of delivery pipe One end is provided with limit spring 17, is provided with the collecting tank 18 comprising filter layer 19 below the opening.
When transport concrete in delivery pipe 2, the compressed by weight limit spring 17 of concrete is moved down, concrete It can normally convey.When rinsing to delivery pipe 2, the fluid flow direction in delivery pipe 2 changes, and pushes limit spring 17 move up, to open outlet, the separation of solid-liquid is completed in the collecting tank 18 after flushing below outlet.Whole process can Simple and fast without artificial operation to be automatically performed, the substance after separation can participate in subsequent recycling, save cost.
The above is only a preferred embodiment of the present invention, it should be understood that the present invention is not limited to described herein Form should not be regarded as an exclusion of other examples, and can be used for other combinations, modifications, and environments, and can be at this In the text contemplated scope, modifications can be made through the above teachings or related fields of technology or knowledge.And those skilled in the art institute into Capable modifications and changes do not depart from the spirit and scope of the present invention, then all should be in the protection scope of appended claims of the present invention It is interior.

Claims (7)

  1. The integrated equipment 1. a kind of pumping of concrete construction is vibrated, it is characterised in that: including mobile platform (1), pass through mobile put down Platform (1) and the delivery pipe (2) lifted upwards, the tamping equipment being located on delivery pipe (2), the driving vibration on mobile platform (1) The mobile driving device of device is smash, the tamping equipment is comprising the motor (7) that vibrates, flexible transfer tube (3) and is located at biography The vibrating spear (6) of defeated pipe (3) end, the vibrating spear (6) move up and down along the direction that delivery pipe (2) end extends.
  2. The integrated equipment 2. a kind of pumping of concrete construction according to claim 1 is vibrated, it is characterised in that: the drive Dynamic device includes driving motor (10), the screw rod (8) for connecting driving motor (10), the nut (5) being located on screw rod (8) and position Support base (9) in screw rod (8) both ends, the nut (5) connect with the motor that vibrates (7).
  3. The integrated equipment 3. a kind of pumping of concrete construction according to claim 1 is vibrated, it is characterised in that: described is defeated It send and is provided with support device on pipe (2), the support device is multiple support rods (4), is provided with pulley on the support rod (4) (11), the transfer tube (3) is located on pulley (11).
  4. The integrated equipment 4. a kind of pumping of concrete construction according to claim 3 is vibrated, it is characterised in that: the branch It is provided between support arrangement by the adjusting rod (12) of hydraulic or air pressure driving.
  5. The integrated equipment 5. a kind of pumping of concrete construction according to claim 1 is vibrated, it is characterised in that: described is defeated Sending pipe (2) includes steel construction hard tube (2.1) and the hose (2.2) for connecting steel construction hard tube (2.1), the steel construction hard tube (2.1) junction of software is provided with flusher, the flusher includes the spray head a towards steel construction hard tube (2.1) (13), towards the spray head b (14) of hose (2.2), the water tank (16) being arranged on mobile platform (1) and for controlling spray head a (13) and spray head b (14) opening and closing control valve.
  6. The integrated equipment 6. a kind of pumping of concrete construction according to claim 5 is vibrated, it is characterised in that: the control Valve processed includes hollow pipe column (24), the return spring (23) being located in hollow pipe column (24) and the work for connecting return spring (23) Seben (22), the hollow pipe column (24) are provided with water inlet (20), hollow pipe column far from the end of return spring (23) side (24) side is respectively arranged with the water outlet a (25) for leading to spray head a (13) and the water outlet b (21) for leading to spray head b (14), described Water outlet b (21) is compared to water outlet a (25) close to water inlet (20).
  7. The integrated equipment 7. a kind of pumping of concrete construction according to claim 5 is vibrated, it is characterised in that: described is defeated Send pipe (2) that the bottom of inlet side is provided with opening, the overthe openings are provided with baffle (15), and the baffle (15) is being leaned on The hinged, other end is provided with limit spring (17) on the inside of nearly delivery pipe (2) inlet end and delivery pipe (2), below the opening It is provided with the collecting tank (18) comprising filter layer (19).
CN201910569558.4A 2019-06-27 2019-06-27 Pumping and vibrating integrated equipment for concrete construction Active CN110173119B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910569558.4A CN110173119B (en) 2019-06-27 2019-06-27 Pumping and vibrating integrated equipment for concrete construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910569558.4A CN110173119B (en) 2019-06-27 2019-06-27 Pumping and vibrating integrated equipment for concrete construction

Publications (2)

Publication Number Publication Date
CN110173119A true CN110173119A (en) 2019-08-27
CN110173119B CN110173119B (en) 2024-04-05

Family

ID=67699210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910569558.4A Active CN110173119B (en) 2019-06-27 2019-06-27 Pumping and vibrating integrated equipment for concrete construction

Country Status (1)

Country Link
CN (1) CN110173119B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924402A (en) * 2019-12-30 2020-03-27 中煤浙江生态环境发展有限公司 Supporting platform
CN111663783A (en) * 2020-07-16 2020-09-15 广州城建职业学院 Assembly type building concrete pouring device based on BIM
CN112324143A (en) * 2020-11-14 2021-02-05 深圳市罗湖建筑安装工程有限公司 Concrete pouring construction equipment and method
CN112359835A (en) * 2020-11-18 2021-02-12 杨玉庆 Concrete pouring device for hydraulic engineering building and using method thereof
CN112962967A (en) * 2021-02-08 2021-06-15 临沂职业学院 Auxiliary device for high-rise building concrete pouring
CN113106855A (en) * 2021-04-20 2021-07-13 樊涛 Bridge support building and pouring forming equipment and method
CN113846845A (en) * 2021-09-06 2021-12-28 中国建筑第八工程局有限公司 Constructional column concrete vibrating pouring equipment and pouring method thereof
CN114645595A (en) * 2022-04-27 2022-06-21 重庆河邦建材有限公司 Concrete pouring method for hollow floor system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102373809A (en) * 2011-11-03 2012-03-14 上海理工大学 Concrete grouting and vibrating device
CN205476513U (en) * 2016-03-04 2016-08-17 中建三局第一建设工程有限责任公司 A vibration device for steel -pipe column concrete placement
CN106088611A (en) * 2016-06-22 2016-11-09 安庆海纳信息技术有限公司 A kind of build concrete ground pump terminal auxiliary pours device
CN206337827U (en) * 2016-11-25 2017-07-18 中铁三局集团有限公司 A kind of slim-lined construction post automatic vibrating device
KR101873942B1 (en) * 2017-11-03 2018-07-03 김칠기 Hydraulic concrete vibrator
CN210369941U (en) * 2019-06-27 2020-04-21 中核华辰建筑工程有限公司 Pumping and vibrating integrated equipment for concrete construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102373809A (en) * 2011-11-03 2012-03-14 上海理工大学 Concrete grouting and vibrating device
CN205476513U (en) * 2016-03-04 2016-08-17 中建三局第一建设工程有限责任公司 A vibration device for steel -pipe column concrete placement
CN106088611A (en) * 2016-06-22 2016-11-09 安庆海纳信息技术有限公司 A kind of build concrete ground pump terminal auxiliary pours device
CN206337827U (en) * 2016-11-25 2017-07-18 中铁三局集团有限公司 A kind of slim-lined construction post automatic vibrating device
KR101873942B1 (en) * 2017-11-03 2018-07-03 김칠기 Hydraulic concrete vibrator
CN210369941U (en) * 2019-06-27 2020-04-21 中核华辰建筑工程有限公司 Pumping and vibrating integrated equipment for concrete construction

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924402A (en) * 2019-12-30 2020-03-27 中煤浙江生态环境发展有限公司 Supporting platform
CN110924402B (en) * 2019-12-30 2021-04-06 中煤浙江生态环境发展有限公司 Supporting platform
CN111663783A (en) * 2020-07-16 2020-09-15 广州城建职业学院 Assembly type building concrete pouring device based on BIM
CN111663783B (en) * 2020-07-16 2021-09-07 广州城建职业学院 Assembly type building concrete pouring device based on BIM
CN112324143A (en) * 2020-11-14 2021-02-05 深圳市罗湖建筑安装工程有限公司 Concrete pouring construction equipment and method
CN112359835A (en) * 2020-11-18 2021-02-12 杨玉庆 Concrete pouring device for hydraulic engineering building and using method thereof
CN112962967A (en) * 2021-02-08 2021-06-15 临沂职业学院 Auxiliary device for high-rise building concrete pouring
CN113106855A (en) * 2021-04-20 2021-07-13 樊涛 Bridge support building and pouring forming equipment and method
CN113106855B (en) * 2021-04-20 2022-12-30 唐山市华运铁路交通器材有限公司 Bridge support building and pouring forming equipment and method
CN113846845A (en) * 2021-09-06 2021-12-28 中国建筑第八工程局有限公司 Constructional column concrete vibrating pouring equipment and pouring method thereof
CN114645595A (en) * 2022-04-27 2022-06-21 重庆河邦建材有限公司 Concrete pouring method for hollow floor system

Also Published As

Publication number Publication date
CN110173119B (en) 2024-04-05

Similar Documents

Publication Publication Date Title
CN110173119A (en) A kind of pumping of concrete construction is vibrated integrated equipment
CN213038803U (en) Mortar spraying device
CN207789342U (en) A kind of material blanking anti-blocking device of building mortar
CN206302812U (en) A kind of vertical wall green device
CN113216183A (en) Hole cleaning and pouring device and method for cast-in-situ bored pile
CN210651306U (en) Concrete mixing device for building site
CN215252874U (en) Hole cleaning and pouring device for cast-in-situ bored pile
CN210369941U (en) Pumping and vibrating integrated equipment for concrete construction
CN211640430U (en) Concrete production proportioning machine convenient to wash
CN206747198U (en) Synchronous grouting tank Rapid washing device in a kind of shield construction
CN205576924U (en) Water conservancy construction feeding device
CN114986706B (en) Automatic manufacturing device and method for civil engineering laboratory samples
CN211362875U (en) Concrete mixing arrangement for construction
CN212218862U (en) Mixer for hydraulic and hydroelectric engineering building
CN101411315A (en) Automatic water-exchanging system of fish tank
CN218429124U (en) Civil engineering cement watering device
CN112267469A (en) Cement pouring equipment for building engineering
CN207110483U (en) Thick-layer Self-leveling pours ground device
CN209772996U (en) A belt cleaning device for mortar holding vessel
CN210086831U (en) Civil engineering watering device
CN208981787U (en) A kind of concrete hoisting funnel of controllable flow rate
CN206337635U (en) It is horizontal integrated from clear dry type pumping plant
CN219705655U (en) Cement pouring equipment
CN218803117U (en) Mortar stirring device
CN214091043U (en) Device is pour in housing construction main part construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Zhen

Inventor after: Jin Guojian

Inventor after: Chen Jianping

Inventor after: Lin Yue

Inventor after: Li Jianwei

Inventor after: Chen Jin

Inventor before: Zhang Zhen

Inventor before: Jin Guojian

Inventor before: Chen Jianping

Inventor before: Lin Yue

Inventor before: Li Jianwei

Inventor before: Chen Jin

GR01 Patent grant
GR01 Patent grant