CN205476470U - Pre -buried mould of housing construction construction blank bolt hole for platform installation - Google Patents

Pre -buried mould of housing construction construction blank bolt hole for platform installation Download PDF

Info

Publication number
CN205476470U
CN205476470U CN201620292448.XU CN201620292448U CN205476470U CN 205476470 U CN205476470 U CN 205476470U CN 201620292448 U CN201620292448 U CN 201620292448U CN 205476470 U CN205476470 U CN 205476470U
Authority
CN
China
Prior art keywords
vertical pole
bolt hole
square framework
buried
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620292448.XU
Other languages
Chinese (zh)
Inventor
李蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201620292448.XU priority Critical patent/CN205476470U/en
Application granted granted Critical
Publication of CN205476470U publication Critical patent/CN205476470U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a pre -buried mould of housing construction construction blank bolt hole for platform installation, it is too complicated to have improved current pre -buried mode, the lower problem of precision. The utility model discloses a square frame, the square frame both ends are equipped with a horizontal pole respectively, just are in square body framework one side is equipped with a vertical pole, horizontal pole, vertical pole all are located square frame's inboard, the both ends of horizontal pole link to each other with square body framework both sides respectively, the both ends of vertical pole link to each other with square body both ends respectively, and the vertical pole still links to each other with two horizontal poles, four angles of square frame, vertical pole link to each other with square frame, and point, horizontal pole link to each other a little with square frame and the horizontal pole do not is equipped with a montant with the continuous some punishment of vertical pole. The utility model discloses can ten two once only pre -buried screw holes, it is efficient, and the position accuracy is high, simultaneously the utility model discloses an equipment can used repeatedly, has reduced die cost widely.

Description

A kind of pre-buried mould of housing construction blank stage+module bolt hole
Technical field
This utility model relates to the pre-buried mould of a kind of housing construction blank stage+module bolt hole.
Background technology
In building engineering is constructed, installation discharging platform, carry out the upper and lower of the parts such as materials machine of constructing, its platform uses shape steel support to be supported, shaped steel solid on floor needs to use U-bolt hole, so need on floor pre-embedded bolt hole, existing pre-buried mode is the most complicated, and precision is relatively low.
Utility model content
In order to improve the problems referred to above, the purpose of this utility model is to provide the pre-buried mould of a kind of housing construction blank stage+module bolt hole.
To achieve these goals, the technical solution adopted in the utility model is as follows:
The pre-buried mould of a kind of housing construction blank stage+module bolt hole, including square framework, described square framework is respectively arranged at two ends with a cross bar, and is provided with a vertical pole in described cube framework side;Described cross bar, vertical pole are respectively positioned on the inner side of square framework;The two ends of described cross bar are connected with cube framework both sides respectively, and the two ends of described vertical pole are connected with cube two ends respectively, and vertical pole is also connected with two cross bars;Be connected with square framework point, cross bar of four angles of described square framework, vertical pole is connected a little with square framework and cross bar is connected with vertical pole at a little and is respectively equipped with a montant.
Further, service sleeve all it is socketed with outside each montant.
Yet further, described service sleeve bottom lock, open top.
Further, described service sleeve top sidewall is provided with through hole, and top sides is along outwards upset.
It addition, described square framework is surrounded by four bars.
Additionally, be all weldingly connected between described cross bar, vertical pole and square framework.
This utility model compared with prior art, has the following advantages and beneficial effect:
This utility model can the most pre-buried 12 screwed holes, efficiency is high;And positional precision is high;Equipment the most of the present utility model can be reused, and greatly reduces die cost.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Wherein, the parts that in accompanying drawing, labelling is corresponding are entitled: the square framework of 1-, 2-cross bar, 3-vertical pole, 4-montant, 5-service sleeve.
Detailed description of the invention
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings, and embodiment of the present utility model includes but not limited to the following example.
Embodiment
As it is shown in figure 1, the pre-buried mould of a kind of housing construction blank stage+module bolt hole, including square framework 1, described square framework is respectively arranged at two ends with a cross bar 2, and is provided with a vertical pole 3 in described cube framework side;Described cross bar, vertical pole are respectively positioned on the inner side of square framework;The two ends of described cross bar are connected with cube framework both sides respectively, and the two ends of described vertical pole are connected with cube two ends respectively, and vertical pole is also connected with two cross bars;Be connected with square framework point, cross bar of four angles of described square framework, vertical pole is connected a little with square framework and cross bar is connected with vertical pole at a little and is respectively equipped with a montant 4.Wherein, described square framework is surrounded by four bars.Described cross bar is paralleled with the bar at square framework two ends;Described vertical pole is paralleled with the bar of square framework both sides.So arrange and be able to ensure that being arranged at each montant being connected on point and four angles meets construction requirement, thus reserve the bolt hole that confession " U " type bolt passes.It addition, be all socketed with service sleeve 5 outside each montant.
When practice of construction, service sleeve is enclosed within montant, then this utility model is positioned over construction location, then carry out casting concrete, after concreting completes, only square framework need to be taken off, the most again service sleeve is taken out from concrete, material is thus formed bolt hole.If the most pre-buried relatively deep, only square framework can need to be taken out without taking out service sleeve.Owing to there being the existence of montant, it can be ensured that each service sleeve is vertical, will not run-off the straight, and the distance between each service sleeve can be limited, thus meet construction demand.
Specifically, described service sleeve bottom lock, open top.By above-mentioned setting, it is possible to prevent concrete to flow into service sleeve in casting process, it is to avoid bolt hole cannot be formed.
When service sleeve is taken off by needs, service sleeve top sidewall is provided with through hole, and top sides is along outwards upset.So arrange, it is possible to the parts such as corresponding suspension hook are installed by through hole, service sleeve are taken out from concrete, what deserves to be explained is, along less than through hole on concrete;If need not take out service sleeve from concrete, then be no need for arranging through hole.Owing to service sleeve top sides is along outwards upset, so arranges and also be able to utilize prominent part to use parts to be taken out from concrete by service sleeve.
In order to make structure of the present utility model more stable, firm.All it is weldingly connected between described cross bar, vertical pole and square framework.By welding make to connect between each parts more firm, thus preferably realize the effect in pre-embedded bolt hole, when further taking out, it is also possible to well directly taken out in service sleeve by montant.
What deserves to be explained is, this utility model simple in construction, low cost of manufacture, and very useful, it is possible to the most pre-buried 12 bolts hole, it is able to ensure that " U " type bolt is just passed through being fixed shape steel support simultaneously.
According to above-described embodiment, this utility model just can be realized well.What deserves to be explained is; on the premise of designing based on said structure; for solving same technical problem; even if some made on this utility model are without substantial change or polishing; the essence of the technical scheme used is still as this utility model, therefore it should also be as in protection domain of the present utility model.

Claims (6)

1. the pre-buried mould of a housing construction blank stage+module bolt hole, it is characterised in that include that square framework (1), described square framework are respectively arranged at two ends with a cross bar (2), and be provided with a vertical pole (3) in described cube framework side;Described cross bar, vertical pole are respectively positioned on the inner side of square framework;The two ends of described cross bar are connected with cube framework both sides respectively, and the two ends of described vertical pole are connected with cube two ends respectively, and vertical pole is also connected with two cross bars;Be connected with square framework point, cross bar of four angles of described square framework, vertical pole is connected a little with square framework and cross bar is connected with vertical pole at a little and is respectively equipped with a montant (4).
The pre-buried mould of a kind of housing construction blank stage+module bolt hole the most according to claim 1, it is characterised in that be all socketed with service sleeve (5) outside each montant.
The pre-buried mould of a kind of housing construction blank stage+module bolt hole the most according to claim 2, it is characterised in that described service sleeve bottom lock, open top.
The pre-buried mould of a kind of housing construction blank stage+module bolt hole the most according to claim 3, it is characterised in that described service sleeve top sidewall is provided with through hole, and top sides is along outwards upset.
The pre-buried mould of a kind of housing construction blank stage+module bolt hole the most according to claim 4, it is characterised in that described square framework is surrounded by four bars.
The pre-buried mould of a kind of housing construction blank stage+module bolt hole the most according to claim 5, it is characterised in that be all weldingly connected between described cross bar, vertical pole and square framework.
CN201620292448.XU 2016-04-08 2016-04-08 Pre -buried mould of housing construction construction blank bolt hole for platform installation Active CN205476470U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620292448.XU CN205476470U (en) 2016-04-08 2016-04-08 Pre -buried mould of housing construction construction blank bolt hole for platform installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620292448.XU CN205476470U (en) 2016-04-08 2016-04-08 Pre -buried mould of housing construction construction blank bolt hole for platform installation

Publications (1)

Publication Number Publication Date
CN205476470U true CN205476470U (en) 2016-08-17

Family

ID=56644488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620292448.XU Active CN205476470U (en) 2016-04-08 2016-04-08 Pre -buried mould of housing construction construction blank bolt hole for platform installation

Country Status (1)

Country Link
CN (1) CN205476470U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696791A (en) * 2016-04-08 2016-06-22 中国五冶集团有限公司 Embedded die for bolt hole used for installing building construction cropping platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696791A (en) * 2016-04-08 2016-06-22 中国五冶集团有限公司 Embedded die for bolt hole used for installing building construction cropping platform
CN105696791B (en) * 2016-04-08 2018-01-02 中国五冶集团有限公司 A kind of pre-buried mould of housing construction blank stage+module bolt hole

Similar Documents

Publication Publication Date Title
CN102587286A (en) Simply supported-continuous construction method for bridge superstructure
CN202219536U (en) Die holder for assembling steel reinforcement cage of prefabricated box girder
CN205476470U (en) Pre -buried mould of housing construction construction blank bolt hole for platform installation
CN204606561U (en) A kind of prefabricated panel pallet
CN203795601U (en) Horizontal connection node for precast concrete members
CN202185966U (en) Novel hydraulic internal mold for U-shaped beam
CN104358405A (en) Heavy load full formwork support system
CN103469735A (en) Method for mounting curve ultrahigh hollow column plate type pier top solid section template
CN203668857U (en) Walkable operating platform frame used for connection and reinforcement of SS-level guardrail templates
CN205529929U (en) Whole shaping die carrier of case back slab muscle
CN109555268A (en) Prefabricated support column and its construction method based on H profile steel
CN105696791A (en) Embedded die for bolt hole used for installing building construction cropping platform
CN111347012B (en) Molding sand box of wind power main frame
CN204151900U (en) A kind of beam column punching block shell combined structure system
CN104100002A (en) Connecting structure of floor and column
CN202705932U (en) T-beam reinforced hanger frame structure
CN108396764B (en) Wire pole prefabricated foundation seat and wire pole assembly
CN205259215U (en) Open trench tunnel open type major structure side wall bailey frame formwork
CN210458956U (en) Template of prefabricated bent cap
CN202862351U (en) T-shaped web horseshoe reinforcement framework precast tire mold
CN207016306U (en) A kind of outer elevator hoistways and wall body fixing device
CN207110068U (en) A kind of connecting node of i-shape steel beam and steel box column
CN203382382U (en) Universal bar gantry
CN205421312U (en) Combined type tower machine basis
CN201953088U (en) Combined support system for high and large special-shaped steel structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant