CN205476470U - Pre -buried mould of housing construction construction blank bolt hole for platform installation - Google Patents

Pre -buried mould of housing construction construction blank bolt hole for platform installation Download PDF

Info

Publication number
CN205476470U
CN205476470U CN201620292448.XU CN201620292448U CN205476470U CN 205476470 U CN205476470 U CN 205476470U CN 201620292448 U CN201620292448 U CN 201620292448U CN 205476470 U CN205476470 U CN 205476470U
Authority
CN
China
Prior art keywords
square frame
bar
bolt hole
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201620292448.XU
Other languages
Chinese (zh)
Inventor
李蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201620292448.XU priority Critical patent/CN205476470U/en
Application granted granted Critical
Publication of CN205476470U publication Critical patent/CN205476470U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种房屋建筑施工切料平台安装用螺栓孔的预埋模具,改善了现有预埋方式过于复杂,精度较低的问题。本实用新型包括方形框体,所述方形框体两端分别设有一根横杆,且在所述方体框体一侧设有一根纵杆;所述横杆、纵杆均位于方形框体的内侧;所述横杆的两端分别与方体框体两侧相连,所述纵杆的两端分别与方体两端相连,且纵杆还与两根横杆相连;所述方形框体四个角、纵杆与方形框体相连点、横杆与方形框体相连点和横杆与纵杆相连点处分别设有一个竖杆。本实用新型可一次性预埋十二个螺纹孔,效率高;而且位置精度高;同时本实用新型的设备能够重复使用,大大地降低了模具成本。

The utility model discloses a pre-embedded mold for bolt holes used for installing a material cutting platform for building construction, which improves the problems that the existing pre-embedded methods are too complicated and have low precision. The utility model comprises a square frame body, a horizontal bar is arranged at both ends of the square frame body, and a longitudinal bar is arranged on one side of the square frame body; The two ends of the horizontal bar are respectively connected with the two sides of the square frame, the two ends of the vertical bar are respectively connected with the two ends of the square body, and the vertical bar is also connected with two horizontal bars; the square frame A vertical bar is respectively arranged at the four corners of the body, the connecting points of the vertical bar and the square frame, the connecting points of the horizontal bar and the square frame, and the connecting points of the horizontal bar and the vertical bar. The utility model can pre-embed twelve threaded holes at one time, and has high efficiency; and the position accuracy is high; at the same time, the equipment of the utility model can be used repeatedly, which greatly reduces the mold cost.

Description

一种房屋建筑施工切料平台安装用螺栓孔的预埋模具 A pre-embedded mold for bolt holes for installation of building construction material cutting platform

技术领域 technical field

本实用新型涉及一种房屋建筑施工切料平台安装用螺栓孔的预埋模具。 The utility model relates to a pre-embedded mold for bolt holes used for installing a material cutting platform for building construction.

背景技术 Background technique

在房屋建筑工程施工中,安装施工卸料平台,进行施工用料机等部件的上下,其平台使用型钢支撑架进行支撑,型钢在楼板上的固体需要使用U型螺栓孔,故而需在楼板上预埋螺栓孔,现有的预埋方式过于复杂,精度较低。 In the construction of housing construction, the construction unloading platform is installed to carry out the up and down of the construction material machine and other components. The platform is supported by the steel support frame. Pre-embedded bolt holes, the existing pre-embedded method is too complicated and the precision is low.

实用新型内容 Utility model content

为了改善上述问题,本实用新型的目的在于提供一种房屋建筑施工切料平台安装用螺栓孔的预埋模具。 In order to improve the above problems, the purpose of this utility model is to provide a pre-embedded mold for the bolt holes used for the installation of the cutting platform for building construction.

为了实现上述目的,本实用新型采用的技术方案如下: In order to achieve the above object, the technical scheme adopted by the utility model is as follows:

一种房屋建筑施工切料平台安装用螺栓孔的预埋模具,包括方形框体,所述方形框体两端分别设有一根横杆,且在所述方体框体一侧设有一根纵杆;所述横杆、纵杆均位于方形框体的内侧;所述横杆的两端分别与方体框体两侧相连,所述纵杆的两端分别与方体两端相连,且纵杆还与两根横杆相连;所述方形框体四个角、纵杆与方形框体相连点、横杆与方形框体相连点和横杆与纵杆相连点处分别设有一个竖杆。 A pre-embedded mold for bolt holes for installing a material cutting platform for house construction, comprising a square frame, a horizontal bar is provided at both ends of the square frame, and a longitudinal bar is provided on one side of the square frame. bar; the cross bar and the vertical bar are all located inside the square frame; the two ends of the horizontal bar are respectively connected with the two sides of the square frame, and the two ends of the vertical bar are respectively connected with the two ends of the square body, and The vertical bar is also connected with two horizontal bars; the four corners of the square frame, the connecting points of the vertical bar and the square frame, the connecting points of the horizontal bar and the square frame, and the connecting points of the horizontal bar and the vertical bar are respectively provided with a vertical pole.

进一步地,每个竖杆外均套接有预埋套管。 Further, each vertical bar is sleeved with a pre-embedded casing.

再进一步地,所述预埋套管底部封闭,顶部开口。 Still further, the embedded casing is closed at the bottom and open at the top.

更进一步地,所述预埋套管顶部侧壁设有通孔,且顶部边沿向外翻转。 Furthermore, the top side wall of the pre-embedded casing is provided with a through hole, and the top edge is turned outward.

另外,所述方形框体由四根杆围成。 In addition, the square frame is surrounded by four rods.

此外,所述横杆、纵杆和方形框体之间均焊接相连。 In addition, the cross bar, the longitudinal bar and the square frame are all connected by welding.

本实用新型与现有技术相比,具有以下优点及有益效果: Compared with the prior art, the utility model has the following advantages and beneficial effects:

本实用新型可一次性预埋十二个螺纹孔,效率高;而且位置精度高;同时本实用新型的设备能够重复使用,大大地降低了模具成本。 The utility model can pre-embed twelve screw holes at one time, and has high efficiency; and the position accuracy is high; meanwhile, the equipment of the utility model can be used repeatedly, which greatly reduces the mold cost.

附图说明 Description of drawings

图1为本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.

其中,附图中标记对应的零部件名称为:1-方形框体,2-横杆,3-纵杆,4-竖杆,5-预埋套管。 Among them, the names of parts corresponding to the marks in the drawings are: 1-square frame, 2-horizontal bar, 3-longitudinal bar, 4-vertical bar, 5-embedded casing.

具体实施方式 detailed description

下面结合附图和实施例对本实用新型作进一步说明,本实用新型的实施方式包括但不限于下列实施例。 The utility model will be further described below in conjunction with the accompanying drawings and examples. The implementation of the utility model includes but not limited to the following examples.

实施例 Example

如图1所示,一种房屋建筑施工切料平台安装用螺栓孔的预埋模具,包括方形框体1,所述方形框体两端分别设有一根横杆2,且在所述方体框体一侧设有一根纵杆3;所述横杆、纵杆均位于方形框体的内侧;所述横杆的两端分别与方体框体两侧相连,所述纵杆的两端分别与方体两端相连,且纵杆还与两根横杆相连;所述方形框体四个角、纵杆与方形框体相连点、横杆与方形框体相连点和横杆与纵杆相连点处分别设有一个竖杆4。其中,所述方形框体由四根杆围成。所述横杆与方形框体两端的杆相平行;所述纵杆与方形框体两侧的杆相平行。这样设置能够确保设置于各个相连点和四个角上的竖杆满足施工要求,从而预留出供“U”型螺栓穿过的螺栓孔。另外,每个竖杆外均套接有预埋套管5。 As shown in Figure 1, a pre-embedded mold for bolt holes for installing a material cutting platform for building construction, comprising a square frame body 1, a cross bar 2 is provided at both ends of the square frame body, and One side of the frame body is provided with a vertical bar 3; the horizontal bar and the vertical bar are all positioned at the inner side of the square frame; the two ends of the horizontal bar are respectively connected with the two sides of the square frame body, They are respectively connected to two ends of the square body, and the vertical bar is also connected to two horizontal bars; the four corners of the square frame, the connecting points of the vertical bar and the square frame, the connecting points of the horizontal bar and the square frame, and the connection points of the horizontal bar and the vertical A vertical rod 4 is respectively arranged at the connecting points of the rods. Wherein, the square frame is surrounded by four rods. The horizontal bar is parallel to the bars at both ends of the square frame; the vertical bar is parallel to the bars on both sides of the square frame. This setting can ensure that the vertical bars arranged at each connection point and four corners meet the construction requirements, thereby reserving bolt holes for "U" bolts to pass through. In addition, each vertical bar is sleeved with a pre-embedded casing 5 .

在实际施工时,将预埋套管套在竖杆上,然后将本实用新型放置于施工位置,然后进行浇筑混凝土,当混凝土浇筑完成后,只需将方形框体取下,然后再将预埋套管从混凝土中取出即可,这样就形成了螺栓孔。当然如果预埋较深,可以无需取出预埋套管,只需将方形框体取出即可。由于有竖杆的存在,能够确保每一个预埋套管垂直,不会发生倾斜,而且能够限定每个预埋套管之间的距离,从而满足施工需求。 In actual construction, put the pre-embedded casing on the vertical bar, then place the utility model at the construction position, and then pour concrete. The buried casing is simply removed from the concrete so that the bolt holes are formed. Of course, if the pre-embedding is deep, it is not necessary to take out the pre-embedded casing, just take out the square frame. Due to the existence of the vertical bar, it can ensure that each embedded casing is vertical without inclination, and the distance between each embedded casing can be limited, so as to meet the construction requirements.

具体地,所述预埋套管底部封闭,顶部开口。通过上述设置,可以防止混凝土在浇筑过程中流入预埋套管,避免无法形成螺栓孔。 Specifically, the embedded casing is closed at the bottom and open at the top. Through the above arrangement, it is possible to prevent the concrete from flowing into the embedded casing during the pouring process, so as to prevent the bolt holes from being unable to be formed.

当需要将预埋套管取下时,预埋套管顶部侧壁设有通孔,且顶部边沿向外翻转。这样设置,能够通过通孔安装相应的吊钩等部件,将预埋套管从混凝土中取出,值得说明的是,混凝土上沿低于通孔;若不需要将预埋套管从混凝土中取出,那么就无需设置通孔。由于预埋套管顶部边沿向外翻转,这样设置也能够利用突出的部分采用部件将预埋套管从混凝土中取出。 When the embedded casing needs to be removed, the top side wall of the embedded casing is provided with a through hole, and the top edge is turned outward. In this way, the corresponding hook and other components can be installed through the through hole, and the embedded casing can be taken out of the concrete. It is worth noting that the upper edge of the concrete is lower than the through hole; , then no vias are required. Since the top edge of the pre-embedded casing is turned outwards, such an arrangement can also utilize the protruding part to take the pre-embedded casing out of the concrete.

为了使本实用新型的结构更加稳定、牢固。所述横杆、纵杆和方形框体之间均焊接相连。通过焊接使得各部件之间连接的更加牢固,从而更好的实现预埋螺栓孔的作用,再取出时,也能够很好的将竖杆直接从预埋套管内取出。 In order to make the structure of the utility model more stable and firm. The cross bar, the vertical bar and the square frame are all connected by welding. Welding makes the connection between the parts more firm, so as to better realize the function of the embedded bolt hole, and when it is taken out again, the vertical bar can also be taken out directly from the embedded casing.

值得说明的是,本实用新型结构简单,制造成本低,而且非常实用,能够一次性预埋十二个螺栓孔,同时能够确保“U”型螺栓刚好穿过进行固定型钢支撑架。 It is worth noting that the utility model has a simple structure, low manufacturing cost, and is very practical. It can pre-embed twelve bolt holes at one time, and at the same time, it can ensure that the "U" bolts just pass through to fix the steel support frame.

按照上述实施例,便可很好地实现本实用新型。值得说明的是,基于上述结构设计的前提下,为解决同样的技术问题,即使在本实用新型上做出的一些无实质性的改动或润色,所采用的技术方案的实质仍然与本实用新型一样,故其也应当在本实用新型的保护范围内。 According to above-mentioned embodiment, just can realize the utility model well. It is worth noting that, based on the premise of the above-mentioned structural design, in order to solve the same technical problem, even if some insubstantial changes or embellishments are made on the utility model, the essence of the technical solution adopted is still the same as that of the utility model. same, so it should also be within the protection scope of the present utility model.

Claims (6)

1. the pre-buried mould of a housing construction blank stage+module bolt hole, it is characterised in that include that square framework (1), described square framework are respectively arranged at two ends with a cross bar (2), and be provided with a vertical pole (3) in described cube framework side;Described cross bar, vertical pole are respectively positioned on the inner side of square framework;The two ends of described cross bar are connected with cube framework both sides respectively, and the two ends of described vertical pole are connected with cube two ends respectively, and vertical pole is also connected with two cross bars;Be connected with square framework point, cross bar of four angles of described square framework, vertical pole is connected a little with square framework and cross bar is connected with vertical pole at a little and is respectively equipped with a montant (4).
The pre-buried mould of a kind of housing construction blank stage+module bolt hole the most according to claim 1, it is characterised in that be all socketed with service sleeve (5) outside each montant.
The pre-buried mould of a kind of housing construction blank stage+module bolt hole the most according to claim 2, it is characterised in that described service sleeve bottom lock, open top.
The pre-buried mould of a kind of housing construction blank stage+module bolt hole the most according to claim 3, it is characterised in that described service sleeve top sidewall is provided with through hole, and top sides is along outwards upset.
The pre-buried mould of a kind of housing construction blank stage+module bolt hole the most according to claim 4, it is characterised in that described square framework is surrounded by four bars.
The pre-buried mould of a kind of housing construction blank stage+module bolt hole the most according to claim 5, it is characterised in that be all weldingly connected between described cross bar, vertical pole and square framework.
CN201620292448.XU 2016-04-08 2016-04-08 Pre -buried mould of housing construction construction blank bolt hole for platform installation Expired - Lifetime CN205476470U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620292448.XU CN205476470U (en) 2016-04-08 2016-04-08 Pre -buried mould of housing construction construction blank bolt hole for platform installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620292448.XU CN205476470U (en) 2016-04-08 2016-04-08 Pre -buried mould of housing construction construction blank bolt hole for platform installation

Publications (1)

Publication Number Publication Date
CN205476470U true CN205476470U (en) 2016-08-17

Family

ID=56644488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620292448.XU Expired - Lifetime CN205476470U (en) 2016-04-08 2016-04-08 Pre -buried mould of housing construction construction blank bolt hole for platform installation

Country Status (1)

Country Link
CN (1) CN205476470U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696791A (en) * 2016-04-08 2016-06-22 中国五冶集团有限公司 Embedded die for bolt hole used for installing building construction cropping platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696791A (en) * 2016-04-08 2016-06-22 中国五冶集团有限公司 Embedded die for bolt hole used for installing building construction cropping platform
CN105696791B (en) * 2016-04-08 2018-01-02 中国五冶集团有限公司 A kind of pre-buried mould of housing construction blank stage+module bolt hole

Similar Documents

Publication Publication Date Title
CN104453224A (en) Formwork support structure of basement exterior wall and construction method of formwork support structure
CN205476470U (en) Pre -buried mould of housing construction construction blank bolt hole for platform installation
CN212027123U (en) Tool for fixing wire box
CN207526100U (en) Wall is poured with aluminum alloy pattern plate leveling and ruggedized construction
CN103031892A (en) Steel truss brace and manufacturing method for steel truss platform
CN204855599U (en) Electric energy meter installing support
CN204491564U (en) A kind of jacket for offshore structure
CN105696791B (en) A kind of pre-buried mould of housing construction blank stage+module bolt hole
CN203603465U (en) Novel descending plate lifting die
CN204680514U (en) Transformer oil storage
CN108775147A (en) A kind of wall body casting template supporting construction device
CN208718374U (en) A kind of steel framework wooden model combination unit
CN205791363U (en) A kind of electrical engineering positioning installation apparatus
CN206859675U (en) A kind of station bottom plate and side wall chamfering punching block positioning instrument
CN202689029U (en) Anchor rod foundation of photovoltaic module support
CN204983652U (en) Drawing die that drips possesses and adopts template for construction that said drawing die that drips possesses
CN203008232U (en) Steel truss strut
CN203188223U (en) Bottomless double-wall steel sleeve box for achieving dry operation 100% recycle
CN202047609U (en) Jacking bracket for integrally lifting house
CN106006361A (en) Pre-buried bolt assembly
CN209114569U (en) The integrated squatting pan of one plants case room movable plank house
CN207790464U (en) A kind of transport device of vehicle-mounted adjustable prefabricated panel
CN220150883U (en) Formwork support base
CN205839988U (en) A kind of built-in connection for steel-structure factory building steel column
CN202416852U (en) Building aluminum alloy template assembly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20160817