CN105696791A - Embedded die for bolt hole used for installing building construction cropping platform - Google Patents

Embedded die for bolt hole used for installing building construction cropping platform Download PDF

Info

Publication number
CN105696791A
CN105696791A CN201610217460.9A CN201610217460A CN105696791A CN 105696791 A CN105696791 A CN 105696791A CN 201610217460 A CN201610217460 A CN 201610217460A CN 105696791 A CN105696791 A CN 105696791A
Authority
CN
China
Prior art keywords
bolt hole
vertical pole
square framework
square frame
cross bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610217460.9A
Other languages
Chinese (zh)
Other versions
CN105696791B (en
Inventor
李蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Industry Co., Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201610217460.9A priority Critical patent/CN105696791B/en
Publication of CN105696791A publication Critical patent/CN105696791A/en
Application granted granted Critical
Publication of CN105696791B publication Critical patent/CN105696791B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/04Cores for anchor holes or the like around anchors embedded in the concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses an embedded die for a bolt hole used for installing a building construction cropping platform.The problem that an existing embedded mode is too complex and low in precision is solved.The embedded die comprises a square frame, the two ends of the square frame are provided with two cross rods respectively, and one side of the square frame is provided with a longitudinal rod.The cross rods and the longitudinal rod are located on the inner side of the square frame, the two ends of the cross rods are connected with the two sides of the square frame respectively, and the two ends of the longitudinal rod are connected with the two ends of the square frame respectively.The longitudinal rod is further connected with the two cross rods.The four corners of the square frame, connection points of the longitudinal rod and the square frame, connection points of the cross rods and the square frame and connection points of the cross rods and the longitudinal rod each are provided with a vertical rod.Twelve threaded holes can be embedded in one time, the efficiency is high, the position accuracy is high, and the embedded die can be reused and greatly reduce die cost.

Description

A kind of pre-buried mould of housing construction blank stage+module bolt hole
Technical field
The present invention relates to the pre-buried mould of a kind of housing construction blank stage+module bolt hole。
Background technology
In building engineering is constructed, installation discharging platform, carry out the upper and lower of the parts such as construction materials machine, its platform uses shape steel support to be supported, shaped steel solid on floor needs to use U-bolt hole, so need on floor pre-embedded bolt hole, existing pre-buried mode is excessively complicated, and precision is relatively low。
Summary of the invention
In order to improve the problems referred to above, it is an object of the invention to provide the pre-buried mould of a kind of housing construction blank stage+module bolt hole。
To achieve these goals, the technical solution used in the present invention is as follows:
The pre-buried mould of a kind of housing construction blank stage+module bolt hole, including square framework, described square framework is respectively arranged at two ends with a cross bar, and is provided with a vertical pole in described cube framework side;Described cross bar, vertical pole are respectively positioned on the inner side of square framework;The two ends of described cross bar are connected with cube framework both sides respectively, and the two ends of described vertical pole are connected with cube two ends respectively, and vertical pole is also connected with two cross bars;Be connected with square framework point, cross bar of four angles of described square framework, vertical pole is connected a little with square framework and cross bar some places that is connected with vertical pole are respectively equipped with a montant。
Further, service sleeve all it is socketed with outside each montant。
Yet further, described service sleeve bottom lock, open top。
Further, described service sleeve top sidewall is provided with through hole, and top sides is along outwards overturning。
It addition, described square framework is surrounded by four bars。
Additionally, be all weldingly connected between described cross bar, vertical pole and square framework。
The present invention compared with prior art, has the following advantages and beneficial effect:
The present invention can disposable pre-buried 12 screwed holes, efficiency is high;And positional precision is high;The equipment of the present invention can be reused simultaneously, greatly reduces die cost。
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention。
Wherein, the parts name that in accompanying drawing, labelling is corresponding is called: the square framework of 1-, 2-cross bar, 3-vertical pole, 4-montant, 5-service sleeve。
Detailed description of the invention
Below in conjunction with drawings and Examples, the invention will be further described, and embodiments of the present invention include but not limited to the following example。
Embodiment
As it is shown in figure 1, the pre-buried mould of a kind of housing construction blank stage+module bolt hole, including square framework 1, described square framework is respectively arranged at two ends with a cross bar 2, and is provided with a vertical pole 3 in described cube framework side;Described cross bar, vertical pole are respectively positioned on the inner side of square framework;The two ends of described cross bar are connected with cube framework both sides respectively, and the two ends of described vertical pole are connected with cube two ends respectively, and vertical pole is also connected with two cross bars;Be connected with square framework point, cross bar of four angles of described square framework, vertical pole is connected a little with square framework and cross bar some places that is connected with vertical pole are respectively equipped with a montant 4。Wherein, described square framework is surrounded by four bars。Described cross bar is paralleled with the bar at square framework two ends;Described vertical pole is paralleled with the bar of square framework both sides。So arrange and be able to ensure that being arranged at each montant being connected on point and four angles meets construction requirement, thus reserving the bolt hole of confession " U " type bolt traverse。It addition, be all socketed with service sleeve 5 outside each montant。
When practice of construction, service sleeve is enclosed within montant, then the present invention is positioned over construction location, then carry out casting concrete, after concreting completes, only square framework need to be taken off, then again service sleeve is taken out from concrete, material is thus formed bolt hole。If certainly pre-buried deeper, it is possible to without taking out service sleeve, only square framework need to be taken out。Existence with montant, it can be ensured that each service sleeve is vertical, will not run-off the straight, and the distance between each service sleeve can be limited, thus meeting construction demand。
Specifically, described service sleeve bottom lock, open top。By above-mentioned setting, it is possible to prevent concrete from flowing into service sleeve in casting process, it is to avoid bolt hole cannot be formed。
When service sleeve is taken off by needs, service sleeve top sidewall is provided with through hole, and top sides is along outwards overturning。So arrange, it is possible to the parts such as corresponding suspension hook are installed by through hole, service sleeve are taken out from concrete, what deserves to be explained is, along lower than through hole on concrete;If service sleeve need not be taken out from concrete, then be no need for arranging through hole。Owing to service sleeve top sides is along outwards upset, so arranges and also be able to utilize prominent part to adopt parts to be taken out from concrete by service sleeve。
In order to the structure making the present invention is more stable, firm。All it is weldingly connected between described cross bar, vertical pole and square framework。By welding make to connect between each parts more firm, thus better realizing the effect in pre-embedded bolt hole, when further taking out, it is also possible to well montant is directly taken out in service sleeve。
What deserves to be explained is, present configuration is simple, low cost of manufacture, and very useful, it is possible to disposable pre-buried 12 bolts hole, is able to ensure that " U " type bolt is just passed through being fixed shape steel support simultaneously。
According to above-described embodiment, the present invention just can be realized well。What deserves to be explained is; under premise based on said structure design, for solving same technical problem, even if some making in the present invention are without substantial change or polishing; the essence of the technical scheme adopted is still the same with the present invention, therefore it should also be as in protection scope of the present invention。

Claims (6)

1. the pre-buried mould of a housing construction blank stage+module bolt hole, it is characterised in that include square framework (1), described square framework is respectively arranged at two ends with a cross bar (2), and is provided with a vertical pole (3) in described cube framework side;Described cross bar, vertical pole are respectively positioned on the inner side of square framework;The two ends of described cross bar are connected with cube framework both sides respectively, and the two ends of described vertical pole are connected with cube two ends respectively, and vertical pole is also connected with two cross bars;Be connected with square framework point, cross bar of four angles of described square framework, vertical pole is connected a little with square framework and cross bar some places that is connected with vertical pole are respectively equipped with a montant (4)。
2. the pre-buried mould of a kind of housing construction blank stage+module bolt hole according to claim 1, it is characterised in that be all socketed with service sleeve (5) outside each montant。
3. the pre-buried mould of a kind of housing construction blank stage+module bolt hole according to claim 2, it is characterised in that described service sleeve bottom lock, open top。
4. the pre-buried mould of a kind of housing construction blank stage+module bolt hole according to claim 3, it is characterised in that described service sleeve top sidewall is provided with through hole, and top sides is along outwards overturning。
5. the pre-buried mould of a kind of housing construction blank stage+module bolt hole according to claim 4, it is characterised in that described square framework is surrounded by four bars。
6. the pre-buried mould of a kind of housing construction blank stage+module bolt hole according to claim 5, it is characterised in that be all weldingly connected between described cross bar, vertical pole and square framework。
CN201610217460.9A 2016-04-08 2016-04-08 A kind of pre-buried mould of housing construction blank stage+module bolt hole Active CN105696791B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610217460.9A CN105696791B (en) 2016-04-08 2016-04-08 A kind of pre-buried mould of housing construction blank stage+module bolt hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610217460.9A CN105696791B (en) 2016-04-08 2016-04-08 A kind of pre-buried mould of housing construction blank stage+module bolt hole

Publications (2)

Publication Number Publication Date
CN105696791A true CN105696791A (en) 2016-06-22
CN105696791B CN105696791B (en) 2018-01-02

Family

ID=56219450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610217460.9A Active CN105696791B (en) 2016-04-08 2016-04-08 A kind of pre-buried mould of housing construction blank stage+module bolt hole

Country Status (1)

Country Link
CN (1) CN105696791B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050012540A (en) * 2003-07-25 2005-02-02 김대현 Fixing way of subsidiary materials for a building and the structure
CN203238953U (en) * 2012-12-10 2013-10-16 中国建筑第八工程局有限公司 Embedded sleeve positioning device
CN204199180U (en) * 2014-10-23 2015-03-11 田文 A kind of bridge pad bolt integral built-in mould
CN204781959U (en) * 2015-05-25 2015-11-18 中国五冶集团有限公司 Ring location auxiliary device
CN205476470U (en) * 2016-04-08 2016-08-17 中国五冶集团有限公司 Pre -buried mould of housing construction construction blank bolt hole for platform installation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050012540A (en) * 2003-07-25 2005-02-02 김대현 Fixing way of subsidiary materials for a building and the structure
CN203238953U (en) * 2012-12-10 2013-10-16 中国建筑第八工程局有限公司 Embedded sleeve positioning device
CN204199180U (en) * 2014-10-23 2015-03-11 田文 A kind of bridge pad bolt integral built-in mould
CN204781959U (en) * 2015-05-25 2015-11-18 中国五冶集团有限公司 Ring location auxiliary device
CN205476470U (en) * 2016-04-08 2016-08-17 中国五冶集团有限公司 Pre -buried mould of housing construction construction blank bolt hole for platform installation

Also Published As

Publication number Publication date
CN105696791B (en) 2018-01-02

Similar Documents

Publication Publication Date Title
CN108729353A (en) A kind of General reinforced cage binding moulding bed
CN203471630U (en) Assembly jig used for assembling pile foundation reinforcing cage
CN105544587A (en) Combined tower crane foundation and construction method thereof
CN211143305U (en) Steel structure building
CN106836255B (en) The integral prefabricated structure of basement bottom board catch pit steel mesh and method of construction
CN103031892A (en) Steel truss brace and manufacturing method for steel truss platform
CN212704265U (en) Molding sand box of wind power main frame
CN205476470U (en) Pre -buried mould of housing construction construction blank bolt hole for platform installation
CN110670873B (en) Support system of steel formwork of ultrahigh large-section concrete column and construction method
CN211057625U (en) Prefabricated pier stud of assembled installation aligning device
CN104358405A (en) Heavy load full formwork support system
CN202185966U (en) Novel hydraulic internal mold for U-shaped beam
CN101725201A (en) Method for constructing reinforced concrete cast-in-situ hollow floor plate cabinet inner module and construction cushion block
CN105696791A (en) Embedded die for bolt hole used for installing building construction cropping platform
CN103334584B (en) Template regulating system for sliding form system
CN105971270A (en) Sliding formwork of vertical grain storage silo
CN215055273U (en) A assembled template for installing support bracket embedded box
CN102454294A (en) Construction method of reinforced concrete and steel structure storage bin combined frame structure
CN102535507B (en) Combined tower base
CN202000263U (en) Descending type movable die frame structure
CN205529929U (en) Whole shaping die carrier of case back slab muscle
CN111347012B (en) Molding sand box of wind power main frame
CN103486335A (en) Method for fixing super high-rise construction concrete pumping pipe
CN110395656B (en) Lifting appliance for sand core with semi-cantilever structure and lifting method thereof
CN105586987B (en) Open trench tunnel open type agent structure side wall Bailey bracket formwork and its construction technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201124

Address after: No.28 Shuguang Xili, Chaoyang District, Beijing 100020

Patentee after: China Metallurgical Industry Co., Ltd

Address before: Jinjiang District mcc5 610000 Chengdu Road, Sichuan province No. 9

Patentee before: CHINA MCC5 GROUP Corp.,Ltd.