CN205475326U - A frock that is arranged in immersed tube tunnel tube coupling transportation by driving - Google Patents

A frock that is arranged in immersed tube tunnel tube coupling transportation by driving Download PDF

Info

Publication number
CN205475326U
CN205475326U CN201620168110.3U CN201620168110U CN205475326U CN 205475326 U CN205475326 U CN 205475326U CN 201620168110 U CN201620168110 U CN 201620168110U CN 205475326 U CN205475326 U CN 205475326U
Authority
CN
China
Prior art keywords
support body
buried
frock
embedded
tube coupling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620168110.3U
Other languages
Chinese (zh)
Inventor
张伟
赵勇
刘学霸
胡斌
刘春标
叶亮
张荣华
徐雪莹
吴孔勇
彭炎锋
邳仲强
崔海龙
南飞燕
陈强
蔡肖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201620168110.3U priority Critical patent/CN205475326U/en
Application granted granted Critical
Publication of CN205475326U publication Critical patent/CN205475326U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model provides a frock that is arranged in immersed tube tunnel tube coupling transportation by driving, including frock frame and pre -buried device, the frock frame is including support body and stiffener, and the support body is equipped with the extension section that a plurality of groups comprise the preceding section of prolonging and decurrence section, simultaneously the inboard tow boat and the rigidity of tube coupling traction of supplying of support body is equipped with the steel facing, pre -buried device includes a plurality of embedded plate subassemblies and pre -buried eye plate subassembly, and the embedded plate subassembly includes pre -buried steel sheet A and dowel A, and pre -buried steel sheet A and dowel A be through pre -buried income tube coupling top surface, and pre -buried steel sheet A surface corresponds the welding with the preceding section of prolonging, pre -buried eye plate subassembly includes pre -buried steel sheet B and dowel B, and the both ends symmetry on pre -buried steel sheet B surface is welded and is equipped with the eye plate, and pre -buried steel sheet B and dowel B are to the side of pre -buried income tube coupling, and the decurrence duan ping who corresponds places in between the eye plate, and is equipped with fixed bolt between the eye of eye plate. With the help of the utility model discloses an after the frock, towboat ship group can realize dragging or pushing up tying up of tube coupling pushing away, effectively reduces the navigation width of towboat ship group, satisfies tube coupling traction and construction demand in comparatively narrow channel.

Description

A kind of frock of cube transportation in immersed tube tunnel
Technical field
This utility model relates to immersed tube tunnel constructing device field, is specifically related to a kind of frock of cube transportation in immersed tube tunnel.
Background technology
The constructing tunnel operation using immersed tunnelling method mainly includes that tube coupling is prefabricated, undocks, transportation by driving, sinking are installed, construction etc. in pipe, and wherein cube transportation is easily affected apart from, fairway depth and the situation such as width, structures distribution waterborne by the construction water velocity in waters, transportation by driving.
The construction of immersed tube tunnel at present has following characteristics: the prefabricated dry-docking of major part immersed tube tunnel tube coupling uses axis dry-docking or axle side dry-docking, and cube transportation distance can be made shorter.And if desired carrying out the immersed tube tunnel construction of distance cube transportation, then navigation channel usually requires that have good navigation width and depth condition;And when interior river valley carries out the transportation by driving construction of immersed tube tunnel tube coupling, then there is narrow or the existence of cube transportation waters the bridge in transportation by driving navigation channel more, make channel span can be affected by bridge navigable width situation.
Generally use when tugboat carries out big part traction towing, tie up drag, three kinds of modes of pushing tow, due to the immersed tube above freeboard of the tube coupling water surface generally only 15cm 20cm.In existing traction, tugboat cannot use to tie up and drag or pushing tow mode traction immersed tube tube coupling, and can only use towing, and therefore towage ship group need to take water field of big area, and the requirement to navigation channel is high.
Utility model content
This utility model be solve above-mentioned in technical problem, it is provided that one can make towboat use to tie up and drag or pushing tow mode carries out the frock of cube transportation in cube transportation towage, and the immersed tube tunnel of the width reducing towboat ship group.
The technical scheme that this utility model is used is:
A kind of frock of cube transportation in immersed tube tunnel, including machine frame and pre-embedded device, it is characterised in that
Machine frame, is connected to towboat side, including support body and stiffener thereof, this support body be provided with some groups by the front section of prolonging and the downward section of extension formed, inside the most described support body, the position for tugboat with tube coupling traction is installed with metal decking;
Pre-embedded device, including some embedded board assemblies and some pre-buried eye plate assemblies, embedded board assembly include pre-embedded steel slab A and dowel A thereof, pre-embedded steel slab A and dowel A through being embedded into tube coupling end face, simultaneously pre-embedded steel slab A surface with described before the section of prolonging corresponding welding;Described pre-buried eye plate assembly includes pre-embedded steel slab B and dowel B thereof, the two ends balanced welding of described pre-embedded steel slab B surface is equipped with eye plate, pre-embedded steel slab B and dowel B thereof is through being embedded into tube coupling side, and the most corresponding described downward section is flat between eye plate, and is provided with Fixed latches between the eyelet of described eye plate.
Described support body and stiffener are section steel material, and described metal decking is steel facing.
Described support body is specification 30# or above channel-section steel, and described stiffener is specification 20# or above channel-section steel, and the thickness of described metal decking is 0.1-0.2m.
Described support body end face is provided with some bollards, and evenly distributed along towboat side, place, and bollard is fastenedly connected by hawser with towboat.
Often organizing in described extension, the front section of prolonging is mutually perpendicular to downward section, and along the long side surface of described support body, arranges evenly and at intervals to support body axis from support body two ends.
Described support body location mid-shaft, is provided with the extension less than 0.5m, two groups of intervals, when machine frame connects tube coupling transportation by driving, makes machine frame entirety stress balance.
The frock of cube transportation in immersed tube tunnel of the present utility model, after by this frock, make towboat ship group can realize tube coupling to tie up to drag or pushing tow, the navigation width of towboat ship group can be effectively reduced, the inland waters of many bridges can be passed through, meet in the tube coupling traction of more narrow fairway and construction demand.
Accompanying drawing explanation
Fig. 1 is the surface structure figure of machine frame in this utility model;
Fig. 2 is the facade structures figure of machine frame in this utility model;
Fig. 3 is the side block diagram of machine frame in this utility model;
Fig. 4 is the structure chart of embedded board assembly in this utility model;
Fig. 5 is the plane structure chart of pre-buried eye plate assembly in this utility model;
Fig. 6 is the layout drawing installed and implement of the present utility model.
Illustrate: the section of prolonging, downward section of 5-, 6-bollard, 7-pre-embedded steel slab A, 8-dowel A, 9-pre-embedded steel slab B, 10-dowel B, 11-eye plate, 12-Fixed latches, 13-tube coupling before 1-support body, 2-stiffener, 3-steel facing, 4-.
Detailed description of the invention
Below in conjunction with the accompanying drawings, the utility model is further described.
The frock of cube transportation in immersed tube tunnel as depicted, this frock realizes tying up tube coupling dragging or pushing tow for tugs group.As shown in Figure 6, this frock is installed on towboat hull and need to transport the outer wall of tube coupling (13) side in opposite directions, and the entire length of frock is the 1/2 of hull length.
The frock of the present embodiment includes machine frame and the pre-embedded device being connected with tube coupling (13).The schematic diagram at each visual angle of machine frame as shown in Figure 1, Figure 2 and Figure 3, the agent structure of this machine frame is made up of support body (1) and stiffener (2), support body (1) uses the channel-section steel of 30#, stiffener (2) uses the channel-section steel of 20#, while making machine frame have higher-strength, support body (1) is also easy to welding.Support body (1) and a side surface in opposite directions of tube coupling (13), need to be welded steel facing (3) with the position of tube coupling (13) bump contact when tying up and drag at tube coupling (13), the thickness of this steel facing (3) is 0.15m, support body (1) over loading stress is avoided to lose, and by steel facing (3) by institute's force dispersion.Support body (1) is along its side, it is provided with and organizes extension more, often group extension is made up of the section of prolonging (4) before orthogonal and downward section (5), often group extension is arranged to support body (1) axis evenly and at intervals from support body (1) two ends, simultaneously, the location mid-shaft of described support body (1), it is provided with two groups of extensions being spaced apart 0.4m, to strengthen the stress in support body (1) stage casing, make and towboat group traction makes the two ends of support body (1) keep preferably balance.Simultaneously, the end face of support body (1) is welded with multiple bollard (6), welding position and the interval of each bollard (6) keep consistent with extension, place towboat is tightly coupled with bollard (6), so that machine frame is connected firmly with hull by hawser.
Pre-embedded device, as shown in Figure 4 and Figure 5, is used for making firmly to be connected between machine frame with tube coupling (13), including organizing embedded board assembly and many group pre-buried eye plate (11) assemblies more.Embedded board assembly is made up of pre-embedded steel slab A (7) and dowel A (8) thereof, when tube coupling (13) main unit preform, in the concrete of each pre-embedded steel slab A (7) and dowel A (8) pre-buried entrance tube coupling (13) body top face thereof, the regular interval of embedded board inter-module is consistent with the regular interval of above-mentioned extension, make pre-buried after pre-embedded steel slab A (7) surface weld with the section of prolonging (4) before above-mentioned support body (1).Pre-buried eye plate (11) assembly includes pre-embedded steel slab B (9) and dowel B (10) thereof, the two ends balanced welding on pre-embedded steel slab B (9) surface is equipped with eye plate (11) simultaneously, when tube coupling (13) main unit preform, in the concrete of each pre-embedded steel slab B (9) and dowel B (10) pre-buried entrance tube coupling (13) body top face thereof, the regular interval of embedded board inter-module is consistent with the regular interval of above-mentioned extension simultaneously, downward section of (5) correspondence of above-mentioned support body (1) is flat between eye plate (11), by loading Fixed latches (12) between the eyelet of eye plate (11), make downward section (5) spacing, when being also easy to construct under water simultaneously, downward section (5) are separated with body.By above-mentioned embedded board assembly and the setting of pre-buried eye plate (11) assembly, machine frame is made firmly to be connected with body when tube coupling (13) transportation by driving, in order to make towboat that tube coupling (13) to be tied up and drag or pushing tow.
After shelving such as the towboat erector of Fig. 6, drag schematic diagram with tying up of tube coupling (13).Machine frame is symmetrically installed on the hull surface of two towboats, tube coupling (13) both sides also symmetry is embedded with embedded board assembly and pre-buried eye plate (11) assembly, after machine frame fixing connection corresponding to pre-embedded device, the towboat group only needing two towboats to be formed carries out synchronizing navigation and can realize tying up tube coupling (13) dragging, and substantially reduces the navigation width of towboat ship group.
The above only have expressed preferred implementation of the present utility model, and it describes more concrete and detailed, but therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that, for the person of ordinary skill of the art, without departing from the concept of the premise utility, it is also possible to making some deformation, improve and substitute, these broadly fall into protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be as the criterion with claims.

Claims (6)

1. a frock for cube transportation in immersed tube tunnel, including machine frame and pre-embedded device, it is characterised in that
Machine frame, is connected to towboat side, including support body and stiffener thereof, this support body be provided with some groups by the front section of prolonging and the downward section of extension formed, inside the most described support body, the position for tugboat with tube coupling traction is installed with metal decking;
Pre-embedded device, including some embedded board assemblies and some pre-buried eye plate assemblies, embedded board assembly include pre-embedded steel slab A and dowel A thereof, pre-embedded steel slab A and dowel A through being embedded into tube coupling end face, simultaneously pre-embedded steel slab A surface with described before the section of prolonging corresponding welding;Described pre-buried eye plate assembly includes pre-embedded steel slab B and dowel B thereof, the two ends balanced welding of described pre-embedded steel slab B surface is equipped with eye plate, pre-embedded steel slab B and dowel B thereof is through being embedded into tube coupling side, and the most corresponding described downward section is flat between eye plate, and is provided with Fixed latches between the eyelet of described eye plate.
A kind of frock of cube transportation in immersed tube tunnel the most according to claim 1, it is characterised in that described support body and stiffener are section steel material, and described metal decking is steel facing.
A kind of frock of cube transportation in immersed tube tunnel the most according to claim 1, it is characterised in that described support body is specification 30# or above channel-section steel, described stiffener is specification 20# or above channel-section steel, and the thickness of described metal decking is 0.1-0.2m.
A kind of frock of cube transportation in immersed tube tunnel the most according to claim 1, it is characterised in that described support body end face is provided with some bollards, and evenly distributed along towboat side, place, and bollard is fastenedly connected by hawser with towboat.
A kind of frock of cube transportation in immersed tube tunnel the most according to claim 1, it is characterized in that, often organizing in described extension, the front section of prolonging is mutually perpendicular to downward section, and along the long side surface of described support body, arrange evenly and at intervals to support body axis from support body two ends.
A kind of frock of cube transportation in immersed tube tunnel the most according to claim 1, it is characterised in that described support body location mid-shaft, is provided with the extension less than 0.5m, two groups of intervals.
CN201620168110.3U 2016-03-04 2016-03-04 A frock that is arranged in immersed tube tunnel tube coupling transportation by driving Withdrawn - After Issue CN205475326U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620168110.3U CN205475326U (en) 2016-03-04 2016-03-04 A frock that is arranged in immersed tube tunnel tube coupling transportation by driving

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620168110.3U CN205475326U (en) 2016-03-04 2016-03-04 A frock that is arranged in immersed tube tunnel tube coupling transportation by driving

Publications (1)

Publication Number Publication Date
CN205475326U true CN205475326U (en) 2016-08-17

Family

ID=56659425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620168110.3U Withdrawn - After Issue CN205475326U (en) 2016-03-04 2016-03-04 A frock that is arranged in immersed tube tunnel tube coupling transportation by driving

Country Status (1)

Country Link
CN (1) CN205475326U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604092A (en) * 2016-03-04 2016-05-25 中铁隧道集团二处有限公司 Tool for floating segment in immersed tunnel
CN106120858A (en) * 2016-08-24 2016-11-16 中铁隧道勘测设计院有限公司 A kind of immersed tube pipeline section floading condition manufacture method of box hat outsourcing
CN106516021A (en) * 2016-11-17 2017-03-22 中交第航务工程局有限公司 Self-propelled carrying and installing all-in-one ship for underwater tunnel immersed tubes
CN106628018A (en) * 2016-11-17 2017-05-10 中交第航务工程局有限公司 Self-propelled large component transportation and installation integrated boat and construction process thereof
US10836459B2 (en) 2016-11-17 2020-11-17 Cccc First Harbor Engineering Co., Ltd. Self-propelled integrated ship for transporting and installing immersed tubes of underwater tunnel and construction process

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604092A (en) * 2016-03-04 2016-05-25 中铁隧道集团二处有限公司 Tool for floating segment in immersed tunnel
CN105604092B (en) * 2016-03-04 2017-06-16 中铁隧道集团二处有限公司 A kind of frock for cube transportation in immersed tube tunnel
CN106120858A (en) * 2016-08-24 2016-11-16 中铁隧道勘测设计院有限公司 A kind of immersed tube pipeline section floading condition manufacture method of box hat outsourcing
CN106120858B (en) * 2016-08-24 2018-07-24 中铁隧道勘测设计院有限公司 A kind of immersed tube pipeline section floading condition production method of box hat outsourcing
CN106516021A (en) * 2016-11-17 2017-03-22 中交第航务工程局有限公司 Self-propelled carrying and installing all-in-one ship for underwater tunnel immersed tubes
CN106628018A (en) * 2016-11-17 2017-05-10 中交第航务工程局有限公司 Self-propelled large component transportation and installation integrated boat and construction process thereof
US10836459B2 (en) 2016-11-17 2020-11-17 Cccc First Harbor Engineering Co., Ltd. Self-propelled integrated ship for transporting and installing immersed tubes of underwater tunnel and construction process
CN106516021B (en) * 2016-11-17 2021-06-11 中交第一航务工程局有限公司 Self-propelled underwater tunnel immersed tube carrying and mounting integrated ship

Similar Documents

Publication Publication Date Title
CN205475326U (en) A frock that is arranged in immersed tube tunnel tube coupling transportation by driving
CN105604092B (en) A kind of frock for cube transportation in immersed tube tunnel
WO2018090875A1 (en) Self-sailing integrated vessel for carrying and mounting submerged tubes of underwater tunnel
CN102381455B (en) Unilateral positioning method for secondary docking of ship in dock
CN104816806B (en) A kind of Large Underwater combination towing gear and its using method
KR101169722B1 (en) Anti-overturning type marine column structure construction apparatus
CN102002948B (en) Piling process for building sheet pile type wharf in shallow coastal water
CN110306435A (en) A kind of super large segmentation more ship through transport construction methods of steel structure bridge
CN103981800B (en) A kind of pontoon bridge system and pontoon bridge construction method
CN204530435U (en) Large structure rolls to take on board uses trestle
CN213768915U (en) Floating transportation system for dragging double-wall steel sleeve box in water
CN202787247U (en) PHC (prestressed high-strength concrete) pile and steel pipe pile composited pile for long piled wharfs
CN1093583C (en) Launching method for laud region prefabricated sinking caisson
CN204151665U (en) A kind of cable-stayed type opens trestle
CN103661831B (en) Bow has the Z-drive tug of two anchor winch
CN207314826U (en) Tool type unilateral formwork system
CN205804363U (en) A kind of floating, fixing convertible pile foundation in water construction platform device
CN203332347U (en) Mixed type wharf boat locating structure
CN108750015B (en) Construction method of channel steel cofferdam floating transportation device
CN102530200A (en) Hydraulic location device for guiding ship in floating dock and working method thereof
CN209194355U (en) A kind of hood type anticollision device, collision-prevention device of pier
CN203714157U (en) Full-rotation tugboat with two anchor winches at fore body
CN202595697U (en) Roll-on dock for half-upright half-slope commercial vehicle
CN105064271A (en) Wharf transformation structure and wharf transformation construction method
CN204080653U (en) A kind of for trestle rapid construction device waterborne

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160817

Effective date of abandoning: 20170616