CN205469056U - Light -duty fast cableway power traveling system for loading - Google Patents
Light -duty fast cableway power traveling system for loading Download PDFInfo
- Publication number
- CN205469056U CN205469056U CN201620179464.8U CN201620179464U CN205469056U CN 205469056 U CN205469056 U CN 205469056U CN 201620179464 U CN201620179464 U CN 201620179464U CN 205469056 U CN205469056 U CN 205469056U
- Authority
- CN
- China
- Prior art keywords
- pulley
- group
- goods
- housing
- hauling rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model provides a light -duty fast cableway power traveling system for loading, including a plurality of pylons and carrier cable, still include with carrier cable sliding connection's the power package that transports the lifting hook group of goods and drive this system's work of being used for, lifting hook group is including the casing and lie in the inside traveling wheel of casing, the coaster is lifted by crane to vertical being connected with on the casing, lifts by crane the coaster including the multiunit assembly pulley that sets up side by side from top to bottom, the multiunit assembly pulley is through fixed cable drive, wherein is connected with on bottom the assembly pulley to be used for hanging a lifting hook of putting the goods, rack winch, tractor, first traction cable, second traction cable that power package includes the return stroke hoist engine and mutually supports and use. The utility model discloses lifting hook group slides on the carrier cable with the transportation goods through power package, not only can be applicable to the mountain region environment, can also be applicable to the environment that other transport vechicles can not reach, and the manual transportation of efficiency ratio also has improvement by a wide margin to the emergence of personal safety accident has been stopped.
Description
Technical field
This utility model relates to freight ropeway, particularly to a kind of Light-duty Quick-installation goods cableway power running gear.
Background technology
Long gas pipeline is mainly used in the conveying of long-distance gas, transportation pipe road between two more remote destinatioies.Pipeline
Being layed in various topography and geomorphology, if being layed in the section, mountain area of rugged confining, massif gradient conference causes difficulty of construction big,
And the companion's walking along the street that may be layed in the middle of massif due to pipeline or be built due to pipeline construction disappears along with recovering landforms
Losing, cause these location vehicles, rush repair equipment to arrive, directly resulting in repairing material requested, instrument cannot deliver in time
The scene of the accident.And gas pipeline ruptures, reveals and cause managing interior medium and reveal, particularly natural gas, hydrogen etc. is inflammable easily
The leakage of explosive gas will cause blast, catch fire, and all can cause serious harm the masses, environment.At present, for above-mentioned transport
Vehicle cannot arrive this situation in the scene of the accident in time, the methods using manpower transport, but the method inefficiency more, and
The landform that the massif gradient is bigger is susceptible to personal safety accident.Therefore, for above-mentioned situation, it is badly in need of a kind of interim fast-assembling and robs
Repair equipment, be applied to mountain area gas pipeline along the line, special for the conveying of gas pipeline rush repair equipment.
Utility model content
For the deficiency in the presence of prior art, this utility model provides a kind of Light-duty Quick-installation goods cableway power Running System
System, solves section, existing mountain area hand haulage's inefficiency, the shortcoming easily sending out personal safety accident.
For achieving the above object, this utility model have employed following technical scheme:
A kind of Light-duty Quick-installation goods cableway power running gear, including multiple pylons and carrier cable, also includes sliding with carrier cable
The suspension hook group being used for transporting goods connected and the power packages driving this system to work, described suspension hook group includes housing and is positioned at shell
The traveling wheel in internal portion, described housing vertically connects and has had hanging pulley, and described hanging pulley includes being set up in parallel up and down
Organizing assembly pulley, described many group assembly pulleys are driven by antilift wire, and wherein connecting on the assembly pulley of bottom has for hanging goods more
The suspension hook of thing;
Rack winch, traction machine and the first hauling rope and that described power packages includes backhaul hoist engine, is used in conjunction with each other
Two hauling ropes, described first hauling rope one end is connected with backhaul hoist engine, and the other end walks around the angle pulley on pylon and housing
Connect;Described second hauling rope one end is walked around traction machine and is connected with rack winch, the other end walk around power packages and suspension hook group it
Between pylon on angle pulley be connected with housing.
Wherein, described housing having the side cord hole for fixing the first hauling rope and the second hauling rope, described antilift wire is walked around
Assembly pulley passes side cord hole.
Specifically, described assembly pulley is two groups, including one group of fixed pulley group near housing and one group of movable pulley away from housing
Group, the fixed pulley that described fixed pulley group is arranged before and after including two;Described running block includes two movable pulleys front and back arranged.
Further, described traction machine is provided with two traction wheels, the both sides of described traction machine rotating shaft are set up two separately and are turned to contrary change
Frequently motor.
Compared to prior art, this utility model has the advantages that suspension hook group is slided on carrier cable by power packages
To transport goods, it is possible not only to be applicable to mountain environment, moreover it is possible to be applicable to the environment that other transport vehicle can not arrive, efficiency ratio
Hand haulage be also greatly improved, and stopped the generation of personal safety accident.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of this utility model suspension hook group;
Fig. 3 is the side view of Fig. 2.
Detailed description of the invention
Below in conjunction with the accompanying drawings and the technical scheme in this utility model is further illustrated by embodiment.
As it is shown in figure 1, the utility model proposes a kind of Light-duty Quick-installation goods cableway power running gear, including two or more
Pylon 1 and carrier cable 2, described carrier cable 2 one end is connected with rope winder 3, then passes around a pylon 1 and is connected with suspension hook group 7,
It is connected with next pylon 1 afterwards;Also include being slidably connected with carrier cable 2 for transporting the suspension hook group 7 of goods and driving this system
The power packages of work, described suspension hook group 7 includes housing 13 and is positioned at the traveling wheel within housing 13, perpendicular on described housing 13
The direct-connected hanging pulley that has been connected to, described hanging pulley includes that the two groups of assembly pulleys being set up in parallel up and down, described two groups of assembly pulleys pass through
Antilift wire 10 drives, and described antilift wire 10 walks around running block 7-2 and then fixed pulley group 7-1 passes from side cord hole 7-3;Its
Connect on the assembly pulley of middle bottom and have the suspension hook 7-4 for hanging goods, need the goods of conveying to hang on hook;Described
Power packages includes backhaul hoist engine 6 and the rack winch 5 being used in conjunction with each other, traction machine the 4, first hauling rope 11, second
Hauling rope 12, described first hauling rope 11 one end is connected with backhaul hoist engine 6, and the other end walks around the angle pulley 9 on pylon 1
It is connected with housing 13;Described second hauling rope 12 one end is walked around traction machine 4 and is connected with rack winch 5, and the other end walks around power
The angle pulley 9 on pylon 1 between group with suspension hook group 7 is connected with housing 13.The second hauling rope 12 that traction machine 4 end is spued
It is wrapped in I-beam wheel, and keeps the second hauling rope 12 of traction machine 4 end that spues to have enough initial tensions, it is ensured that second
The hauling rope 12 frictional force on traction wheel;The installation and debugging of rack winch 5, identical with traction machine 4, and basis will with lead
Drawing machine 4 and keep appropriately distance, in order to avoid the second hauling rope 12 relaxes, or pendulum angle affects traction machine 4.Backhaul hoist engine 6
The same with rack winch 5, except for the difference that, working is reverse-winding the first hauling rope 11.Operationally, traction is coordinated
Machine 4 speed exports the first hauling rope 11, does not allow tractive resistance the biggest;Another effect of backhaul hoist engine 6 is at suspended object
Can not glide because of the component of deadweight, or use when gliding not in place.Backhaul hoist engine 6 and rack winch 5 power of motor
0.75Kw, VFC, manual knob stepless time adjustment.
When conveying articles, according to demand carrier cable 2 is arranged on the pylon 1 on differing heights ground;Time up, on goods
Row relies on traction machine 4 to provide power, backhaul hoist engine 6 to rotate the first hauling rope 11 and reclaims;Time descending, the second hauling rope 12 depends on
Thering is provided power to sling the gravity of goods in suspension hook group 7 by traction machine 4, suspension hook group 7 relies on the Gravitational sliding of self and goods.
As described in Fig. 2, Fig. 3, described housing 13 has for fixing the first hauling rope 11 and side cord hole of the second hauling rope 12
7-3, one end of the first hauling rope 11 and the second hauling rope 12 is each attached in cord hole 7-3 of side, and described antilift wire 10 walks around pulley
Group passes side cord hole 7-3, and antilift wire 10 is used for lifting fixed block group 7-1, thus reaches to lift the purpose of goods.Described cunning
Wheels are two groups, including one group of fixed pulley group 7-1 near housing 13 and one group of running block 7-2 away from housing 13, described
The fixed pulley that fixed pulley group 7-1 is arranged before and after including two;Described running block 7-2 includes two movable pulleys front and back arranged.
Fixed pulley includes front fixed pulley and rear fixed pulley, and movable pulley includes front movable pulley and rear movable pulley.
On the basis of antilift wire 10 is fixed on, suspension hook 7-4 catches on goods, and now the second hauling rope 12 is not tightened, traction machine 4
Rotating, the second hauling rope 12 is slowly tightened, and running block 7-2 starts up to move until pushing against fixed pulley group 7-1, then
Unclamp antilift wire 10, then running block 7-2 can be because gravity be toward falling, and now traction machine 4 moves, by this section of lower backwardness
Hauling rope is regained, and front movable pulley, rear movable pulley are again strained and pushed against front fixed pulley, rear fixed pulley, the most repeatedly until fixing
Rope 10 is stuck in cord hole 7-3 of side, and front fixed pulley, rear fixed pulley push against front movable pulley, rear movable pulley, now traction machine 4
Motion will drive whole suspension hook group 7 up to move again;If needing suspension hook group 7 down to move, then only backhaul need to be rolled up
The first hauling rope 11 raised is released, and suspension hook group 7 relies on self gravitation down to move.Postpone when goods arrives specific bit,
Traction machine 4 is released the second hauling rope 12 and coordinates and hang on immobilizing foundation by antilift wire 10, then proceedes to release the second traction
Rope 12, goods will be fallen by self gravitation.
Described traction machine 4 is provided with two traction wheels, and the both sides of described traction machine 4 rotating shaft are set up two separately and turned to contrary variable-frequency electric
Machine, traction machine 4 uses two 0.75Kw motor parallels, turns to contrary, uses a 1.5Kw Frequency Converter Control, manual knob
Stepless time adjustment.All have you forward and reverse, button control.
Traction machine 4 is major impetus parts in native system, in a pre-installation, is ready for basis;The basis of traction machine 4 selects
On the line of multiple pylons 1, in order to not affect the safety being hung the transport operation of part and operator, general backhaul elevator
Machine 6, rack winch 5, traction machine 4, switch board 8 are successively set on about 10 meters below from most proximal end pylon 1, and ensure
Operator can observe traffic condition intuitively, in order to takes measures in time.In the case of necessary, such as, in order to
Avoid natural gas and fire district, can be by traction machine 4, switch board 8 etc., one answers electrification device to draw, and sets up to safety zone.
Finally illustrating, above example is only in order to illustrate the technical solution of the utility model and unrestricted, although with reference to relatively
This utility model has been described in detail by good embodiment, it will be understood by those within the art that, can be to this practicality
Novel technical scheme is modified or equivalent, without deviating from objective and the scope of technical solutions of the utility model, its
All should contain in the middle of right of the present utility model.
Claims (4)
1. a Light-duty Quick-installation goods cableway power running gear, including multiple pylons and carrier cable, it is characterised in that: also
Including with carrier cable be slidably connected for the suspension hook group transporting goods and the power packages driving this system to work, described suspension hook group
Including housing and the traveling wheel that is positioned at enclosure interior, described housing vertically connects and has had hanging pulley, described hanging pulley bag
Including the many groups assembly pulley being set up in parallel up and down, described many group assembly pulleys are driven by antilift wire, wherein on the assembly pulley of bottom
Connect and have the suspension hook for hanging goods;
Rack winch, traction machine and the first hauling rope and that described power packages includes backhaul hoist engine, is used in conjunction with each other
Two hauling ropes, described first hauling rope one end is connected with backhaul hoist engine, and the other end walks around the angle pulley on pylon and housing
Connect;Described second hauling rope one end is walked around traction machine and is connected with rack winch, the other end walk around power packages and suspension hook group it
Between pylon on angle pulley be connected with housing.
2. Light-duty Quick-installation goods cableway power running gear as claimed in claim 1, it is characterised in that: open on described housing
Having the side cord hole for fixing the first hauling rope and the second hauling rope, described antilift wire is walked around assembly pulley and is passed side cord hole.
3. Light-duty Quick-installation goods cableway power running gear as claimed in claim 1 or 2, it is characterised in that: described pulley
Group is two groups, and including one group of fixed pulley group near housing and one group of running block away from housing, described fixed pulley group includes
The fixed pulley arranged before and after two;Described running block includes two movable pulleys front and back arranged.
4. Light-duty Quick-installation goods cableway power running gear as claimed in claim 3, it is characterised in that: described traction machine sets
Being equipped with two traction wheels, the both sides of described traction machine rotating shaft are set up two separately and are turned to contrary frequency conversion motor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620179464.8U CN205469056U (en) | 2016-03-09 | 2016-03-09 | Light -duty fast cableway power traveling system for loading |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620179464.8U CN205469056U (en) | 2016-03-09 | 2016-03-09 | Light -duty fast cableway power traveling system for loading |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205469056U true CN205469056U (en) | 2016-08-17 |
Family
ID=56656781
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620179464.8U Expired - Fee Related CN205469056U (en) | 2016-03-09 | 2016-03-09 | Light -duty fast cableway power traveling system for loading |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205469056U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106379765A (en) * | 2016-10-21 | 2017-02-08 | 长江勘测规划设计研究有限责任公司 | Clamp resetting structure and method for reclaiming main cable of cable crane |
CN111252683A (en) * | 2020-02-28 | 2020-06-09 | 佛山市粤优创钢结构有限公司 | Bridge deck crane and application method thereof applied to bridge dismantling |
CN111268571A (en) * | 2020-03-25 | 2020-06-12 | 中铁七局集团郑州工程有限公司 | Cableway with hoisting function |
-
2016
- 2016-03-09 CN CN201620179464.8U patent/CN205469056U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106379765A (en) * | 2016-10-21 | 2017-02-08 | 长江勘测规划设计研究有限责任公司 | Clamp resetting structure and method for reclaiming main cable of cable crane |
CN106379765B (en) * | 2016-10-21 | 2022-05-31 | 长江勘测规划设计研究有限责任公司 | Cable machine main cable recycling and step changing structure and method |
CN111252683A (en) * | 2020-02-28 | 2020-06-09 | 佛山市粤优创钢结构有限公司 | Bridge deck crane and application method thereof applied to bridge dismantling |
CN111268571A (en) * | 2020-03-25 | 2020-06-12 | 中铁七局集团郑州工程有限公司 | Cableway with hoisting function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201494438U (en) | Simple fast-assembling cableway for maintenance and emergency repair of mountain pipeline | |
CN105620493B (en) | A kind of novel rapid-installation freight ropeway | |
CN102501853B (en) | Steel wire rope pull type mountain orchard freight machine | |
CN209702099U (en) | Tunnel Mobile crane | |
CN205469056U (en) | Light -duty fast cableway power traveling system for loading | |
CN107237649A (en) | The long steep inclined shaft transportation system of light section and construction method | |
CN102826448B (en) | Hoisting mechanism and gantry crane | |
CN108190738B (en) | Hoisting and transporting device for mining monorail crane | |
CN109235514A (en) | A kind of mining multi-purpose crawler type traction loading truck-mounted crane | |
CN204551477U (en) | A kind of cable transmission lifting appliance | |
CN202829249U (en) | Mechanical system of continuous rope mechanical speed-adjusting winch system | |
CN111332319A (en) | Cableway self-propelled transportation equipment | |
CN102795545A (en) | Stabilizing device of tire-type crane lift | |
CN203889011U (en) | Material transporting device of drilling platform | |
CN201033858Y (en) | Tower height-adjustable double-rope freight ropeway | |
CN205469058U (en) | Novel fast -assembling freight transportation cableway | |
CN101850936B (en) | Push rod type automatic turning device for legs | |
CN203667819U (en) | Large-dip angle lane monorail crane transporting device | |
CN107444232A (en) | A kind of compartment tail gate apparatus for automatically lifting | |
CN103386196B (en) | Rescue system for sky wheel | |
JP7161080B2 (en) | Cableway self-propelled transport facility | |
CN104386602A (en) | Inclined roadway trackless auxiliary transportation method and device | |
CN209308086U (en) | Mining multi-purpose crawler type traction loads truck-mounted crane | |
CN204172741U (en) | A kind of vehicular oil engine handing device and use the vehicle of this mechanism | |
CN207469857U (en) | Vehicle conveying equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160817 Termination date: 20170309 |