CN205467346U - Automatic change electric energy meter drain pan hot melt nut assembly line - Google Patents

Automatic change electric energy meter drain pan hot melt nut assembly line Download PDF

Info

Publication number
CN205467346U
CN205467346U CN201620191822.7U CN201620191822U CN205467346U CN 205467346 U CN205467346 U CN 205467346U CN 201620191822 U CN201620191822 U CN 201620191822U CN 205467346 U CN205467346 U CN 205467346U
Authority
CN
China
Prior art keywords
electric energy
energy meter
bottom case
hot
streamline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620191822.7U
Other languages
Chinese (zh)
Inventor
聂建根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Hongxu Electrical Co Ltd
Original Assignee
Henan Hongxu Electrical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Hongxu Electrical Co Ltd filed Critical Henan Hongxu Electrical Co Ltd
Priority to CN201620191822.7U priority Critical patent/CN205467346U/en
Application granted granted Critical
Publication of CN205467346U publication Critical patent/CN205467346U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The assembly line of automatic installation electric energy meter drain pan copper nut, it contains hot melt nut district, check field and letter sorting district, has been transformed into the automation mechanized operation with manual operation, and speed is faster, the better quality. This assembly line passes through the manipulator, has realized seamless combination with injection moulding device, very big improvement production efficiency. Subsidiary verifying attachment, can be accurate rapid inspection goes out the quality of product, labour saving and time saving.

Description

Automatization's electric energy meter bottom case hot-melting nut streamline
Technical field
This utility model relates to electric energy meter industry, and a kind of hot melt that carries out electric energy meter bottom case nut is installed and the automatic assembly line of inspection.
Background technology
Conventional production methods is: electric energy meter bottom case from injection machine out after, artificial taking-up take above hot-melting nut machine, by screw nut hot melting to drain pan, the product quality thus produced is not fine, and efficiency is low.
Utility model content
In order to solve the problems referred to above, this utility model patent discloses a kind of automatization and installs the streamline of electric energy meter bottom case copper nut, and it comprises hot-melting nut district, inspection area and off-sorting station.
For realizing above-mentioned technical purpose, the technical scheme is that automatization electric energy meter bottom case hot-melting nut streamline, it is provided with transporter, hot-melting nut machine, verifying attachment and sorting equipment, and the automatic control system that transporter, hot-melting nut machine, verifying attachment and sorting equipment are controlled it is sequentially provided with above transporter.
Sorting equipment described in the utility model is sucker mechanical hand.
Being additionally provided with position correction device on transporter described in the utility model, position correction device is made up of two pieces of baffle plates being oppositely arranged, and the entrance of two pieces of baffle plates bends laterally, and the distance between two pieces of baffle plates is equal with the length of electric energy meter bottom case.
Verifying attachment described in the utility model is the measurement head that cylinder controls to pump.
Automatic control system described in the utility model is made up of multiple induction apparatuss and host computer.
Transporter described in the utility model is conveyer belt.
This utility model provides the benefit that: manual operation is transformed to automation mechanized operation by this utility model patent, speed faster, better quality.This streamline passes through mechanical hand, achieves seamless combination with injection-moulding device, greatly improves production efficiency.Subsidiary verifying attachment, it is possible to verify the quality of product rapidly and accurately is time saving and energy saving.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is plan structure schematic diagram of the present utility model;
In figure: 1, transporter, 2, hot-melting nut machine, 3, verifying attachment, 301, measure head, 4, sorting equipment, 5, inspection position device, 501, position, school plate, 6, electric energy meter bottom case, 7, induction apparatus.
Detailed description of the invention
The streamline of electric energy meter bottom case copper nut is installed by automatization, and it comprises hot-melting nut district, inspection area and off-sorting station, and first, the moulding produced in injection machine is taken out by mechanical hand, and is put on streamline;Secondly, injection molding material is cooled down on streamline a period of time, in order to preferably hot-melting nut;By the transmission of transporter, electric energy meter bottom case cooling completed sends into hot-melting nut district: by the induction apparatus being placed on streamline, learn that product arrives this region, then three levers, a fixed stop are stretched out in this position, are fixed by product, then by hot-melting nut machine by the bottom of heated nut push table, after being pressed into, all stopping means are regained, and transporter starts, and electric energy meter bottom case enters next step operation;Inspection area comprises two and is controlled up and down measurement head, distance-sensor, a mechanical hand by cylinder, its effect is through measuring head and gos deep into nut embedding area and measure and press whether the degree of depth of nut meets the requirements, if met the requirements, it is sent to next step operation.If do not met, sorting taking out, being put in collecting receptacle.This set production line balance speed is fast, can receive the product of two injection-moulding devices (depanning mode 1 goes out 4) simultaneously, be processed, and efficiency is high, and quality is good.
Further, sorting equipment is sucker mechanical hand, and its mode of operation is, is sorted away by the electric energy meter bottom case of disqualified upon inspection, utilizes sucker to hold the removal of electric energy meter bottom case surface, lossless is quickly moved out.
Further, position correction device it is additionally provided with on transporter, ensure that electric energy meter bottom case enters into hot-melting nut district with stable and correct transmission track, the opening part of position correction device is slightly larger than other orientation, being made up of two pieces of baffle plates being oppositely arranged, the entrance of two pieces of baffle plates bends laterally, and the distance between two pieces of baffle plates is equal with the length of electric energy meter bottom case, the contraction of opening is to shrink with gradual change form, is slowly directed to electric energy meter bottom case specify position.
Further, transporter can be selected for conveyer belt, conveyer belt can be set to three groups, first group of conveyer belt can be used for cooling and be sent to hot-melting nut district, second group is used for hot-melting nut district, 3rd group is used for inspection area and off-sorting station, and inspection area is identical with the line speed of off-sorting station, can complete inspection and sorting work.
Further, automatic control system is made up of multiple induction apparatuss and host computer, induction apparatus checks electric energy meter bottom case to enter hot-melting nut district, host computer starts hot-melting nut and carries out screw nut hot melting, host computer is again started up actuating device and electric energy meter bottom case is delivered to inspection area, the induction apparatus of inspection area, inspection sending to electric energy meter bottom case, signal is passed to host computer, host computer starts verifying attachment and tests, after having inspected, detection structure is passed to host computer by induction apparatus, and underproof electric energy meter bottom case is rejected by PC control sorting equipment.

Claims (6)

1. automatization's electric energy meter bottom case hot-melting nut streamline, it is characterized in that: be provided with transporter (1), it is sequentially provided with hot-melting nut machine (2), verifying attachment (3) and sorting equipment (4), and the automatic control system that transporter (1), hot-melting nut machine (2), verifying attachment (3) and sorting equipment (4) are controlled in transporter (1) top.
2. automatization as claimed in claim 1 electric energy meter bottom case hot-melting nut streamline, it is characterised in that: described sorting equipment (4) is sucker mechanical hand.
3. automatization as claimed in claim 1 electric energy meter bottom case hot-melting nut streamline, it is characterized in that: on described transporter (1), be additionally provided with position correction device (5), position correction device (5) is made up of two pieces of baffle plates being oppositely arranged (501), the entrance of two pieces of baffle plates (501) bends laterally, and the distance between two pieces of baffle plates (501) is equal with the length of electric energy meter bottom case (6).
4. automatization as claimed in claim 1 electric energy meter bottom case hot-melting nut streamline, it is characterised in that: described verifying attachment (3) is the measurement head (301) that cylinder controls to pump.
5. automatization as claimed in claim 1 electric energy meter bottom case hot-melting nut streamline, it is characterised in that: described automatic control system is made up of multiple induction apparatuss and host computer.
6. automatization as claimed in claim 1 electric energy meter bottom case hot-melting nut streamline, it is characterised in that: described transporter (1) is conveyer belt.
CN201620191822.7U 2016-03-14 2016-03-14 Automatic change electric energy meter drain pan hot melt nut assembly line Expired - Fee Related CN205467346U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620191822.7U CN205467346U (en) 2016-03-14 2016-03-14 Automatic change electric energy meter drain pan hot melt nut assembly line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620191822.7U CN205467346U (en) 2016-03-14 2016-03-14 Automatic change electric energy meter drain pan hot melt nut assembly line

Publications (1)

Publication Number Publication Date
CN205467346U true CN205467346U (en) 2016-08-17

Family

ID=56657198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620191822.7U Expired - Fee Related CN205467346U (en) 2016-03-14 2016-03-14 Automatic change electric energy meter drain pan hot melt nut assembly line

Country Status (1)

Country Link
CN (1) CN205467346U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109821776A (en) * 2019-01-21 2019-05-31 海宁联丰东进电子有限公司 A kind of general common mode inductance electric parameters testing equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109821776A (en) * 2019-01-21 2019-05-31 海宁联丰东进电子有限公司 A kind of general common mode inductance electric parameters testing equipment

Similar Documents

Publication Publication Date Title
CN205880170U (en) Trinity full automated inspection machine of battery
CN106291379A (en) Accumulator three-in-one full automatic testing machine
CN207288100U (en) A kind of more specification inserts detect screening installation automatically
CN104505485A (en) Cell tab automatic-detection machine
CN204315655U (en) Battery pole ear automatic detecting machine
CN108571922A (en) Flange part size automatic detecting machine
CN103341452A (en) Test separator for NTC (negative temperature coefficient) heat-sensitive chips
CN203591958U (en) Interface detection sorting machine
CN109900553B (en) Building concrete compressive strength test detection device and operation method thereof
CN204817221U (en) Spring size detection machine
CN102866160B (en) System and method for detecting surface quality of coin mold
CN104359372A (en) Connector height measuring machine
CN204228064U (en) A kind of connector height measurer
CN205467346U (en) Automatic change electric energy meter drain pan hot melt nut assembly line
CN204182595U (en) A kind of lithium ion battery surface defect detection equipment
CN206056509U (en) Axial workpiece machine vision size detecting device
CN205081346U (en) Mould a contact pin device
CN204128554U (en) The rapid automatized detection system of timepiece industry precision parts quality
CN106441114B (en) Machine is examined entirely to electron throttle shaft size
CN105241755A (en) Road traffic marking material anti-crack property tester and use method thereof
CN209803316U (en) Withstand voltage testing device for electric energy meter
CN204470137U (en) Bearing outer ring checkout gear
CN203816940U (en) Testing machine for resistance of carbon brushes
CN208052423U (en) A kind of nut feeding jig of injection mold
CN206253365U (en) Die quality detects apparatus for automatically sorting

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817