CN205462937U - Full -automatic omega formula VCI bimetal coating system - Google Patents
Full -automatic omega formula VCI bimetal coating system Download PDFInfo
- Publication number
- CN205462937U CN205462937U CN201620039135.3U CN201620039135U CN205462937U CN 205462937 U CN205462937 U CN 205462937U CN 201620039135 U CN201620039135 U CN 201620039135U CN 205462937 U CN205462937 U CN 205462937U
- Authority
- CN
- China
- Prior art keywords
- room
- automatic
- full
- formula
- hot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a full -automatic omega formula VCI bimetal coating system, including last workstation, going up the task work and doing bench side and be equipped with the chain convey system, the work piece of going up a workstation is carried to the hot -blast room that weathers through the chain convey system, the hot -blast room of weathering is through keeping apart the first inside groove spray booth of path connection, and the entry of the first outside spray booth of exit linkage of first inside groove spray booth, this first outside spray booth pass through the levelling room and connect the hot -air drying room, the entry of the exit linkage wet wind drying chamber of this hot -air drying room, and the back is drawn forth from the wet wind drying chamber to the conveying chain of chain convey system, and the task work does bench side under reacing, lifts metal work off. The utility model discloses a full -automatic omega formula VCI bimetal coating system combines each process of metal work spraying, and the work piece does not need the transition, only needs loop through each processing position on the driving chain, can become the finished product after leaving final processing position, effectively puies forward high pressure heater work efficiency rate.
Description
Technical field
This utility model relates to metal works production line field, specifically a kind of full-automatic Ω Formula V CI bimetallic coating coating
System.
Background technology
Metal works in process of production, needs through a lot of operations, such as welding, pickling, spraying etc., and existing spray
It is coated with and often completes different operation at different workshops, such disadvantageously, after completing one procedure the process of transition is relatively
Long, when needing to complete next process at short notice after upper one procedure completes, when transition can not be controlled well
In the case of between, usually can affect the crudy of subsequent handling.Such as after basecoat paint program spraying VCI coating,
Return again to finish paint spray booth spray paint, need transition car to forward other finish paint painting workshops to, be easy in transfer process
Occur destroying the VCI dope layer sprayed, largely can cause poor product quality.It is thus desirable to solve
The problems referred to above.
Utility model content
Goal of the invention: in order to overcome the deficiencies in the prior art, this utility model provides a kind of full-automatic Ω Formula V CI
Bimetallic coating application system.
Technical scheme: for solving above-mentioned technical problem, one of the present utility model full-automatic Ω Formula V CI bimetallic coating is coated with
Covering system, including upper part workbench, described upper part workbench is arranged over chain conveyor system, the workpiece of upper part workbench
It is delivered to hot blast drying room by chain conveyor system;Described hot blast drying room connects the first inside groove by channel isolation and sprays
Room, the outlet of the first inside groove spray booth connects the entrance of the first external spray room, and levelling room is passed through in this first external spray room
Connecting hot wind drying room, the outlet of this hot wind drying room connects the entrance of wet wind drying chamber, the carrier chain of chain conveyor system
After wet wind drying chamber is drawn, arrive above lower part workbench, metal works is unloaded.Chain conveyor system has run through whole
Individual spraying line system, after metal works is lifted on upper part workbench by it, sends into hot blast drying room and dries up metal work
Part residual moisture, carries out inside groove spraying subsequently into the first inside groove spray booth, and inside groove is delivered to outside first after having sprayed again
Portion's spray booth is by outside for metal works integral spray, and after completing, carrier chain is by metal works by levelling room, carries out surface stream
Flat process, after terminating, sends into hot wind drying room and dries, and the metal works of drying continues to be fed into wet wind drying to be carried out
Paint shaping and drying.Complete the metal works of the drying of spraying, after entering lower part workbench, workman transport after unloading.
Further, be additionally provided with between described first external spray room and hot wind drying room by levelling room connect second in
Groove spray booth and the second external spray room, can further improve the quality of spraying.
Further, described upper part workbench includes the upper part conveyer belt driven by driving means, it is simple to the upper part of workman.
Further, described lower part workbench includes the lower part conveyer belt driven by driving means, it is simple to workman transports workpiece.
Further, the drying temperature of described hot wind drying room is 50 DEG C.
Further, the drying temperature of described wet wind drying chamber is 50 DEG C.
Further, the material of described first inside groove spray booth spraying is VCI coating.
Beneficial effect: one of the present utility model full-automatic Ω Formula V CI bimetallic coating application system, sprays metal works
The each procedure being coated with combines, and workpiece need not transition, only need to pass sequentially through each working position on driving-chain,
Finished product can be become after leaving last working position, be effectively improved working (machining) efficiency.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is further described.
As it is shown in figure 1, a kind of full-automatic Ω Formula V CI bimetallic coating application system, including upper part workbench 1, upper part
Workbench 1 is provided above chain conveyor system 2, and the workpiece of upper part workbench 1 is delivered to by chain conveyor system 2
Hot blast drying room 3;Hot blast drying room 3 connects the first inside groove spray booth 5, the first inside groove spray booth 5 by channel isolation 4
The material of spraying is VCI coating.The outlet of the first inside groove spray booth 5 connects the entrance of the first external spray room 6, and this is the years old
One external spray room 6 connects hot wind drying room 8 by levelling room 7, and the outlet of this hot wind drying room 8 connects wet wind dries
The entrance of room 9, the carrier chain of chain conveyor system 2, after wet wind drying chamber 9 is drawn, arrives on lower part workbench 14
Side, unloads metal works.It is additionally provided with between first external spray room 6 and hot wind drying room 8 by levelling room 7 even
The second logical inside groove spray booth 10 and the second external spray room 11, can further improve the quality of spraying.Upper part workbench
1 includes the upper part conveyer belt 13 driven by driving means, it is simple to the upper part of workman.Lower part workbench 14 includes being filled by driving
Put the lower part conveyer belt 15 of driving, it is simple to workman transports workpiece.The drying temperature of hot wind drying room 8 is 50 DEG C.Wet wind
The drying temperature of drying chamber 9 is 50 DEG C.Chain conveyor system 2 has run through whole spraying line system, and it is by metal work
After part lifts on upper part workbench 1, send into hot blast drying room 3 and dry up metal works residual moisture, subsequently into first
Inside groove spray booth 5 carries out inside groove spraying, and inside groove is delivered to the first external spray room 6 again by outside metal works after having sprayed
Portion's integral spray, after completing, carrier chain is by metal works by levelling room 7, carries out the process of surface levelling, after terminating,
Sending into hot wind drying room 8 to dry, the metal works of drying continues to be fed into wet wind drying to carry out painting shaping and drying.Complete
Become the metal works of the drying of spraying, after entering lower part workbench 14, workman transport after unloading.
One of the present utility model full-automatic Ω Formula V CI bimetallic coating application system, each road work that metal works is sprayed
Sequence combines, and workpiece need not transition, only need to pass sequentially through each working position on driving-chain, leave
Finished product can be become after later working position, be effectively improved working (machining) efficiency.
Below it is only preferred implementation of the present utility model, it should be pointed out that: for those skilled in the art
For, on the premise of without departing from this utility model principle, it is also possible to make some improvements and modifications, these improve and profit
Decorations also should be regarded as protection domain of the present utility model.
Claims (7)
1. a full-automatic Ω Formula V CI bimetallic coating application system, it is characterised in that: include part workbench, institute
Stating part workbench and be arranged over chain conveyor system, the workpiece of upper part workbench is delivered to hot blast by chain conveyor system
Dry up room;Described hot blast drying room connects the first inside groove spray booth by channel isolation, and the outlet of the first inside groove spray booth is even
Connecing the entrance of the first external spray room, this first external spray room connects hot wind drying room, this hot-air seasoning by levelling room
The outlet of room connects the entrance of wet wind drying chamber, and the carrier chain of chain conveyor system is after wet wind drying chamber is drawn, under arrival
Above part workbench, metal works is unloaded.
2. with according to the full-automatic Ω Formula V CI bimetallic coating application system described in claim 1, it is characterised in that: institute
State and between the first external spray room and hot wind drying room, be additionally provided with the second inside groove spray booth and second connected by levelling room
External spray room.
Full-automatic Ω Formula V CI bimetallic coating application system the most according to claim 1, it is characterised in that: institute
State the upper part conveyer belt that part workbench includes being driven by driving means.
Full-automatic Ω Formula V CI bimetallic coating application system the most according to claim 1, it is characterised in that: institute
State the lower part conveyer belt that lower part workbench includes being driven by driving means.
Full-automatic Ω Formula V CI bimetallic coating application system the most according to claim 1, it is characterised in that: institute
The drying temperature stating hot wind drying room is 50 DEG C.
Full-automatic Ω Formula V CI bimetallic coating application system the most according to claim 1, it is characterised in that: institute
The drying temperature stating wet wind drying chamber is 50 DEG C.
Full-automatic Ω Formula V CI bimetallic coating application system the most according to claim 1, it is characterised in that: institute
The material stating the first inside groove spray booth spraying is VCI coating.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620039135.3U CN205462937U (en) | 2016-01-15 | 2016-01-15 | Full -automatic omega formula VCI bimetal coating system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620039135.3U CN205462937U (en) | 2016-01-15 | 2016-01-15 | Full -automatic omega formula VCI bimetal coating system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205462937U true CN205462937U (en) | 2016-08-17 |
Family
ID=56668128
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620039135.3U Active CN205462937U (en) | 2016-01-15 | 2016-01-15 | Full -automatic omega formula VCI bimetal coating system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205462937U (en) |
-
2016
- 2016-01-15 CN CN201620039135.3U patent/CN205462937U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105983503B (en) | A kind of full-automatic plastic cement vacuum coating paint line and film plating process | |
CN102847630B (en) | Spraying production line | |
CN104959252B (en) | A kind of automatic paint-spraying machine | |
CN106269376A (en) | Workpiece auto spray painting intelligence production line | |
CN104841596B (en) | Powder spraying, curing system | |
CN106155028A (en) | The control system of flexible paint line and control method | |
CN107486353A (en) | A kind of paint line for wheel and axletree | |
CN110314792A (en) | A kind of spraying method of the automatic spray unit of slim-lined construction workpiece | |
CN106166525A (en) | A kind of automobile component fully-automatic coating production line | |
CN105399451B (en) | A kind of automatic glazing equipment of robot | |
CN206075126U (en) | The control system of flexible paint line | |
CN205462937U (en) | Full -automatic omega formula VCI bimetal coating system | |
CN208066618U (en) | A kind of UV piano lacquers production line | |
CN107755144A (en) | Flush coater | |
CN106694329A (en) | Metal powder spraying technological process | |
CN110180726A (en) | A kind of novel double track spray-painting production line | |
CN106179857B (en) | It is a kind of suitable for small batch, the automatic coating system and method for multi items components | |
CN1330433C (en) | Sprinkle type pre-processing method for surface of plastic pieces | |
CN107983607A (en) | A kind of brilliant swimming production technology of aluminium section bar | |
CN206064711U (en) | The layout structure of flexible paint line | |
CN107717482A (en) | Combined production line | |
CN108543660A (en) | The middle painting of Car Body Painting -/finishing coat production line and its production technology | |
KR20100075721A (en) | In-line vacuum deposition system which can connect with coating system. and deposition method using the same | |
CN205518344U (en) | Circulating paint finishing | |
CN205628424U (en) | Auxiliary engine system under banbury mixer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |