CN205444121U - That can not cut off water supply maintenance aqueduct wall goes along with sb. to guard him facility temporarily - Google Patents

That can not cut off water supply maintenance aqueduct wall goes along with sb. to guard him facility temporarily Download PDF

Info

Publication number
CN205444121U
CN205444121U CN201620012239.5U CN201620012239U CN205444121U CN 205444121 U CN205444121 U CN 205444121U CN 201620012239 U CN201620012239 U CN 201620012239U CN 205444121 U CN205444121 U CN 205444121U
Authority
CN
China
Prior art keywords
aqueduct
wall
water supply
wall body
guard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620012239.5U
Other languages
Chinese (zh)
Inventor
王瑞贵
蔡建国
邬志
黄东军
俞丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201620012239.5U priority Critical patent/CN205444121U/en
Application granted granted Critical
Publication of CN205444121U publication Critical patent/CN205444121U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a that can not cut off water supply maintenance aqueduct wall goes along with sb. To guard him facility temporarily. The utility model discloses a satisfying under the condition of not cutting off the water supply, keeping in repair the reposition of redundant personnel of damaged aqueduct section wall body or demolition construction wall body futilely to reach and maintain thoroughly, remove a hidden danger, save the mesh of environmental protection. The utility model provides a: should go along with sb. To guard him the facility temporarily and have an operating aqueduct, the wall body of aqueduct both sides has included supporting wall body and construction wall body, sets up interim block structure in construction wall body inboard, interim block structure vertical from the aqueduct bottom until the aqueduct top, be advisable in order to cover the construction wall body completely along water flow direction, interim block structure side reason near water is the streamline form and all sets up rubber stagnant water structure with wall body contact department, interim block structure's upper portion, middle part and bottom set up horizontal reinforcement girder. The utility model is suitable for a transformation with emergent access path is keeped in repair to urban water supply engineering aqueduct section wall structure under the circumstances of not cutting off the water supply.

Description

Can not cut off the water supply maintenance aqueduct wall body go along with sb. to guard him facility temporarily
Technical field
This utility model relate to a kind of can not cut off the water supply maintenance aqueduct wall body go along with sb. to guard him facility temporarily.It is applicable to urban water supply engineering aqueduct section wall body structure keep in repair in the case of not cutting off the water supply and the transformation of access path of meeting an urgent need.
Background technology
The aqueduct segment structure of urban water supply engineering easily occurs the phenomenon such as concrete aging, groove body seepage failure during long-play, if do not carried out thorough overhaul, maintenance, then can build up risk, contingency once occurs, will result in great economic loss and social influence.Along with the expansion of city size, the increase day by day of water requirements, the urban water supply engineering after long-play becomes the main resource of water supply in city, and for meeting city domestic water demand, analysis on aqueduct structure does not the most possess the condition of construction of cutting off the water supply.Owing to not allowing aqueduct section to cut off the water supply construction, conventional maintenance measure is only by some apparent consolidation groutings and reinforces and repair, it is impossible to the seepage and the safety that thoroughly solve body of wall reduce problem, it is impossible to meet engineering demand.
Therefore, aqueduct section body of wall is reconstructed with doing maintenance, or newly-built emergent access path water guide relief aqueduct section to possess maintenance condition of cutting off the water supply extremely the most urgent, have become as the big technical barrier that vast hydraulic engineering worker faces.
Summary of the invention
The technical problems to be solved in the utility model is: for the problem of above-mentioned existence, there is provided a kind of maintenance aqueduct wall body of cutting off the water supply goes along with sb. to guard him facility temporarily, meet do not cut off the water supply under conditions of, keep in repair aqueduct section body of wall or the shunting of Demolition Construction body of wall of breakage, to reach to keep in repair thorough, the purpose of environmental protection of removing a hidden danger, save dryly.
This utility model be the technical scheme is that a kind of can not cut off the water supply maintenance aqueduct wall body go along with sb. to guard him facility temporarily, there is operating aqueduct, the body of wall of aqueduct both sides includes support body of wall and construction body of wall, it is characterized in that: inside construction body of wall, temporary plugging structure is set, this temporary plugging structure vertically bottom aqueduct until aqueduct top, be advisable along water (flow) direction so that construction body of wall is completely covered;Temporary plugging structure lateral edges near water is streamlined and is respectively provided with rubber water-proof structure with body of wall contact position;The top of temporary plugging structure, middle part and bottom arrange horizontal reinforcing beam.
Described temporary plugging structure is waterproof and has the thin-wall construction of enough rigidity and intensity, material selection steel, timber, plastics or composite.
Utilize I-steel or channel-section steel that vertical supporting is set between the support body of wall on described temporary plugging structure and construction body of wall both sides.
The beneficial effects of the utility model are: 1) can realize the segmentation in the case of not cutting off the water supply of water supply project aqueduct section and keep in repair wall body or for the newly-increased escape truck of construction at wall body open split;2) temporary plugging building enclosure can be reused, and reduces construction costs;3) common material, construction machinery and construction technology is made full use of, it is easy to implement.4) there is significant economic and social benefit.
Accompanying drawing explanation
Fig. 1 is floor map of the present utility model.
Fig. 2 is the A-A profile of Fig. 1.
Detailed description of the invention
The present embodiment can not cut off the water supply maintenance aqueduct wall body go along with sb. to guard him facility as shown in Figure 1 and Figure 2 temporarily, aqueduct 1 is in the middle of the operation that can not cut off the water supply as the important step in urban water supply engineering, and the body of wall of aqueduct both sides is also found that the construction body of wall 5 of percolating water in addition to supporting body of wall 2.In order to keep in repair or Demolition Construction body of wall 5 in the case of not cutting off the water supply, it was necessary for before construction disposing temporary plugging structure 3, this temporary plugging structure is located at the inner side of construction body of wall 5, height bottom aqueduct until aqueduct top, width (along water (flow) direction) is advisable so that construction body of wall 5 is completely covered, both sides should be with the support overlapping certain size of body of wall 2, the high 1-10m of this example temporary plugging structure 3, wide 1-12m.The edge designs streamlining of described temporary plugging structure 3 side near water, temporary plugging structure 3 and body of wall contact position are respectively provided with rubber water-proof structure 4 (including both sides and the sealing of body of wall and the sealing of bottom).The top of temporary plugging structure 3, middle part and bottom optionally utilize I-steel, angle steel or channel-section steel to arrange horizontal reinforcing beam 6.
Described temporary plugging structure 3 is waterproof and has the thin-wall construction of enough rigidity and intensity, and material can use steel, timber, plastics or composite.
It is also with I-steel between the support body of wall 2 on described temporary plugging structure 3 and construction body of wall 5 both sides or channel-section steel arranges vertical supporting 7, as shown in Figure 1.
Can keep in repair after temporary plugging structure 3 installs or Demolition Construction body of wall 5.In construction time, the conveyance capacity of aqueduct section is the 30-95% of design conditions, and in aqueduct, water velocity is 0.5-4m/s, and maintenance or Demolition Construction body of wall appropriate to the occasion employing cutting machine or rig bore and remove, and is not suitable for using blasting demolishing method.

Claims (3)

1. one kind can not cut off the water supply maintenance aqueduct wall body go along with sb. to guard him facility temporarily, there is operating aqueduct (1), the body of wall of aqueduct both sides includes support body of wall (2) and construction body of wall (5), it is characterized in that: in construction body of wall (5) inner side, temporary plugging structure (3) is set, this temporary plugging structure vertically bottom aqueduct until aqueduct top, be advisable along water (flow) direction so that construction body of wall (5) is completely covered;Temporary plugging structure (3) lateral edges near water is streamlined and is respectively provided with rubber water-proof structure (4) with body of wall contact position;Top, middle part and the bottom of temporary plugging structure (3) arranges horizontal reinforcing beam (6).
The most according to claim 1 can not cut off the water supply maintenance aqueduct wall body go along with sb. to guard him facility temporarily, it is characterized in that: described temporary plugging structure (3) is waterproof and has the thin-wall construction of enough rigidity and intensity, material selection steel, timber, plastics or composite.
The most according to claim 2 can not cut off the water supply maintenance aqueduct wall body go along with sb. to guard him facility temporarily, it is characterised in that: described temporary plugging structure (3) with construct body of wall (5) both sides support body of wall (2) between utilize I-steel or channel-section steel that vertical supporting (7) is set.
CN201620012239.5U 2016-01-07 2016-01-07 That can not cut off water supply maintenance aqueduct wall goes along with sb. to guard him facility temporarily Active CN205444121U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620012239.5U CN205444121U (en) 2016-01-07 2016-01-07 That can not cut off water supply maintenance aqueduct wall goes along with sb. to guard him facility temporarily

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620012239.5U CN205444121U (en) 2016-01-07 2016-01-07 That can not cut off water supply maintenance aqueduct wall goes along with sb. to guard him facility temporarily

Publications (1)

Publication Number Publication Date
CN205444121U true CN205444121U (en) 2016-08-10

Family

ID=56602049

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620012239.5U Active CN205444121U (en) 2016-01-07 2016-01-07 That can not cut off water supply maintenance aqueduct wall goes along with sb. to guard him facility temporarily

Country Status (1)

Country Link
CN (1) CN205444121U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120656A (en) * 2016-08-12 2016-11-16 武大巨成结构股份有限公司 A kind of constructing device changing waterstop under water and using method thereof
CN110761575A (en) * 2019-10-17 2020-02-07 上海市基础工程集团有限公司 Recoverable device for dry operation construction of partial pool wall transformation under full-water operation working condition of pool
CN111648311A (en) * 2020-05-29 2020-09-11 中国葛洲坝集团第一工程有限公司 Enclosure device for maintaining connecting seam of aqueduct without water interruption

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120656A (en) * 2016-08-12 2016-11-16 武大巨成结构股份有限公司 A kind of constructing device changing waterstop under water and using method thereof
CN106120656B (en) * 2016-08-12 2018-03-30 武大巨成结构股份有限公司 A kind of application method of the underwater constructing device for changing waterstop
CN110761575A (en) * 2019-10-17 2020-02-07 上海市基础工程集团有限公司 Recoverable device for dry operation construction of partial pool wall transformation under full-water operation working condition of pool
CN110761575B (en) * 2019-10-17 2021-05-28 上海市基础工程集团有限公司 Recoverable device for dry operation construction of partial pool wall transformation under full-water operation working condition of pool
CN111648311A (en) * 2020-05-29 2020-09-11 中国葛洲坝集团第一工程有限公司 Enclosure device for maintaining connecting seam of aqueduct without water interruption
CN111648311B (en) * 2020-05-29 2021-12-03 中国葛洲坝集团第一工程有限公司 Enclosure device for maintaining connecting seam of aqueduct without water interruption

Similar Documents

Publication Publication Date Title
CN204076498U (en) A kind of Precast T-Beam beam rib steel-bar binding location moulding bed
CN205444121U (en) That can not cut off water supply maintenance aqueduct wall goes along with sb. to guard him facility temporarily
CN205775674U (en) A kind of across railway prefabricated assembled protecting canopy frame
CN205654352U (en) Can dismantle ordinary pressure toolchanger
CN103114681B (en) High-altitude long-span reinforced concrete beam treat pouring structure
CN105736005A (en) Detachable normal-pressure tool change device
CN105350454B (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
CN107217605A (en) A kind of continuous beam Demolition Construction method
CN103104091A (en) Sliding mold whole lifting platform and construction method
CN104060830B (en) Method for lifting and transporting large parts of underground nuclear power station
CN204716257U (en) Guarantee that shield whole starts and the variable door opening cribbing of station main body synchronous construction
CN103938534A (en) Overhead rail transit station integrated bridge structure and application method thereof
CN101363224A (en) Movable foundation pit support system and construction method
CN204266132U (en) Adopt the railway Frame Pier crossbeam of D type beam
CN107100631A (en) Pass through the construction method of active fault Tunnel Second Lining
CN204715366U (en) A kind of large-area deep foundation pit subregion is along the support system under inverse operating mode
CN210134410U (en) Grid type panel of drilling platform
CN103742155B (en) A kind of long-span segment method for dismounting
CN111608086A (en) Lateral flat top construction structure and method for steel-concrete composite beam
CN102561392A (en) Structure for supporting construction elevator foundation on basement top plate and construction method thereof
CN105298102A (en) Movable steel structure special-shaped rail car scaffold and construction method
CN105756368A (en) Simple construction method for removing columns for bracket girders of heavy-duty industrial workshops
CN105113416A (en) Construction method for frame bridge main body adjacent to existing buildings
CN205242437U (en) A redundant formula vertical braces structure for protection of 220kV cable normal position
CN204644878U (en) A kind of transom pier steel truss girder lifting construction device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant