CN107217605A - A kind of continuous beam Demolition Construction method - Google Patents

A kind of continuous beam Demolition Construction method Download PDF

Info

Publication number
CN107217605A
CN107217605A CN201610172504.0A CN201610172504A CN107217605A CN 107217605 A CN107217605 A CN 107217605A CN 201610172504 A CN201610172504 A CN 201610172504A CN 107217605 A CN107217605 A CN 107217605A
Authority
CN
China
Prior art keywords
bridge
continuous beam
cutting
cut
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610172504.0A
Other languages
Chinese (zh)
Inventor
张治成
王云峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN201610172504.0A priority Critical patent/CN107217605A/en
Publication of CN107217605A publication Critical patent/CN107217605A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of continuous beam Demolition Construction method, it is related to the realm of building construction, the continuous beam Demolition Construction method includes:1. preparation of construction;2. bridge deck is removed;3. bearing is locked;4. support is set up;5. box beam is cut;6. beam block is removed;7. bridge pier is removed.Employ and first remove pitch, the bridge floor facility such as anti-collision wall, then proping cutting box beam, last hoisting beam block and cut bridge pier, construction safety and efficiency are ensured, professional commanding is set in work progress, operating personnel submit onself to someone's direction personnel's instruction construction, it is ensured that safety.

Description

A kind of continuous beam Demolition Construction method
Technical field
The present invention relates to the realm of building construction, it is more particularly related to a kind of continuous Beam Demolition Construction method.
Background technology
In the engineerings such as building, bridge, aviation and pipe-line, being commonly encountered a kind of beam has Three or more supportings, referred to as continuous beam, continuous beam has intermediate support, so its deformation It is generally smaller than single beam with internal force, thus using very wide in engineering structure.
Continuous beam is manufactured using armored concrete mostly, is usually used in manufacturing bridge, and under-clearance Generally higher than 4m, stabilized structure, and continuity are good, in the construction for removing continuous beam very Difficulty, traditional Demolition Construction method can not remove continuous beam safely.
The content of the invention
Problem to be solved by this invention is to provide a kind of continuous beam Demolition Construction method.
To achieve these goals, the technical scheme taken of the present invention is:A kind of continuous beam is removed Construction method, it is characterised in that comprise the following steps:
(1) preparation of construction:Get out remove the plant equipment and instrument of continuous beam;
(2) bridge deck is removed:Bridge deck remove include bridge floor pitch remove, expansion joint dismounting, Anti-collision wall is removed;
(3) bearing is locked:In bearing surrounding 20mm steel plate connects bearing upper and lower cover platess, weldering Connect firmly, lock bearing;
(4) support is set up:Continuous beam removes support system by HR100 portal supports, regulation Bar, in length and breadth intertie, horizontal reinforcing bar, bridging, adjustable frames and bracket, wood stupefied Distribution beam is constituted;
(5) box beam is cut:Bridge is divided into recycle after some pieces and meets tonnage demand Loop wheel machine lifting landing, the first longitudinally cutting transverse cuts again of main line continuous beam, ring road continuous beam is direct Transverse cuts, box beam cutting is using the cutting of electronic rope saw cut system, in units of connection, main line The left width of bridge and the cutting of right width widened section are carried out by order horizontal behind first longitudinal direction, the right width mark of main line bridge Quasi- section and each ramp bridge only carry out transverse cuts;
(6) beam block is removed:After the completion of box beam segmentation cutting, lifted and cut from crawler crane Beam block lands;
(7) bridge pier is removed:Remaining bridge pier part is cut using pick machine.
It is preferred that, the bridge floor pitch in the step (2) uses LXH1300D type pitch millings Per 150m as a milling interval on machine milling, bridge floor, discarded pitch is transported by transport vehicle Outside the venue.
It is preferred that, at step (2) the Bridge expansion joint first with sharp weapon along seam cut open it is flexible The rubber strip of seam, middle shaped steel is cut off with oxyacetylene metal-cutting, and remaining residual fraction is removed in the lump with end floor beam.
It is preferred that, there is one of anti-collision wall on the outside of main line bridge in the step (2), ramp bridge has Twice anti-collision wall, anti-collision wall is hung using rope saw cutting machine stripping and slicing and removed.
It is preferred that, in the step (5) in the rope cutting process of electronic rope saw, rope fortune Protection is blocked with security protection before dynamic direction, and safety sign is set in certain area, is forbidden Pedestrian enters construction operation region.
Beneficial effect:The continuous beam Demolition Construction method includes:1. preparation of construction;2. bridge floor System removes;3. bearing is locked;4. support is set up;5. box beam is cut;6. beam block is removed; 7. bridge pier is removed.Employ and first remove the bridge floor facilities such as pitch, anti-collision wall, then proping is cut Cut box beam, last hoisting beam block and cut bridge pier, ensured construction safety and efficiency, constructed During set professional commanding, operating personnel submit onself to someone's direction personnel's instruction construction, it is ensured that safety.
Embodiment
The following detailed description of a kind of preferred embodiment of continuous beam Demolition Construction method of the invention.
A kind of continuous beam Demolition Construction method, it is characterised in that comprise the following steps:
(1) preparation of construction:Get out remove the plant equipment and instrument of continuous beam;
(2) bridge deck is removed:Bridge deck remove include bridge floor pitch remove, expansion joint dismounting, Anti-collision wall is removed;
(3) bearing is locked:In bearing surrounding 20mm steel plate connects bearing upper and lower cover platess, weldering Connect firmly, lock bearing;
(4) support is set up:Continuous beam removes support system by HR100 portal supports, regulation Bar, in length and breadth intertie, horizontal reinforcing bar, bridging, adjustable frames and bracket, wood stupefied Distribution beam is constituted;
(5) box beam is cut:Bridge is divided into recycle after some pieces and meets tonnage demand Loop wheel machine lifting landing, the first longitudinally cutting transverse cuts again of main line continuous beam, ring road continuous beam is direct Transverse cuts, box beam cutting is using the cutting of electronic rope saw cut system, in units of connection, main line The left width of bridge and the cutting of right width widened section are carried out by order horizontal behind first longitudinal direction, the right width mark of main line bridge Quasi- section and each ramp bridge only carry out transverse cuts;
(6) beam block is removed:After the completion of box beam segmentation cutting, lifted and cut from crawler crane Beam block lands;
(7) bridge pier is removed:Remaining bridge pier part is cut using pick machine.
Bridge floor pitch is used on LXH1300D type pitch milling machine millings, bridge floor per 150m conducts One milling interval, discarded pitch is transported outside the venue by transport vehicle.Sharp weapon are first used at bridge expanssion joint The rubber strip at expansion joint is cut open along seam, middle shaped steel, remaining residual fraction and end are cut off with oxyacetylene metal-cutting Crossbeam is removed in the lump.There is one of anti-collision wall on the outside of main line bridge, ramp bridge has twice anti-collision wall, prevent Hit wall and hung using rope saw cutting machine stripping and slicing and removed.
In the rope cutting process of electronic rope saw, blocked before the rope direction of motion with security protection Protection, and safety sign is set in certain area, forbid pedestrian to enter construction operation region.
Employ and first remove the bridge floor facilities such as pitch, anti-collision wall, then proping cutting box beam, most Hoisting beam block and bridge pier is cut afterwards, ensured and set in construction safety and efficiency, work progress specially Industry commanding, operating personnel submit onself to someone's direction personnel's instruction construction, it is ensured that safety.
Embodiments of the invention are the foregoing is only, the patent model of the present invention is not thereby limited Enclose, equivalent structure or equivalent stream that every utilization description of the invention and embodiment content are made Cheng Bianhuan, or other related technical fields are directly or indirectly used in, similarly it is included in this In the scope of patent protection of invention.

Claims (5)

1. a kind of continuous beam Demolition Construction method, it is characterised in that comprise the following steps:
(1) preparation of construction:Get out remove the plant equipment and instrument of continuous beam;
(2) bridge deck is removed:Bridge deck remove include bridge floor pitch remove, expansion joint dismounting, Anti-collision wall is removed;
(3) bearing is locked:In bearing surrounding 20mm steel plate connects bearing upper and lower cover platess, weldering Connect firmly, lock bearing;
(4) support is set up:Continuous beam removes support system by HR100 portal supports, regulation Bar, in length and breadth intertie, horizontal reinforcing bar, bridging, adjustable frames and bracket, wood stupefied Distribution beam is constituted;
(5) box beam is cut:Bridge is divided into recycle after some pieces and meets tonnage demand Loop wheel machine lifting landing, the first longitudinally cutting transverse cuts again of main line continuous beam, ring road continuous beam is direct Transverse cuts, box beam cutting is using the cutting of electronic rope saw cut system, in units of connection, main line The left width of bridge and the cutting of right width widened section are carried out by order horizontal behind first longitudinal direction, the right width mark of main line bridge Quasi- section and each ramp bridge only carry out transverse cuts;
(6) beam block is removed:After the completion of box beam segmentation cutting, lifted and cut from crawler crane Beam block lands;
(7) bridge pier is removed:Remaining bridge pier part is cut using pick machine.
2. according to a kind of continuous beam Demolition Construction method described in claim 1, its feature exists In:Bridge floor pitch in the step (2) uses LXH1300D type pitch milling machine millings, Per 150m as a milling interval on bridge floor, discarded pitch is transported outside the venue by transport vehicle.
3. according to a kind of continuous beam Demolition Construction method described in claim 1, its feature exists In:First cut open the rubber at expansion joint at step (2) the Bridge expansion joint along seam with sharp weapon Band, middle shaped steel is cut off with oxyacetylene metal-cutting, and remaining residual fraction is removed in the lump with end floor beam.
4. according to a kind of continuous beam Demolition Construction method described in claim 1, its feature exists In:There is one of anti-collision wall on the outside of main line bridge in the step (2), ramp bridge has twice anticollision Wall, anti-collision wall is hung using rope saw cutting machine stripping and slicing and removed.
5. according to a kind of continuous beam Demolition Construction method described in claim 1, its feature exists In:In the step (5) in the rope cutting process of electronic rope saw, the rope direction of motion Protection is above blocked with security protection, and safety sign is set in certain area, forbids pedestrian to enter Construction operation region.
CN201610172504.0A 2016-03-21 2016-03-21 A kind of continuous beam Demolition Construction method Pending CN107217605A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610172504.0A CN107217605A (en) 2016-03-21 2016-03-21 A kind of continuous beam Demolition Construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610172504.0A CN107217605A (en) 2016-03-21 2016-03-21 A kind of continuous beam Demolition Construction method

Publications (1)

Publication Number Publication Date
CN107217605A true CN107217605A (en) 2017-09-29

Family

ID=59927828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610172504.0A Pending CN107217605A (en) 2016-03-21 2016-03-21 A kind of continuous beam Demolition Construction method

Country Status (1)

Country Link
CN (1) CN107217605A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589564A (en) * 2018-04-17 2018-09-28 成都西南交大研究院有限公司 A kind of bridge static state cutting whole into sections method for dismounting based on non-explosion
CN109056557A (en) * 2018-08-17 2018-12-21 中铁五局集团有限公司 A kind of existing method for bridge construction of decomposition dismounting
CN109208493A (en) * 2018-09-07 2019-01-15 南昌大学 A kind of cross-line single-box multi-cell cast-in-situ steel reinforced concrete bridge superstructure Demolition Construction method
CN110565549A (en) * 2019-09-26 2019-12-13 常州市市政建设工程有限公司 New bridge dismantling process for urban viaduct
CN110725220A (en) * 2019-10-26 2020-01-24 中铁六局集团有限公司 Construction method for dismantling pier
CN110984004A (en) * 2020-01-17 2020-04-10 广东冠粤路桥有限公司 Method for dismantling lower supporting structure of bridge
CN111364377A (en) * 2020-03-12 2020-07-03 中铁大桥局武汉桥梁特种技术有限公司 Concrete continuous beam bridge reconstruction construction method
CN111501584A (en) * 2020-03-31 2020-08-07 上海城建市政工程(集团)有限公司 Bridge dismantling construction method for prestressed concrete continuous beam
CN111648260A (en) * 2020-04-27 2020-09-11 北京诺和兴建设工程有限公司 Construction process for bridge demolition
CN111676844A (en) * 2020-06-05 2020-09-18 中国建筑土木建设有限公司 Bridge dismantling trolley and method for dismantling bridge by using same
CN111794133A (en) * 2020-06-19 2020-10-20 中铁大桥局上海工程有限公司 Method for dismantling concrete guardrail on bridge
CN111927145A (en) * 2020-07-21 2020-11-13 广州地铁设计研究院股份有限公司 Method for chiseling track beam and bottom plate
CN113774821A (en) * 2021-08-28 2021-12-10 中交一公局集团有限公司 Bridge disassembling process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012207388A (en) * 2011-03-29 2012-10-25 Kurosawa Construction Co Ltd Removal method for bridge floor slab
CN103343512A (en) * 2013-07-03 2013-10-09 上海市机械施工集团有限公司 Method for dismantling large-section concrete box girders and hoisting device
CN103938557A (en) * 2014-03-11 2014-07-23 卢耒运 Overpass bridge dismounting method
CN104131519A (en) * 2014-08-11 2014-11-05 浙江兴土桥梁专用装备制造有限公司 Bridge demolishing construction method and device thereof
CN105113434A (en) * 2015-09-18 2015-12-02 杭州江润科技有限公司 Framing demounting supporting structure of spandrelless arch bridge of over crossing operation highway and construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012207388A (en) * 2011-03-29 2012-10-25 Kurosawa Construction Co Ltd Removal method for bridge floor slab
CN103343512A (en) * 2013-07-03 2013-10-09 上海市机械施工集团有限公司 Method for dismantling large-section concrete box girders and hoisting device
CN103938557A (en) * 2014-03-11 2014-07-23 卢耒运 Overpass bridge dismounting method
CN104131519A (en) * 2014-08-11 2014-11-05 浙江兴土桥梁专用装备制造有限公司 Bridge demolishing construction method and device thereof
CN105113434A (en) * 2015-09-18 2015-12-02 杭州江润科技有限公司 Framing demounting supporting structure of spandrelless arch bridge of over crossing operation highway and construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王健伟等: "某大跨混凝土连续梁桥拆除技术", 《施工技术》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589564A (en) * 2018-04-17 2018-09-28 成都西南交大研究院有限公司 A kind of bridge static state cutting whole into sections method for dismounting based on non-explosion
CN109056557A (en) * 2018-08-17 2018-12-21 中铁五局集团有限公司 A kind of existing method for bridge construction of decomposition dismounting
CN109208493A (en) * 2018-09-07 2019-01-15 南昌大学 A kind of cross-line single-box multi-cell cast-in-situ steel reinforced concrete bridge superstructure Demolition Construction method
CN110565549A (en) * 2019-09-26 2019-12-13 常州市市政建设工程有限公司 New bridge dismantling process for urban viaduct
CN110725220A (en) * 2019-10-26 2020-01-24 中铁六局集团有限公司 Construction method for dismantling pier
CN110984004B (en) * 2020-01-17 2021-07-06 广东冠粤路桥有限公司 Method for dismantling lower supporting structure of bridge
CN110984004A (en) * 2020-01-17 2020-04-10 广东冠粤路桥有限公司 Method for dismantling lower supporting structure of bridge
CN111364377A (en) * 2020-03-12 2020-07-03 中铁大桥局武汉桥梁特种技术有限公司 Concrete continuous beam bridge reconstruction construction method
CN111364377B (en) * 2020-03-12 2021-08-27 中铁大桥局武汉桥梁特种技术有限公司 Concrete continuous beam bridge reconstruction construction method
CN111501584A (en) * 2020-03-31 2020-08-07 上海城建市政工程(集团)有限公司 Bridge dismantling construction method for prestressed concrete continuous beam
CN111648260A (en) * 2020-04-27 2020-09-11 北京诺和兴建设工程有限公司 Construction process for bridge demolition
CN111676844A (en) * 2020-06-05 2020-09-18 中国建筑土木建设有限公司 Bridge dismantling trolley and method for dismantling bridge by using same
CN111676844B (en) * 2020-06-05 2022-05-17 中国建筑土木建设有限公司 Bridge dismantling trolley and method for dismantling bridge by using same
CN111794133A (en) * 2020-06-19 2020-10-20 中铁大桥局上海工程有限公司 Method for dismantling concrete guardrail on bridge
CN111927145A (en) * 2020-07-21 2020-11-13 广州地铁设计研究院股份有限公司 Method for chiseling track beam and bottom plate
CN113774821A (en) * 2021-08-28 2021-12-10 中交一公局集团有限公司 Bridge disassembling process

Similar Documents

Publication Publication Date Title
CN107217605A (en) A kind of continuous beam Demolition Construction method
CN103938557B (en) A kind of bridge crossing method for dismounting
CN103470068B (en) Method for dismantling underground space concrete structure of existing rolling line
CN108166500A (en) A kind of cutting disassembling of deep foundation ditch concrete near a river and recovery method
CN105442866B (en) Protective demolition and installation method for large-scale highrise steel structure
CN109972858A (en) Shockproof concrete building structures method for dismounting
CN108193894A (en) The construction method of rope saw dismantling concrete wall
CN106192781A (en) The method for dismounting of prestressing force list case three Room plate-girder
CN107355248A (en) A kind of fully mechanized coal face fully-mechanized mining equipment method for rapidly mounting
CN104099872B (en) A kind of undercrossing tunnel large span box culvert is vertical to be chosen and horizontal lifts jacking construction method
CN108035544A (en) Expansion joint position shear wall side formwork reinforcing device and construction method
US12012311B2 (en) Construction system
CN103243912A (en) Multilayer no-board frame structure constructing method
CN116356801A (en) Ground continuous wall stay column dismantling mode
CN205220993U (en) Marine interim guarantor guardrail bar
CN110453934A (en) Method for dismounting for large-scale steel structure roofing workshop
CN108868192A (en) Short distance overcrossing railway both wired transom pier overarm brace Demolition Construction engineering method
CN213202204U (en) Overhead hoist is demolishd to real abdomen section limit case of truss-like combination arched bridge
CN210483759U (en) Multi-functional convenient steelframe platform truck in tunnel
CN106276030A (en) The way of transportation of waste material is removed in a kind of coke dry quenching furnace overhaul
CN214243475U (en) Multi-purpose arm for self rooting on steel beam flange
CN106624125B (en) A kind of energy conservation blast furnace billet shears
CN206253720U (en) A kind of energy-conservation blast furnace billet shears
CN205444884U (en) Wallboard for civil engineering
CN109576427A (en) A kind of hole drilling type blast furnace residual iron method for dismounting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170929