CN107217605A - A kind of continuous beam Demolition Construction method - Google Patents
A kind of continuous beam Demolition Construction method Download PDFInfo
- Publication number
- CN107217605A CN107217605A CN201610172504.0A CN201610172504A CN107217605A CN 107217605 A CN107217605 A CN 107217605A CN 201610172504 A CN201610172504 A CN 201610172504A CN 107217605 A CN107217605 A CN 107217605A
- Authority
- CN
- China
- Prior art keywords
- bridge
- continuous beam
- cutting
- cut
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a kind of continuous beam Demolition Construction method, it is related to the realm of building construction, the continuous beam Demolition Construction method includes:1. preparation of construction;2. bridge deck is removed;3. bearing is locked;4. support is set up;5. box beam is cut;6. beam block is removed;7. bridge pier is removed.Employ and first remove pitch, the bridge floor facility such as anti-collision wall, then proping cutting box beam, last hoisting beam block and cut bridge pier, construction safety and efficiency are ensured, professional commanding is set in work progress, operating personnel submit onself to someone's direction personnel's instruction construction, it is ensured that safety.
Description
Technical field
The present invention relates to the realm of building construction, it is more particularly related to a kind of continuous
Beam Demolition Construction method.
Background technology
In the engineerings such as building, bridge, aviation and pipe-line, being commonly encountered a kind of beam has
Three or more supportings, referred to as continuous beam, continuous beam has intermediate support, so its deformation
It is generally smaller than single beam with internal force, thus using very wide in engineering structure.
Continuous beam is manufactured using armored concrete mostly, is usually used in manufacturing bridge, and under-clearance
Generally higher than 4m, stabilized structure, and continuity are good, in the construction for removing continuous beam very
Difficulty, traditional Demolition Construction method can not remove continuous beam safely.
The content of the invention
Problem to be solved by this invention is to provide a kind of continuous beam Demolition Construction method.
To achieve these goals, the technical scheme taken of the present invention is:A kind of continuous beam is removed
Construction method, it is characterised in that comprise the following steps:
(1) preparation of construction:Get out remove the plant equipment and instrument of continuous beam;
(2) bridge deck is removed:Bridge deck remove include bridge floor pitch remove, expansion joint dismounting,
Anti-collision wall is removed;
(3) bearing is locked:In bearing surrounding 20mm steel plate connects bearing upper and lower cover platess, weldering
Connect firmly, lock bearing;
(4) support is set up:Continuous beam removes support system by HR100 portal supports, regulation
Bar, in length and breadth intertie, horizontal reinforcing bar, bridging, adjustable frames and bracket, wood stupefied
Distribution beam is constituted;
(5) box beam is cut:Bridge is divided into recycle after some pieces and meets tonnage demand
Loop wheel machine lifting landing, the first longitudinally cutting transverse cuts again of main line continuous beam, ring road continuous beam is direct
Transverse cuts, box beam cutting is using the cutting of electronic rope saw cut system, in units of connection, main line
The left width of bridge and the cutting of right width widened section are carried out by order horizontal behind first longitudinal direction, the right width mark of main line bridge
Quasi- section and each ramp bridge only carry out transverse cuts;
(6) beam block is removed:After the completion of box beam segmentation cutting, lifted and cut from crawler crane
Beam block lands;
(7) bridge pier is removed:Remaining bridge pier part is cut using pick machine.
It is preferred that, the bridge floor pitch in the step (2) uses LXH1300D type pitch millings
Per 150m as a milling interval on machine milling, bridge floor, discarded pitch is transported by transport vehicle
Outside the venue.
It is preferred that, at step (2) the Bridge expansion joint first with sharp weapon along seam cut open it is flexible
The rubber strip of seam, middle shaped steel is cut off with oxyacetylene metal-cutting, and remaining residual fraction is removed in the lump with end floor beam.
It is preferred that, there is one of anti-collision wall on the outside of main line bridge in the step (2), ramp bridge has
Twice anti-collision wall, anti-collision wall is hung using rope saw cutting machine stripping and slicing and removed.
It is preferred that, in the step (5) in the rope cutting process of electronic rope saw, rope fortune
Protection is blocked with security protection before dynamic direction, and safety sign is set in certain area, is forbidden
Pedestrian enters construction operation region.
Beneficial effect:The continuous beam Demolition Construction method includes:1. preparation of construction;2. bridge floor
System removes;3. bearing is locked;4. support is set up;5. box beam is cut;6. beam block is removed;
7. bridge pier is removed.Employ and first remove the bridge floor facilities such as pitch, anti-collision wall, then proping is cut
Cut box beam, last hoisting beam block and cut bridge pier, ensured construction safety and efficiency, constructed
During set professional commanding, operating personnel submit onself to someone's direction personnel's instruction construction, it is ensured that safety.
Embodiment
The following detailed description of a kind of preferred embodiment of continuous beam Demolition Construction method of the invention.
A kind of continuous beam Demolition Construction method, it is characterised in that comprise the following steps:
(1) preparation of construction:Get out remove the plant equipment and instrument of continuous beam;
(2) bridge deck is removed:Bridge deck remove include bridge floor pitch remove, expansion joint dismounting,
Anti-collision wall is removed;
(3) bearing is locked:In bearing surrounding 20mm steel plate connects bearing upper and lower cover platess, weldering
Connect firmly, lock bearing;
(4) support is set up:Continuous beam removes support system by HR100 portal supports, regulation
Bar, in length and breadth intertie, horizontal reinforcing bar, bridging, adjustable frames and bracket, wood stupefied
Distribution beam is constituted;
(5) box beam is cut:Bridge is divided into recycle after some pieces and meets tonnage demand
Loop wheel machine lifting landing, the first longitudinally cutting transverse cuts again of main line continuous beam, ring road continuous beam is direct
Transverse cuts, box beam cutting is using the cutting of electronic rope saw cut system, in units of connection, main line
The left width of bridge and the cutting of right width widened section are carried out by order horizontal behind first longitudinal direction, the right width mark of main line bridge
Quasi- section and each ramp bridge only carry out transverse cuts;
(6) beam block is removed:After the completion of box beam segmentation cutting, lifted and cut from crawler crane
Beam block lands;
(7) bridge pier is removed:Remaining bridge pier part is cut using pick machine.
Bridge floor pitch is used on LXH1300D type pitch milling machine millings, bridge floor per 150m conducts
One milling interval, discarded pitch is transported outside the venue by transport vehicle.Sharp weapon are first used at bridge expanssion joint
The rubber strip at expansion joint is cut open along seam, middle shaped steel, remaining residual fraction and end are cut off with oxyacetylene metal-cutting
Crossbeam is removed in the lump.There is one of anti-collision wall on the outside of main line bridge, ramp bridge has twice anti-collision wall, prevent
Hit wall and hung using rope saw cutting machine stripping and slicing and removed.
In the rope cutting process of electronic rope saw, blocked before the rope direction of motion with security protection
Protection, and safety sign is set in certain area, forbid pedestrian to enter construction operation region.
Employ and first remove the bridge floor facilities such as pitch, anti-collision wall, then proping cutting box beam, most
Hoisting beam block and bridge pier is cut afterwards, ensured and set in construction safety and efficiency, work progress specially
Industry commanding, operating personnel submit onself to someone's direction personnel's instruction construction, it is ensured that safety.
Embodiments of the invention are the foregoing is only, the patent model of the present invention is not thereby limited
Enclose, equivalent structure or equivalent stream that every utilization description of the invention and embodiment content are made
Cheng Bianhuan, or other related technical fields are directly or indirectly used in, similarly it is included in this
In the scope of patent protection of invention.
Claims (5)
1. a kind of continuous beam Demolition Construction method, it is characterised in that comprise the following steps:
(1) preparation of construction:Get out remove the plant equipment and instrument of continuous beam;
(2) bridge deck is removed:Bridge deck remove include bridge floor pitch remove, expansion joint dismounting,
Anti-collision wall is removed;
(3) bearing is locked:In bearing surrounding 20mm steel plate connects bearing upper and lower cover platess, weldering
Connect firmly, lock bearing;
(4) support is set up:Continuous beam removes support system by HR100 portal supports, regulation
Bar, in length and breadth intertie, horizontal reinforcing bar, bridging, adjustable frames and bracket, wood stupefied
Distribution beam is constituted;
(5) box beam is cut:Bridge is divided into recycle after some pieces and meets tonnage demand
Loop wheel machine lifting landing, the first longitudinally cutting transverse cuts again of main line continuous beam, ring road continuous beam is direct
Transverse cuts, box beam cutting is using the cutting of electronic rope saw cut system, in units of connection, main line
The left width of bridge and the cutting of right width widened section are carried out by order horizontal behind first longitudinal direction, the right width mark of main line bridge
Quasi- section and each ramp bridge only carry out transverse cuts;
(6) beam block is removed:After the completion of box beam segmentation cutting, lifted and cut from crawler crane
Beam block lands;
(7) bridge pier is removed:Remaining bridge pier part is cut using pick machine.
2. according to a kind of continuous beam Demolition Construction method described in claim 1, its feature exists
In:Bridge floor pitch in the step (2) uses LXH1300D type pitch milling machine millings,
Per 150m as a milling interval on bridge floor, discarded pitch is transported outside the venue by transport vehicle.
3. according to a kind of continuous beam Demolition Construction method described in claim 1, its feature exists
In:First cut open the rubber at expansion joint at step (2) the Bridge expansion joint along seam with sharp weapon
Band, middle shaped steel is cut off with oxyacetylene metal-cutting, and remaining residual fraction is removed in the lump with end floor beam.
4. according to a kind of continuous beam Demolition Construction method described in claim 1, its feature exists
In:There is one of anti-collision wall on the outside of main line bridge in the step (2), ramp bridge has twice anticollision
Wall, anti-collision wall is hung using rope saw cutting machine stripping and slicing and removed.
5. according to a kind of continuous beam Demolition Construction method described in claim 1, its feature exists
In:In the step (5) in the rope cutting process of electronic rope saw, the rope direction of motion
Protection is above blocked with security protection, and safety sign is set in certain area, forbids pedestrian to enter
Construction operation region.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610172504.0A CN107217605A (en) | 2016-03-21 | 2016-03-21 | A kind of continuous beam Demolition Construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610172504.0A CN107217605A (en) | 2016-03-21 | 2016-03-21 | A kind of continuous beam Demolition Construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107217605A true CN107217605A (en) | 2017-09-29 |
Family
ID=59927828
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610172504.0A Pending CN107217605A (en) | 2016-03-21 | 2016-03-21 | A kind of continuous beam Demolition Construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107217605A (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589564A (en) * | 2018-04-17 | 2018-09-28 | 成都西南交大研究院有限公司 | A kind of bridge static state cutting whole into sections method for dismounting based on non-explosion |
CN109056557A (en) * | 2018-08-17 | 2018-12-21 | 中铁五局集团有限公司 | A kind of existing method for bridge construction of decomposition dismounting |
CN109208493A (en) * | 2018-09-07 | 2019-01-15 | 南昌大学 | A kind of cross-line single-box multi-cell cast-in-situ steel reinforced concrete bridge superstructure Demolition Construction method |
CN110565549A (en) * | 2019-09-26 | 2019-12-13 | 常州市市政建设工程有限公司 | New bridge dismantling process for urban viaduct |
CN110725220A (en) * | 2019-10-26 | 2020-01-24 | 中铁六局集团有限公司 | Construction method for dismantling pier |
CN110984004A (en) * | 2020-01-17 | 2020-04-10 | 广东冠粤路桥有限公司 | Method for dismantling lower supporting structure of bridge |
CN111364377A (en) * | 2020-03-12 | 2020-07-03 | 中铁大桥局武汉桥梁特种技术有限公司 | Concrete continuous beam bridge reconstruction construction method |
CN111501584A (en) * | 2020-03-31 | 2020-08-07 | 上海城建市政工程(集团)有限公司 | Bridge dismantling construction method for prestressed concrete continuous beam |
CN111648260A (en) * | 2020-04-27 | 2020-09-11 | 北京诺和兴建设工程有限公司 | Construction process for bridge demolition |
CN111676844A (en) * | 2020-06-05 | 2020-09-18 | 中国建筑土木建设有限公司 | Bridge dismantling trolley and method for dismantling bridge by using same |
CN111794133A (en) * | 2020-06-19 | 2020-10-20 | 中铁大桥局上海工程有限公司 | Method for dismantling concrete guardrail on bridge |
CN111927145A (en) * | 2020-07-21 | 2020-11-13 | 广州地铁设计研究院股份有限公司 | Method for chiseling track beam and bottom plate |
CN113774821A (en) * | 2021-08-28 | 2021-12-10 | 中交一公局集团有限公司 | Bridge disassembling process |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012207388A (en) * | 2011-03-29 | 2012-10-25 | Kurosawa Construction Co Ltd | Removal method for bridge floor slab |
CN103343512A (en) * | 2013-07-03 | 2013-10-09 | 上海市机械施工集团有限公司 | Method for dismantling large-section concrete box girders and hoisting device |
CN103938557A (en) * | 2014-03-11 | 2014-07-23 | 卢耒运 | Overpass bridge dismounting method |
CN104131519A (en) * | 2014-08-11 | 2014-11-05 | 浙江兴土桥梁专用装备制造有限公司 | Bridge demolishing construction method and device thereof |
CN105113434A (en) * | 2015-09-18 | 2015-12-02 | 杭州江润科技有限公司 | Framing demounting supporting structure of spandrelless arch bridge of over crossing operation highway and construction method |
-
2016
- 2016-03-21 CN CN201610172504.0A patent/CN107217605A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012207388A (en) * | 2011-03-29 | 2012-10-25 | Kurosawa Construction Co Ltd | Removal method for bridge floor slab |
CN103343512A (en) * | 2013-07-03 | 2013-10-09 | 上海市机械施工集团有限公司 | Method for dismantling large-section concrete box girders and hoisting device |
CN103938557A (en) * | 2014-03-11 | 2014-07-23 | 卢耒运 | Overpass bridge dismounting method |
CN104131519A (en) * | 2014-08-11 | 2014-11-05 | 浙江兴土桥梁专用装备制造有限公司 | Bridge demolishing construction method and device thereof |
CN105113434A (en) * | 2015-09-18 | 2015-12-02 | 杭州江润科技有限公司 | Framing demounting supporting structure of spandrelless arch bridge of over crossing operation highway and construction method |
Non-Patent Citations (1)
Title |
---|
王健伟等: "某大跨混凝土连续梁桥拆除技术", 《施工技术》 * |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589564A (en) * | 2018-04-17 | 2018-09-28 | 成都西南交大研究院有限公司 | A kind of bridge static state cutting whole into sections method for dismounting based on non-explosion |
CN109056557A (en) * | 2018-08-17 | 2018-12-21 | 中铁五局集团有限公司 | A kind of existing method for bridge construction of decomposition dismounting |
CN109208493A (en) * | 2018-09-07 | 2019-01-15 | 南昌大学 | A kind of cross-line single-box multi-cell cast-in-situ steel reinforced concrete bridge superstructure Demolition Construction method |
CN110565549A (en) * | 2019-09-26 | 2019-12-13 | 常州市市政建设工程有限公司 | New bridge dismantling process for urban viaduct |
CN110725220A (en) * | 2019-10-26 | 2020-01-24 | 中铁六局集团有限公司 | Construction method for dismantling pier |
CN110984004B (en) * | 2020-01-17 | 2021-07-06 | 广东冠粤路桥有限公司 | Method for dismantling lower supporting structure of bridge |
CN110984004A (en) * | 2020-01-17 | 2020-04-10 | 广东冠粤路桥有限公司 | Method for dismantling lower supporting structure of bridge |
CN111364377A (en) * | 2020-03-12 | 2020-07-03 | 中铁大桥局武汉桥梁特种技术有限公司 | Concrete continuous beam bridge reconstruction construction method |
CN111364377B (en) * | 2020-03-12 | 2021-08-27 | 中铁大桥局武汉桥梁特种技术有限公司 | Concrete continuous beam bridge reconstruction construction method |
CN111501584A (en) * | 2020-03-31 | 2020-08-07 | 上海城建市政工程(集团)有限公司 | Bridge dismantling construction method for prestressed concrete continuous beam |
CN111648260A (en) * | 2020-04-27 | 2020-09-11 | 北京诺和兴建设工程有限公司 | Construction process for bridge demolition |
CN111676844A (en) * | 2020-06-05 | 2020-09-18 | 中国建筑土木建设有限公司 | Bridge dismantling trolley and method for dismantling bridge by using same |
CN111676844B (en) * | 2020-06-05 | 2022-05-17 | 中国建筑土木建设有限公司 | Bridge dismantling trolley and method for dismantling bridge by using same |
CN111794133A (en) * | 2020-06-19 | 2020-10-20 | 中铁大桥局上海工程有限公司 | Method for dismantling concrete guardrail on bridge |
CN111927145A (en) * | 2020-07-21 | 2020-11-13 | 广州地铁设计研究院股份有限公司 | Method for chiseling track beam and bottom plate |
CN113774821A (en) * | 2021-08-28 | 2021-12-10 | 中交一公局集团有限公司 | Bridge disassembling process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107217605A (en) | A kind of continuous beam Demolition Construction method | |
CN103938557B (en) | A kind of bridge crossing method for dismounting | |
CN103470068B (en) | Method for dismantling underground space concrete structure of existing rolling line | |
CN108166500A (en) | A kind of cutting disassembling of deep foundation ditch concrete near a river and recovery method | |
CN105442866B (en) | Protective demolition and installation method for large-scale highrise steel structure | |
CN109972858A (en) | Shockproof concrete building structures method for dismounting | |
CN108193894A (en) | The construction method of rope saw dismantling concrete wall | |
CN106192781A (en) | The method for dismounting of prestressing force list case three Room plate-girder | |
CN107355248A (en) | A kind of fully mechanized coal face fully-mechanized mining equipment method for rapidly mounting | |
CN104099872B (en) | A kind of undercrossing tunnel large span box culvert is vertical to be chosen and horizontal lifts jacking construction method | |
CN108035544A (en) | Expansion joint position shear wall side formwork reinforcing device and construction method | |
US12012311B2 (en) | Construction system | |
CN103243912A (en) | Multilayer no-board frame structure constructing method | |
CN116356801A (en) | Ground continuous wall stay column dismantling mode | |
CN205220993U (en) | Marine interim guarantor guardrail bar | |
CN110453934A (en) | Method for dismounting for large-scale steel structure roofing workshop | |
CN108868192A (en) | Short distance overcrossing railway both wired transom pier overarm brace Demolition Construction engineering method | |
CN213202204U (en) | Overhead hoist is demolishd to real abdomen section limit case of truss-like combination arched bridge | |
CN210483759U (en) | Multi-functional convenient steelframe platform truck in tunnel | |
CN106276030A (en) | The way of transportation of waste material is removed in a kind of coke dry quenching furnace overhaul | |
CN214243475U (en) | Multi-purpose arm for self rooting on steel beam flange | |
CN106624125B (en) | A kind of energy conservation blast furnace billet shears | |
CN206253720U (en) | A kind of energy-conservation blast furnace billet shears | |
CN205444884U (en) | Wallboard for civil engineering | |
CN109576427A (en) | A kind of hole drilling type blast furnace residual iron method for dismounting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170929 |