CN205443956U - 利用整体抱箍施工盖梁的支撑体系 - Google Patents
利用整体抱箍施工盖梁的支撑体系 Download PDFInfo
- Publication number
- CN205443956U CN205443956U CN201620167574.2U CN201620167574U CN205443956U CN 205443956 U CN205443956 U CN 205443956U CN 201620167574 U CN201620167574 U CN 201620167574U CN 205443956 U CN205443956 U CN 205443956U
- Authority
- CN
- China
- Prior art keywords
- bent cap
- pier stud
- support system
- staple bolt
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
利用整体抱箍施工盖梁的支撑体系,包括已施工完成墩柱,盖梁模板支撑体系,盖梁模板,盖梁结构,抱箍结构,已施工完成墩柱作为整个结构体系的下承,抱箍结构拼装在墩柱上,盖梁模板支撑体系搭接在抱箍结构上面,将整个结构体系的重量传递给抱箍结构,盖梁模板支撑体系上安装盖梁模板,在盖梁模板基础上搭建盖梁结构,在墩柱顶端安装用于防止抱箍结构下滑的防滑装置。本实用新型利用这套装置可有效克服盖梁施工时地质条件差、跨越特殊地理条件不宜搭设满堂支架以及墩柱较高,搭设支架危险性高的难题,可高效安全的施工桥梁盖梁,满足现阶段绝大多数项目对桥梁施工的安全性和工期的严格要求。
Description
技术领域
本实用新型涉及公路桥梁施工技术,尤其涉及一种利用整体抱箍施工盖梁的支撑体系。
背景技术
抱箍法施工盖梁在我国公路桥梁工程中比较常见,适用于所有门式墩下构盖梁的施工,不受地基、墩高等因素限制,更实用。同时抱箍设计构件简单,安装拆除均可在地面和盖梁底模同步完成,施工周期短,周转快,节约了大量工料机的投入,更为经济。但往往存在摩阻力不足引起的抱箍下滑、支撑体系刚度不足引起的扰度超限等影响盖梁施工质量的现象较多。因此施工前必须进行严格的结构验算,并需要全面考虑各种因素,有足够的安全系数,确保盖梁施工安全和质量要求。
发明内容
本实用新型为解决盖梁施工时地质条件差、跨越特殊地理条件不宜搭设满堂支架以及墩柱较高,搭设支架危险性高的难题,提供一种改良抱箍法施工桥梁盖梁的支撑体系。
本实用新型所采取的技术方案:
利用整体抱箍施工盖梁的支撑体系,包括已施工完成墩柱,盖梁模板支撑体系,盖梁模板,盖梁结构,抱箍结构,已施工完成墩柱作为整个结构体系的下承,抱箍结构拼装在墩柱上,盖梁模板支撑体系搭接在抱箍结构上面,将整个结构体系的重量传递给抱箍结构,盖梁模板支撑体系上安装盖梁模板,在盖梁模板基础上搭建盖梁结构,在墩柱顶端安装用于防止抱箍结构下滑的防滑装置。
所述的抱箍结构从墩柱底部开始拼装,其内径比墩柱的直径大1cm~2cm,抱箍结构与混凝土接触面平整,接触位置垫一层2cm厚的橡胶板。
本实用新型的有益效果:本实用新型利用这套装置可有效克服盖梁施工时地质条件差、跨越特殊地理条件不宜搭设满堂支架以及墩柱较高,搭设支架危险性高的难题,可高效安全的施工桥梁盖梁,满足现阶段绝大多数项目对桥梁施工的安全性和工期的严格要求。
附图说明
图1为本实用新型的结构示意图。
图2为本实用新型中未安装抱箍结构时的结构示意图。
图3为本实用新型抱箍结构主图。
图4为本实用新型抱箍结构俯视图。
其中:1-墩柱;2-盖梁模板支撑体系;3-盖梁模板;4-盖梁结构;5-抱箍结构;6-防滑装置。
具体实施方式
利用整体抱箍施工盖梁的支撑体系,包括已施工完成墩柱1,盖梁模板支撑体系2,盖梁模板3,盖梁结构4,抱箍结构5;已施工完成墩柱1作为整个结构体系的下承,抱箍结构5拼装在墩柱1上,盖梁模板支撑体系2搭接在抱箍结构5上面,将整个结构体系的重量传递给抱箍结构5,盖梁模板支撑体系2上安装盖梁模板3,在盖梁模板3基础上搭建盖梁结构4,在墩柱1顶端安装用于防止抱箍结构5下滑的防滑装置6。
所述的抱箍结构5从墩柱1底部开始拼装,其内径比墩柱1的直径大1cm~2cm,抱箍结构5与混凝土接触面平整,接触位置垫一层2cm厚的橡胶板。
Claims (2)
1.利用整体抱箍施工盖梁的支撑体系,其特征在于,包括已施工完成墩柱(1),盖梁模板支撑体系(2),盖梁模板(3),盖梁结构(4),抱箍结构(5);已施工完成墩柱(1)作为整个结构体系的下承,抱箍结构(5)拼装在墩柱(1)上,盖梁模板支撑体系(2)搭接在抱箍结构(5)上面,将整个结构体系的重量传递给抱箍结构(5),盖梁模板支撑体系(2)上安装盖梁模板(3),在盖梁模板(3)基础上搭建盖梁结构(4),在墩柱(1)顶端安装用于防止抱箍结构(5)下滑的防滑装置(6)。
2.根据权利要求1所述的利用整体抱箍施工盖梁的支撑体系,其特征在于,所述的抱箍结构(5)从墩柱(1)底部开始拼装,其内径比墩柱(1)的直径大1cm~2cm,抱箍结构(5)与混凝土接触面平整,接触位置垫一层2cm厚的橡胶板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620167574.2U CN205443956U (zh) | 2016-03-04 | 2016-03-04 | 利用整体抱箍施工盖梁的支撑体系 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620167574.2U CN205443956U (zh) | 2016-03-04 | 2016-03-04 | 利用整体抱箍施工盖梁的支撑体系 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205443956U true CN205443956U (zh) | 2016-08-10 |
Family
ID=56604965
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620167574.2U Expired - Fee Related CN205443956U (zh) | 2016-03-04 | 2016-03-04 | 利用整体抱箍施工盖梁的支撑体系 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205443956U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108342987A (zh) * | 2018-01-24 | 2018-07-31 | 中铁二十二局集团第工程有限公司 | 盖梁支撑结构 |
CN108505448A (zh) * | 2018-04-30 | 2018-09-07 | 安徽省公路桥梁工程有限公司 | 桥墩盖梁抱箍钢梁模板体系及其施工方法 |
US11479929B2 (en) | 2020-08-07 | 2022-10-25 | Peri Se | Formwork system and method |
-
2016
- 2016-03-04 CN CN201620167574.2U patent/CN205443956U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108342987A (zh) * | 2018-01-24 | 2018-07-31 | 中铁二十二局集团第工程有限公司 | 盖梁支撑结构 |
CN108505448A (zh) * | 2018-04-30 | 2018-09-07 | 安徽省公路桥梁工程有限公司 | 桥墩盖梁抱箍钢梁模板体系及其施工方法 |
US11479929B2 (en) | 2020-08-07 | 2022-10-25 | Peri Se | Formwork system and method |
US11885083B2 (en) | 2020-08-07 | 2024-01-30 | Peri Se | Formwork system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205443956U (zh) | 利用整体抱箍施工盖梁的支撑体系 | |
CN104088291A (zh) | 一种环形楔块组合式混凝土预制块塔吊基础 | |
CN102535504A (zh) | 桥梁隔震基础 | |
CN203977246U (zh) | 一种装配式道路 | |
CN104878686B (zh) | 防止曲线梁桥水平侧移装置的施工方法 | |
CN104278635B (zh) | 地锚式悬索桥猫道承重索的转向方法 | |
CN103603468A (zh) | 免支撑钢结构螺旋形楼梯 | |
CN110700503B (zh) | 一种用于楼梯节点连接的耗能转动式连接方法 | |
CN203821428U (zh) | 一种环形楔块组合式混凝土预制块塔吊基础 | |
CN204151675U (zh) | 地锚式悬索桥猫道承重索的转向架 | |
KR101526126B1 (ko) | 조립식 모듈을 구비하는 인도교 및 이의 시공방법 | |
CN103541556B (zh) | 装配式住宅pc预制构件安装调平方法 | |
CN203701302U (zh) | 预制板连接构件 | |
CN203393637U (zh) | 一种承重托架 | |
CN104313995A (zh) | 三向复合限位装置 | |
CN108487529A (zh) | 一种三向隔振楼板结构 | |
CN201661001U (zh) | 预制混凝土板 | |
CN204343464U (zh) | 利用施工缝作为明缝的混凝土施工浇筑结构系统 | |
CN204212047U (zh) | 三向复合限位装置 | |
CN203700899U (zh) | 钢质工具式临时施工道路 | |
CN202559223U (zh) | 一种新型的预制引桥 | |
CN113235400A (zh) | 一种可调节插槽式预制墩柱与承台的连接构造及施工方法 | |
CN205088700U (zh) | 装配式混凝土基础体系 | |
CN202323990U (zh) | 一种可以调节塔吊平衡度的塔基基础 | |
CN207079464U (zh) | 套筒式桥梁高阻尼隔震橡胶支座 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160810 Termination date: 20210304 |
|
CF01 | Termination of patent right due to non-payment of annual fee |