CN207079464U - 套筒式桥梁高阻尼隔震橡胶支座 - Google Patents
套筒式桥梁高阻尼隔震橡胶支座 Download PDFInfo
- Publication number
- CN207079464U CN207079464U CN201720856053.2U CN201720856053U CN207079464U CN 207079464 U CN207079464 U CN 207079464U CN 201720856053 U CN201720856053 U CN 201720856053U CN 207079464 U CN207079464 U CN 207079464U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- anchor bolt
- rubber support
- bearing
- steel slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
套筒式桥梁高阻尼隔震橡胶支座。传统的隔震橡胶支座与墩、梁的连接效果差,一体性不好,抗震性能差。本实用新型组成包括橡胶支座(1),支座上端固定有顶钢板(2),支座下端固定有底钢板(3),顶钢板与上支座钢板(4)通过螺栓(5)连接,底钢板与下支座钢板(6)通过螺栓连接,上支座钢板与上预埋钢板(7)通过上锚固螺栓(8)连接,下支座钢板与下预埋钢板(9)通过下锚固螺栓(10)连接,上套筒(11)与上锚固螺栓通过螺纹连接,下套筒(12)与下锚固螺栓通过螺纹连接,上套筒与上预埋钢板配合焊接,下套筒与下预埋钢板配合焊接。本实用新型用于套筒式桥梁高阻尼隔震橡胶支座。
Description
技术领域:
本实用新型涉及一种套筒式桥梁高阻尼隔震橡胶支座。
背景技术:
我国是一个强震多发国家,地震发生频率高、强度大、分布范围广、伤亡多、灾害严重,桥梁作为生命线系统工程中的重要组成部分,开始在我们桥梁工程界得到日益重视,并逐步开展了桥梁减隔震设计研究工作。传统的隔震橡胶支座与墩、梁的连接效果差,一体性不好,抗震性能差。
实用新型内容:
本实用新型的目的是提供一种套筒式桥梁高阻尼隔震橡胶支座。
上述的目的通过以下的技术方案实现:
一种套筒式桥梁高阻尼隔震橡胶支座,其组成包括:橡胶支座,所述的支座上端固定有顶钢板,所述的支座下端固定有底钢板,所述的顶钢板与上支座钢板通过螺栓连接,所述的底钢板与下支座钢板通过螺栓连接,所述的上支座钢板与上预埋钢板通过上锚固螺栓连接,所述的下支座钢板与下预埋钢板通过下锚固螺栓连接,上套筒与所述的上锚固螺栓通过螺纹连接,下套筒与所述的下锚固螺栓通过螺纹连接,所述的上套筒与所述的上预埋钢板配合焊接,所述的下套筒与所述的下预埋钢板配合焊接。
本实用新型的有益效果:
本实用新型的套筒式桥梁高阻尼隔震橡胶支座具有稳定支撑、弹性复位和阻尼功能,在地震中可以吸收地震能量,减轻地震影响,并可单独作为隔震装置使用。本实用新型的高阻尼支座表面覆盖有橡胶保护层,保护内部橡胶不受臭氧、紫外线影响,具有更好的耐老化性,50年等效阻尼比降低不到2%。
本实用新型通过套筒与墩、梁的混凝土连接,通过套筒外壁的波浪形大大增强与现浇的墩、梁的结合力,此外锚固螺栓还具有一段长出套筒的锚杆段,使得支座钢板与墩、梁结合为一体。
附图说明:
附图1是本实用新型的结构示意图。
具体实施方式:
实施例1:
一种套筒式桥梁高阻尼隔震橡胶支座,其组成包括:橡胶支座1,所述的支座上端固定有顶钢板2,所述的支座下端固定有底钢板3,所述的顶钢板与上支座钢板4通过螺栓5连接,所述的底钢板与下支座钢板6通过螺栓连接,所述的上支座钢板与上预埋钢板7通过上锚固螺栓8连接,所述的下支座钢板与下预埋钢板9通过下锚固螺栓10连接,上套筒11与所述的上锚固螺栓通过螺纹连接,下套筒12与所述的下锚固螺栓通过螺纹连接,所述的上套筒与所述的上预埋钢板配合焊接,所述的下套筒与所述的下预埋钢板配合焊接,所述的上套筒、所述的下套筒与墩或梁连接。所述的套筒的侧壁是波浪形,增大与混凝土的接触面积以增大与混凝土的结合力。安装套筒时,先将锚固螺栓穿过支座钢板与预埋钢板,然后将套筒旋接到锚固螺栓上,直至将套筒旋进至与预埋钢板接触,然后进行配合焊接。
实施例2:
实施例1所述的套筒式桥梁高阻尼隔震橡胶支座,其安装方法如下所述:
1.首先浇筑桥墩及支座垫石,在桥墩及支座垫石上预先设置预留孔,清除预留孔中的杂物,务必使支座垫石顶面平整、光滑,且四角高差不大于2mm。
支座在工厂组装,仔细调平,对中上、下各部件,将支座本体用临时连接构件连接成整体,不得松脱,并用锚固螺栓将支座本体和上、下预埋组件(包括上预埋钢板,上、下锚杆13和上、下套筒)连接成整体(也可将上下预埋组件单独包装运输,支座安装时再连接成整体)。
支座安装前,工地应检查支座及预埋组件的连接状况是否正常,且不得任意松动,并应检查上预埋钢板表面与上支座钢板是否密贴,检查支座的标识和安装方向,应杜绝安装方向错误。
将连接成整体的支座安装在垫石顶面,仔细检查支座位置及标高后,采用重力灌浆法或压力灌浆法向预留孔内灌入无收缩高强度环氧树脂砂浆;现浇梁也可采用预装钢板法安装支座。
待环氧树脂砂浆达到设计强度后,再次校核支座中心位置及标高,拧紧上下锚固螺栓。
清洁上预埋钢板的上表面,安装主梁模板并进行主梁浇筑等作业。
现场浇筑梁体混凝土,待强度达设计标准值后拆除支架及其他临时连接构件,完成支座安装。
Claims (1)
1.一种套筒式桥梁高阻尼隔震橡胶支座,其组成包括:橡胶支座,其特征是:所述的支座上端固定有顶钢板,所述的支座下端固定有底钢板,所述的顶钢板与上支座钢板通过螺栓连接,所述的底钢板与下支座钢板通过螺栓连接,所述的上支座钢板与上预埋钢板通过上锚固螺栓连接,所述的下支座钢板与下预埋钢板通过下锚固螺栓连接,上套筒与所述的上锚固螺栓通过螺纹连接,下套筒与所述的下锚固螺栓通过螺纹连接,所述的上套筒与所述的上预埋钢板配合焊接,所述的下套筒与所述的下预埋钢板配合焊接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720856053.2U CN207079464U (zh) | 2017-07-14 | 2017-07-14 | 套筒式桥梁高阻尼隔震橡胶支座 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720856053.2U CN207079464U (zh) | 2017-07-14 | 2017-07-14 | 套筒式桥梁高阻尼隔震橡胶支座 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207079464U true CN207079464U (zh) | 2018-03-09 |
Family
ID=61421754
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720856053.2U Expired - Fee Related CN207079464U (zh) | 2017-07-14 | 2017-07-14 | 套筒式桥梁高阻尼隔震橡胶支座 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207079464U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112229335A (zh) * | 2020-10-30 | 2021-01-15 | 国网河南省电力公司经济技术研究院 | 一种变电站隔震监测装置 |
-
2017
- 2017-07-14 CN CN201720856053.2U patent/CN207079464U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112229335A (zh) * | 2020-10-30 | 2021-01-15 | 国网河南省电力公司经济技术研究院 | 一种变电站隔震监测装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102704491B (zh) | 一种型钢与钢筋混凝土梁组合基坑支护围檩及其施工方法 | |
CN104790424B (zh) | 风力发电塔基础环基础的加固系统及其加固方法 | |
CN105155685B (zh) | 一种装配式梁柱节点及其施工方法 | |
CN108374431B (zh) | 一种新型半装配式抗震消能挡土墙及其施工方法 | |
CN108005401A (zh) | 一种既有框架结构隔震加固的柱的托换方法 | |
CN107190635A (zh) | 哑铃型钢管混凝土组合桥墩及与承台的连接结构和方法 | |
CN106988303B (zh) | 一种桩基及其施工方法 | |
CN104481166B (zh) | 老旧小区外加装配式阳台结构及其施工方法 | |
WO2009101454A1 (en) | Tie rod for structural projects | |
CN103225257A (zh) | 仿古栈道的悬挑梁结构及其施工工艺 | |
CN205935236U (zh) | 一种自复位方钢管混凝土框架柱脚节点 | |
CN212478159U (zh) | 一种隔震支座下预埋钢板安装连接结构 | |
CN211143549U (zh) | 一种装配式楼梯与墙体的连接结构 | |
CN207079464U (zh) | 套筒式桥梁高阻尼隔震橡胶支座 | |
CN100353008C (zh) | 隔震支座预埋件及其安装方法 | |
CN207244435U (zh) | 一种适用于梁桥的锚固装置与调高支座 | |
CN108643682B (zh) | 钢结构立柱固定用预制底座 | |
CN204370831U (zh) | 老旧小区外加装配式阳台结构 | |
CN102535496A (zh) | 扩展墩结构和形成扩展墩结构的方法 | |
CN207633567U (zh) | 一种新型可更换式摇摆耗能柱脚 | |
CN206941372U (zh) | 哑铃型钢管混凝土组合桥墩及与承台的连接结构 | |
CN207538201U (zh) | 一种后张预应力装配砼框架抗震耗能构件体系 | |
CN213896733U (zh) | 一种桥梁隔震基础 | |
CN109339475B (zh) | 用于加固砌体结构的附加抗侧力索结构及加固方法 | |
CN209637263U (zh) | 用于加固砌体结构的附加抗侧力索结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Harbin Dragon Technology Co. Ltd. Assignor: Harbin Railway Technical College Contract record no.: 2019230000005 Denomination of utility model: High damping shock insulation rubber bearing of telescopic bridge Granted publication date: 20180309 License type: Exclusive License Record date: 20190328 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180309 Termination date: 20190714 |
|