CN205401958U CN201620191096.9U CN201620191096U CN205401958U CN 205401958 U CN205401958 U CN 205401958U CN 201620191096 U CN201620191096 U CN 201620191096U CN 205401958 U CN205401958 U CN 205401958U
Authority
CN
China
Prior art keywords
template
bolt hole
hard
caging bolt
stencil body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620191096.9U
Other languages
Chinese (zh)
Inventor
吴生久
邓宏
李爽
丁蛟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
No 3 Construction Co Ltd of Chongqing Construction Engineering Group
Original Assignee
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd filed Critical CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Priority to CN201620191096.9U priority Critical patent/CN205401958U/en
Application granted granted Critical
Publication of CN205401958U publication Critical patent/CN205401958U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)

Abstract

The utility model discloses a port template is reserved to hard -cover room wall pipeline, including template body, stopper and spacing bolt, be equipped with first spacing bolt hole, a fastening bolt hole and first trompil on the template body, four corners of template body are equipped with the fixed orifices respectively, be equipped with corresponding with first spacing bolt hole, a fastening bolt hole and first the trompil respectively spacing bolt hole of second, the 2nd fastening bolt hole and second trompil on the stopper, the stopper through spacing bolt fastening on the template body. The utility model discloses utilize the customization template to fix pipe port, made clear the inspection reference point of every port, avoidd the not enough of traditional observation, adopt the operating procedure that the customization template is fixed and the traditional approach is fixed pretty much the same, the processing ease, recycle after the on -the -spot template rim charge preparation of mould material utilization, die cost can not increase by a wide margin, wastes material cyclic utilization, environmental protection and energy saving.

Description

A kind of hard-cover room reserved port template of metope pipeline
Technical field
This utility model relates to a kind of template, specifically the reserved port template of a kind of hard-cover room metope pipeline.
Background technology
The composition of modern building increasingly tends to multi-functional, multi-configuration, maximize, structure type is also many combines finishing with armored concrete, hard-cover room ratio in all parts of the country at present rises year by year, data show according to statistics, in Beijing, fine fitment house accounts for the 45% of total amount, Shanghai accounts for 55%, Guangzhou, Shenzhen is then more than 70%, the hard-cover ratio average out to 27.8% of tier 2 cities, along with constantly popularizing of a large amount of fine fitment houses, a lot of rough house construction methods can not meet the requirement of hard-cover house, the variation of functionalization makes water, electricity, warm, logical engineering increases, shared proportion increases, importance strengthens, corresponding quality problems also highlight, wherein owner is used impact bigger by the reserved port quality problems of pipeline.
Along with hard-cover room is popularized in a large number, traditional architecture construction coordinates with decorations construction also can be more and more closer, each side details quality control is by the emphasis of quality control on construction after being, some traditional metering systems and control mode will be replaced by new technology, new technique, the fraction controlled during although simply all details control of water distribution point finished surface in finishing room, but the economic benefit that this details control technology and theory possess and social benefit are obvious, have a wide range of applications promotion prospect.
Utility model content
The purpose of this utility model is in that to provide a kind of hard-cover room reserved port template of metope pipeline, with the problem solving to propose in above-mentioned background technology.
For achieving the above object, this utility model provides following technical scheme:
A kind of hard-cover room reserved port template of metope pipeline, including stencil body, limited block and caging bolt, described stencil body is provided with the first caging bolt hole, the first fastening bolt holes and the first perforate, four corners of described stencil body are respectively equipped with fixing hole, described limited block is provided with corresponding with the first caging bolt hole, the first fastening bolt holes and the first perforate respectively the second caging bolt hole, the second fastening bolt holes and the second perforate, and described limited block is fixed on stencil body by caging bolt.
As further program of the utility model: described stencil body adopts template waste material to make.
As this utility model further scheme: the size of described stencil body is not more than 300*200mm, the thickness of stencil body is 13-17mm.
As this utility model further scheme: the thickness of described stencil body is 15mm.
As this utility model further scheme: the center of circle of described first caging bolt hole, the first fastening bolt holes and the first perforate is arranged on the same line, described first caging bolt hole is provided with two, the centre-to-centre spacing in two caging bolt holes is 50mm, described first perforate is provided with two, two the first perforates are separately positioned on the two ends in two caging bolt holes, and described first fastening bolt holes is arranged in two the first caging bolt holes in the heart.
As this utility model further scheme: described limited block adopts waste and old band steel to make.
Compared with prior art, the beneficial effects of the utility model are: utilize custom built forms that pipe end is fixed, and specify that the inspection reference point of each port, have evaded the deficiency of conventional view method;The fixing operating procedure fixing with traditional method of custom built forms is adopted to be more or less the same, processing ease;Mold materials utilizes Site Template rim charge to make Posterior circle and uses, and die cost can't be significantly increased, the cyclic utilization of waste, environmental protection and energy saving.
Accompanying drawing explanation
Fig. 1 is the structural representation of the reserved port template of hard-cover room metope pipeline.
Fig. 2 is the sectional view of the reserved port template of hard-cover room metope pipeline.
Fig. 3 is the structural representation of stencil body in the reserved port template of hard-cover room metope pipeline.
Fig. 4 is the structural representation of limited block in the reserved port template of hard-cover room metope pipeline.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model, rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of this utility model protection.
nullRefer to Fig. 1~4,In this utility model embodiment,A kind of hard-cover room reserved port template of metope pipeline,Including stencil body 1、Limited block 2 and caging bolt 3,Described stencil body 1 adopts template waste material to make,The size of stencil body 1 is not more than 300*200mm,The thickness of stencil body 1 is 13-17mm,It is preferably 15mm,Described stencil body 1 is provided with the first caging bolt hole 4、First fastening bolt holes 5 and the first perforate 6,Described first caging bolt hole 4、The center of circle of the first fastening bolt holes 5 and the first perforate 6 is arranged on the same line,Described first caging bolt hole 4 is provided with two,The centre-to-centre spacing in two caging bolt holes 4 is 50mm,Described first perforate 6 is provided with two,Two the first perforates 6 are separately positioned on the two ends in two caging bolt holes 4,Described first fastening bolt holes 5 is arranged in two the first caging bolt holes 4 in the heart,Four corners of described stencil body 1 are respectively equipped with fixing hole 10,Described limited block 2 adopts waste and old band steel to process,Described limited block 2 be provided with respectively with the first caging bolt hole 4、First fastening bolt holes 5 and corresponding the second caging bolt hole 7 of the first perforate 6、Second fastening bolt holes 8 and the second perforate 9,Described limited block 2 is fixed on stencil body 1 by caging bolt 3.
This utility model is in use, first adopt plug, pad is by integral to template and Tube formation, the setting height(from bottom) of template is determined by the datum line in template, horizontal level, hammer into first fixing nail, adopt the top of horizon rule measurement module, guarantee that template top is in level, hammer into second fixing nail, hammer into the fixing nail of residue, in conjunction with decoration design layer thickness or according to on-the-spot actual (real) thickness, far and near distance by two caging bolt adjusting templates Yu body of wall, guarantee that template identity distance is identical with design thickness from body of wall distance, the perpendicularity in measurement module front simultaneously, guarantee that template front is in vertically, caging bolt is finally kept no longer to change, and the fixing nail stickfast of four on mould is leaned on, guarantee that die location no longer changes.
It is obvious to a person skilled in the art that this utility model is not limited to the details of above-mentioned one exemplary embodiment, and when without departing substantially from spirit of the present utility model or basic feature, it is possible to realize this utility model in other specific forms.Therefore, no matter from which point, embodiment all should be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims rather than described above, it is intended that all changes in the implication of the equivalency dropping on claim and scope included in this utility model.Any accompanying drawing labelling in claim should be considered as the claim that restriction is involved.
In addition, it is to be understood that, although this specification is been described by according to embodiment, but not each embodiment only comprises an independent technical scheme, this narrating mode of description is only for clarity sake, description should be made as a whole by those skilled in the art, and the technical scheme in each embodiment through appropriately combined, can also form other embodiments that it will be appreciated by those skilled in the art that.

Claims (6)

1. the reserved port template of hard-cover room metope pipeline, including stencil body (1), limited block (2) and caging bolt (3), it is characterized in that, described stencil body (1) is provided with the first caging bolt hole (4), first fastening bolt holes (5) and the first perforate (6), four corners of described stencil body (1) are respectively equipped with fixing hole (10), described limited block (2) be provided with respectively with the first caging bolt hole (4), first fastening bolt holes (5) and corresponding the second caging bolt hole (7) of the first perforate (6), second fastening bolt holes (8) and the second perforate (9), described limited block (2) is fixed on stencil body (1) by caging bolt (3).
2. the reserved port template of hard-cover room according to claim 1 metope pipeline, it is characterised in that described stencil body (1) adopts template waste material to make.
3. the reserved port template of hard-cover room according to claim 1 and 2 metope pipeline, it is characterised in that the size of described stencil body (1) is not more than 300*(200) mm, the thickness of stencil body (1) is 13-17mm.
4. the reserved port template of hard-cover room according to claim 3 metope pipeline, it is characterised in that the thickness of described stencil body (1) is (15) mm.
5. the reserved port template of hard-cover room according to claim 1 metope pipeline, it is characterized in that, described first caging bolt hole (4), the center of circle of the first fastening bolt holes (5) and the first perforate (6) is arranged on the same line, described first caging bolt hole (4) is provided with two, the centre-to-centre spacing of two caging bolt holes (4) is 50mm, described first perforate (6) is provided with two, two the first perforates (6) are separately positioned on the two ends of two caging bolt holes (4), described first fastening bolt holes (5) is arranged in two the first caging bolt holes (4) in the heart.
6. the reserved port template of hard-cover room according to claim 1 metope pipeline, it is characterised in that described limited block (2) adopts waste and old band steel to make.
CN201620191096.9U 2016-03-14 2016-03-14 Port template is reserved to hard -cover room wall pipeline Expired - Fee Related CN205401958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620191096.9U CN205401958U (en) 2016-03-14 2016-03-14 Port template is reserved to hard -cover room wall pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620191096.9U CN205401958U (en) 2016-03-14 2016-03-14 Port template is reserved to hard -cover room wall pipeline

Publications (1)

Publication Number Publication Date
CN205401958U true CN205401958U (en) 2016-07-27

Family

ID=56421994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620191096.9U Expired - Fee Related CN205401958U (en) 2016-03-14 2016-03-14 Port template is reserved to hard -cover room wall pipeline

Country Status (1)

Country Link
CN (1) CN205401958U (en)

Similar Documents

Publication Publication Date Title
CN103046697A (en) Construction method of 25-40-degree concrete pitched roofs
CN107766978A (en) The intelligent optimization method of skewed pattern
CN206554473U (en) A kind of cross clip laid for floor tile
CN205401958U (en) Port template is reserved to hard -cover room wall pipeline
CN202164521U (en) Three-dimensional porous permeable ecological floor framework
CN204024043U (en) A kind of for concrete pitched roof mounting structure
CN203769273U (en) Rapid floor tile laying leveling device
CN203319869U (en) Recycled aggregate modifying device by spraying
CN102590060A (en) Different-gradient soil stable infiltration instrument
CN110008534A (en) A kind of model system level division methods and device based on BIM
CN201991198U (en) Combined plastering tool
CN201722796U (en) Washroom wall corner waterproof node
CN204781756U (en) House outer wall is with widening decorative aluminum board
CN107700794A (en) The technique constructed to the antistatic floor of architecture indoor
CN209603192U (en) A kind of slabstone well lid modelled after an antique
CN107558604A (en) A kind of method for exempting from form removal raised table building
CN206091046U (en) Building board
CN106567523A (en) Technique for improving construction quality of antistatic floor in furniture production workshop
CN106499138A (en) The construction method that the wallpaper in furniture construction of hydropower papers quality can be improved
CN206158101U (en) Indoor stone ground structure
CN202011296U (en) Sand die used for fabricating cement ornament
CN102873751A (en) Method for manufacturing exhaust passage
CN105715051B (en) A kind of hard-cover room metope pipeline reserves port installation method
CN109914812A (en) A kind of floor leveling construction accessory part and its application method
CN206554311U (en) A kind of high efficiency environment-friendly type building facade Insulation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160727

Termination date: 20190314

CF01 Termination of patent right due to non-payment of annual fee