CN205397433U CN201620150399.6U CN201620150399U CN205397433U CN 205397433 U CN205397433 U CN 205397433U CN 201620150399 U CN201620150399 U CN 201620150399U CN 205397433 U CN205397433 U CN 205397433U
Authority
CN
China
Prior art keywords
conveyer
pipe die
production line
fixed
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620150399.6U
Other languages
Chinese (zh)
Inventor
周兆弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620150399.6U priority Critical patent/CN205397433U/en
Application granted granted Critical
Publication of CN205397433U publication Critical patent/CN205397433U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structure Of Belt Conveyors (AREA)

Abstract

The utility model belongs to the technical field of the building, a a branch -cut bridge is crossed to pipe die for tubular pile automation line is related to. Including a plurality of conveyers that are inline and axial lead coincidence, the transport breach has between per two adjacent conveyers, the base has below the conveyer, the conveyer install on the base and base active connections, the base on be fixed with elevating system that an ability goes up and down in vertical direction and elevating system's top and conveyer fixed connection, as elevating system during along the lift of vertical direction, conveyer and elevating system go up and down in step. The utility model discloses in pipe die or tubular pile transportation process, thereby improve conveying height through the jacking transfer chain, the interference that kept away other transfer chains is convenient for make mutually independent and is carried the network.

Description

Pipe die transition wire for automatic production line for pipe pile
Technical field
The invention belongs to technical field of buildings, relate to a kind of pipe die transition wire for automatic production line for pipe pile, for, in automatic production line for pipe pile, pile tube or pipe die being carried.
Background technology
Pile tube is important pile foundation material, also it is important cement products, compared with general foundation engineering, there is the advantages such as good, fast, the engineering geology strong adaptability of construction of piling quality, in the foundation engineering being widely used in all kinds of building and construct, such as fields such as skyscraper, public building, general industry and civil buildings, harbour, harbour, highway, bridge, heavy machine tool, warehouse, shore protections.Pile tube is in process of production, it is necessary to through steps such as cloth, matched moulds, centrifugal, steam-cured, the demouldings, need pile tube or pipe die are carried between each step, and existing conveying carries out usually by driving or crane, therefore constrains the automated production of pile tube.
Chinese patent literature discloses a kind of pile for prestressed pipe production line [application number: 201120300555.X], and including for making cage muscle, and cage muscle head plate, tailgate, cage muscle being assemblied together makes district;It is arranged on described cage muscle and makes on side, district, for the cage muscle made is assembled to bed die Shang Zhuanlong district;Described cage muscle makes and is provided with pipe die conveyor group between district and described Zhuan Long district;It is arranged on side, described Zhuan Long district, to the cover mold district clearing up and carrying cover mold after taking off cover mold;It is arranged on described Zhuan Long district and cage muscle makes between district, carry out cover mold and bed die the mould closing section of matched moulds, between described cover mold district and mould closing section, being provided with pipe die conveyor group;It is arranged on described cage muscle and makes on district's opposite side, the Tai Qian cloth district to the mould cloth after matched moulds;It is arranged on the centrifugal forming district on side, described Tai Qian cloth district;It is arranged on the steam-cured district on side, described centrifugal forming district;Being arranged on the form removal district on side, described steam-cured district, described form removal district is arranged on described side, cover mold district;It is arranged on the steam pressure district on described form removal district opposite side.
Such scheme also discloses jack and jacking translation machine; but from disclosure of which; it is only limitted to pipe die or pile tube jack-up thus not affecting other chain making machines, say, that jack and jacking translation machine do not disclose how jacking and carry the concrete structure of pipe die.
Summary of the invention
It is an object of the invention to for the problems referred to above, it is provided that the pipe die transition wire for automatic production line for pipe pile of a kind of convenient conveying pile tube or pipe die.
For reaching above-mentioned purpose, present invention employs following technical proposal: a kind of pipe die transition wire for automatic production line for pipe pile, including some be arranged in a linear and axial line overlap conveyer, there is between the conveyer that each two is adjacent conveying breach, there is below conveyer base, described conveyer is arranged on base and is movably connected with the base, described base is fixed with one can fixing with conveyer at the top of the elevating mechanism of vertical direction lifting and elevating mechanism be connected, when elevating mechanism vertically lifts, described conveyer and elevating mechanism synchronization lifting.
In the above-mentioned pipe die transition wire for automatic production line for pipe pile, described elevating mechanism includes two two ends that can be positioned at base along the lifting assembly of vertical direction lifting and lifting assembly, and described base is provided with an elevation synchro drive that two lifting assembly rising or falling speeds can be made to synchronize when two lifting assembly liftings.
In the above-mentioned pipe die transition wire for automatic production line for pipe pile, described elevation synchro drive include fixing on a conveyor and be rotationally connected with conveyer and in horizontally disposed synchronizing shaft, the two ends of described synchronizing shaft drive with two lifting assemblies respectively and connect thus the lifting of another lifting assembly can be driven when one of them lifting assembly rising or falling speed is more than the rising or falling speed of another lifting assembly so that the rising or falling speed of two lifting assemblies is Tong Bu.
In the above-mentioned pipe die transition wire for automatic production line for pipe pile, described elevation synchro drive includes some leads being fixed on base two ends, the outer wall of described lead is provided with groove, synchronizing shaft is fixed with and some engages with the groove on lead with lead gear one to one and gear.
In the above-mentioned pipe die transition wire for automatic production line for pipe pile, described synchronizing shaft has two and is arranged on conveyer both sides, each lifting assembly be respectively provided on two sides with a lead.
In the above-mentioned pipe die transition wire for automatic production line for pipe pile, described conveyer is fixed with some fairleads and fairlead and coordinates with lead socket and can move up and down along lead.
In the above-mentioned pipe die transition wire for automatic production line for pipe pile, described conveyer include conveyer belt and on the conveyor belt equally spaced be fixed with some with conveyer belt synchronizing moving and prominent conveyor belt surface it is thus possible to the transport trolley contacted with the object on conveyer belt.
In the above-mentioned pipe die transition wire for automatic production line for pipe pile, described conveyer belt is respectively provided on two sides with a guide rail extending to conveyer belt two ends, and the both sides of described transport trolley are connected to a roller and roller is pressed on guide rail and is connected with guide rail rolling.
In the above-mentioned pipe die transition wire for automatic production line for pipe pile, described lifting assembly top fixing connection jacking seat and jacking seat are fixed with conveyer and are connected, described fairlead is fixed on jacking seat, being further fixed on bearing block on described jacking seat, synchronizing shaft is inserted in bearing block and is rotationally connected with bearing block.
In the above-mentioned pipe die transition wire for automatic production line for pipe pile, described conveyer also include conveying support and be fixed on conveying support and with the conveying power transmission shaft that is rotationally connected of support, described power transmission shaft is connected with conveyer belt, the energy driving conveying belt axial rotation when drive axis, described elevating mechanism is fixing with conveying support to be connected, and some conveyers share the outfan transmission of a driving mechanism and the driving mechanism power transmission shaft with connecting on conveyer.
Compared with prior art, it is an advantage of the current invention that: in pipe die or pile tube course of conveying, by jacking pipeline thus improving delivery head, circumvent the interference of other pipelines, it is simple to make separate transport net;Elevation synchro drive ensure that the reliable and stable of course of conveying.
Accompanying drawing explanation
Fig. 1 is structural representation provided by the invention;
Fig. 2 is the structural representation of conveyer;
Fig. 3 is the another kind of structural representation of conveyer;
Fig. 4 is the structural representation in another direction of Fig. 3;
Fig. 5 is the structural representation in another direction of Fig. 3.
In figure: conveyer 1, base 2, elevating mechanism 3, lifting assembly 4, elevation synchro drive 5, synchronizing shaft 6, lead 7, gear 8, fairlead 9, conveyer belt 10, transport trolley 11, guide rail 12, roller 13, jacking seat 14, bearing block 15, conveying support 16, driving mechanism 17, power transmission shaft 18, pipe die 100, running wheel circle 101, mouth 102 of stepping down.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention will be further described in detail.
As shown in Figure 1 and Figure 5, a kind of pipe die transition wire for automatic production line for pipe pile, including some be arranged in a linear and axial line overlap conveyer 1, between the conveyer 1 that each two is adjacent, there is mouth 102 of stepping down, there is below conveyer 1 base 2, described conveyer 1 is arranged on base 2 and is flexibly connected with base 2, described base 2 is fixed with one can fixing with conveyer 1 at the top of the elevating mechanism 3 of vertical direction lifting and elevating mechanism 3 be connected, when elevating mechanism 3 vertically lifts, described conveyer 1 and elevating mechanism 3 synchronization lifting.
Conveyer 1 is prior art, it is possible to adopt chain-linked conveyer, ribbon conveyer or conveying worm.In the present embodiment, shown in Fig. 4, described conveyer 1 also include conveying support 16 and be fixed on conveying support 16 and with the conveying power transmission shaft 18 that is rotationally connected of support 16, described power transmission shaft 18 is connected with conveyer belt 10, energy driving conveying belt 10 axial rotation when power transmission shaft 18 rotates, described elevating mechanism 3 is fixing with conveying support 16 to be connected, some conveyers 1 share the outfan transmission of a driving mechanism 17 and driving mechanism 17 power transmission shaft 18 with connecting on conveyer 1, so that all of conveyer 1 can synchronous axial system, the speed on every conveyer 1 of pile tube or pipe die is identical, course of conveying remains stable for.Wherein, driving mechanism 17 can select motor or hydraulic unit driver, power transmission shaft 18 can above fixed chain wheels or other tensioner so that power transmission shaft 18 can rotate by driving conveying belt 10.Conveyer belt 10 can be chain-type, roll roll-type, belt etc..
It will be appreciated by those skilled in the art that in the present embodiment can also be some active conveyers add some passive conveyers with the use of.Passive conveyer is the conveyer not setting driving mechanism.
As shown in Figure 2, elevating mechanism 3 includes two two ends that can be positioned at base 2 along the lifting assembly 4 of vertical direction lifting and lifting assembly 4, and described base 2 is provided with an elevation synchro drive 5 that two lifting assembly 4 rising or falling speeds can be made when two lifting assemblies 4 lift to synchronize.Lifting assembly 4 can be the driver of hydraulic unit driver, motor or turbine and worm structure, it is, of course, preferable to be hydraulic unit driver.
Shown in Fig. 3, elevation synchro drive 5 include being fixed on conveyer 1 and be rotationally connected with conveyer 1 and in horizontally disposed synchronizing shaft 6, the two ends of described synchronizing shaft 6 drive with two lifting assemblies 4 respectively and connect thus another lifting assembly 4 can be driven to lift so that the rising or falling speed of two lifting assemblies 4 is Tong Bu when one of them lifting assembly 4 rising or falling speed is more than the rising or falling speed of another lifting assembly 4.Such as, synchronizing shaft 6 two ends are fixing with the outfan of lifting assembly 4 respectively to be connected, and is connected with carrying support 16 to be rotationally connected or fixing, so that synchronizing shaft 6 plays the effect of lifting assembly 4 synchronization lifting pulling two ends in the middle part of synchronizing shaft 6.
As preferred scheme, elevation synchro drive 5 includes some leads 7 being fixed on base 2 two ends, the outer wall of described lead 7 is provided with groove, groove can be made with file or other processing works, lead 7 outer wall is made to form spline-simulating structure, synchronizing shaft 6 is fixed with and some engages with the groove on lead 7 with lead 7 gear 8 one to one and gear 8, gear 8 and lead 7 are actually formed the engagement system of wheel and rack, owing to synchronizing shaft 6 is horizontally disposed with, therefore the gear 8 at synchronizing shaft 6 two ends also can synchronization lifting, and lifting assembly 4 is played and pulls or impetus by gear 8, force the lifting assembly 4 energy synchronization lifting at base 2 two ends, therefore conveyer belt 10 is in plateau in the course of the work, object on conveyer belt 10 such as pipe die, pile tubes etc. also can steadily be carried.
It is highly preferred that synchronizing shaft 6 has two and is arranged on conveyer 1 both sides, each lifting assembly 4 be respectively provided on two sides with a lead 7.Conveyer 1 is fixed with some fairleads 9 and fairlead 9 coordinate with lead 7 socket and can move up and down along lead 7.
Conveyer 1 include conveyer belt 10 and on conveyer belt 10 equally spaced be fixed with some with conveyer belt 10 synchronizing moving and prominent conveyer belt 10 surface it is thus possible to the transport trolley 11 contacted with the object on conveyer belt 10, the shape that the surface with pipe die or pile tube matches can be made in transport trolley 11 top.When carrying pipe die with conveyer belt 10, it is well known that pipe die 100 surface is equally spaced has running wheel circle or rib circle, and the position of transport trolley 11 coordinates with running wheel circle 101 or rib circle just, so that course of conveying is more reliable and more stable.
In order to make conveyer belt 10 can drive transport trolley 11 smoothly, conveyer belt 10 is respectively provided on two sides with a guide rail 12 extending to conveyer belt 10 two ends, and the both sides of described transport trolley 11 are connected to a roller 13 and roller 13 is pressed on guide rail 12 and is connected with guide rail 12 rolling.
Individual in the present embodiment, lifting assembly 4 top fixing connection jacking seat 14 and jacking seat 14 are fixed with conveyer 1 and are connected, described fairlead 9 is fixed on jacking seat 14, and described jacking seat 14 is further fixed on bearing block 15, and synchronizing shaft 6 is inserted in bearing block 15 and is rotationally connected with bearing block 15.
The operation principle of the present invention is:
This transition wire, other pipeline can be placed in mouth 102 of stepping down, thus forming crisscross transport net structure, pipe die 100 or pile tube are in course of conveying, separate generation between the pipeline of vertical and horizontal is made to disturb, the problem being accomplished by solving space, the present invention is lifted by elevating mechanism 3 driving conveying belt 10, thus forming the effect of three-dimensional conveying, when conveyer belt 10 two ends and other pipelines near time, elevating mechanism 3 only need to be used conveyer belt 10 jack-up, and other pipeline will not be produced interference by the object on conveyer belt 10.
Owing to pipe die or pile tube need a steady pipeline being the level of state in course of conveying; otherwise can beat; all can produce to damage to pile tube and pipeline; therefore; keep pipeline 10 can synchronize to be key problem in technology in two ends when lifting; the present invention gives 4 one power of lifting assembly by the gear 8 at synchronizing shaft 6 two ends, so that two lifting assembly 4 synchronization liftings, also ensures that the level of conveyer belt 10.
Specific embodiment described herein is only to present invention spirit explanation for example.Described specific embodiment can be made various amendment or supplements or adopt similar mode to substitute by those skilled in the art, but without departing from the spirit of the present invention or surmount the scope that appended claims is defined.
Although more employing conveyer 1, base 2, elevating mechanism 3, lifting assembly 4, elevation synchro drive 5, synchronizing shaft 6, lead 7, gear 8, fairlead 9, conveyer belt 10, transport trolley 11, guide rail 12, roller 13, jacking seat 14, bearing block 15, conveying support 16, driving mechanism 17, power transmission shaft 18, pipe die 100, running wheel circle 101, the terms such as mouth 102 of stepping down herein, but it is not precluded from using the probability of other term.These terms are used to be only used to describe and explain more easily the essence of the present invention;It is all contrary with spirit of the present invention for being construed as any additional restriction.

Claims (10)

1. the pipe die transition wire for automatic production line for pipe pile, including some be arranged in a linear and axial line overlap conveyer (1), it is characterized in that, between the conveyer (1) that each two is adjacent, there is mouth of stepping down (102), conveyer (1) lower section has base (2), described conveyer (1) is arranged on base (2) and above and is flexibly connected with base (2), described base (2) is fixed with one can fixing with conveyer (1) at the top of the elevating mechanism (3) of vertical direction lifting and elevating mechanism (3) be connected, when elevating mechanism (3) vertically lifts, described conveyer (1) and elevating mechanism (3) synchronization lifting.
2. the pipe die transition wire for automatic production line for pipe pile according to claim 1, it is characterized in that, described elevating mechanism (3) includes two two ends that can be positioned at base (2) along the lifting assembly (4) of vertical direction lifting and lifting assembly (4), and described base (2) is provided with an elevation synchro drive (5) that two lifting assembly (4) rising or falling speeds can be made to synchronize when two lifting assembly (4) liftings.
3. the pipe die transition wire for automatic production line for pipe pile according to claim 2, it is characterized in that, described elevation synchro drive (5) include being fixed on conveyer (1) upper and be rotationally connected with conveyer (1) and be horizontally disposed synchronizing shaft (6), the two ends of described synchronizing shaft (6) drive with two lifting assemblies (4) respectively and connect thus another lifting assembly (4) can be driven when one of them lifting assembly (4) rising or falling speed is more than the rising or falling speed of another lifting assembly (4) to lift so that the rising or falling speed of two lifting assemblies (4) is Tong Bu.
4. the pipe die transition wire for automatic production line for pipe pile according to claim 3, it is characterized in that, described elevation synchro drive (5) includes some leads (7) being fixed on base (2) two ends, the outer wall of described lead (7) is provided with groove, synchronizing shaft (6) is fixed with and some engages with the groove on lead (7) with lead (7) gear one to one (8) and gear (8).
5. the pipe die transition wire for automatic production line for pipe pile according to claim 4, it is characterized in that, described synchronizing shaft (6) has two and is arranged on conveyer (1) both sides, each lifting assembly (4) be respectively provided on two sides with a lead (7).
6. the pipe die transition wire for automatic production line for pipe pile according to claim 3 or 4 or 5, it is characterized in that, described conveyer (1) is fixed with some fairleads (9) and fairlead (9) and coordinates with lead (7) socket and can move up and down along lead (7).
7. the pipe die transition wire for automatic production line for pipe pile according to claim 1, it is characterized in that, described conveyer (1) include conveyer belt (10) and conveyer belt (10) upper equally spaced be fixed with some with conveyer belt (10) synchronizing moving and prominent conveyer belt (10) surface it is thus possible to the transport trolley (11) contacted with the object on conveyer belt (10).
8. the pipe die transition wire for automatic production line for pipe pile according to claim 7, it is characterized in that, described conveyer belt (10) is respectively provided on two sides with a guide rail (12) extending to conveyer belt (10) two ends, and the both sides of described transport trolley (11) are connected to a roller (13) and roller (13) is pressed on guide rail (12) and above and is connected with guide rail (12) rolling.
9. the pipe die transition wire for automatic production line for pipe pile according to claim 6, it is characterized in that, described lifting assembly (4) top fixing connection jacking seat (14) and jacking seat (14) are fixed with conveyer (1) and are connected, described fairlead (9) is fixed on jacking seat (14), being further fixed on bearing block (15) on described jacking seat (14), synchronizing shaft (6) is inserted in bearing block (15) and is rotationally connected with bearing block (15).
10. the pipe die transition wire for automatic production line for pipe pile according to claim 7 or 8, it is characterized in that, described conveyer (1) also includes conveying support (16) and is fixed on the power transmission shaft (18) that conveying support (16) is upper and is rotationally connected with conveying support (16), described power transmission shaft (18) is connected with conveyer belt (10), energy driving conveying belt (10) axial rotation when power transmission shaft (18) rotates, described elevating mechanism (3) is fixing with conveying support (16) to be connected, some conveyers (1) share the outfan transmission of a driving mechanism (17) and driving mechanism (17) power transmission shaft (18) with connecting on conveyer (1).
CN201620150399.6U 2016-02-29 2016-02-29 A branch -cut bridge is crossed to pipe die for tubular pile automation line Active CN205397433U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620150399.6U CN205397433U (en) 2016-02-29 2016-02-29 A branch -cut bridge is crossed to pipe die for tubular pile automation line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620150399.6U CN205397433U (en) 2016-02-29 2016-02-29 A branch -cut bridge is crossed to pipe die for tubular pile automation line

Publications (1)

Publication Number Publication Date
CN205397433U true CN205397433U (en) 2016-07-27

Family

ID=56424837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620150399.6U Active CN205397433U (en) 2016-02-29 2016-02-29 A branch -cut bridge is crossed to pipe die for tubular pile automation line

Country Status (1)

Country Link
CN (1) CN205397433U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105564971A (en) * 2016-02-29 2016-05-11 周兆弟 Pipe mold transition line for pipe pile automatic production line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105564971A (en) * 2016-02-29 2016-05-11 周兆弟 Pipe mold transition line for pipe pile automatic production line

Similar Documents

Publication Publication Date Title
CN202148052U (en) Automatic stacking device
CN102434171B (en) Tunnel bottom concrete side-slipping lining construction method and side-slipping needle beam bottom board trolley
CN103057968A (en) Profile steel stacker
CN106115569A (en) Three-dimensional transfer loading equipment
CN104944139A (en) Jacking transfer-machine
CN203893677U (en) Hydraulic drive stepping type feeding rack
CN206466618U (en) The Flat Car for Transshipment system
CN203581979U (en) Automatic plate supplying machine
CN103287838A (en) Vertical conveying equipment capable of achieving automatic overturning of flange plates for H-shaped steel three-plate assembly
CN210944676U (en) Small-size jacking equipment is used in civil engineering
CN205397433U (en) A branch -cut bridge is crossed to pipe die for tubular pile automation line
CN201982799U (en) Cross traveling trolley for pipe laying ship
CN105600303A (en) Transitional conveying mechanism used for tubular pile automatic production line
CN205397255U (en) A transition conveyer constructs for tubular pile automation line
CN202325546U (en) Side slip type needle beam bottom die trolley
CN105173752B (en) Numerical control multifunctional automatic conveying and stacking system for green bricks
CN204173857U (en) A kind of feeder of power supply adaptor aging line
CN204078698U (en) Veneer sheet automatic lifting conveying integrated machine
CN105564971B (en) Pipe die transition wire for automatic production line for pipe pile
CN103171870A (en) Cooling and conveying device of graphitized electrode
CN112620733A (en) Automatic board unloading and water conveying system of drilling machine and using method thereof
CN201914684U (en) Wind power equipment assembly line and carrying device thereof
CN103991720B (en) Large-sized concrete caisson transport systems and transportation resources
CN211415657U (en) Segment production line conveying device
CN205367573U (en) Elevator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant