CN205395812U - Electric Railway link up unloaded monitoring device of system of power supply - Google Patents

Electric Railway link up unloaded monitoring device of system of power supply Download PDF

Info

Publication number
CN205395812U
CN205395812U CN201620177886.1U CN201620177886U CN205395812U CN 205395812 U CN205395812 U CN 205395812U CN 201620177886 U CN201620177886 U CN 201620177886U CN 205395812 U CN205395812 U CN 205395812U
Authority
CN
China
Prior art keywords
electric
feeder
substation
power supply
electric substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620177886.1U
Other languages
Chinese (zh)
Inventor
李群湛
郭锴
解绍峰
赵艺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201620177886.1U priority Critical patent/CN205395812U/en
Application granted granted Critical
Publication of CN205395812U publication Critical patent/CN205395812U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model provides an electric Railway link up unloaded monitoring device of system of power supply relates to a. C. Electrification railway power supply technical field. Link up the power supply system alternative seat TS0 monitoring device of the electric substation ware that is chosen at electric Railway, the TS0's of electric substation feeder current transformer's measuring junction is connected to the input of watch -dog, and the output of watch -dog is connected to the control end of other electric substation's feeder circuit breakers through optical network, when feeder electric current less than or equal to designated value that the TS0's of electric substation watch -dog detected through feeder current transformer measuring junction, make this feeder circuit breaker tripped to the control end of other electric substation's feeder circuit breakers through the optical network output command, otherwise other electric substation's feeder circuit breakers still keep the operating position, from this can this system of accurate judgement whether be in the circuit breaker in light condition and the tripping equalizing current looped in when the empty load the minimal cut set, effectively eliminate electric Railway have a perfect understanding the power supply system light condition under with the equalizing current of electric net shape one -tenth.

Description

A kind of system zero load supervising device of the through power supply of electric railway
Technical field
This utility model relates to attached wires of AC electrified railway power supply technique field, particularly relates to the power supply technique of the through electric power system of electric railway.
Background technology
The commonly used single phase industrial frequency AC system powered by municipal power supply system of electric railway, for making single-phase traction load equilibrium assignmen as far as possible in three-phase electrical power system, electric railway often adopts the scheme of rotation phase sequence, point phase switched-mode power supply.Divide and isolate with neutral section insulator between the adjacent service area at phase subregion place, form electricity point phase, an abbreviation point phase.The traditional approach of the logical phase splitting of electric locomotive is manual undue phase, relies primarily on driver and is performed manually by and moves back level, close auxiliary unit, disconnected main circuit breaker, cross neutral section, again co-host break road device by train inertia, close auxiliary unit and then recover traction power to complete undue phase.This artificial commutation mode easily causes the charged logical phase splitting of electric locomotive (undue phase) and occurs arcing to burn out overhead contact line parts, even results in the accidents such as phase fault.Continuous rising along with train speed, have employed automatic passing over of neutral section technology, mainly there is automatically switch on undue phase, vehicle-mounted automatic passing over of neutral section and post automatic passing over of neutral section etc. of floor switches several, but still suffer from the electric process of transient state of the logical phase splitting of train in switch switching, it is easily generated bigger switching overvoltage or overcurrent, cause the accidents such as Traction networks and mobile unit scaling loss, even result in automatic passing over of neutral section operation failure, affect power supply reliability and safe train operation.Therefore, electricity point phase link is link the weakest in whole tractive power supply system, the bottleneck that train becomes high-speed railway too mutually or even whole electric railway traction is powered.
Theory and practice shows to adopt single-phase traction transformer or combination type cophase supply technology can cancel the electricity point phase in its exit at traction substation, can cancel the electricity point phase at this place in the adopted two-side feeding technology of subregion.On lines join ground, traction substation adopts cophase supply technology and the adopted two-side feeding technology of subregion to be the formation of cancelling completely the tractive power supply system of electricity point phase, is called through electric power system, thus eliminating power supply bottleneck, improves power supply capacity and transport capacity.It will be appreciated, however, that through power supply is implemented in electric railway more or less will cause undesirable euqalizing current (penetration) between electrical network and tractive power supply system.Euqalizing current (penetration) shows when tractive power supply system zero load substantially, and euqalizing current " will be flooded " by load institute when load is more than no-load current.This utility model can effectively eliminate euqalizing current during through electric power system zero load.
Utility model content
The purpose of this utility model is just to provide the system zero load supervising device of the through power supply of a kind of electric railway, and it can eliminate euqalizing current during zero load effectively.
This utility model solves its technical problem, the technical scheme adopted is: the system zero load supervising device of the through power supply of a kind of electric railway, the former limit of main converter MT of each traction substation connects three phase network ABC, secondary limit is connected to Traction networks OCS through traction bus TB, tractive feeder F and feeder breaker K and feeder current transformer CT thereof, and the Traction networks OCS between each traction substation is connected to implement electric railway with connecting power supply;A traction substation is selected to be designated as electric substation TS0, all the other traction substations are designated as electric substation TSi, i=1 ..., n-1, n >=2;Unloaded supervising device includes electric substation TS0Watch-dog SU, electric substation TS0Feeder current transformer CT0, fiber optic network FO and each electric substation TSiFeeder breaker Ki;The input of watch-dog SU connects electric substation TS0Feeder current transformer CT0Measurement end MU, the outfan of watch-dog SU is connected to each electric substation TS through fiber optic network FOiFeeder breaker KiControl end CUi
The system zero load supervising device of the through power supply of a kind of electric railway, realizes monitoring, by the following method as electric substation TS0Watch-dog SU by feeder current transformer CT0When measuring the end MU tractive feeder electric current detected less than or equal to designated value, watch-dog SU is through fiber optic network FO output order to each electric substation TSiFeeder breaker KiControl end CUiMake feeder breaker KiTripping operation, otherwise each electric substation TSiFeeder breaker KiMaintenance "on" position, i=1 ..., n-1, n >=2.This through electric power system is used for the through electric power system of electric railway being made up of Traction networks OCS and n seat traction substation.
Designated value refers to that the through electric power system of electric railway is subject to unloaded trend value when flowing or no-load current value without train, is mainly charging trend or the charging current of this through electric power system, and its numerical value is much smaller than train load.
As electric substation TSiDuring more than 2, should as far as possible by electric substation TS0It is positioned close to the position in the middle of system.
Obviously, feeder breaker can be conventional mechanical switch, it is also possible to be electronic power switch.
Operation principle of the present utility model is: utilize fiber optic network transmission capacity advantage big, fireballing and data synchronization technology to obtain the synchrodata of strange land traction substation, the trend distribution character of the passive network according to electrical network and electric railway through electric power system composition and the unloaded boundary (all there were significant differences for the numerical values recited of the two and power-factor angle) with load of the through electric power system of electric railway, with the unloaded trend value of the through electric power system of electric railway or no-load current value for designated value, a traction substation is selected (to be designated as electric substation TS0) for reference, it is judged that whether this system is in Light Condition, and tripping euqalizing current forms the chopper in the minimal cut set in loop when zero load, thus eliminating euqalizing current.
Compared with prior art, the beneficial effects of the utility model are:
One, of the present utility model can accurately judge whether this system is in Light Condition, and tripping euqalizing current forms the chopper in the minimal cut set in loop when zero load.
Two, of the present utility model can effectively eliminate under the through electric power system Light Condition of electric railway with electrical network formed euqalizing current.
Three, this utility model simple in construction, superior performance, advanced technology, method are reliable, it is easy to implement.
Accompanying drawing explanation
Fig. 1 is the through electric power system zero load supervising device structural representation of this utility model embodiment.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model will be further described.
Embodiment: Fig. 1 illustrates the through electric power system structural representation of this utility model embodiment.The system zero load supervising device of the through power supply of a kind of electric railway, for the through electric power system of electric railway being made up of Traction networks OCS and n seat traction substation;The former limit of main converter MT of traction substation connects three phase network ABC, secondary limit is connected to Traction networks OCS through traction bus TB, tractive feeder F and feeder breaker K and feeder current transformer CT thereof, and the Traction networks OCS between each traction substation is connected to implement electric railway with connecting power supply;The main converter MT of traction substation is generally tractive transformer or the assembly of tractive transformer and compensation device;In figure, L1, L2, L3 are train;A traction substation is selected to be designated as electric substation TS0, all the other traction substations are designated as electric substation TSi, i=1 ..., n-1, n >=2;Described unloaded supervising device is by electric substation TS0Watch-dog SU, electric substation TS0Feeder current transformer CT0, fiber optic network FO and each electric substation TSiFeeder breaker KiComposition;The input of watch-dog SU connects electric substation TS0Feeder current transformer CT0Measurement end MU, the outfan of watch-dog SU is connected to each electric substation TS through fiber optic network FOiFeeder breaker KiControl end CUi, as shown in phantom in Figure 1, arrow represents information flow direction.
The system zero load supervising device of the through power supply of a kind of electric railway, realizes monitoring: by the following method as electric substation TS0Watch-dog SU by feeder current transformer CT0When the tractive feeder electric current that measurement end detects is less than or equal to designated value, watch-dog SU is through fiber optic network FO output order to each electric substation TSiFeeder breaker KiControl end CUiMake feeder breaker KiTripping operation, otherwise each electric substation TSiFeeder breaker KiMaintenance "on" position, i=1 ..., n-1, n >=2, as shown in phantom in Figure 1.
Designated value refers to that the through electric power system of electric railway is subject to unloaded trend value when flowing or no-load current value without train, is mainly charging trend or the electric current of this through electric power system, and its numerical value is much smaller than train load.
As electric substation TSiDuring more than 2, should as far as possible by electric substation TS0It is positioned close to the position in the middle of system.
Operation principle of the present utility model is: utilize fiber optic network transmission capacity advantage big, fireballing and data synchronization technology to obtain the synchrodata of strange land traction substation, the trend distribution character of the passive network according to electrical network and electric railway through electric power system composition and the unloaded boundary with load of the through electric power system of electric railway, select a traction substation (to be designated as electric substation TS0) for reference, it is judged that whether this system is in Light Condition, and tripping euqalizing current forms the chopper in the minimal cut set in loop when zero load.

Claims (2)

1. the system zero load supervising device of the through power supply of electric railway, the former limit of main converter MT of each traction substation connects three phase network ABC, secondary limit is connected to Traction networks OCS through traction bus TB, tractive feeder F and feeder breaker K and feeder current transformer CT thereof, and the Traction networks OCS between each traction substation is connected to implement electric railway with connecting power supply;It is characterized in that: select a traction substation to be designated as electric substation TS0, all the other traction substations are designated as electric substation TSi, i=1 ..., n-1, n >=2;Unloaded supervising device includes electric substation TS0Watch-dog SU, electric substation TS0Feeder current transformer CT0, fiber optic network FO and each electric substation TSiFeeder breaker Ki;The input of watch-dog SU connects electric substation TS0Feeder current transformer CT0Measurement end MU, the outfan of watch-dog SU is connected to each electric substation TS through fiber optic network FOiFeeder breaker KiControl end CUi
2. the system zero load supervising device of the through power supply of a kind of electric railway according to claim 1, it is characterised in that: described feeder breaker can be conventional mechanical switch, it is also possible to be electronic power switch.
CN201620177886.1U 2016-03-09 2016-03-09 Electric Railway link up unloaded monitoring device of system of power supply Expired - Fee Related CN205395812U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620177886.1U CN205395812U (en) 2016-03-09 2016-03-09 Electric Railway link up unloaded monitoring device of system of power supply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620177886.1U CN205395812U (en) 2016-03-09 2016-03-09 Electric Railway link up unloaded monitoring device of system of power supply

Publications (1)

Publication Number Publication Date
CN205395812U true CN205395812U (en) 2016-07-27

Family

ID=56443030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620177886.1U Expired - Fee Related CN205395812U (en) 2016-03-09 2016-03-09 Electric Railway link up unloaded monitoring device of system of power supply

Country Status (1)

Country Link
CN (1) CN205395812U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105691244A (en) * 2016-03-09 2016-06-22 西南交通大学 System no-load monitoring device for electrified railway cut-through power supply and monitoring method thereof
CN109119979A (en) * 2018-10-25 2019-01-01 西南交通大学 A kind of cable fault protective device and its guard method
CN114336641A (en) * 2022-03-17 2022-04-12 西南交通大学 Three-phase power supply ride-through power utilization system and control method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105691244A (en) * 2016-03-09 2016-06-22 西南交通大学 System no-load monitoring device for electrified railway cut-through power supply and monitoring method thereof
CN109119979A (en) * 2018-10-25 2019-01-01 西南交通大学 A kind of cable fault protective device and its guard method
CN114336641A (en) * 2022-03-17 2022-04-12 西南交通大学 Three-phase power supply ride-through power utilization system and control method
CN114336641B (en) * 2022-03-17 2022-05-24 西南交通大学 Three-phase power supply ride-through power utilization system and control method

Similar Documents

Publication Publication Date Title
CN104057842B (en) Coaxial cable power supply system of electrified railway
CN105790274A (en) Power flow control device and control method for run-through power supply system converter type traction substation
CN103151763B (en) A kind of electric railway AT Traction networks fault distinguishing and guard method
EP3216644B1 (en) Distributed protection system for power supply at sections of electrified railway propulsion system
CN105691244A (en) System no-load monitoring device for electrified railway cut-through power supply and monitoring method thereof
CN102343835B (en) Method for realizing electric auto-passing neutral section of train by utilizing power electronic switching device
CN103552488B (en) A kind of electrified railway two way feeding system
CN109552113B (en) Traction network segment protection jump system and method for preventing train from entering electroless section in electrified mode
CN110605999B (en) Measurement and control protection system and method for through type in-phase power supply network
CN205395812U (en) Electric Railway link up unloaded monitoring device of system of power supply
CN205407265U (en) Link up power supply system converter type traction substation trend regulation and control device
CN106571620B (en) A kind of failure judgment method of both-end direct current line of flexible direct current power transmission ground short circuit
CN103532221B (en) The circuit backup power automatic switching implementation method of a kind of self adaptation 330kV bus arrangement and operational mode
CN203611784U (en) Two-side power supply system of electrified railway
CN204978290U (en) Electric Railway pulls power supply structure
CN101767540A (en) Switch-free switching auto-passing neutral section device for the electric railway
CN104092193A (en) 10kV power distribution network mixed line fault processing method
CN109842204A (en) Stand-by heat line electricity source based on optical-fibre channel controls in-put of spare power supply method
CN206678832U (en) A kind of electric railway subregion connects powered construction
CN202106867U (en) Device for suppressing excess voltage of articulated phase insulator
CN105655880B (en) The configuration mode of 110 kilovolts of system busbar voltage load equiblibrium mass distributions of intelligent substation double bus scheme mode
CN210792876U (en) Measurement and control protection system of through-type in-phase power supply network
CN103018631A (en) System for 10kV fault line detection
CN110165658A (en) Optical-fibre channel stand-by heat route in-put of spare power supply method based on main transformer control
CN109950915A (en) Stand-by heat lines join in-put of spare power supply method based on source side optical-fibre channel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160727

Termination date: 20180309

CF01 Termination of patent right due to non-payment of annual fee