CN105655880B - The configuration mode of 110 kilovolts of system busbar voltage load equiblibrium mass distributions of intelligent substation double bus scheme mode - Google Patents

The configuration mode of 110 kilovolts of system busbar voltage load equiblibrium mass distributions of intelligent substation double bus scheme mode Download PDF

Info

Publication number
CN105655880B
CN105655880B CN201610033379.5A CN201610033379A CN105655880B CN 105655880 B CN105655880 B CN 105655880B CN 201610033379 A CN201610033379 A CN 201610033379A CN 105655880 B CN105655880 B CN 105655880B
Authority
CN
China
Prior art keywords
sections
configuration
busbar
interval
combining unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610033379.5A
Other languages
Chinese (zh)
Other versions
CN105655880A (en
Inventor
陈雅云
庄小河
陈瑞章
吴玉婷
张国华
郑庆林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610033379.5A priority Critical patent/CN105655880B/en
Publication of CN105655880A publication Critical patent/CN105655880A/en
Application granted granted Critical
Publication of CN105655880B publication Critical patent/CN105655880B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/20Bus-bar or other wiring layouts, e.g. in cubicles, in switchyards
    • H02B1/22Layouts for duplicate bus-bar selection

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of configuration modes of 110 kilovolts of system busbar voltage load equiblibrium mass distributions of intelligent substation double bus scheme mode, the interval of number odd number is cascaded from I section of busbar combining unit of 110kV, the interval of number even number is cascaded from II section of busbar combining unit of 110kV, by the protection of I sections of busbar combining units of 110kV and odd-numbered line segregation, observing and controlling, control and intelligent assembly are articulated in I sections of DC power supplies, the protection of II sections of busbar combining units of 110kV and even-numbered line segregation, observing and controlling, control and intelligent assembly are articulated in II sections of DC power supplies, adjust the voltage cascade optical cable circuit at 110kV circuit even-numbereds interval.The present invention does not need to increase any equipment and material, and by adjusting partly interval cascade optical cable circuit, changing interval relevant voltage virtual terminator configuration can avoid because I sections of busbar combining unit device fails cause protection seting cooperation difficulty.

Description

The 110 kilovolts of system busbar voltage load balancings of intelligent substation double bus scheme mode The configuration mode of distribution
Technical field
The present invention relates to a kind of 110 kilovolts of system voltage allocation plans, particularly a kind of intelligent substation double bus schemes The configuration mode of 110 kilovolts of system busbar voltage load equiblibrium mass distributions of mode.
Background technology
It is well known that double bus scheme mode busbar PT powers simultaneously to multiple interval multiple equipments, once it breaks down Influence face is very big, deteriorated area protection seting cooperation, in some instances it may even be possible to cause power grid large number of equipment refused action or tripping of bypassing the immediate leadership.It is near several Year, it puts into operation with intelligent substation Accelerating The Construction and constantly, combining unit and intelligent terminal are extensively using changing tradition change Power station output, way of output research and development and design concept, and for 110 kilovolts of system lists of Intelligent transformer station double bus scheme mode Equipment is configured, the mono- protections being configured of all 110kV of 220kV intelligent stations at present and automatic safety device are by I sections of busbares of 110kV Combining unit cascade, which is drawn, takes busbar voltage, such as Fig. 1, shown in 2.DC power supply designs:110kV I, II sections of busbar combining units are straight Galvanic electricity source is drawn respectively takes I, II sections of power supplys of DC power system, the protection of 110kV line segregations, observing and controlling, control and intelligent assembly electricity Source carries out power distribution according to odd even interval numbers.General odd-numbered interval takes I sections of DC power supply, and even-numbered interval takes II Section power supply.As shown in Figure 3.The bus bar configuration scheme of the prior art there are it is main the problem of have:1)110kVI sections of busbares merge single Element device failure causes all 110kV line segregations voltages for cascading its busbar voltage to lose, distance protection and with directional element Quick fraction zero-sequenceprotection be blocked, only retain long delay PT broken string overcurrent protection and zero-sequenceprotection(When generally adjusting action Between be 3 ~ 4 seconds), any circuit or element fault under this power system operating mode certainly will be got over caused by protection seting coordinates difficulty Grade action, expands fault coverage, in some instances it may even be possible to a plurality of circuit be caused to trip simultaneously.2)Protection, the control at even-numbered interval System and intelligent assembly are mounted with cascade busbar combining unit not on same section DC power supply, and DC power supply I segment faults lose feelings Under condition, all 110kV route protections voltages lose, and the influence of generation is the same as 1)Analysis.
Invention content
It is an object of the invention in place of overcome the deficiencies in the prior art, and provide a kind of in current existing design scheme On the basis of, it does not need to increase any equipment and material, by adjusting partly interval cascade optical cable circuit, modification interval relevant voltage Virtual terminator is configured, so that it may avoid because I sections of busbar combining unit device fails lead to protection seting cooperation difficulty, any level Join circuit or element failure under its busbar voltage and therefore cause action of bypassing the immediate leadership, expand fault coverage, in some instances it may even be possible to cause A plurality of circuit trips simultaneously, the 110 kilovolts of system electricity of intelligent substation double bus scheme mode that is easier to improve and realize Press configuration mode.
A kind of configuration side of 110 kilovolts of system busbar voltage load equiblibrium mass distributions of intelligent substation double bus scheme mode Formula, according to grid equipment management and running load balancing Distribution Principles, during normal operation, half interval is mounted on using odd-numbered I sections of bus runs, the other half interval are mounted on II sections of bus runs using even-numbered, and two loop line road of double loop is compiled using odd even Number different sections of bus runs of mounting, the interval cascade of number odd number is from I section of busbar combining unit of 110kV, the interval of number even number Cascade is from II section of busbar combining unit of 110kV, while by I sections of busbar combining units of 110kV and odd-numbered line segregation Protection, observing and controlling, control and intelligent assembly are articulated in I sections of DC power supplies, and II sections of busbar combining units of 110kV and even number are compiled Protection, observing and controlling, control and the intelligent assembly of number line segregation are articulated in II sections of DC power supplies, and adjustment 110kV circuits even number is compiled The voltage cascade optical cable circuit at number interval, i.e. the voltage cascade optical cable of even-numbered line segregation combining unit are female by being connected to I section Line combining unit reconfiguration to II sections of busbar combining units export optical port, modification 110kV circuit even-numbereds interval combining unit grade Join the virtual terminator configuration of control source:
When changing virtual terminator configuration, system integrator designs table, profit according to the modification virtual terminator that designing unit provides first Use SCD(Whole station system configuration file Substation Configuration Description)Configuration file is to 110kV lines The configuration of road even-numbered interval combining unit is modified, and deletes even-numbered line segregation combining unit to I sections of 110kV The voltage SMV lines of busbar combining unit link even-numbered line segregation combining unit to II sections of busbares of 110kV and merge list The voltage SMV lines of member, when SMV lines are configured, for recipient, it is necessary to first add external signal, then add internal signal. It is as follows to add external signal configuration sequence:1)Select the physical address of SMV recipient;2)Selection SMV recipient corresponds to LD;3)Choosing The LN where SMV lines is selected,;4)Select virtual terminator line Inputs options;5)Select external signal;6)By sending device The FCDA that transmission data under SMV accessing points is concentrated is dragged to middle window, and discharge in order.Select internal signal configuration suitable Sequence:In reception device, the LD-- under SMV accessing points》LN--》FC--》Under DO, corresponding DA is selected, is dragged to centre Row in window where corresponding external signal completes the connection of external signal and internal signal namely completes a SMV company Line completes the modification generation of SCD file configuration.
After modification generates above-mentioned SCD file, then line segregation equipment manufacturer is literary by SCD with the configuration tool of IED devices CID files are generated after being extracted in part with this IED relevant informations, and passes through and specific IED equipment is attached under device configuration tool, i.e., Complete virtual terminator configuration.
It completes after being filled under above-mentioned configuration virtual terminator configuration and CID files, finally by I sections of busbar combining unit cascades of 110kV Optical port to even-numbered line segregation combining unit is closed, while II sections of busbar combining unit grades of 110kV are coupled to even number and are compiled The spare optical port of number line segregation combining unit opens, that is, completes all virtual terminators configurations and optical port configuration output.
110kV intervals combining unit cascade voltage configuration transport protocol is IEC60044-8, be should be noted in configuration process.
The virtual terminator describes IED(Intelligent electronic device Intelligent Electronic Device)'s GOOSE(Towards the transformer substation case Generic object oriented substation events of general object)、 SV (Sampled value Sampled value)Input, output signal tie point general name, to identification procedure layer, wall and its between The secondary circuit signal of contact is equal to the screen terminal of traditional substation.
LN where SMV lines, is generally fixed in LLNO.
In summary, present invention advantage following compared with prior art:
The present invention does not need to increase any equipment and material, by adjusting part on the basis of current existing design scheme Interval cascade optical cable circuit, the relevant voltage virtual terminator configuration of modification interval can be avoided because I sections of busbar combining unit equipment are sent out Raw failure causes protection seting cooperation difficult, thus any circuit cascaded under its busbar voltage or element failure cause to expand Big failure occurs, and improves the stability of power supply.
Description of the drawings
Fig. 1 is I sections of busbar combining unit wiring schematic diagrams of 110kV of the prior art.
Fig. 2 is II sections of busbar combining unit wiring schematic diagrams of 110kV of the prior art.
Fig. 3 is 110kV system interval DC power supply wiring schematic diagrams.
Fig. 4 is I sections of busbar combining unit wiring schematic diagrams of 110kV of the present invention.
Fig. 5 is II sections of busbar combining unit wiring schematic diagrams of 110kV of the present invention.
Specific embodiment
The present invention is described in more detail with reference to embodiment.
Embodiment 1
A kind of configuration side of 110 kilovolts of system busbar voltage load equiblibrium mass distributions of intelligent substation double bus scheme mode Formula, according to grid equipment management and running load balancing Distribution Principles, during normal operation, half interval is mounted on using odd-numbered I sections of bus runs, the other half interval are mounted on II sections of bus runs using even-numbered, and two loop line road of double loop is compiled using odd even Number different sections of bus runs of mounting, the interval cascade of number odd number is from I section of busbar combining unit of 110kV, the interval of number even number Cascade is from II section of busbar combining unit of 110kV, while by I sections of busbar combining units of 110kV and odd-numbered line segregation Protection, observing and controlling, control and intelligent assembly are articulated in I sections of DC power supplies, and II sections of busbar combining units of 110kV and even number are compiled Protection, observing and controlling, control and the intelligent assembly of number line segregation are articulated in II sections of DC power supplies, and adjustment 110kV circuits even number is compiled The voltage cascade optical cable circuit at number interval, i.e. the voltage cascade optical cable of even-numbered line segregation combining unit are female by being connected to I section Line combining unit reconfiguration to II sections of busbar combining units export optical port, wiring such as Fig. 4,5.Between modification 110kV circuit even-numbereds Every the virtual terminator configuration of combining unit cascade voltage input:
When changing virtual terminator configuration, system integrator designs table, profit according to the modification virtual terminator that designing unit provides first Use SCD(Whole station system configuration file Substation Configuration Description)Configuration file is to 110kV lines The configuration of road even-numbered interval combining unit is modified, and deletes even-numbered line segregation combining unit to I sections of 110kV The voltage SMV lines of busbar combining unit link even-numbered line segregation combining unit to II sections of busbares of 110kV and merge list The voltage SMV lines of member, when SMV lines are configured, for recipient, it is necessary to first add external signal, then add internal signal. It is as follows to add external signal configuration sequence:1)Select the physical address of SMV recipient;2)Selection SMV recipient corresponds to LD;3)Choosing The LN where SMV lines is selected,;4)Select virtual terminator line Inputs options;5)Select external signal;6)By sending device The FCDA that transmission data under SMV accessing points is concentrated is dragged to middle window, and discharge in order.Select internal signal configuration suitable Sequence:In reception device, the LD-- under SMV accessing points》LN--》FC--》Under DO, corresponding DA is selected, is dragged to centre Row in window where corresponding external signal completes the connection of external signal and internal signal namely completes a SMV company Line completes the modification generation of SCD file configuration.
After modification generates above-mentioned SCD file, then line segregation equipment manufacturer is literary by SCD with the configuration tool of IED devices CID files are generated after being extracted in part with this IED relevant informations, and passes through and specific IED equipment is attached under device configuration tool, i.e., Complete virtual terminator configuration.
It completes after being filled under above-mentioned configuration virtual terminator configuration and CID files, finally by I sections of busbar combining unit cascades of 110kV Optical port to even-numbered line segregation combining unit is closed, while II sections of busbar combining unit grades of 110kV are coupled to even number and are compiled The spare optical port of number line segregation combining unit opens, that is, completes all virtual terminators configurations and optical port configuration output.
The not described part of the present embodiment is same as the prior art.

Claims (1)

1. a kind of configuration mode of 110 kilovolts of system busbar voltage load equiblibrium mass distributions of intelligent substation double bus scheme mode, According to grid equipment management and running load balancing Distribution Principles, during normal operation, half interval is mounted on I sections using odd-numbered Bus run, the other half interval are mounted on II sections of bus runs using even-numbered, and two loop line road of double loop is numbered using odd even Mount different sections of bus runs, it is characterised in that:The interval cascade of number odd number is from I section of busbar combining unit of 110kV, and number is occasionally Several interval is cascaded from II section of busbar combining unit of 110kV, while by I sections of busbar combining units of 110kV and odd-numbered line Protection, observing and controlling, control and the intelligent assembly at road interval are articulated in I sections of DC power supplies, II sections of busbar combining units of 110kV with And protection, observing and controlling, control and the intelligent assembly of even-numbered line segregation are articulated in II sections of DC power supplies, adjust 110kV lines The voltage cascade optical cable circuit at road even-numbered interval, optical cable is cascaded by connecing by the voltage of even-numbered line segregation combining unit Optical port is exported in I sections of busbar combining unit reconfigurations to II sections of busbar combining units, modification 110kV circuit even-numbereds interval merges The virtual terminator configuration of unit cascaded control source:
When changing virtual terminator configuration, system integrator designs table according to the modification virtual terminator that designing unit provides first, utilizes SCD Configuration file modifies to the configuration of 110kV circuit even-numbereds interval combining unit, deletes even-numbered line segregation and closes And unit links even-numbered line segregation combining unit extremely to the voltage SMV lines of I sections of busbar combining units of 110kV The voltage SMV lines of II sections of busbar combining units of 110kV, when SMV lines are configured, for recipient, it is necessary to which first addition is external to be believed Number, internal signal is then added, addition external signal configuration sequence is as follows:1)Select the physical address of SMV recipient;2)Selection SMV recipient corresponds to LD;3)Select the LN where SMV lines;4)Select virtual terminator line Inputs options;5)Selection is external to be believed Number;6)The FCDA that transmission data under the SMV accessing points of sending device is concentrated is dragged to middle window, and discharge in order;Choosing Select internal signal configuration sequence:In reception device, the LD-- under SMV accessing points》LN--》FC--》Under DO, selection is corresponding DA is dragged to the row where corresponding external signal in middle window, that is, completes the connection of external signal and internal signal, A SMV line is completed, that is, completes the modification generation of SCD file configuration;
After modification generates above-mentioned SCD file, line segregation equipment manufacturer with the configuration tool of IED devices by SCD file with this CID files are generated, and pass through and specific IED equipment is attached under device configuration tool after the extraction of IED relevant informations, that is, complete empty end Son configuration;
It completes after being filled under above-mentioned virtual terminator configuration and CID files, I sections of busbar combining unit grades of 110kV is finally coupled to even number and are compiled The optical port of number line segregation combining unit is closed, while II sections of busbar combining unit grades of 110kV are coupled between even-numbered circuit It is opened every the spare optical port of combining unit, that is, completes all virtual terminator configurations and optical port configuration output.
CN201610033379.5A 2016-01-19 2016-01-19 The configuration mode of 110 kilovolts of system busbar voltage load equiblibrium mass distributions of intelligent substation double bus scheme mode Active CN105655880B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610033379.5A CN105655880B (en) 2016-01-19 2016-01-19 The configuration mode of 110 kilovolts of system busbar voltage load equiblibrium mass distributions of intelligent substation double bus scheme mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610033379.5A CN105655880B (en) 2016-01-19 2016-01-19 The configuration mode of 110 kilovolts of system busbar voltage load equiblibrium mass distributions of intelligent substation double bus scheme mode

Publications (2)

Publication Number Publication Date
CN105655880A CN105655880A (en) 2016-06-08
CN105655880B true CN105655880B (en) 2018-06-19

Family

ID=56486885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610033379.5A Active CN105655880B (en) 2016-01-19 2016-01-19 The configuration mode of 110 kilovolts of system busbar voltage load equiblibrium mass distributions of intelligent substation double bus scheme mode

Country Status (1)

Country Link
CN (1) CN105655880B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107037815B (en) * 2017-06-13 2024-05-14 江苏振邦医用智能装备有限公司 Intelligent trolley logistics system
CN109616874B (en) * 2018-10-31 2021-01-05 许继集团有限公司 Method for rebuilding and expanding intelligent substation without power outage

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101599661A (en) * 2009-04-02 2009-12-09 杭州中实四方电力自动化有限公司 Full high-frequency does not have the railway signal intelligent power supply panel of two-way contact
CN105162254A (en) * 2015-09-01 2015-12-16 国网浙江省电力公司 Digitalized transformation method for transformer substation
CN204928123U (en) * 2015-08-07 2015-12-30 国家电网公司 Intelligent substation merging cells voltage automatic switch -over control circuit

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101599661A (en) * 2009-04-02 2009-12-09 杭州中实四方电力自动化有限公司 Full high-frequency does not have the railway signal intelligent power supply panel of two-way contact
CN204928123U (en) * 2015-08-07 2015-12-30 国家电网公司 Intelligent substation merging cells voltage automatic switch -over control circuit
CN105162254A (en) * 2015-09-01 2015-12-16 国网浙江省电力公司 Digitalized transformation method for transformer substation

Also Published As

Publication number Publication date
CN105655880A (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN104518564B (en) Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
WO2017166735A1 (en) Power-grid self-healing system and self-healing logic thereof in 110kv chain power-supply mode
CN102368612B (en) Triple-double wiring way of medium-voltage electric distribution network
CN106908693A (en) A kind of arc suppression coil earthing system single-phase grounding selecting method of high-accuracy
CN109787224B (en) Method for generating regional power grid load transfer strategy for preventing cascading overload
CN104113141B (en) A kind of intelligence longitudinally interconnects feeder automation control method
CN103390887B (en) Containing the distribution system failure separation method of micro-capacitance sensor
CN102386614B (en) Method for sharing standby protecting device by power equipment in intelligent transformer substation
CN102842897B (en) A kind of enclosed type current protection system and guard method
CN110932258A (en) Diamond type distribution network
CN204068430U (en) A kind of intelligence longitudinally interconnected feeder automation control system
CN107959286B (en) 3/2 wiring mode-based dynamic reconstruction method for power transmission network
CN105655880B (en) The configuration mode of 110 kilovolts of system busbar voltage load equiblibrium mass distributions of intelligent substation double bus scheme mode
CN107591784A (en) A kind of distribution statements based on collusion adaptive incomplete differential protection method of circuit
CN109768544B (en) Regional power grid load transfer method
CN103022989A (en) Digital current protection method for alternating-current looped serial power supply mode of subways
CN104659765A (en) Channel configuration and protection scheme applied to multi-terminal radiation network of power system
WO2012139656A1 (en) Energy distribution network and method for operating same
CN103227468A (en) Main wiring pairing and stringing optimization method for transformer station
CN106026090B (en) A kind of urban power distribution network mixes earthed system load transfer method
CN205395812U (en) Electric Railway link up unloaded monitoring device of system of power supply
CN105162254B (en) Transformer station's digital improvement method
CN204046277U (en) On-pole switch station
CN105024360A (en) Distribution network switching station relay protection operation optimization method
CN105515166B (en) 110 kilovolts of system busbar combining units of intelligent substation double bus scheme mode can back brake maintenance voltage allocation plan

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant