CN205245218U - Boiler system - Google Patents
Boiler system Download PDFInfo
- Publication number
- CN205245218U CN205245218U CN201521134653.5U CN201521134653U CN205245218U CN 205245218 U CN205245218 U CN 205245218U CN 201521134653 U CN201521134653 U CN 201521134653U CN 205245218 U CN205245218 U CN 205245218U
- Authority
- CN
- China
- Prior art keywords
- boiler
- main pipe
- primary air
- isolation plate
- air main
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/34—Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery
Landscapes
- Air Supply (AREA)
Abstract
本实用新型涉及能量转换设备,公开了一种锅炉系统,该锅炉系统包括第一锅炉和第二锅炉,所述第一锅炉具有第一锅炉热一次风母管(1),所述第二锅炉具有第二锅炉热一次风母管(2),所述第一锅炉热一次风母管(1)和第二锅炉热一次风母管(2)之间设置有邻炉加热母管(3),该邻炉加热母管(3)上设置有连通控制装置,以能够通过该连通控制装置选择性地连通和截止所述第一锅炉热一次风母管(1)和第二锅炉热一次风母管(2)。本实用新型的锅炉系统通过设置的邻炉加热母管将第二锅炉的热一次风引入到第一锅炉中,解决了锅炉点火启动困难的问题。
The utility model relates to energy conversion equipment, and discloses a boiler system. The boiler system includes a first boiler and a second boiler. There is a second boiler hot primary air main pipe (2), and an adjacent furnace heating main pipe (3) is arranged between the first boiler hot primary air main pipe (1) and the second boiler hot primary air main pipe (2) , the adjacent furnace heating main pipe (3) is provided with a communication control device, so that the first boiler primary hot air main pipe (1) and the second boiler primary hot air main pipe (1) can be selectively connected and cut off through the communication control device. Mother pipe (2). The boiler system of the utility model introduces the hot primary air of the second boiler into the first boiler through the adjacent furnace heating main pipe, which solves the problem of difficulty in igniting and starting the boiler.
Description
技术领域technical field
本实用新型涉及能量转换设备,具体地,涉及一种锅炉系统。The utility model relates to energy conversion equipment, in particular to a boiler system.
背景技术Background technique
锅炉启动后正常运行时,排出的烟气流动经过空气预热器,空气预热器加热一次风、二次风,其中一次风进入到制粉系统并从制粉系统的磨煤机携带煤粉流出,进入到炉膛燃烧,燃烧产生的高温烟气加热锅炉内的受热面,烟气排出后利用其余热加热空气预热器,如此循环以维持锅炉燃烧并保证一次风达到的需要的温度。锅炉从冷态启动时,由于自身还没有产生热的烟气,空气预热器不能对一次风加热,因此通常单独设置一台燃油锅炉作为启动锅炉进行供热,或者设置暖风器(暖风器加热的汽源取自辅汽联箱),通过暖风器对一次风加热以使一次风达到预定的出风温度后再启动点火。在气温较低的地域环境下,暖风器往往出力不足而造成一次风温度达不到点火温度,造成不能顺利启动点火;而在燃煤挥发分较低时锅炉的点火也存在困难,此时需要提高一次风的温度。此外,锅炉在冷态启动时需要对炉膛以及炉膛内的受热面加热,以减少热应力,该加热过程通常也是由进入炉膛的一次风加热,需要耗费大量的辅汽。When the boiler is in normal operation after startup, the exhausted flue gas flows through the air preheater, and the air preheater heats the primary air and the secondary air. The primary air enters the pulverizing system and carries pulverized coal from the coal mill of the pulverizing system. It flows out and enters the furnace for combustion. The high-temperature flue gas generated by the combustion heats the heating surface in the boiler. After the flue gas is discharged, the residual heat is used to heat the air preheater. This cycle maintains the combustion of the boiler and ensures that the primary air reaches the required temperature. When the boiler starts from a cold state, the air preheater cannot heat the primary air because it has not yet produced hot flue gas. Therefore, an oil-fired boiler is usually installed separately as a start-up boiler for heating, or a heater (heater The steam source heated by the heater is taken from the auxiliary steam header), and the primary air is heated by the heater so that the primary air reaches the predetermined air outlet temperature before ignition is started. In the regional environment with low temperature, the output of the air heater is often insufficient, so that the temperature of the primary air cannot reach the ignition temperature, resulting in the failure to start the ignition smoothly; Need to increase the temperature of the primary air. In addition, when the boiler is started in a cold state, it needs to heat the furnace and the heating surface in the furnace to reduce thermal stress. This heating process is usually heated by the primary air entering the furnace, which consumes a large amount of auxiliary steam.
因此,需要更好的技术方案以解决锅炉冷态启动时不易点火、需要更大容量的辅助热源以及需要耗费大量辅汽等技术问题。Therefore, a better technical solution is needed to solve technical problems such as difficult ignition of the boiler during cold start, the need for a larger capacity auxiliary heat source, and the need to consume a large amount of auxiliary steam.
实用新型内容Utility model content
本实用新型的目的是提供一种锅炉系统,该锅炉系统至少能够部分解决以上锅炉系统在启动时存在的技术问题。The purpose of the utility model is to provide a boiler system, which can at least partially solve the above technical problems in the startup of the boiler system.
为了实现上述目的,本实用新型提供一种锅炉系统,该锅炉系统包括第一锅炉和第二锅炉,所述第一锅炉具有第一锅炉热一次风母管,所述第二锅炉具有第二锅炉热一次风母管,所述第一锅炉热一次风母管和第二锅炉热一次风母管之间设置有邻炉加热母管,该邻炉加热母管上设置有连通控制装置,以能够通过该连通控制装置选择性地连通和截止所述第一锅炉热一次风母管和第二锅炉热一次风母管。In order to achieve the above object, the utility model provides a boiler system, the boiler system includes a first boiler and a second boiler, the first boiler has a primary hot air main pipe of the first boiler, and the second boiler has a second boiler The hot primary air main pipe, the adjacent furnace heating main pipe is arranged between the first boiler hot primary air main pipe and the second boiler hot primary air main pipe, and the adjacent furnace heating main pipe is provided with a communication control device to be able to The communication control device selectively connects and cuts off the first boiler hot primary air main pipe and the second boiler hot primary air main pipe.
优选地,所述邻炉加热母管上设置有第一隔离板阀和第二隔离板阀,所述第一隔离板阀和第二隔离板阀能够控制所述第一锅炉热一次风母管和第二锅炉热一次风母管之间的连通和截止。Preferably, the heating main pipe adjacent to the furnace is provided with a first isolation plate valve and a second isolation plate valve, and the first isolation plate valve and the second isolation plate valve can control the heating of the first boiler primary air main pipe. The communication and cut-off between the hot primary air main pipe of the second boiler.
优选地,所述第一隔离板阀和第二隔离板阀为翻板阀或插板阀。Preferably, the first isolation plate valve and the second isolation plate valve are flap valves or gate valves.
优选地,所述第一隔离板阀和第二隔离板阀为电动隔离板阀。Preferably, the first isolation plate valve and the second isolation plate valve are electric isolation plate valves.
优选地,所述锅炉系统包括多个用于给第一锅炉供应煤粉的磨煤机,该多个磨煤机中至少包括对应设置有点燃器的磨煤机,所述第一锅炉热一次风母管上设置有启动隔离挡板阀,该启动隔离挡板阀能够被控制为使得所述邻炉加热母管中的热风经由该第一锅炉热一次风母管的一部分仅供应到所述对应设置有点燃器的所述磨煤机中。Preferably, the boiler system includes a plurality of coal pulverizers for supplying pulverized coal to the first boiler, the plurality of coal pulverizers at least include coal pulverizers correspondingly provided with igniters, and the first boiler heats The start-up isolation baffle valve is set on the air main pipe, and the start-up isolation baffle valve can be controlled so that the hot air in the heating main pipe of the adjacent furnace is only supplied to the In the coal pulverizer correspondingly provided with the igniter.
优选地,对应设置有所述点燃器的磨煤机包括第一磨煤机和第二磨煤机。Preferably, the coal mills correspondingly provided with the igniter include a first coal mill and a second coal mill.
优选地,所述第一锅炉还包括用于提供冷一次风的第一锅炉冷一次风母管,所述第一锅炉热一次风母管和所述第一锅炉冷一次风母管分别设置有调节阀门组并连接到所述磨煤机的一次风入口管。Preferably, the first boiler also includes a first boiler cold primary air main pipe for providing cold primary air, and the first boiler hot primary air main pipe and the first boiler cold primary air main pipe are respectively provided with Adjust the valve group and connect to the primary air inlet pipe of the coal mill.
通过上述技术方案,在第一锅炉热一次风母管和第二锅炉热一次风母管之间设置邻炉加热母管,当第一锅炉从冷态启动时开通邻炉加热母管,从而将第二锅炉的热一次风引入到第一锅炉热一次风母管中,通过该热一次风提高第一锅炉的磨煤机出口处的一次风温度,解决因暖风器出力不足或因燃煤挥发分低而造成的锅炉点火启动困难的问题;此外,第二锅炉的热一次风进入第一锅炉的一次风循环通道,对第一锅炉的炉膛以及炉膛内的受热面直接加热,极大地降低了锅炉启动时的辅汽用量,并减小了炉膛内受热面在点火初期的升温率,从而减小受热面的热应力。Through the above technical scheme, the adjacent furnace heating main pipe is set between the first boiler hot primary air main pipe and the second boiler hot primary air main pipe, and the adjacent furnace heating main pipe is opened when the first boiler starts from the cold state, so that the The hot primary air of the second boiler is introduced into the hot primary air main pipe of the first boiler, and the temperature of the primary air at the outlet of the coal mill of the first boiler is increased through the hot primary air, so as to solve the problems caused by insufficient output of the heater or coal burning. The low volatile content caused the difficulty in starting the boiler; in addition, the hot primary air of the second boiler enters the primary air circulation channel of the first boiler, directly heating the furnace of the first boiler and the heating surface in the furnace, which greatly reduces the Reduce the amount of auxiliary steam when the boiler starts, and reduce the temperature rise rate of the heating surface in the furnace at the initial stage of ignition, thereby reducing the thermal stress on the heating surface.
本实用新型的其它特征和优点将在随后的具体实施方式部分予以详细说明。Other features and advantages of the present utility model will be described in detail in the following specific embodiments.
附图说明Description of drawings
附图是用来提供对本实用新型的进一步理解,并且构成说明书的一部分,与下面的具体实施方式一起用于解释本实用新型,但并不构成对本实用新型的限制。在附图中:The accompanying drawings are used to provide a further understanding of the utility model, and constitute a part of the description, together with the following specific embodiments, are used to explain the utility model, but do not constitute a limitation to the utility model. In the attached picture:
图1是本实用新型锅炉系统中邻炉加热母管的连接关系示意图。Fig. 1 is a schematic diagram of the connection relationship of the adjacent furnace heating main pipe in the boiler system of the present invention.
附图标记说明Explanation of reference signs
1第一锅炉热一次风母管1 Primary hot air main pipe of the first boiler
2第二锅炉热一次风母管2 Second boiler hot primary air main pipe
3邻炉加热母管3 Adjacent furnace heating main pipe
4第一锅炉冷一次风母管4 Primary cold air main pipe of the first boiler
5第一磨煤机5 first coal mill
6第二磨煤机6 second coal mill
具体实施方式detailed description
以下结合附图对本实用新型的具体实施方式进行详细说明。应当理解的是,此处所描述的具体实施方式仅用于说明和解释本实用新型,并不用于限制本实用新型。The specific embodiment of the utility model will be described in detail below in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are only used to illustrate and explain the utility model, and are not intended to limit the utility model.
参考图1所示,本实用新型提供的锅炉系统包括第一锅炉和第二锅炉,所述第一锅炉具有第一锅炉热一次风母管1,所述第二锅炉具有第二锅炉热一次风母管2,所述第一锅炉热一次风母管1和第二锅炉热一次风母管2之间设置有邻炉加热母管3,该邻炉加热母管3上设置有连通控制装置,以能够通过该连通控制装置选择性地连通和截止所述第一锅炉热一次风母管1和第二锅炉热一次风母管2。第一锅炉热一次风母管1是第一锅炉中供应热一次风的总管,第二锅炉热一次风母管2是第二锅炉中供应热一次风的总管。Referring to Fig. 1, the boiler system provided by the utility model includes a first boiler and a second boiler, the first boiler has a first boiler hot primary air main pipe 1, and the second boiler has a second boiler hot primary air A main pipe 2, an adjacent furnace heating main pipe 3 is arranged between the first boiler hot primary air main pipe 1 and the second boiler hot primary air main pipe 2, and the adjacent furnace heating main pipe 3 is provided with a communication control device, The first boiler hot primary air main pipe 1 and the second boiler hot primary air main pipe 2 can be selectively connected and blocked through the communication control device. The hot primary air main pipe 1 of the first boiler is the main pipe for supplying the hot primary air in the first boiler, and the hot primary air main pipe 2 for the second boiler is the main pipe for supplying the hot primary air in the second boiler.
由于在第一锅炉热一次风母管1和第二锅炉热一次风母管2之间设置有邻炉加热母管3,当第一锅炉从冷态启动时开通邻炉加热母管3,将第二锅炉的热一次风引入到第一锅炉热一次风母管1中,该引入的热一次风进入第一锅炉的制粉系统中,能够提高第一锅炉的磨煤机出口处的一次风温度,解决因暖风器出力不足或因燃煤挥发分低而造成第一锅炉点火启动困难的问题;此外,该引入的热一次风进入第一锅炉的炉膛,对第一锅炉的炉膛以及炉膛内的受热面直接加热,极大地降低了锅炉启动时的辅汽用量,并减小了炉膛内受热面在点火初期的升温率,从而减小受热面的热应力。Since an adjacent furnace heating main pipe 3 is arranged between the first boiler hot primary air main pipe 1 and the second boiler hot primary air main pipe 2, when the first boiler is started from a cold state, the adjacent furnace heating main pipe 3 is opened, and the The hot primary air of the second boiler is introduced into the hot primary air main pipe 1 of the first boiler, and the introduced hot primary air enters the pulverizing system of the first boiler, which can improve the primary air at the outlet of the coal mill of the first boiler. Temperature, to solve the problem of difficulty in starting the first boiler due to insufficient output of the air heater or low volatile content of coal-fired; in addition, the introduced hot primary air enters the furnace of the first boiler, and affects the furnace of the first boiler and the furnace The heating surface in the furnace is directly heated, which greatly reduces the auxiliary steam consumption when the boiler is started, and reduces the temperature rise rate of the heating surface in the furnace at the initial stage of ignition, thereby reducing the thermal stress on the heating surface.
可以理解的是,在该锅炉系统中,当第二锅炉从冷态启动时,同样可以将第一锅炉中的热一次风从第一锅炉热一次风母管1通过邻炉加热母管3引入到第二锅炉的第二锅炉热一次风母管2中,以改善第二锅炉启动的条件。It can be understood that in this boiler system, when the second boiler starts from a cold state, the hot primary air in the first boiler can also be introduced from the first boiler hot primary air main pipe 1 through the adjacent furnace heating main pipe 3 To the second boiler hot primary air main pipe 2 of the second boiler to improve the conditions for starting the second boiler.
所述邻炉加热母管3上的连通控制装置可以为各种可以实现的方式,例如,可以设置为第一隔离板阀31和第二隔离板阀32,所述第一隔离板阀31和第二隔离板阀32能够控制所述第一锅炉热一次风母管1和第二锅炉热一次风母管2之间的连通和截止。锅炉系统正常运行时或在检修时第一隔离板阀31和第二隔离板阀32关闭,防止热一次风在第一锅炉热一次风母管1和第二锅炉热一次风母管2之间串动;锅炉系统中的某一侧锅炉点火启动前,开启与运行一侧的锅炉相对应的隔离板阀(第一隔离板阀31或第二隔离板阀32),控制与启动一侧的锅炉相对应的隔离板阀的开度,从而控制通过邻炉加热母管3的热一次风的流量。The communication control device on the adjacent furnace heating main pipe 3 can be implemented in various ways, for example, it can be set as a first isolation plate valve 31 and a second isolation plate valve 32, and the first isolation plate valve 31 and the second isolation plate valve The second isolation plate valve 32 can control the connection and cut-off between the first boiler hot primary air main pipe 1 and the second boiler hot primary air main pipe 2 . When the boiler system is in normal operation or during maintenance, the first isolation plate valve 31 and the second isolation plate valve 32 are closed to prevent the hot primary air from being between the primary hot air main pipe 1 of the first boiler and the primary hot air main pipe 2 of the second boiler Serial operation; before the boiler on one side of the boiler system is ignited and started, the isolation plate valve (the first isolation plate valve 31 or the second isolation plate valve 32) corresponding to the boiler on the running side is opened, and the valve on the control and start-up side The opening of the isolation plate valve corresponding to the boiler controls the flow of the hot primary air passing through the heating main pipe 3 of the adjacent furnace.
所述第一隔离板阀31和第二隔离板阀32可以为翻板阀或插板阀;进一步优选地,所述第一隔离板阀31和第二隔离板阀32为电动隔离板阀。The first isolation plate valve 31 and the second isolation plate valve 32 may be flap valves or gate valves; further preferably, the first isolation plate valve 31 and the second isolation plate valve 32 are electric isolation plate valves.
所述锅炉系统包括多个用于给第一锅炉供应煤粉的磨煤机,该多个磨煤机中至少包括对应设置有点燃器的磨煤机,所述第一锅炉热一次风母管1上设置有启动隔离挡板阀,该启动隔离挡板阀能够被控制为使得所述邻炉加热母管3中的热风经由该第一锅炉热一次风母管1的一部分仅供应到所述对应设置有点燃器的所述磨煤机中。通过该设置,由邻炉加热母管3供应的热一次风仅供给到设置有点燃器的磨煤机中,保证了该设置有点燃器的磨煤机的出口处一次风的温度,有利于第一锅炉点火。优选地,对应设置有所述点燃器的磨煤机包括第一磨煤机5和第二磨煤机6。The boiler system includes a plurality of pulverizers for supplying pulverized coal to the first boiler, and at least one of the plurality of pulverizers is provided with a corresponding igniter, and the hot primary air main pipe of the first boiler 1 is provided with a start-up isolation damper valve, which can be controlled so that the hot air in the adjacent furnace heating main pipe 3 is only supplied to the In the coal pulverizer correspondingly provided with the igniter. Through this setting, the hot primary air supplied by the adjacent furnace heating main pipe 3 is only supplied to the coal mill equipped with an igniter, which ensures the temperature of the primary air at the outlet of the coal mill equipped with an igniter, which is beneficial The first boiler is fired. Preferably, the coal mills correspondingly provided with the igniter include a first coal mill 5 and a second coal mill 6 .
所述第一锅炉还可以包括用于提供冷一次风的第一锅炉冷一次风母管4,所述第一锅炉热一次风母管1和所述第一锅炉冷一次风母管4分别设置有调节阀门组并连接到所述磨煤机的一次风入口管。所述冷一次风为温度比热一次风低的一次风,通常为未经预热器加热的一次风。通过冷一次风和热一次风的调节,可以更好地控制进入磨煤机的一次风的温度。The first boiler may also include a first boiler cold primary air main pipe 4 for providing cold primary air, and the first boiler hot primary air main pipe 1 and the first boiler cold primary air main pipe 4 are respectively arranged There is a set of regulating valves and a primary air inlet pipe connected to the coal mill. The cold primary air is primary air whose temperature is lower than that of the hot primary air, usually the primary air that has not been heated by a preheater. By adjusting the cold primary air and hot primary air, the temperature of the primary air entering the coal mill can be better controlled.
以上结合附图详细描述了本实用新型的优选实施方式,但是,本实用新型并不限于上述实施方式中的具体细节,在本实用新型的技术构思范围内,可以对本实用新型的技术方案进行多种简单变型,这些简单变型均属于本实用新型的保护范围。The preferred embodiment of the utility model has been described in detail above in conjunction with the accompanying drawings, but the utility model is not limited to the specific details of the above-mentioned embodiment. These simple modifications all belong to the protection scope of the present utility model.
另外需要说明的是,在上述具体实施方式中所描述的各个具体技术特征,在不矛盾的情况下,可以通过任何合适的方式进行组合。为了避免不必要的重复,本实用新型对各种可能的组合方式不再另行说明。In addition, it should be noted that the various specific technical features described in the above specific implementation manners may be combined in any suitable manner if there is no contradiction. In order to avoid unnecessary repetition, the utility model will not further describe various possible combinations.
此外,本实用新型的各种不同的实施方式之间也可以进行任意组合,只要其不违背本实用新型的思想,其同样应当视为本实用新型所公开的内容。In addition, any combination of various implementations of the present invention can also be made, as long as they do not violate the idea of the present invention, they should also be regarded as the disclosed content of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521134653.5U CN205245218U (en) | 2015-12-31 | 2015-12-31 | Boiler system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521134653.5U CN205245218U (en) | 2015-12-31 | 2015-12-31 | Boiler system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205245218U true CN205245218U (en) | 2016-05-18 |
Family
ID=55944289
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201521134653.5U Expired - Lifetime CN205245218U (en) | 2015-12-31 | 2015-12-31 | Boiler system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205245218U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106016242A (en) * | 2016-05-24 | 2016-10-12 | 南京电力设备质量性能检验中心 | Normal putting-into-operation device for realizing denitration at starting stage by heating fed water and fume in close-furnace grading manner |
| CN110043918A (en) * | 2019-04-18 | 2019-07-23 | 中国大唐集团科学技术研究院有限公司华东电力试验研究院 | A kind of adjacent stove heating activation system with steam air heater |
-
2015
- 2015-12-31 CN CN201521134653.5U patent/CN205245218U/en not_active Expired - Lifetime
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106016242A (en) * | 2016-05-24 | 2016-10-12 | 南京电力设备质量性能检验中心 | Normal putting-into-operation device for realizing denitration at starting stage by heating fed water and fume in close-furnace grading manner |
| CN106016242B (en) * | 2016-05-24 | 2018-01-30 | 南京电力设备质量性能检验中心 | Face the feedwater of stove progressive solution and flue gas realizes startup stage denitration bringing normally into operation device |
| CN110043918A (en) * | 2019-04-18 | 2019-07-23 | 中国大唐集团科学技术研究院有限公司华东电力试验研究院 | A kind of adjacent stove heating activation system with steam air heater |
| CN110043918B (en) * | 2019-04-18 | 2024-04-02 | 中国大唐集团科学技术研究院有限公司华东电力试验研究院 | Adjacent furnace heating starting system with air heater |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100557306C (en) | Start-up method of once-through boiler with boiler water circulation pump adjacent to steam heating boiler | |
| CN103047637B (en) | Coke furnace flue gas waste heat and ascending pipe coal gas waste heat combined recycling system | |
| CN100557304C (en) | Drain expansion and start-up method of once-through boiler adjacent steam heating boiler | |
| CN107420933B (en) | Exhaust-heat primary air heat exchanger system for hot air powder feeding system of ball mill | |
| CN107327322A (en) | A kind of combustion engine coal machine coupled electricity-generation system and its operation method | |
| CN106895389A (en) | A kind of First air and fume afterheat are combined and utilize system | |
| JP6171893B2 (en) | Coal fired biomass biomass burning method and equipment | |
| CN205245149U (en) | Anti cold system of congealing of outer circulating combustion equipment of flue gas | |
| CN204716317U (en) | The interactive start up system of a kind of generator set | |
| CN103438419A (en) | Method for starting coal pulverizing system before running of 1,000MW first-stage large bypass system unit | |
| CN115289458A (en) | Air supply auxiliary heating system in starting process of coal-fired power plant and operation method | |
| CN202485204U (en) | Double-air-blower double-control energy-saving air heater | |
| CN216619875U (en) | A fan coal mill combustion and pulverizing system | |
| CN212396378U (en) | Wide load denitration of boiler and improvement wind temperature integration system | |
| CN103388832A (en) | Optimized method for starting heat engine | |
| CN212901578U (en) | Adjacent furnace flue gas rushing system | |
| CN206755139U (en) | A kind of coal-fired thermal power generation unit starter | |
| CN203687006U (en) | Preheat starting system for supercritical generator set | |
| CN102269421A (en) | Method and device for increasing hot air temperature of power station boiler | |
| CN205746950U (en) | Power station coal pulverizer steam air heater bypath system | |
| CN115218207B (en) | Boiler and its starting method | |
| CN116147010A (en) | A Boiler System Realizing Flexible Deep Peak Shaving | |
| CN105423289A (en) | Condensation-resistant system and method of flue gas outer circulation combustion equipment | |
| JP2007187352A (en) | Starting method of boiler | |
| CN206359466U (en) | A kind of coke oven flue suction equalization system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160518 |
|
| CX01 | Expiry of patent term |