CN205245218U - Boiler system - Google Patents

Boiler system Download PDF

Info

Publication number
CN205245218U
CN205245218U CN201521134653.5U CN201521134653U CN205245218U CN 205245218 U CN205245218 U CN 205245218U CN 201521134653 U CN201521134653 U CN 201521134653U CN 205245218 U CN205245218 U CN 205245218U
Authority
CN
China
Prior art keywords
boiler
female pipe
heat primary
primary air
wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521134653.5U
Other languages
Chinese (zh)
Inventor
马元坤
秦松
徐荣田
张利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenhua Group Corp Ltd
Shenhua Guoneng Group Corp Ltd
Shenhua Guoneng Ningxia Coal Power Co Ltd
Original Assignee
Shenhua Group Corp Ltd
Shenhua Guoneng Group Corp Ltd
Shenhua Guoneng Ningxia Coal Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenhua Group Corp Ltd, Shenhua Guoneng Group Corp Ltd, Shenhua Guoneng Ningxia Coal Power Co Ltd filed Critical Shenhua Group Corp Ltd
Priority to CN201521134653.5U priority Critical patent/CN205245218U/en
Application granted granted Critical
Publication of CN205245218U publication Critical patent/CN205245218U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Abstract

The utility model relates to an energy conversion equipment discloses a boiler system, and this boiler system includes first boiler and second boiler, first boiler has the first boiler heat female pipe of a wind (1), the second boiler has the second boiler heat female pipe of a wind (2), be provided with the adjacent stove female pipe of heating (3) between first boiler heat female pipe of a wind (1) and the second boiler heat female pipe of a wind (2), be provided with intercommunication controlling means on this neighbour's stove female pipe of heating (3) to can communicate the controlling means optionally intercommunication and end through this first boiler heat female pipe of a wind (1) and the second boiler heat female pipe of a wind (2). The utility model discloses a during boiler system introduces first boiler through the female pipe of adjacent stove heating that sets up with wind of heat of second boiler, boiler lighting up starting difficulty's problem has been solved.

Description

A kind of steam generator system
Technical field
The utility model relates to energy conversion, particularly, relates to a kind of steam generator system.
Background technology
While normally operation after boiler startup, the flow of flue gas of discharge is through air preheater, air preheaterAdd heat primary air, Secondary Air, wherein a wind enters into pulverized coal preparation system and takes from the coal pulverizer of pulverized coal preparation systemBand coal dust flows out, and enters into hearth combustion, the heating surface in the high-temperature flue gas heating boiler that burning produces,Flue gas utilizes its waste-heat air preheater after discharging, and so circulation is to maintain boiler combustion and to ensure oneThe temperature of the needs that inferior wind reaches. Boiler is during from cold start, because self does not also produce hot flue gas,Air preheater can not, to a wind heating, therefore arrange separately an oil burning boiler as starting pot conventionallyStove carries out heat supply, or steam air heater (auxiliary vapour header is taken from the vapour source of steam air heater heating) is set, by warmWind device to the heating of wind so that wind is restarted igniting after reaching predetermined leaving air temp. At temperatureUnder low territorial environment, often undercapacity and cause an air temperature not reach firing temperature of steam air heater,Cause starting ignition smoothly; And the igniting of boiler also has difficulties in the time that coal-fired volatile matter is lower, thisTime need to improve the temperature of a wind. In addition, boiler need to be in burner hearth and burner hearth in the time of cold startHeating surface heating, to reduce thermal stress, this heating process is also to be added by a wind that enters burner hearth conventionallyHeat, need to expend a large amount of auxiliary vapour.
Therefore while, needing better technical scheme to start with solution boiler cold-state, be difficult for lighting a fire, need largerThe auxiliary thermal source of capacity and need to expend the technical problems such as a large amount of auxiliary vapour.
Utility model content
The purpose of this utility model is to provide a kind of steam generator system, and this steam generator system at least can partly solveThe technical problem that above steam generator system exists in the time starting.
To achieve these goals, the utility model provides a kind of steam generator system, and this steam generator system comprisesOne boiler and the second boiler, described the first boiler has the female pipe of the first boiler heat primary air, described second potStove and accessory has the female pipe of the second boiler heat primary air, the female pipe of described the first boiler heat primary air and the second boiler hot oneBetween the female pipe of inferior wind, be provided with the female pipe of adjacent stove heating, this neighbour's stove heats to be provided with to be communicated with on female pipe controls dressPut, with can by this connection control device optionally connected sum end described the first boiler heat primary airThe female pipe of female pipe and the second boiler heat primary air.
Preferably, described adjacent stove heats and on female pipe, is provided with the first isolation plate valve and the second isolation plate valve, instituteState the first isolation plate valve and the second isolation plate valve and can control described the first boiler heat primary air mother Guan HeConnected sum cut-off between the female pipe of two boiler heat primary airs.
Preferably, described the first isolation plate valve and the second isolation plate valve are flap valve or push-pull valve.
Preferably, described the first isolation plate valve and the second isolation plate valve are electronic isolation plate valve.
Preferably, described steam generator system comprises multiple for the coal pulverizer to the first boiler supplying coal dust, shouldIn multiple coal pulverizers, at least comprise that correspondence is provided with the coal pulverizer of device for igniting, described the first boiler heat primary airOn female pipe, be provided with and start isolation flapper valve, this startup isolation flapper valve can be controlled as and make described neighbourStove heats described in hot blast in female pipe is only fed to via a part for the female pipe of this first boiler heat primary airCorrespondence is provided with in the described coal pulverizer of device for igniting.
Preferably, the coal pulverizer that correspondence is provided with described device for igniting comprises the first coal pulverizer and the second coal-grindingMachine.
Preferably, described the first boiler also comprises the cold wind mother of the first boiler for a cold wind is providedPipe, the female pipe of the cold wind of the female pipe of described the first boiler heat primary air and described the first boiler is respectively arranged with tuneJoint valve sets is also connected to a wind inlet tube of described coal pulverizer.
By technique scheme, at the female pipe of the first boiler heat primary air and the female pipe of the second boiler heat primary airBetween the female pipe of adjacent stove heating is set, when the first boiler is opened the female pipe of adjacent stove heating during from cold start, therebyThe heat primary air of the second boiler is incorporated in the female pipe of the first boiler heat primary air, carries by this heat primary airAn air temperature in the coal pulverizer exit of high the first boiler, solves because of steam air heater undercapacity or because of fire coalLow and the problem of the boiler ignition start difficulty that causes of volatile matter; In addition, the heat primary air of the second boiler entersA wind circulation canal that enters the first boiler, the heating surface in burner hearth and burner hearth to the first boiler is directHeating, the auxiliary vapour consumption while greatly having reduced boiler startup, and reduced burner hearth internal heating surface in ignitingThe rate of temperature rise at initial stage, thus the thermal stress of heating surface reduced.
Other features and advantages of the utility model give the detailed description of the invention part subsequently in detailExplanation.
Brief description of the drawings
Accompanying drawing is to be used to provide further understanding of the present utility model, and forms of descriptionPoint, be used from explanation the utility model with detailed description of the invention one below, but do not form this practicalityNovel restriction. In the accompanying drawings:
Fig. 1 is the annexation schematic diagram that in the utility model steam generator system, adjacent stove heats female pipe.
Description of reference numerals
The female pipe of 1 first boiler heat primary air
The female pipe of 2 second boiler heat primary airs
The female pipe of 3 adjacent stove heating
The female pipe of the cold wind of 4 first boilers
5 first coal pulverizers
6 second coal pulverizers
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is elaborated. Be to be understood thatBe, detailed description of the invention described herein is only for description and interpretation the utility model, and is not used in limitThe utility model processed.
Shown in figure 1, the steam generator system that the utility model provides comprises the first boiler and the second boiler,Described the first boiler has the female pipe 1 of the first boiler heat primary air, and described the second boiler has the second boiler hotThe female pipe 2 of wind, the female pipe of the female pipe 1 of described the first boiler heat primary air and the second boiler heat primary air 2 itBetween be provided with the female pipe 3 of adjacent stove heating, on the female pipe 3 of this neighbour's stove heating, be provided with connection control device, with energyEnough by this connection control device optionally connected sum end the female pipe of described the first boiler heat primary air 1 HeThe female pipe 2 of the second boiler heat primary air. The female pipe 1 of the first boiler heat primary air is supply heat one in the first boilerThe house steward of inferior wind, the female pipe 2 of the second boiler heat primary air is the house stewards that supply heat primary air in the second boiler.
Owing to being provided with between the female pipe 1 of the first boiler heat primary air and the female pipe 2 of the second boiler heat primary airThe female pipe 3 of adjacent stove heating, when the first boiler is opened the female pipe 3 of adjacent stove heating during from cold start, by second potThe heat primary air of stove is incorporated in the female pipe 1 of the first boiler heat primary air, and the heat primary air of this introducing enters theIn the pulverized coal preparation system of one boiler, can improve an air temperature in the coal pulverizer exit of the first boiler, separateCertainly cause asking of the first boiler ignition start difficulty because of steam air heater undercapacity or because coal-fired volatile matter is lowTopic; In addition, the heat primary air of this introducing enters the burner hearth of the first boiler, the burner hearth to the first boiler andHeating surface in burner hearth directly heats, the auxiliary vapour consumption while greatly having reduced boiler startup, and reducedBurner hearth internal heating surface is at the rate of temperature rise of Initial Stage after Ignition, thereby reduces the thermal stress of heating surface.
Be understandable that, in this steam generator system, when the second boiler is during from cold start, equally canHeat primary air in the first boiler is drawn by the female pipe 3 of adjacent stove heating from the female pipe 1 of the first boiler heat primary airEnter in the female pipe 2 of the second boiler heat primary air of the second boiler, to improve the condition of the second boiler startup.
Connection control device on the female pipe 3 of described adjacent stove heating can be the various modes that can realize, exampleAs, can be set to the first isolation plate valve 31 and the second isolation plate valve 32, described the first isolation plate valve 31Can control the female pipe 1 of described the first boiler heat primary air and the second boiler hot one with the second isolation plate valve 32Connected sum cut-off between the female pipe 2 of inferior wind. When steam generator system normally moves or at when maintenance the first division boardValve 31 and the second isolation plate valve 32 are closed, and prevent that heat primary air is the female pipe of the first boiler heat primary air 1 HeVibration between the female pipe 2 of the second boiler heat primary air; Before a certain side boiler ignition start in steam generator system,Open the isolation plate valve corresponding with the boiler of operation one side (the first isolation plate valve 31 or the second division boardValve 32), control the aperture of the isolation plate valve corresponding with the boiler that starts a side, thereby control by adjacentThe flow of the heat primary air of the female pipe 3 of stove heating.
Described the first isolation plate valve 31 and the second isolation plate valve 32 can be flap valve or push-pull valve; Enter onePreferably, described the first isolation plate valve 31 and the second isolation plate valve 32 are electronic isolation plate valve to step.
Described steam generator system comprises multiple for the coal pulverizer to the first boiler supplying coal dust, the plurality of coal-grindingIn machine, at least comprise that correspondence is provided with the coal pulverizer of device for igniting, on the female pipe 1 of described the first boiler heat primary airBe provided with and start isolation flapper valve, this startup isolation flapper valve can be controlled as and make described adjacent stove heatingHot blast in female pipe 3 is only fed to described correspondence via a part for the female pipe 1 of this first boiler heat primary airBe provided with in the described coal pulverizer of device for igniting. By this setting, by the heat one of female pipe 3 supplies of adjacent stove heatingInferior wind is only supplied in the coal pulverizer that is provided with device for igniting, has ensured this coal pulverizer that is provided with device for ignitingThe temperature of the wind in exit, is conducive to the first ignition of the boiler. Preferably, correspondence is lighted described in being provided withThe coal pulverizer of device comprises the first coal pulverizer 5 and the second coal pulverizer 6.
Described the first boiler can also comprise the female pipe of the cold wind of the first boiler for a cold wind is provided4, the female pipe 4 of the cold wind of the female pipe 1 of described the first boiler heat primary air and described the first boiler arranges respectivelyThere is control valve group and be connected to a wind inlet tube of described coal pulverizer. A described cold wind is temperature ratioThe wind that heat primary air is low, is generally a wind without preheater heating. By a cold wind and heatThe adjusting of a wind, can control the temperature of a wind that enters coal pulverizer better.
Below describe by reference to the accompanying drawings preferred embodiment of the present utility model in detail, still, this practicality is newType is not limited to the detail in above-mentioned embodiment, within the scope of technical conceive of the present utility model,Can carry out multiple simple variant to the technical solution of the utility model, these simple variant all belong to this realityWith novel protection domain.
It should be noted that in addition each the concrete technology spy described in above-mentioned detailed description of the inventionLevy, in reconcilable situation, can combine by any suitable mode. For fear of needn'tThe repetition of wanting, the utility model is to the explanation no longer separately of various possible combinations.
In addition, between various embodiment of the present utility model, also can be combined, onlyWant it without prejudice to thought of the present utility model, it should be considered as content disclosed in the utility model equally.

Claims (7)

1. a steam generator system, is characterized in that, this steam generator system comprises the first boiler and the second boiler,Described the first boiler has the female pipe of the first boiler heat primary air (1), and described the second boiler has the second boilerThe female pipe of heat primary air (2), the female pipe of described the first boiler heat primary air (1) and the second boiler heat primary airBetween female pipe (2), be provided with the adjacent stove female pipe of heating (3), the company of being provided with on this neighbour's stove female pipe of heating (3)Logical control device, with can by this connection control device optionally connected sum end described the first boilerThe female pipe of the female pipe of heat primary air (1) and the second boiler heat primary air (2).
2. steam generator system according to claim 1, is characterized in that, the female pipe of described adjacent stove heating(3) on, be provided with the first isolation plate valve (31) and the second isolation plate valve (32), described the first division boardValve (31) and the second isolation plate valve (32) can be controlled the described female pipe of the first boiler heat primary air (1)And the female connected sum cut-off of managing between (2) of the second boiler heat primary air.
3. steam generator system according to claim 2, is characterized in that, described the first isolation plate valve(31) and the second isolation plate valve (32) is flap valve or push-pull valve.
4. steam generator system according to claim 3, is characterized in that, described the first isolation plate valve(31) and the second isolation plate valve (32) is electronic isolation plate valve.
5. according to the steam generator system described in any one in claim 1 to 4, it is characterized in that instituteState steam generator system comprise multiple for to the coal pulverizer of the first boiler supplying coal dust, in the plurality of coal pulverizer extremelyComprise that less correspondence is provided with the coal pulverizer of device for igniting, on the described female pipe of the first boiler heat primary air (1), establishBe equipped with and start isolation flapper valve, this startup isolation flapper valve can be controlled as and make described adjacent stove heating femaleDescribed in hot blast in pipe (3) is only fed to via a part for the female pipe of this first boiler heat primary air (1)Correspondence is provided with in the described coal pulverizer of device for igniting.
6. steam generator system according to claim 5, is characterized in that, correspondence is provided with described pointThe coal pulverizer of burner comprises the first coal pulverizer (5) and the second coal pulverizer (6).
7. steam generator system according to claim 5, is characterized in that, described the first boiler also wrapsDraw together the cold female pipe of a wind of the first boiler (4) for a cold wind is provided, described the first boiler heat primary airFemale pipe (1) is respectively arranged with control valve group and is connected with the cold female pipe of a wind of described the first boiler (4)To a wind inlet tube of described coal pulverizer.
CN201521134653.5U 2015-12-31 2015-12-31 Boiler system Active CN205245218U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521134653.5U CN205245218U (en) 2015-12-31 2015-12-31 Boiler system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521134653.5U CN205245218U (en) 2015-12-31 2015-12-31 Boiler system

Publications (1)

Publication Number Publication Date
CN205245218U true CN205245218U (en) 2016-05-18

Family

ID=55944289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521134653.5U Active CN205245218U (en) 2015-12-31 2015-12-31 Boiler system

Country Status (1)

Country Link
CN (1) CN205245218U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106016242A (en) * 2016-05-24 2016-10-12 南京电力设备质量性能检验中心 Normal putting-into-operation device for realizing denitration at starting stage by heating fed water and fume in close-furnace grading manner
CN110043918A (en) * 2019-04-18 2019-07-23 中国大唐集团科学技术研究院有限公司华东电力试验研究院 A kind of adjacent stove heating activation system with steam air heater

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106016242A (en) * 2016-05-24 2016-10-12 南京电力设备质量性能检验中心 Normal putting-into-operation device for realizing denitration at starting stage by heating fed water and fume in close-furnace grading manner
CN106016242B (en) * 2016-05-24 2018-01-30 南京电力设备质量性能检验中心 Face the feedwater of stove progressive solution and flue gas realizes startup stage denitration bringing normally into operation device
CN110043918A (en) * 2019-04-18 2019-07-23 中国大唐集团科学技术研究院有限公司华东电力试验研究院 A kind of adjacent stove heating activation system with steam air heater
CN110043918B (en) * 2019-04-18 2024-04-02 中国大唐集团科学技术研究院有限公司华东电力试验研究院 Adjacent furnace heating starting system with air heater

Similar Documents

Publication Publication Date Title
CN1328485C (en) Waste heat steam generator
CN101338894A (en) Low-calorie fuel dual prewarming and thermal storage type energy-saving boiler
CN205245218U (en) Boiler system
CN206572939U (en) The fuel gas table kiln stove of magnetic tape trailer Flash Gas Compression Skid System
CN110388637A (en) A kind of energy-saving type boiler ultra-low load steady combustion system
CN103453540A (en) Boiler
CN203273907U (en) Combustion air system of large-scale household garbage incinerator
CN110287561B (en) Low-temperature flue gas cooling system of standby combustor and parameter design method thereof
CN107461736A (en) A kind of gas industry boiler smoke recycling denitration and air preheating system
CN106931451A (en) Spiral-flow type incinerator
CN101451767A (en) Thermal storage type energy-saving boiler and burning method thereof
CN2890657Y (en) Heat storage type pulse burning nozzle
CN102128447A (en) Steam heating method of bed materials of fluidized bed boiler
CN101338906A (en) Low-grade fuel dual prewarming and thermal storage type condensation energy-saving boiler
CN103868054A (en) Boiler starting speed increasing and oil-saving arrangement structure for heat power station and method for rapidly starting boiler
CN204716317U (en) The interactive start up system of a kind of generator set
CN208418705U (en) A kind of pyrolysis installation
CN202074509U (en) Gas-solid two-phase series-parallel ignition stabilizing burner for coal difficult to burn
CN203687006U (en) Preheat starting system for supercritical generator set
CN205402692U (en) Mix coal slurry fluidized bed boiler that burns papermaking mud
CN204513437U (en) A kind of cold air heating device and boiler milling system
CN101354184A (en) Fast heat and energy-saving type hot air boiler
CN105466010A (en) Burning-speed-controllable coal storage and vaporization integral hot-blast stove special for greenhouse
CN212901578U (en) Adjacent furnace flue gas rushing system
CN111911956B (en) Primary fan starting method of boiler adopting micro-oil ignition starting mode

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant