CN205243010U - Multi -functional built -in fitting is used in construction - Google Patents
Multi -functional built -in fitting is used in construction Download PDFInfo
- Publication number
- CN205243010U CN205243010U CN201521028109.2U CN201521028109U CN205243010U CN 205243010 U CN205243010 U CN 205243010U CN 201521028109 U CN201521028109 U CN 201521028109U CN 205243010 U CN205243010 U CN 205243010U
- Authority
- CN
- China
- Prior art keywords
- shutoff
- connecting piece
- steel pipe
- connector
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to a construction technical field's a multi -functional built -in fitting is used in construction, including decoration shutoff, connecting piece, steel pipe, stagnant water piece, stud, fender ring, plastics shutoff, rubber pad, its characterized in that, decorating the shutoff and passing through the screw and is connected with the connecting piece, connecting piece and steel pipe fixed connection, steel pipe are equipped with the stagnant water piece outward, and stud and connecting piece pass through threaded connection, fender ring, plastics shutoff, rubber pad are installed at the connecting piece inner chamber in proper order, between decorating between shutoff and the connecting piece. The beneficial effects are that: simple structure, pre -buried various construction usage that satisfy different periods, different purposes once, one is multi -purpose, and the province expects, saves labour, saves time.
Description
Technical field
The utility model relates to technical field of building construction, particularly relates to the multi-functional built-in fitting of a kind of construction.
Background technology
In building construction process, build shear wall, waterproof dykes and dams, pond, concrete collar tie beam etc. and usually use water-proof boltFixing concrete formwork for placing, after form removable, water-proof bolt is generally stayed in construction wall. External wall plastering, whitewash, paste wallThe decoration of exterior wall constructions such as brick need to arrange operation platform, conventionally adopt scaffold erecting method, especially skyscraper, pin handBetween frame and building, position and number needs as requested will arrange connector, and to strengthen scaffold stability, this need to beThe position of each layer of collar tie beam installation connecting element is pre-buried built-in fittings such as vertical steel pipe, through-wall bolt or expansion bolt. Building is builtBecome be delivered for use after exterior wall maintenance maintenance, clean time need to scaffold erecting operation platform is set equally. Built-in fitting kind is many,Purposes is single, and the workload that scaffolds erecting is large, and the duplication of labour is many, and will consume a large amount of material, artificial, length consuming time, effectRate is low.
Summary of the invention
For overcoming prior art defect, the technical problem that the utility model solves is to provide a kind of construction with multi-functional pre-buriedPart, simple in structure, the once pre-buried various construction purposes that meet different periods, different objects, one is multiplex, material-saving,Saving of labor, save time.
In order to achieve the above object, the utility model is realized by the following technical solutions:
The multi-functional built-in fitting of a kind of construction, comprise decoration shutoff, connector, steel pipe, sealing piece, studs,Baffle ring, plastics shutoff, rubber blanket, is characterized in that, described decoration shutoff is connected with connector by screw thread, connector withSteel pipe is fixedly connected with, and steel pipe is provided with sealing piece outward, and studs and connector are threaded connection; Described baffle ring, plastic sealStifled, rubber blanket is arranged on connector inner chamber successively, between decorating between shutoff and connector.
Compared with prior art, the beneficial effects of the utility model are:
Simple in structure, the once pre-buried various construction purposes that meet different periods, different objects, one is multiplex, material-saving,Saving of labor, save time:
1) can be used as the fixing formwork for placing of water-proof bolt: replace and decorate shutoff with studs, two groups of connectors, double end spiral shellBetween post, fixing formwork for placing can be installed, build complete form removal, under studs is detachable, recycle and reuse;
2) can be used to connect and build material Turnoverplatform, external wall construction platform: by bolt easily by material Turnoverplatform,External wall construction platform is connected on pre-buried connector and forms operation platform;
3) can be used to stable connection external scaffolding: be screwed into pre-buried connector one end and pin hand by threaded connecting rod one endFrame fastener connects, and scaffold and building can be fixed together;
4) can beautifying and decorating building: after Practical Completion, by decoration shutoff by can play decoration building, decorateShutoff can be made into miscellaneous as required, for street architecture thing can also install rainbow, color lamp etc.;
5), when building needs External Wall maintenance maintenance, cleaning after building up and being delivered for use, unload decoration shutoff, pre-buried connectionPart can be used to connect external wall construction platform equally, scaffolds erecting operation platform is set.
Brief description of the drawings
Fig. 1 is structural representation front view of the present utility model;
Fig. 2 is I portion structure enlarged diagram in Fig. 1;
Fig. 3 structural representation right view of the present utility model.
In figure: 1-decorates shutoff 2-connector 3-steel pipe 4-sealing piece 5-studs 6-baffle ring 7-plastic sealStifled 8-rubber blanket
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described further:
See Fig. 1-Fig. 3, the utility model relates to the multi-functional built-in fitting of a kind of construction, comprises and decorates shutoff 1, connectionPart 2, steel pipe 3, sealing piece 4, studs 5, baffle ring 6, plastics shutoff 7, rubber blanket 8, described decoration shutoff 1Be connected with connector 2 by screw thread, connector 2 is fixedly connected with steel pipe 3, the outer sealing piece 4, double end spiral shell of being provided with of steel pipe 3Post 5 is threaded connection with connector 2; Described baffle ring 6, plastics shutoff 7, rubber blanket 8 are arranged on connector 2 successivelyInner chamber, between decorating between shutoff 1 and connector 2, seals up steel pipe 3 inner chambers and prevents infiltration.
[embodiment 1]
Fix formwork for placing as water-proof bolt: replace and decorate 1, two group of connector 2 of shutoff, double end spiral shell with studs 5Fixing formwork for placing is installed between post 5, is built complete form removal, under studs 5 is detachable, recycle and reuse, energy-conservationEnvironmental protection.
[embodiment 2]
Be used for connecting and build material Turnoverplatform, external wall construction platform: can be easily by material Turnoverplatform, outer by boltWall operation platform (need to make in addition) is connected on pre-buried connector 2 and forms operation platform.
[embodiment 3]
Be used for stable connection external scaffolding: be screwed into pre-buried connector by threaded connecting rod (need to make in addition) one end2, the other end is connected with scaffold clasp, scaffold and building can be fixed together, prevent scaffold rock,Wave, increase its stability.
[embodiment 4]
Beautifying and decorating building: after Practical Completion, decoration shutoff 1 is arranged on built-in connection 2, can plays decorative beautyChange building, decorate shutoff 1 can be made into as required miscellaneous, for street architecture thing can also install rainbow,Color lamps etc., get through plastics shutoff 7 and are communicated with formation embedded threading pipe with steel pipe 3.
[embodiment 5]
Building needs External Wall maintenance maintenance, cleaning after building up and being delivered for use time, can unload and decorate shutoff 1, pre-buried connectionPart 2 can be used to connect external wall construction platform (need to make in addition) equally, scaffolds erecting operation platform is set.
Claims (1)
1. the multi-functional built-in fitting of construction, comprises and decorates shutoff, connector, steel pipe, sealing piece, double end spiral shellPost, baffle ring, plastics shutoff, rubber blanket, is characterized in that, described decoration shutoff is connected with connector by screw thread, connectsPart is fixedly connected with steel pipe, and steel pipe is provided with sealing piece outward, and studs and connector are threaded connection; Described baffle ring, mouldMaterial shutoff, rubber blanket are arranged on connector inner chamber successively, between decorating between shutoff and connector.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521028109.2U CN205243010U (en) | 2015-12-10 | 2015-12-10 | Multi -functional built -in fitting is used in construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521028109.2U CN205243010U (en) | 2015-12-10 | 2015-12-10 | Multi -functional built -in fitting is used in construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205243010U true CN205243010U (en) | 2016-05-18 |
Family
ID=55942090
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521028109.2U Active CN205243010U (en) | 2015-12-10 | 2015-12-10 | Multi -functional built -in fitting is used in construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205243010U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113090025A (en) * | 2021-04-12 | 2021-07-09 | 中建二局第二建筑工程有限公司 | Aluminum mold matching overhanging outer frame construction method of full concrete outer wall structure |
-
2015
- 2015-12-10 CN CN201521028109.2U patent/CN205243010U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113090025A (en) * | 2021-04-12 | 2021-07-09 | 中建二局第二建筑工程有限公司 | Aluminum mold matching overhanging outer frame construction method of full concrete outer wall structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201826468U (en) | Thermal decorating plate | |
CN102031866B (en) | A kind of disassembly-free heat-insulation decoration formwork and installation method thereof | |
CN201687125U (en) | Precast concrete wallboard | |
CN101831986A (en) | Precast composite outer insulated wall plate and manufacturing method thereof | |
CN203499163U (en) | GRC (glass fiber-reinforced concrete) decorative concrete outer wallboard | |
CN206279651U (en) | Assembled cast-in-place concrete external heat insulating wall steel skeleton template system and connector | |
CN202265937U (en) | Decorative roman column structure | |
CN201687127U (en) | Prefabricated composite outer heat preservation wallboard | |
CN206385769U (en) | The application structure of combined type tapping screw and hanging part on base course wall decorative architecture | |
CN201133041Y (en) | Heat preservation veneer for CPF exterior wall | |
CN205243010U (en) | Multi -functional built -in fitting is used in construction | |
CN104912273A (en) | Construction method of integrated outer wall of insulation facing structure and outer wall | |
CN207420088U (en) | A kind of detachable combination cornice for facade rebuilding construction | |
CN109779104A (en) | The fixed external mold assembled of internal model exempts to tear composite shuttering and installation method open | |
CN104594529B (en) | Steel-structure factory building exterior wall corner column is framed and external wall construction method | |
CN108798046A (en) | A kind of high-level structure storage concrete curing system and its construction method | |
CN208749042U (en) | A kind of prefabricated thermal insulation edge list of built-in pipeline | |
CN108978889A (en) | The novel prefabricated beam-column connection of one kind and connection method | |
CN104234249A (en) | Construction method of outer heat insulation wall using polyurethane hard foam composite boards | |
CN205063315U (en) | Outer wall scaffold connecting piece | |
CN201424719Y (en) | Composite heat insulating silicon calcium plate curtain wall | |
CN208748909U (en) | On-site assembly cladding | |
CN205063067U (en) | CCA rock wool compound incubation integration board | |
CN101767372A (en) | Composite decorative board and manufacturing method thereof | |
CN204715665U (en) | Heat preservation facing structure integrated exterior wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |