CN205242264U - A security operating platform for pier stud - Google Patents

A security operating platform for pier stud Download PDF

Info

Publication number
CN205242264U
CN205242264U CN201520966501.5U CN201520966501U CN205242264U CN 205242264 U CN205242264 U CN 205242264U CN 201520966501 U CN201520966501 U CN 201520966501U CN 205242264 U CN205242264 U CN 205242264U
Authority
CN
China
Prior art keywords
pier stud
main hoisting
platform
shoulder pole
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520966501.5U
Other languages
Chinese (zh)
Inventor
王吉兵
丁永军
张云富
王安鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201520966501.5U priority Critical patent/CN205242264U/en
Application granted granted Critical
Publication of CN205242264U publication Critical patent/CN205242264U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

本实用新型公开了一种用于墩柱的安全操作平台,包括由墩柱顶部支撑的支撑结构,在所述支撑结构的两端固接有对称布置的两个吊篮,两个所述吊篮通过两根拉杆连接,两根所述拉杆分设在墩柱的前后两侧,两根拉杆通过两根联系杆连接,两根所述联系杆分设墩柱的左右两侧。本实用新型通过支撑结构挂设在既有墩柱上,承受能力可靠。墩柱左右两侧的吊篮,上部通过扁担梁相连接,下部通过拉杆相连接,整体性强,安全系数高,稳定性好。同时本实用新型具有结构简单、施工效率高、可多次周转使用、造价低廉和使用方便等特点。

The utility model discloses a safe operation platform for pier columns, which comprises a supporting structure supported by the top of the pier column, two hanging baskets arranged symmetrically are fixedly connected to both ends of the supporting structure, and the two hanging baskets The basket is connected by two pull rods, and the two pull rods are respectively arranged on the front and rear sides of the pier column, and the two pull rods are connected by two connecting rods, and the two described tie rods are respectively arranged on the left and right sides of the pier column. The utility model is hung on the existing pier through the support structure, and the bearing capacity is reliable. The hanging baskets on the left and right sides of the pier column, the upper part is connected by a pole beam, and the lower part is connected by a tie rod, which has strong integrity, high safety factor and good stability. At the same time, the utility model has the characteristics of simple structure, high construction efficiency, repeated use, low cost and convenient use.

Description

一种用于墩柱的安全操作平台A safe operation platform for piers

技术领域technical field

本实用新型涉及一种施工安全操作平台,特别是一种用于墩柱的安全操作平台。The utility model relates to a construction safety operation platform, in particular to a safety operation platform for piers.

背景技术Background technique

近年来随着桥梁工程事业的不断发展,盖梁施工工艺也日趋成熟化、多样化。采用传统的抱箍法施工盖梁因其具有结构轻巧、无需大量支架、相对其他施工方法简单、适应性强、施工周期短等优点,一直受到施工方的青睐。在利用抱箍法施工盖梁时,需要首先在墩柱上安装抱箍。抱箍通常设置在墩柱顶部偏下的位置,距离地面较高,并且是悬空的。为了让工人能够安全地安装抱箍,需要在墩柱周围搭设脚手架或者吊装一个施工爬梯,使工人能够站在脚手架或爬梯上安装抱箍。这两种施工操作平台均存在材料消耗大、施工效率低的问题,并且一旦遇到桥下是河流、深沟、软土淤泥等危险场地,往往需要对地基进行处理,施工成本高且存在安全隐患。In recent years, with the continuous development of bridge engineering, the construction technology of cap beams has become more mature and diversified. The construction of cap beams using the traditional hoop method has been favored by construction parties because of its advantages of light structure, no need for a large number of supports, simplicity compared with other construction methods, strong adaptability, and short construction period. When using the hoop method to construct the cap beam, it is necessary to first install the hoop on the pier column. The hoop is usually set at the position lower than the top of the pier column, higher than the ground, and suspended in the air. In order to allow workers to install the hoop safely, it is necessary to build a scaffold around the pier column or hoist a construction ladder so that the workers can stand on the scaffold or ladder to install the hoop. Both of these two construction operation platforms have the problems of large material consumption and low construction efficiency, and once they encounter dangerous places such as rivers, deep ditches, soft soil and silt under the bridge, it is often necessary to deal with the foundation, the construction cost is high and there is a safety hazard. Hidden danger.

发明内容Contents of the invention

本实用新型为解决公知技术中存在的技术问题而提供一种用于墩柱的安全操作平台,该平台安全稳定、材料消耗少、施工效率高。The utility model provides a safe operation platform for piers to solve the technical problems in the known technology. The platform is safe and stable, has less material consumption and high construction efficiency.

本实用新型为解决公知技术中存在的技术问题所采取的技术方案是:一种用于墩柱的安全操作平台,其特征在于,包括由墩柱顶部支撑的支撑结构,在所述支撑结构的两端固接有对称布置的两个吊篮,两个所述吊篮通过两根拉杆连接,两根所述拉杆分设在墩柱的前后两侧,两根拉杆通过两根联系杆连接,两根所述联系杆分设墩柱的左右两侧。The technical solution adopted by the utility model to solve the technical problems in the known technology is: a safe operation platform for pier columns, which is characterized in that it includes a support structure supported by the top of the pier column, and Two hanging baskets arranged symmetrically are fixed at both ends, and the two hanging baskets are connected by two tie rods. The left and right sides of the pier column are respectively set according to the connecting rod.

墩柱顶部有预留钢筋,所述支撑结构采用轴对称结构,包括两道支撑梁和两道扁担梁,两道所述支撑梁左右对称地置放在墩柱顶部,并穿过预留钢筋,两道所述扁担梁前后对称地垂直固接在两道所述支撑梁的两端。There are reserved steel bars on the top of the pier column, and the support structure adopts an axisymmetric structure, including two support beams and two pole beams. The two support beams are placed symmetrically on the top of the pier column and pass through the reserved steel bars The two shoulder pole beams are vertically fixed to the two ends of the two support beams symmetrically front and back.

每个所述吊篮包括与所述扁担梁垂直固接的两根主吊杆和两根副吊杆,所述主吊杆的上端与所述扁担梁的一端固接,所述副吊杆的上端与所述扁担梁固接,在所述主吊杆和所述副吊杆的下端固接有平台底框,在所述平台底框上固接有平台踏板,在所述主吊杆和所述副吊杆之间以及两根所述主吊杆之间固接有防护栏杆,在所述主吊杆和所述副吊杆的外侧挂设有防护网。Each of the hanging baskets includes two main booms and two auxiliary booms vertically fixed to the shoulder beam, the upper end of the main boom is fixed to one end of the shoulder beam, and the auxiliary boom The upper end of the upper end of the platform is fixedly connected with the shoulder pole beam, the lower end of the main boom and the auxiliary boom is fixedly connected with a platform bottom frame, and a platform pedal is fixedly connected on the bottom frame of the platform. A protective railing is fixedly connected between the auxiliary suspender and between the two main suspenders, and a protective net is hung on the outside of the main suspender and the auxiliary suspender.

在所述扁担梁与所述主吊杆的连接处以及所述主吊杆与所述平台底框的连接处均设有加劲板。A stiffening plate is provided at the connection between the shoulder pole beam and the main suspender and the connection between the main suspender and the platform bottom frame.

本实用新型具有的优点和积极效果是:通过支撑结构挂设在既有墩柱上,承受能力可靠。墩柱左右两侧的吊篮,上部通过扁担梁相连接,下部通过拉杆相连接,整体性强,安全系数高,稳定性好。同时本实用新型具有结构简单、施工效率高、可多次周转使用、造价低廉和使用方便等特点。The utility model has the advantages and positive effects that: the supporting structure is hung on the existing piers, and the bearing capacity is reliable. The hanging baskets on the left and right sides of the pier column, the upper part is connected by a pole beam, and the lower part is connected by a tie rod, which has strong integrity, high safety factor and good stability. At the same time, the utility model has the characteristics of simple structure, high construction efficiency, repeated use, low cost and convenient use.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型的主视图。Fig. 2 is the front view of the utility model.

图中:1、支撑梁;2、扁担梁;3、主吊杆;4、副吊杆;5、平台底框;6、平台踏板;7、防护栏杆;8、防护网;9、拉杆;10、联系杆;11、加劲板;12墩柱;13、预留钢筋。In the figure: 1. supporting beam; 2. pole beam; 3. main boom; 4. auxiliary boom; 5. platform bottom frame; 6. platform pedal; 7. protective railing; 8. protective net; 10. Connecting rod; 11. Stiffening plate; 12 Pier column; 13. Reserved steel bar.

具体实施方式detailed description

为能进一步了解本实用新型的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:In order to further understand the invention content, characteristics and effects of the present utility model, the following examples are given, and detailed descriptions are as follows in conjunction with the accompanying drawings:

请参阅图1和图2,一种用于墩柱的安全操作平台,包括由墩柱12顶部支撑的支撑结构,在所述支撑结构的两端固接有对称布置的两个吊篮,两个所述吊篮通过两根拉杆9连接,两根所述拉杆9分设在墩柱12的前后两侧,两根拉杆9通过两根联系杆10连接,两根所述联系杆10分设在墩柱12的左右两侧。Please refer to Fig. 1 and Fig. 2, a kind of safe operation platform for pier column, comprises the supporting structure that is supported by the top of pier column 12, two hanging baskets arranged symmetrically are affixed at the two ends of described supporting structure, two The two hanging baskets are connected by two pull rods 9, and the two pull rods 9 are arranged on the front and rear sides of the pier column 12. The two pull rods 9 are connected by two connecting rods 10, and the two connecting rods 10 are arranged on the pier The left and right sides of column 12.

在本实施例中,墩柱12顶部有预留钢筋13,所述支撑结构采用轴对称结构,包括两道支撑梁1和两道扁担梁2,两道所述支撑梁1左右对称地置放在墩柱12顶部,并穿过预留钢筋13,两道所述扁担梁2前后对称地垂直固接在两道所述支撑梁1的两端。每个所述吊篮包括与所述扁担梁2垂直固接的两根主吊杆3和两根副吊杆4,所述主吊杆3的上端与所述扁担梁2的一端固接,所述副吊杆4的上端与所述扁担梁2固接,在所述主吊杆3和所述副吊杆4的下端固接有平台底框5,在所述平台底框5上固接有平台踏板6,在所述主吊杆3和所述副吊杆4之间以及两根所述主吊杆4之间固接有防护栏杆7,在所述主吊杆4和所述副吊杆3的外侧挂设有防护网8。在所述扁担梁2与所述主吊杆4的连接处以及所述主吊杆4与所述平台底框5的连接处均设有加劲板11。In this embodiment, there is a reserved steel bar 13 on the top of the pier column 12, and the support structure adopts an axisymmetric structure, including two support beams 1 and two pole beams 2, and the two support beams 1 are placed symmetrically from left to right On the top of the pier column 12 and passing through the reserved steel bars 13, the two shoulder beams 2 are vertically fixed to the two ends of the two support beams 1 symmetrically front and back. Each hanging basket includes two main booms 3 and two auxiliary booms 4 vertically fixed to the shoulder beam 2, the upper end of the main boom 3 is fixed to one end of the shoulder beam 2, The upper end of the auxiliary suspender 4 is fixedly connected to the shoulder pole beam 2, and the lower end of the main suspender 3 and the auxiliary suspender 4 is affixed with a platform bottom frame 5, and fixed on the platform bottom frame 5 A platform pedal 6 is connected, a protective railing 7 is affixed between the main boom 3 and the secondary boom 4 and between the two main booms 4, and between the main boom 4 and the A protective net 8 is hung on the outer side of the auxiliary boom 3 . A stiffening plate 11 is provided at the joint between the shoulder pole beam 2 and the main suspender 4 and the joint between the main suspender 4 and the platform bottom frame 5 .

尽管上面结合附图对本实用新型的优选实施例进行了描述,但是本实用新型并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本实用新型的启示下,在不脱离本实用新型宗旨和权利要求所保护的范围情况下,还可以做出很多形式,这些均属于本实用新型的保护范围之内。Although the preferred embodiment of the utility model has been described above in conjunction with the accompanying drawings, the utility model is not limited to the above-mentioned specific implementation, and the above-mentioned specific implementation is only illustrative and not restrictive. Under the enlightenment of the utility model, those skilled in the art can also make many forms without departing from the purpose of the utility model and the protection scope of the claims, and these all belong to the protection scope of the utility model.

Claims (4)

1. for a safe operation platform for pier stud, it is characterized in that, comprise the supporting construction by pier stud top braces,Be connected with two hanging baskets that are arranged symmetrically with at the two ends of described supporting construction, two described hanging baskets connect by two pull bars,Two described pull bars divide the both sides, front and back that are located at pier stud, and two pull bars connect by two contact bars, two described contact barsSet up the left and right sides of pier stud separately.
2. the safe operation platform for pier stud according to claim 1, is characterized in that, pier stud top has reservedReinforcing bar, described supporting construction adopts axially symmetric structure, comprises twice brace summer and twice shoulder pole girder, brace summer described in twiceSymmetrically be seated in pier stud top, and through reserved steel bar, before and after shoulder pole girder, be vertically fixed in symmetrically described in twiceThe two ends of brace summer described in twice.
3. the safe operation platform for pier stud according to claim 2, is characterized in that, each described hanging basket bagDraw together two piece main hoisting bars of affixed vertical with described shoulder pole girder and two secondary suspension rods, the upper end of described main hoisting bar and described shoulder pole girderOne end affixed, the upper end of described secondary suspension rod and described shoulder pole girder are affixed, in the lower end of described main hoisting bar and described secondary suspension rodBe connected with platform underframe, on described platform underframe, be connected with platform pedal, between described main hoisting bar and described secondary suspension rodAnd be connected with guard rail between two described main hoisting bars, be linked with anti-in the outside of described main hoisting bar and described secondary suspension rodProtecting wire net.
4. the safe operation platform for pier stud according to claim 3, is characterized in that, described shoulder pole girder withThe junction of the junction of described main hoisting bar and described main hoisting bar and described platform underframe is equipped with stiffener.
CN201520966501.5U 2015-11-26 2015-11-26 A security operating platform for pier stud Expired - Fee Related CN205242264U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520966501.5U CN205242264U (en) 2015-11-26 2015-11-26 A security operating platform for pier stud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520966501.5U CN205242264U (en) 2015-11-26 2015-11-26 A security operating platform for pier stud

Publications (1)

Publication Number Publication Date
CN205242264U true CN205242264U (en) 2016-05-18

Family

ID=55941344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520966501.5U Expired - Fee Related CN205242264U (en) 2015-11-26 2015-11-26 A security operating platform for pier stud

Country Status (1)

Country Link
CN (1) CN205242264U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107881927A (en) * 2017-10-10 2018-04-06 岩土科技股份有限公司 A kind of apparatus for examination and repair of bridge bearing platform and its casing
CN109706841A (en) * 2019-01-08 2019-05-03 广西路桥工程集团有限公司 A kind of movable hanging basket and its construction method facilitating high-strength bolt construction
CN110886245A (en) * 2018-09-07 2020-03-17 林丹 Small hanging basket for pier top construction
CN111851311A (en) * 2020-08-17 2020-10-30 中国五冶集团有限公司 A kind of steel-concrete composite pier installation and operation platform and its assembly method
CN117536116A (en) * 2023-11-29 2024-02-09 中建四局贵州投资建设有限公司 Safety operation platform for installing bent cap anchor ear

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107881927A (en) * 2017-10-10 2018-04-06 岩土科技股份有限公司 A kind of apparatus for examination and repair of bridge bearing platform and its casing
CN110886245A (en) * 2018-09-07 2020-03-17 林丹 Small hanging basket for pier top construction
CN109706841A (en) * 2019-01-08 2019-05-03 广西路桥工程集团有限公司 A kind of movable hanging basket and its construction method facilitating high-strength bolt construction
CN109706841B (en) * 2019-01-08 2020-09-18 广西路桥工程集团有限公司 Construction method of movable hanging basket convenient for high-strength bolt construction
CN111851311A (en) * 2020-08-17 2020-10-30 中国五冶集团有限公司 A kind of steel-concrete composite pier installation and operation platform and its assembly method
CN117536116A (en) * 2023-11-29 2024-02-09 中建四局贵州投资建设有限公司 Safety operation platform for installing bent cap anchor ear

Similar Documents

Publication Publication Date Title
CN205242264U (en) A security operating platform for pier stud
CN206052555U (en) Hood type safe operation platform
CN207048306U (en) Sliding formwork flexibility platform
CN106429883A (en) Tower crane foundation used for bridge construction
CN207267961U (en) An operating platform for pouring bridge piers
CN101818562B (en) Triangular rack of reinforcing steel
CN106758862B (en) Lattice tubular tower and frame peace tears platform open
CN206109986U (en) A simply hang basket for construction of bridge cross slab
CN208056613U (en) A kind of overhanging type framed bent sets up structure
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN104278830A (en) Integral combined scaffold
CN205397790U (en) A subassembly that is used for construction elevator to attach wall pull rod overlength
CN204212388U (en) Integral combined scaffolding
CN207458703U (en) Shock-proof transformer stent and potential device
CN206636170U (en) A kind of shaped steel cantilever frame for being used for structural supporter and external scaffolding
CN205558308U (en) Integrated form platform of unloading
CN204038917U (en) Detachable external hanging type operating platform
CN208166406U (en) Derrick crane tool-type adheres to operating platform
CN106401157A (en) Movable operation platform and high-altitude construction method
CN207749848U (en) An anti-fall building construction support
CN215052132U (en) Mounting bracket platform for cable-stayed bridge of arc steel tower
CN204738519U (en) Outer device of climbing of floor superelevation
CN207131053U (en) Shaped steel platform for construction
CN206655455U (en) A kind of pier stud reinforcing bar binding platform keel shoe
CN203613776U (en) Platform special for suspended dome cable net construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160518

Termination date: 20201126

CF01 Termination of patent right due to non-payment of annual fee