CN209668648U - A kind of tower crane sustaining wall operating platform - Google Patents

A kind of tower crane sustaining wall operating platform Download PDF

Info

Publication number
CN209668648U
CN209668648U CN201920282327.0U CN201920282327U CN209668648U CN 209668648 U CN209668648 U CN 209668648U CN 201920282327 U CN201920282327 U CN 201920282327U CN 209668648 U CN209668648 U CN 209668648U
Authority
CN
China
Prior art keywords
tower crane
standing platform
bar
sustaining wall
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920282327.0U
Other languages
Chinese (zh)
Inventor
刘长勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201920282327.0U priority Critical patent/CN209668648U/en
Application granted granted Critical
Publication of CN209668648U publication Critical patent/CN209668648U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a kind of tower crane sustaining wall operating platforms, including the standing platform and supporting element being connect with firmware, firmware includes the round steel for being fixedly installed on standing platform two sides of the bottom and the Screw arbor with nut at both-ends with the fixed setting of round steel welding, drawknot bar is fixedly installed on the middle part of standing platform bottom, wirerope one end connects standing platform, and the other end is connected and fixed the wirerope snap ring for being set to top;Supporting element includes the upright bar connecting with the drawknot bar for stretching out standing platform and the jacking being installed at the top of upright bar, and jacking is fixedly connected with the flitch that top is fixedly installed, and sweep the floor bar and backing plate is fixedly installed in bottom of upright rod.After the tower crane sustaining wall operating platform of the utility model once assembles, next time be can be used directly, and the amount of labour is small, no security risk, without removing climbing frame, is not influenced structure normal construction, is saved the time, construction cost is low.

Description

A kind of tower crane sustaining wall operating platform
Technical field
The utility model belongs to construction equipment field, more particularly to a kind of tower crane sustaining wall operating platform.
Background technique
Sustaining wall can be all set tower crane and structure every one section of height when the tower crane horizontal arm on seat ground is more than free height Object is connected, in order that playing, tower crane is vertically secured, prevents because the power that Tai Gao and handling object generate makes tower body shake or fall It collapses.
Climbing frame due to safely, be easily understood, it is flat as operation using climbing frame when tower crane sustaining wall is mounted on no foothold at present Platform is more universal.
But 1. climbing frame has the disadvantage in that removes protection on climbing frame, work surface is provided for sustaining wall, after sustaining wall is installed It also needs to restore to protect, the amount of labour is big;2. removing protective net, scaffold board, cross bar etc. on climbing frame high-altitude has security risk;3. tradition Tower crane sustaining wall installation before need remove sustaining wall periphery climbing frame protection, sustaining wall be installed after and need to restore climbing frame protection, the time compared with Long, and during climbing frame notch protection peace is torn open, climbing frame can not be promoted, structure can not normal construction, influence the construction period;4. passing Tower crane sustaining wall unite at no foothold, tower crane sustaining wall passes through climbing frame and is fixed in structure, and the climbing frame for needing to remove sustaining wall periphery is anti- Shield after sustaining wall is installed and needs to restore climbing frame protection, higher cost.
Utility model content
The purpose of the utility model is to provide a kind of tower crane sustaining wall operating platforms, to solve to exist using climbing frame construction operation The amount of labour it is big, there is a problem of that security risk, to influence construction period, construction cost high.
The technical solution that the utility model solves above-mentioned technical problem is as follows: a kind of tower crane sustaining wall operating platform, including with Firmware connection standing platform and supporting element, firmware include be fixedly installed on standing platform two sides of the bottom round steel and with this The Screw arbor with nut at both-ends of the fixed setting of round steel welding, the drawknot bar of firmware are fixedly installed on the middle part of standing platform bottom, and Side is extend out to outside standing platform;Supporting element includes the upright bar connecting with the drawknot bar for stretching out standing platform and is installed on the upright bar The jacking at top, the jacking are fixedly connected with the flitch that top is fixedly installed, and sweep the floor bar and backing plate is fixedly installed in bottom of upright rod;It stands Vertical platform periphery is girder, and the secondary beam of inside is welded in the girder, and girder and secondary beam upper surface are laid with checkered steel plate, and the standing is flat Three faces of platform are welded with guard rail and are welded with hanging ring in four corners;It is flat that wirerope one end of firmware is connected to standing The hanging ring of platform, the other end are fixedly installed by wirerope snap ring.
The utility model tower crane sustaining wall operating platform as described above, further, time of round steel and standing platform two sides of the bottom Beam is welded as a whole.
The utility model tower crane sustaining wall operating platform as described above, further, in the middle part of drawknot bar and standing platform bottom Secondary beam is welded as a whole.
The utility model tower crane sustaining wall operating platform as described above, further, girder and secondary beam are all made of square steel tube.
The utility model tower crane sustaining wall operating platform as described above, further, jacking use U-shaped jacking.
The utility model tower crane sustaining wall operating platform as described above, further, upright bar are in longitudinally disposed four, rectangle, adjacent Horizon bar is connected between two upright bars.
After the tower crane sustaining wall operating platform of the utility model once assembles, next time be can be used directly, and need to only be taken in floor If supporting element, the amount of labour is small;In place using tower crane lifting once mounting, no security risk;It is installed below climbing frame, without removing Climbing frame does not influence structure normal construction, saves the time;After primary assembling, without pass through climbing frame, it is only necessary to be taken in floor If Simple support frame, cost is relatively low.
Detailed description of the invention
By made detailed description in conjunction with the following drawings, the above-mentioned and/or otherwise advantage of the utility model will It becomes more apparent upon and is easier to understand, these attached drawings are only schematical, are not intended to limit the utility model, in which:
Fig. 1 is a kind of structural schematic diagram of the standing platform of embodiment of the utility model;
Fig. 2 is a kind of hanging ring scheme of installation of embodiment of the utility model;
Fig. 3 is operating platform side view at a kind of window opening of embodiment of the utility model;
Fig. 4 is partial enlarged view at Fig. 3 A;
Fig. 5 is a kind of wirerope bottom connection figure of embodiment of the utility model;
Fig. 6 is connection figure at the top of a kind of wirerope of embodiment of the utility model;
Fig. 7 is operating platform side view at a kind of window opening side shear wall of embodiment of the utility model;
Fig. 8 is a kind of operating platform applying working condition plan view of embodiment of the utility model.
In attached drawing, parts list represented by the reference numerals are as follows:
1, girder, 2, hanging ring, 3, guard rail, 4, secondary beam, 5, checkered steel plate, 6, wirerope, 7, window opening, 8, floor, 9, Drawknot bar, 10, flitch, 11, upright bar, 12, jacking, 13, horizon bar, 14, bar of sweeping the floor, 15, backing plate, 16, screw hole, 17, steel wire Rope snap ring, 18, round steel, 19, mountain type card, 20, nut, 21, Screw arbor with nut at both-ends, 22, tower crane.
Specific embodiment
Hereinafter, the embodiment of the tower crane sustaining wall operating platform of the utility model is described with reference to the accompanying drawings.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model Design, be it is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art can also be public based on the claim of this application book and specification institute For the content opened using obvious other technical solutions, these technical solutions include using doing to the embodiment recorded herein The technical solution of any obvious substitutions and modifications out.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each section Shape and its correlation.It note that for the ease of clearly showing the structure of each component of the utility model embodiment, respectively It is not drawn according to identical ratio between attached drawing.Identical reference marker is for indicating identical part.
As shown in Figures 1 to 8, the tower crane sustaining wall operating platform of a kind of embodiment of the utility model comprising with firmware The standing platform and supporting element of connection, standing platform length are that tower crane helps point outermost bolt-center distance plus two sides each 400mm;
Firmware includes being fixedly welded in the round steel 18 of standing platform two sides of the bottom and setting with the fixation of the round steel 18 welding The Screw arbor with nut at both-ends 21 set, the Screw arbor with nut at both-ends 21 pass through the screw hole 16 on 7 side shear wall of operating platform two sides window opening and in ends It is fixed by mountain type card 19 and nut 20;
Standing platform periphery is girder 1, and secondary beam 4 is welded in inside, and girder 1 and 4 upper surface of secondary beam are laid with checkered steel plate 5, should Standing platform peripheral solder guard rail 3 and in four corner's welding hanging rings 2, drawknot bar 9 is fixedly welded in standing platform bottom Secondary beam 4 in the middle part of portion, round steel 18 are fixedly welded the secondary beam 4 in standing platform two sides of the bottom, and 4 spacing of secondary beam is according to 7 width of window opening Adjustment, hole is wide after 4 collar extension spacing of secondary beam is equal to the main frame installation of window, in order to which drawknot bar 9 passes through, girder 1, secondary beam 4, guard rail 3 are all made of 40 × 60mm square steel tube, and drawknot bar 9 uses 48 steel pipe of φ;6 one end of wirerope connects the hanging ring 2 on standing platform, separately It is fixed by wirerope snap ring 17 in end that one end passes through the screw hole 16 on 7 top wall of window opening;
Supporting element includes the upright bar 11 connecting with the drawknot bar 9 for stretching out standing platform and the jacking for being installed on 11 top of upright bar 12, jacking 12 is fixedly connected with the flitch 10 that top is fixedly installed, and flitch 10 holds out against the floor 8 in top, and 11 bottom of upright bar is set Set sweep the floor bar 14 and backing plate 15;Upright bar 11 is in longitudinally disposed four, rectangle, is connected with horizon bar 13 between adjacent two upright bar 11.
When processing standing platform, first primary-secondary beam is welded, then weld checkered steel plate 5 and hanging ring 2, finally welding protection Railing;
When processing firmware, first Screw arbor with nut at both-ends 21 and round steel 18 are welded, then round steel 18 is welded on to time of two sides On beam 4, then by drawknot bar 9 be welded on middle part secondary beam 4 on;
Four upright bars 11 are set in floor, backing plate 15 is put in 11 bottom of upright bar, 11 top caving support 12 of upright bar, is on jacking 12 Flitch 10, flitch 10 hold out against floor 8, and the drawknot bar 9 of firmware is buckled in the upright bar 11 of supporting element and can be fastened by bolts.
Operating platform is hung to outside tower crane sustaining wall mounting layer using tower crane, manually standing platform is drawn using the rope made of hemp, makes pair It draws screw rod 21 to be directed at screw hole, Screw arbor with nut at both-ends 21 is fastened on shear wall, is then connect drawknot bar 9 with upright bar 11 with fastener Get up, finally wirerope 6 is fixed on hole Zhou Bianliang or shear wall.
The beneficial effects of the utility model are as follows:
1. traditional tower crane sustaining wall installation needs to remove protection on climbing frame by climbing frame, provide work surface, sustaining wall for sustaining wall It also needs to restore to protect after being installed, the amount of labour is big;And after the tower crane sustaining wall operating platform of the utility model once assembles, next time It can be used directly, only need to set up supporting element in floor, the amount of labour is small;
2. traditional sustaining wall installation is needed by climbing frame, protective net, scaffold board, cross bar etc. are removed on climbing frame high-altitude safety Hidden danger, and the tower crane sustaining wall operating platform of the utility model lifts once mounting in place using tower crane, no security risk.
3. needing the climbing frame for removing sustaining wall periphery to protect before traditional tower crane sustaining wall installation, after sustaining wall is installed and need to restore to climb Frame protection, the time is longer, and climbing frame notch protection peace tear open during, climbing frame can not be promoted, structure can not normal construction, influence It construction period, and the tower crane sustaining wall operating platform of the utility model, is installed below climbing frame, without removing climbing frame, does not influence to tie Structure normal construction, saves the time;
4. traditional tower crane sustaining wall is fixed in structure across climbing frame at no foothold, needs to remove climbing for sustaining wall periphery Frame protection after sustaining wall is installed and needs to restore climbing frame protection, higher cost;And the tower crane sustaining wall operation of the utility model is flat After platform once assembles, without pass through climbing frame, it is only necessary to set up Simple support frame in floor, cost is relatively low.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and other feature combination, and those skilled in the art are also Other combinations between each technical characteristic can be carried out according to the purpose of utility model, be subject to the purpose for realizing the utility model.

Claims (6)

1. a kind of tower crane sustaining wall operating platform, including the standing platform and supporting element being connect with firmware, which is characterized in that firm Part includes the round steel for being fixedly installed on standing platform two sides of the bottom and the Screw arbor with nut at both-ends with the fixed setting of round steel welding, is consolidated The drawknot bar of part is fixedly installed on the middle part of standing platform bottom, and extend out to outside standing platform in side;Supporting element include with The jacking for stretching out the upright bar of the drawknot bar connection of standing platform and being installed at the top of the upright bar, the jacking and top fixed setting Flitch is fixedly connected, and sweep the floor bar and backing plate is fixedly installed in bottom of upright rod;Standing platform periphery is girder, and the secondary beam of inside is welded in The girder, girder and secondary beam upper surface are laid with checkered steel plate, and three faces of the standing platform are welded with guard rail and turn at four Hanging ring is welded at angle;Wirerope one end of firmware is connected to the hanging ring of standing platform, and the other end is solid by wirerope snap ring Fixed setting.
2. tower crane sustaining wall operating platform according to claim 1, which is characterized in that round steel and standing platform two sides of the bottom Secondary beam is welded as a whole.
3. tower crane sustaining wall operating platform according to claim 1, which is characterized in that in the middle part of drawknot bar and standing platform bottom Secondary beam be welded as a whole.
4. tower crane sustaining wall operating platform according to claim 1, which is characterized in that girder and secondary beam are all made of square steel tube.
5. tower crane sustaining wall operating platform according to claim 1, which is characterized in that jacking uses U-shaped jacking.
6. according to such as tower crane sustaining wall operating platform described in any one of claim 1 to 5, which is characterized in that upright bar is vertical in rectangle To setting four, horizon bar is connected between adjacent two upright bar.
CN201920282327.0U 2019-03-06 2019-03-06 A kind of tower crane sustaining wall operating platform Expired - Fee Related CN209668648U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920282327.0U CN209668648U (en) 2019-03-06 2019-03-06 A kind of tower crane sustaining wall operating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920282327.0U CN209668648U (en) 2019-03-06 2019-03-06 A kind of tower crane sustaining wall operating platform

Publications (1)

Publication Number Publication Date
CN209668648U true CN209668648U (en) 2019-11-22

Family

ID=68570667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920282327.0U Expired - Fee Related CN209668648U (en) 2019-03-06 2019-03-06 A kind of tower crane sustaining wall operating platform

Country Status (1)

Country Link
CN (1) CN209668648U (en)

Similar Documents

Publication Publication Date Title
CN107100187B (en) Tower crane steel girder erection structure and installation method
CN101555728A (en) High-rise building construction assembled overhanging safe guarding shed and construction method thereof
CN106429883A (en) Tower crane foundation used for bridge construction
CN205242264U (en) A security operating platform for pier stud
CN107806237A (en) A kind of high building hydraulic climbing protecting screen and its construction method
CN209668648U (en) A kind of tower crane sustaining wall operating platform
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN107217912B (en) A kind of superelevation physical isolation construction method for neighbouring high-speed rail Business Line construction
CN212671146U (en) Novel precast beam intensity detects and hangs device
CN215291305U (en) Hydroelectric station generator overhauls combination platform
CN212002401U (en) High-altitude horizontal overhanging steel pipe closed hard protection shed
CN211447860U (en) Tool type outer cantilever protection device
CN212129859U (en) Detachable steel structure aerial work operating platform
CN104818859B (en) The installation method of orbit traffic overhead station operation platform
CN204038917U (en) Detachable external hanging type operating platform
CN211312215U (en) Hydraulic integral self-climbing construction platform
CN210419022U (en) Tower crane standard knot with safety performance
CN209924407U (en) Combined working platform for steel structure high-altitude installation
CN207847037U (en) A kind of high building hydraulic climbing protecting screen
CN204212388U (en) Monolithic combined scaffold
CN207749848U (en) A kind of fall arrest construction holder
CN206360392U (en) Attachment type raise scaffold periphery protecting wire net
CN207392709U (en) A kind of ladder cage formula combined scaffold
CN112647701A (en) Hydroelectric station generator overhauls combination platform
CN220847163U (en) Parallel steel strand stay cable mounting platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191122

CF01 Termination of patent right due to non-payment of annual fee