CN209668648U - A kind of tower crane sustaining wall operating platform - Google Patents
A kind of tower crane sustaining wall operating platform Download PDFInfo
- Publication number
- CN209668648U CN209668648U CN201920282327.0U CN201920282327U CN209668648U CN 209668648 U CN209668648 U CN 209668648U CN 201920282327 U CN201920282327 U CN 201920282327U CN 209668648 U CN209668648 U CN 209668648U
- Authority
- CN
- China
- Prior art keywords
- tower crane
- standing platform
- bar
- sustaining wall
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 24
- 239000010959 steel Substances 0.000 claims abstract description 24
- 238000003466 welding Methods 0.000 claims abstract description 6
- 239000007787 solid Substances 0.000 claims 1
- 230000009194 climbing Effects 0.000 abstract description 30
- 238000010276 construction Methods 0.000 abstract description 12
- 238000009434 installation Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 244000025254 Cannabis sativa Species 0.000 description 1
- 235000012766 Cannabis sativa ssp. sativa var. sativa Nutrition 0.000 description 1
- 235000012765 Cannabis sativa ssp. sativa var. spontanea Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 235000009120 camo Nutrition 0.000 description 1
- 235000005607 chanvre indien Nutrition 0.000 description 1
- 239000011487 hemp Substances 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 229910000679 solder Inorganic materials 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000010408 sweeping Methods 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a kind of tower crane sustaining wall operating platforms, including the standing platform and supporting element being connect with firmware, firmware includes the round steel for being fixedly installed on standing platform two sides of the bottom and the Screw arbor with nut at both-ends with the fixed setting of round steel welding, drawknot bar is fixedly installed on the middle part of standing platform bottom, wirerope one end connects standing platform, and the other end is connected and fixed the wirerope snap ring for being set to top;Supporting element includes the upright bar connecting with the drawknot bar for stretching out standing platform and the jacking being installed at the top of upright bar, and jacking is fixedly connected with the flitch that top is fixedly installed, and sweep the floor bar and backing plate is fixedly installed in bottom of upright rod.After the tower crane sustaining wall operating platform of the utility model once assembles, next time be can be used directly, and the amount of labour is small, no security risk, without removing climbing frame, is not influenced structure normal construction, is saved the time, construction cost is low.
Description
Technical field
The utility model belongs to construction equipment field, more particularly to a kind of tower crane sustaining wall operating platform.
Background technique
Sustaining wall can be all set tower crane and structure every one section of height when the tower crane horizontal arm on seat ground is more than free height
Object is connected, in order that playing, tower crane is vertically secured, prevents because the power that Tai Gao and handling object generate makes tower body shake or fall
It collapses.
Climbing frame due to safely, be easily understood, it is flat as operation using climbing frame when tower crane sustaining wall is mounted on no foothold at present
Platform is more universal.
But 1. climbing frame has the disadvantage in that removes protection on climbing frame, work surface is provided for sustaining wall, after sustaining wall is installed
It also needs to restore to protect, the amount of labour is big;2. removing protective net, scaffold board, cross bar etc. on climbing frame high-altitude has security risk;3. tradition
Tower crane sustaining wall installation before need remove sustaining wall periphery climbing frame protection, sustaining wall be installed after and need to restore climbing frame protection, the time compared with
Long, and during climbing frame notch protection peace is torn open, climbing frame can not be promoted, structure can not normal construction, influence the construction period;4. passing
Tower crane sustaining wall unite at no foothold, tower crane sustaining wall passes through climbing frame and is fixed in structure, and the climbing frame for needing to remove sustaining wall periphery is anti-
Shield after sustaining wall is installed and needs to restore climbing frame protection, higher cost.
Utility model content
The purpose of the utility model is to provide a kind of tower crane sustaining wall operating platforms, to solve to exist using climbing frame construction operation
The amount of labour it is big, there is a problem of that security risk, to influence construction period, construction cost high.
The technical solution that the utility model solves above-mentioned technical problem is as follows: a kind of tower crane sustaining wall operating platform, including with
Firmware connection standing platform and supporting element, firmware include be fixedly installed on standing platform two sides of the bottom round steel and with this
The Screw arbor with nut at both-ends of the fixed setting of round steel welding, the drawknot bar of firmware are fixedly installed on the middle part of standing platform bottom, and
Side is extend out to outside standing platform;Supporting element includes the upright bar connecting with the drawknot bar for stretching out standing platform and is installed on the upright bar
The jacking at top, the jacking are fixedly connected with the flitch that top is fixedly installed, and sweep the floor bar and backing plate is fixedly installed in bottom of upright rod;It stands
Vertical platform periphery is girder, and the secondary beam of inside is welded in the girder, and girder and secondary beam upper surface are laid with checkered steel plate, and the standing is flat
Three faces of platform are welded with guard rail and are welded with hanging ring in four corners;It is flat that wirerope one end of firmware is connected to standing
The hanging ring of platform, the other end are fixedly installed by wirerope snap ring.
The utility model tower crane sustaining wall operating platform as described above, further, time of round steel and standing platform two sides of the bottom
Beam is welded as a whole.
The utility model tower crane sustaining wall operating platform as described above, further, in the middle part of drawknot bar and standing platform bottom
Secondary beam is welded as a whole.
The utility model tower crane sustaining wall operating platform as described above, further, girder and secondary beam are all made of square steel tube.
The utility model tower crane sustaining wall operating platform as described above, further, jacking use U-shaped jacking.
The utility model tower crane sustaining wall operating platform as described above, further, upright bar are in longitudinally disposed four, rectangle, adjacent
Horizon bar is connected between two upright bars.
After the tower crane sustaining wall operating platform of the utility model once assembles, next time be can be used directly, and need to only be taken in floor
If supporting element, the amount of labour is small;In place using tower crane lifting once mounting, no security risk;It is installed below climbing frame, without removing
Climbing frame does not influence structure normal construction, saves the time;After primary assembling, without pass through climbing frame, it is only necessary to be taken in floor
If Simple support frame, cost is relatively low.
Detailed description of the invention
By made detailed description in conjunction with the following drawings, the above-mentioned and/or otherwise advantage of the utility model will
It becomes more apparent upon and is easier to understand, these attached drawings are only schematical, are not intended to limit the utility model, in which:
Fig. 1 is a kind of structural schematic diagram of the standing platform of embodiment of the utility model;
Fig. 2 is a kind of hanging ring scheme of installation of embodiment of the utility model;
Fig. 3 is operating platform side view at a kind of window opening of embodiment of the utility model;
Fig. 4 is partial enlarged view at Fig. 3 A;
Fig. 5 is a kind of wirerope bottom connection figure of embodiment of the utility model;
Fig. 6 is connection figure at the top of a kind of wirerope of embodiment of the utility model;
Fig. 7 is operating platform side view at a kind of window opening side shear wall of embodiment of the utility model;
Fig. 8 is a kind of operating platform applying working condition plan view of embodiment of the utility model.
In attached drawing, parts list represented by the reference numerals are as follows:
1, girder, 2, hanging ring, 3, guard rail, 4, secondary beam, 5, checkered steel plate, 6, wirerope, 7, window opening, 8, floor, 9,
Drawknot bar, 10, flitch, 11, upright bar, 12, jacking, 13, horizon bar, 14, bar of sweeping the floor, 15, backing plate, 16, screw hole, 17, steel wire
Rope snap ring, 18, round steel, 19, mountain type card, 20, nut, 21, Screw arbor with nut at both-ends, 22, tower crane.
Specific embodiment
Hereinafter, the embodiment of the tower crane sustaining wall operating platform of the utility model is described with reference to the accompanying drawings.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model
Design, be it is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model
System.In addition to the embodiment recorded herein, those skilled in the art can also be public based on the claim of this application book and specification institute
For the content opened using obvious other technical solutions, these technical solutions include using doing to the embodiment recorded herein
The technical solution of any obvious substitutions and modifications out.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each section
Shape and its correlation.It note that for the ease of clearly showing the structure of each component of the utility model embodiment, respectively
It is not drawn according to identical ratio between attached drawing.Identical reference marker is for indicating identical part.
As shown in Figures 1 to 8, the tower crane sustaining wall operating platform of a kind of embodiment of the utility model comprising with firmware
The standing platform and supporting element of connection, standing platform length are that tower crane helps point outermost bolt-center distance plus two sides each
400mm;
Firmware includes being fixedly welded in the round steel 18 of standing platform two sides of the bottom and setting with the fixation of the round steel 18 welding
The Screw arbor with nut at both-ends 21 set, the Screw arbor with nut at both-ends 21 pass through the screw hole 16 on 7 side shear wall of operating platform two sides window opening and in ends
It is fixed by mountain type card 19 and nut 20;
Standing platform periphery is girder 1, and secondary beam 4 is welded in inside, and girder 1 and 4 upper surface of secondary beam are laid with checkered steel plate 5, should
Standing platform peripheral solder guard rail 3 and in four corner's welding hanging rings 2, drawknot bar 9 is fixedly welded in standing platform bottom
Secondary beam 4 in the middle part of portion, round steel 18 are fixedly welded the secondary beam 4 in standing platform two sides of the bottom, and 4 spacing of secondary beam is according to 7 width of window opening
Adjustment, hole is wide after 4 collar extension spacing of secondary beam is equal to the main frame installation of window, in order to which drawknot bar 9 passes through, girder 1, secondary beam 4, guard rail
3 are all made of 40 × 60mm square steel tube, and drawknot bar 9 uses 48 steel pipe of φ;6 one end of wirerope connects the hanging ring 2 on standing platform, separately
It is fixed by wirerope snap ring 17 in end that one end passes through the screw hole 16 on 7 top wall of window opening;
Supporting element includes the upright bar 11 connecting with the drawknot bar 9 for stretching out standing platform and the jacking for being installed on 11 top of upright bar
12, jacking 12 is fixedly connected with the flitch 10 that top is fixedly installed, and flitch 10 holds out against the floor 8 in top, and 11 bottom of upright bar is set
Set sweep the floor bar 14 and backing plate 15;Upright bar 11 is in longitudinally disposed four, rectangle, is connected with horizon bar 13 between adjacent two upright bar 11.
When processing standing platform, first primary-secondary beam is welded, then weld checkered steel plate 5 and hanging ring 2, finally welding protection
Railing;
When processing firmware, first Screw arbor with nut at both-ends 21 and round steel 18 are welded, then round steel 18 is welded on to time of two sides
On beam 4, then by drawknot bar 9 be welded on middle part secondary beam 4 on;
Four upright bars 11 are set in floor, backing plate 15 is put in 11 bottom of upright bar, 11 top caving support 12 of upright bar, is on jacking 12
Flitch 10, flitch 10 hold out against floor 8, and the drawknot bar 9 of firmware is buckled in the upright bar 11 of supporting element and can be fastened by bolts.
Operating platform is hung to outside tower crane sustaining wall mounting layer using tower crane, manually standing platform is drawn using the rope made of hemp, makes pair
It draws screw rod 21 to be directed at screw hole, Screw arbor with nut at both-ends 21 is fastened on shear wall, is then connect drawknot bar 9 with upright bar 11 with fastener
Get up, finally wirerope 6 is fixed on hole Zhou Bianliang or shear wall.
The beneficial effects of the utility model are as follows:
1. traditional tower crane sustaining wall installation needs to remove protection on climbing frame by climbing frame, provide work surface, sustaining wall for sustaining wall
It also needs to restore to protect after being installed, the amount of labour is big;And after the tower crane sustaining wall operating platform of the utility model once assembles, next time
It can be used directly, only need to set up supporting element in floor, the amount of labour is small;
2. traditional sustaining wall installation is needed by climbing frame, protective net, scaffold board, cross bar etc. are removed on climbing frame high-altitude safety
Hidden danger, and the tower crane sustaining wall operating platform of the utility model lifts once mounting in place using tower crane, no security risk.
3. needing the climbing frame for removing sustaining wall periphery to protect before traditional tower crane sustaining wall installation, after sustaining wall is installed and need to restore to climb
Frame protection, the time is longer, and climbing frame notch protection peace tear open during, climbing frame can not be promoted, structure can not normal construction, influence
It construction period, and the tower crane sustaining wall operating platform of the utility model, is installed below climbing frame, without removing climbing frame, does not influence to tie
Structure normal construction, saves the time;
4. traditional tower crane sustaining wall is fixed in structure across climbing frame at no foothold, needs to remove climbing for sustaining wall periphery
Frame protection after sustaining wall is installed and needs to restore climbing frame protection, higher cost;And the tower crane sustaining wall operation of the utility model is flat
After platform once assembles, without pass through climbing frame, it is only necessary to set up Simple support frame in floor, cost is relatively low.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and other feature combination, and those skilled in the art are also
Other combinations between each technical characteristic can be carried out according to the purpose of utility model, be subject to the purpose for realizing the utility model.
Claims (6)
1. a kind of tower crane sustaining wall operating platform, including the standing platform and supporting element being connect with firmware, which is characterized in that firm
Part includes the round steel for being fixedly installed on standing platform two sides of the bottom and the Screw arbor with nut at both-ends with the fixed setting of round steel welding, is consolidated
The drawknot bar of part is fixedly installed on the middle part of standing platform bottom, and extend out to outside standing platform in side;Supporting element include with
The jacking for stretching out the upright bar of the drawknot bar connection of standing platform and being installed at the top of the upright bar, the jacking and top fixed setting
Flitch is fixedly connected, and sweep the floor bar and backing plate is fixedly installed in bottom of upright rod;Standing platform periphery is girder, and the secondary beam of inside is welded in
The girder, girder and secondary beam upper surface are laid with checkered steel plate, and three faces of the standing platform are welded with guard rail and turn at four
Hanging ring is welded at angle;Wirerope one end of firmware is connected to the hanging ring of standing platform, and the other end is solid by wirerope snap ring
Fixed setting.
2. tower crane sustaining wall operating platform according to claim 1, which is characterized in that round steel and standing platform two sides of the bottom
Secondary beam is welded as a whole.
3. tower crane sustaining wall operating platform according to claim 1, which is characterized in that in the middle part of drawknot bar and standing platform bottom
Secondary beam be welded as a whole.
4. tower crane sustaining wall operating platform according to claim 1, which is characterized in that girder and secondary beam are all made of square steel tube.
5. tower crane sustaining wall operating platform according to claim 1, which is characterized in that jacking uses U-shaped jacking.
6. according to such as tower crane sustaining wall operating platform described in any one of claim 1 to 5, which is characterized in that upright bar is vertical in rectangle
To setting four, horizon bar is connected between adjacent two upright bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920282327.0U CN209668648U (en) | 2019-03-06 | 2019-03-06 | A kind of tower crane sustaining wall operating platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920282327.0U CN209668648U (en) | 2019-03-06 | 2019-03-06 | A kind of tower crane sustaining wall operating platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209668648U true CN209668648U (en) | 2019-11-22 |
Family
ID=68570667
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920282327.0U Expired - Fee Related CN209668648U (en) | 2019-03-06 | 2019-03-06 | A kind of tower crane sustaining wall operating platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209668648U (en) |
-
2019
- 2019-03-06 CN CN201920282327.0U patent/CN209668648U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107100187B (en) | Tower crane steel girder erection structure and installation method | |
CN101555728A (en) | High-rise building construction assembled overhanging safe guarding shed and construction method thereof | |
CN106429883A (en) | Tower crane foundation used for bridge construction | |
CN205242264U (en) | A security operating platform for pier stud | |
CN107806237A (en) | A kind of high building hydraulic climbing protecting screen and its construction method | |
CN209668648U (en) | A kind of tower crane sustaining wall operating platform | |
CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space | |
CN107217912B (en) | A kind of superelevation physical isolation construction method for neighbouring high-speed rail Business Line construction | |
CN212671146U (en) | Novel precast beam intensity detects and hangs device | |
CN215291305U (en) | Hydroelectric station generator overhauls combination platform | |
CN212002401U (en) | High-altitude horizontal overhanging steel pipe closed hard protection shed | |
CN211447860U (en) | Tool type outer cantilever protection device | |
CN212129859U (en) | Detachable steel structure aerial work operating platform | |
CN104818859B (en) | The installation method of orbit traffic overhead station operation platform | |
CN204038917U (en) | Detachable external hanging type operating platform | |
CN211312215U (en) | Hydraulic integral self-climbing construction platform | |
CN210419022U (en) | Tower crane standard knot with safety performance | |
CN209924407U (en) | Combined working platform for steel structure high-altitude installation | |
CN207847037U (en) | A kind of high building hydraulic climbing protecting screen | |
CN204212388U (en) | Monolithic combined scaffold | |
CN207749848U (en) | A kind of fall arrest construction holder | |
CN206360392U (en) | Attachment type raise scaffold periphery protecting wire net | |
CN207392709U (en) | A kind of ladder cage formula combined scaffold | |
CN112647701A (en) | Hydroelectric station generator overhauls combination platform | |
CN220847163U (en) | Parallel steel strand stay cable mounting platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191122 |
|
CF01 | Termination of patent right due to non-payment of annual fee |