CN205236348U - Water saving fixtures of spray rinsing in advance that before painting handled - Google Patents

Water saving fixtures of spray rinsing in advance that before painting handled Download PDF

Info

Publication number
CN205236348U
CN205236348U CN201521101665.8U CN201521101665U CN205236348U CN 205236348 U CN205236348 U CN 205236348U CN 201521101665 U CN201521101665 U CN 201521101665U CN 205236348 U CN205236348 U CN 205236348U
Authority
CN
China
Prior art keywords
pipeline
hydro
peening
hot water
rinsing bowl
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521101665.8U
Other languages
Chinese (zh)
Inventor
吴思明
茅立安
余大海
黄叶东
沈泽京
李仁德
俞连荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Mingquan Industrial Coating Co Ltd
Original Assignee
Zhejiang Mingquan Industrial Coating Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Mingquan Industrial Coating Co Ltd filed Critical Zhejiang Mingquan Industrial Coating Co Ltd
Priority to CN201521101665.8U priority Critical patent/CN205236348U/en
Application granted granted Critical
Publication of CN205236348U publication Critical patent/CN205236348U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning By Liquid Or Steam (AREA)

Abstract

The utility model discloses a water saving fixtures of spray rinsing in advance that before painting handled, its room of including body, set up in the internal wash bowl of degrease in advance in room is connected the degrease wash bowl of degrease wash bowl is connected in advance the rill measuring tank of degrease wash bowl is connected the hot water washtrough of rill measuring tank, set up in the pipeline of spray rinsing in advance no. 1 of degrease wash bowl top in advance, set up in the pipeline of spray rinsing in advance no. 2 of rill measuring tank top, set up in the spray rinsing pipeline is washed to the hot water of hot water washtrough top, and connects in advance the degrease wash bowl the rill measuring tank the hot water washtrough in advance spray rinsing pipeline no. 1 two draws in the spray rinsing pipeline in advance the pipeline of spray rinsing pipeline is washed to hot water, the utility model discloses simple structure establishes the pipeline through propping up for the water of one back process that before painting handled can be used for previous process, has accomplished the water conservation, reduces the drainage, the purpose of environmental protection.

Description

A kind of pre-hydro-peening water saving fixtures of Coating Pretreatment
Technical field
The utility model relates to pretreatment device for coating, particularly a kind of pre-hydro-peening water saving fixtures of Coating Pretreatment.
Background technology
Paint line, owing to there is a lot of chemical treatment operations and washing step, is the technical process that consumes in a large number water. As Coating Pretreatment technology, the traditional approach of initial pre-treatment is drill traverse formula, steeps by drill traverse by technological process. Along with improvement and the development of technique, occurred two-in-one, i.e. oil removing, eliminate rust two-in-one, and three-in-one be oil removing, rust cleaning, the three-in-one technique of passivation. At present, external and domestic household electric appliances adopt fountain pre-treatment more, are characterized in that production efficiency is high, easy and simple to handle, are easy to realize the production automation or semi-automation, and degreasing effect is good, and phosphating coat is evenly fine and close. But no matter how develop, surface-treated pre-treating technology is all that necessary, traditional Coating Pretreatment cleaning is: pre-degreasing washing → drop liquid → degreasing washing → drop liquid → hot water wash A → drop liquid → hot water wash B. For example notification number is CN103357560B(2014-12-10) the disclosed Coating Pretreatment analogue means with drill traverse and spray function, each procedure is also separate, has respectively rinsing bowl separately and moisturizing, overblow blowdown pipeline. Each rinsing bowl adds separately fresh tap water, by overflow discharge, water consumption is very large, water use efficiency is low, both wastes water, the energy and cleaning agent, has also greatly increased sewage load. On the other hand, the large-scale shortage of water resources situation of China is in continuous aggravation, and the shortage of water resource more and more becomes the key factor of restriction China's economy and social development. Along with becoming better and approaching perfection day by day of Environmental Protection in China regulation, sewage discharge regulation, environmental protection problem has been subject to great attention, and sewage drainage standard improves day by day, and sewage disposal expense also day by day rises thereupon. How to design and formulate rational manufacturing technique for painting dressing, ensureing that under the prerequisite of product quality, reasonable use of water, using water wisely, farthest reduce water consumption and quantity of wastewater effluent, is not only related to the survival and development of enterprise, is also the large problem of national economy.
Utility model content
The purpose of this utility model is to address the above problem, and a kind of pre-hydro-peening water saving fixtures of Coating Pretreatment are provided, and the water that a rear procedure can be used is that last procedure is used, has reduced the waste of water resource, has also protected environment.
Above-mentioned technical purpose of the present utility model is achieved by the following technical programs:
A kind of pre-hydro-peening water saving fixtures of Coating Pretreatment, it comprises chamber body, be arranged at the pre-degreasing rinsing bowl in the body of described chamber, connect the degreasing rinsing bowl of described pre-degreasing rinsing bowl, connect the rill measuring tank of described degreasing rinsing bowl, connect the hot water washing groove of described rill measuring tank, be arranged at the pre-hydro-peening pipeline one of described pre-degreasing rinsing bowl top, be arranged at the pre-hydro-peening pipeline two of described rill measuring tank top, be arranged at the hot water wash hydro-peening pipeline of described hot water washing groove top, and connect described pre-degreasing rinsing bowl, described rill measuring tank, described hot water washing groove, described pre-hydro-peening pipeline one, the pipeline of described pre-hydro-peening pipeline two and described hot water wash hydro-peening pipeline,
Described pipeline comprises the first pipeline that connects described pre-hydro-peening pipeline one and described rill measuring tank, connect the second pipeline of described pre-hydro-peening pipeline two, described hot water wash hydro-peening pipeline and described hot water washing groove, and be arranged at the blowoff line on described pre-degreasing rinsing bowl top;
On described the first pipeline, be provided with water pump one, on the first pipeline of described water pump one rear and front end, be also provided with stop valve one and stop valve two;
Described the second pipeline comprises main line and auxiliary pipeline, described main line comprises the water pump two and the bag filter that are arranged on described main line, be arranged at stop valve three and stop valve four on the main pipeline of described water pump two rear and front ends, and be arranged at stop valve five and stop valve six on the main pipeline of described bag filter rear and front end.
This programme by separating the playpipe of an arm as pre-hydro-peening pipeline two on hot water wash hydro-peening pipeline, be placed in the draining section between rill measuring tank and hot water wash hydro-peening pipeline, utilize the waste water that conventionally adopts overflow mode to drain in hot water washing groove, to just carrying out pre-hydro-peening by degreasing district workpiece out, the water of ejection flows into rill measuring tank; The injection line that water in rill measuring tank is transported to pre-hydro-peening pipeline one through stop valve one, water pump one and stop valve two is again carried out pre-hydro-peening to the workpiece that just enters cleaning equipment; Sewage after pre-hydro-peening enters dirty ditch through blowoff line after being collected by water fender. Through the pre-hydro-peening of twice, can greatly reduce the pollution level of the degreaser of pre-degreasing rinsing bowl and the hot water of hot water washing groove, improve cleaning performance, save water and Degreasing medicament.
As preferably, body top, described chamber has slotted hole along its length, is provided with hairbrush in slotted hole. The setting of described slotted hole is to pass through workpiece for stretched wire, and the setting of described hairbrush is in order to seal slotted hole, prevents that fog is excessive.
As preferably, described pre-degreasing rinsing bowl top end opening is set to horn-like. It is in order to facilitate in the pre-degreasing rinsing bowl of flow direction, mainly to play guide functions, to collect each available water source that described pre-degreasing rinsing bowl top is set to horn-like.
As preferably, described degreasing rinsing bowl top end opening is set to horn-like, and described degreasing rinsing bowl top is connected with described pre-degreasing rinsing bowl top. It is in order to facilitate in flow direction degreasing rinsing bowl that described degreasing rinsing bowl top is set to horn-like, the main guide functions that rises, it is for better drainage that described degreasing rinsing bowl top is connected with described pre-degreasing rinsing bowl top, make degreaser can flow to arbitrarily any rinsing bowl, and no longer eminence ponding, to collect each available water source, is saved water source.
As preferably, described rill measuring tank top end opening is set to horn-like, and described rill measuring tank top is connected with described degreasing rinsing bowl top. It is in order to facilitate in flow direction rill measuring tank that described rill measuring tank top is set to horn-like, the main guide functions that rises, it is for better drainage that described rill measuring tank top is connected with described degreasing rinsing bowl top, degreaser can be flowed to arbitrarily in any groove, and eminence ponding no longer.
As preferably, described hot water washing groove top end opening is set to horn-like, and described hot water washing groove top is connected with described rill measuring tank top. It is in order to facilitate in flow direction hot water washing groove that described hot water washing groove top is set to horn-like, the main guide functions that rises, it is for better drainage that described hot water washing groove top is connected with described rill measuring tank top, and liquid can be flowed to arbitrarily in any groove, and eminence ponding no longer.
As preferably, on described pre-hydro-peening pipeline one and described pre-hydro-peening pipeline two, be provided with spray-hole. The setting of described spray-hole is the hydro-peening function in order to realize described pre-hydro-peening pipeline one and described pre-hydro-peening pipeline two, completes the cleaning by degreasing to workpiece.
As preferably, described hot water wash hydro-peening pipeline comprises two or more injection units, on described injection unit, is provided with spray-hole. The setting of described spray-hole is the hydro-peening function in order to realize described hot water wash hydro-peening pipeline, completes the hot water cleaning to workpiece.
As preferably, on described pre-hydro-peening pipeline two, be provided with stop valve seven. The setting of described stop valve seven is the water yields that regulate pre-hydro-peening pipeline two for convenient.
As preferably, described auxiliary pipeline comprises the stop valve eight being arranged on described auxiliary pipeline, and described auxiliary pipeline one end is connected on the main line between described stop valve four and described stop valve five, and the other end is connected on the main line after described stop valve six. The setting of described auxiliary pipeline is that equipment cannot move when preventing described main line fault, described auxiliary pipeline setting is to be auxiliary main line, in the time of main line fault, can continue operational outfit, described auxiliary pipeline the maintenance work that can also facilitate main line is set.
In sum, the utlity model has following beneficial effect:
The pre-hydro-peening water saving fixtures of a kind of Coating Pretreatment that the utility model provides; can utilize the most front contrary one matting originally to want the waste water of overflow discharge to carry out pre-hydro-peening to processed workpiece; the treatment fluid that makes processed workpiece take next procedure to reduces; improve cleaning efficiency; reduce the consumption of cleaning agent; save water, protected environment.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
1-chamber body in figure, the pre-degreasing rinsing bowl of 2-, 3-degreasing rinsing bowl, 4-rill measuring tank, 5-hot water washing groove, the pre-hydro-peening pipeline one of 6-, the pre-hydro-peening pipeline two of 7-, 8-hot water wash hydro-peening pipeline, 9-pipeline, 71-stop valve seven, 91-the first pipeline, 92-the second pipeline, 93-blowoff line, 911-water pump one, 912-stop valve one, 913-stop valve two, 921-main line, the auxiliary pipeline of 922-, 9211-water pump two, 9212-bag filter, 9213-stop valve three, 9214-stop valve four, 9215-stop valve five, 9216-stop valve six, 9221-stop valve eight.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
This specific embodiment is only to explanation of the present utility model; it is not to restriction of the present utility model; those skilled in the art are reading after this description and can make to the present embodiment the amendment that there is no creative contribution as required, but as long as within the scope of claim of the present utility model, are all subject to the protection of Patent Law.
As shown in Figure 1, a kind of pre-hydro-peening water saving fixtures of Coating Pretreatment, it comprises chamber body 1, be arranged at the pre-degreasing rinsing bowl 2 in chamber body 1, connect the degreasing rinsing bowl 3 of pre-degreasing rinsing bowl 2, connect the rill measuring tank 4 of degreasing rinsing bowl 3, connect the hot water washing groove 5 of rill measuring tank 4, be arranged at the pre-hydro-peening pipeline 1 of pre-degreasing rinsing bowl 2 tops, be arranged at the pre-hydro-peening pipeline 27 of rill measuring tank 4 tops, be arranged at the hot water wash hydro-peening pipeline 8 of hot water washing groove 5 tops, and connect pre-degreasing rinsing bowl 2, rill measuring tank 4, hot water washing groove 5, pre-hydro-peening pipeline 1, the pipeline 9 of pre-hydro-peening pipeline 27 and hot water wash hydro-peening pipeline 8,
Pipeline 9 comprises the first pipeline 91 that connects pre-hydro-peening pipeline 1 and rill measuring tank 4, connects the second pipeline 92 of pre-hydro-peening pipeline 27, hot water wash hydro-peening pipeline 8 and hot water washing groove 5, and is arranged at the blowoff line 93 on pre-degreasing rinsing bowl 2 tops;
On the first pipeline 91, be provided with water pump 1, on the first pipeline 91 of water pump one 911 rear and front ends, be also provided with stop valve 1 and stop valve 2 913;
The second pipeline 92 comprises main line 921 and auxiliary pipeline 922, main line 921 comprises the water pump 2 9211 and the bag filter 9212 that are arranged on main line 921, be arranged at stop valve 3 9213 and stop valve 4 9214 on the main pipeline 921 of water pump 2 9211 rear and front ends, and be arranged at stop valve 5 9215 and stop valve 6 9216 on the main pipeline 921 of bag filter 9212 rear and front ends.
This programme by separating the playpipe of an arm as pre-hydro-peening pipeline 27 on hot water wash hydro-peening pipeline 8, be placed in the draining section between rill measuring tank 4 and hot water wash hydro-peening pipeline 8, utilize the waste water that conventionally adopts overflow mode to drain in hot water washing groove 5, to just carrying out pre-hydro-peening by degreasing district workpiece out, the water of ejection flows into rill measuring tank 4; The injection line that water in rill measuring tank 4 is transported to pre-hydro-peening pipeline 1 through stop valve 1, water pump 1 and stop valve 2 913 is again carried out pre-hydro-peening to the workpiece that just enters cleaning equipment; Sewage after pre-hydro-peening enters dirty ditch through blowoff line 93 after being collected by water fender. Through the pre-hydro-peening of twice, can greatly reduce the pollution level of the degreaser of pre-degreasing rinsing bowl 2 and the hot water of hot water washing groove 5, improve cleaning performance, save water and Degreasing medicament.
Body 1 top in chamber has slotted hole along its length, is provided with hairbrush in slotted hole. The setting of slotted hole is to pass through workpiece for stretched wire, and the setting of hairbrush is in order to seal slotted hole, prevents that fog is excessive.
Pre-degreasing rinsing bowl 2 top end openings are set to horn-like. It is in order to facilitate in the pre-degreasing rinsing bowl 2 of flow direction, mainly to play guide functions that pre-degreasing rinsing bowl 2 tops are set to horn-like.
Degreasing rinsing bowl 3 top end openings are set to horn-like, and degreasing rinsing bowl 3 tops are connected with pre-degreasing rinsing bowl 2 tops. It is in order to facilitate in flow direction degreasing rinsing bowl 3 that degreasing rinsing bowl 3 tops are set to horn-like, the main guide functions that rises, it is for better drainage that degreasing rinsing bowl 3 tops are connected with pre-degreasing rinsing bowl 2 tops, make degreaser can flow to arbitrarily any rinsing bowl, and no longer height ponding.
Rill measuring tank 4 top end openings are set to horn-like, and rill measuring tank 4 tops are connected with degreasing rinsing bowl 3 tops. It is in order to facilitate in flow direction rill measuring tank 4 that rill measuring tank 4 tops are set to horn-like, the main guide functions that rises, it is for better drainage that rill measuring tank 4 tops are connected with degreasing rinsing bowl 3 tops, and degreaser can be flowed to arbitrarily in any groove, and no longer height ponding.
Hot water washing groove 5 top end openings are set to horn-like, and hot water washing groove 5 tops are connected with rill measuring tank 4 tops. It is in order to facilitate in flow direction hot water washing groove 5 that hot water washing groove 5 tops are set to horn-like, the main guide functions that rises, it is for better drainage that hot water washing groove 5 tops are connected with rill measuring tank 4 tops, and liquid can be flowed to arbitrarily in any groove, and no longer height ponding.
On pre-hydro-peening pipeline 1 and pre-hydro-peening pipeline 27, be provided with spray-hole. The setting of spray-hole is the hydro-peening function in order to realize pre-hydro-peening pipeline 1 and pre-hydro-peening pipeline 27, completes the cleaning by degreasing to workpiece.
Hot water wash hydro-peening pipeline 8 comprises two or more injection units, is provided with spray-hole on injection unit. The setting of spray-hole is the hydro-peening function in order to realize hot water wash hydro-peening pipeline 8, completes the hot water cleaning to workpiece.
On pre-hydro-peening pipeline 27, be provided with stop valve 7 71. The setting of stop valve 7 71 is the water yields that regulate pre-hydro-peening pipeline 27 for convenient.
Auxiliary pipeline 922 comprises the stop valve 8 9221 being arranged on auxiliary pipeline 922, and auxiliary pipeline 922 one end are connected on the main line 921 between stop valve 4 9214 and stop valve 5 9215, and the other end is connected on the main line 921 after stop valve 6 9216. The setting of auxiliary pipeline 922 is that equipment cannot move when preventing main line 921 fault, it is to be auxiliary main line 921 that auxiliary pipeline 922 arranges, in the time of main line 921 fault, can continue operational outfit, auxiliary pipeline 922 the maintenance work that can also facilitate main line 921 is set.
In the time using this device; workpiece passes through chamber body 1 progressively by pre-degreasing rinsing bowl 2; degreasing rinsing bowl 3; rill measuring tank 4 and hot water washing groove 5; and the water that the install pipeline of this device makes in hot water washing groove 5 to use can eject by pre-hydro-peening pipeline 27 and flows to rill measuring tank 4; and water in rill measuring tank 4 can flow to pre-degreasing rinsing bowl 2 by pre-hydro-peening pipeline one 6 hydro-peenings; thereby make the rinse water of last procedure can be progressively by front one matting used; accomplish using water wisely; reduce sewage effluent, the object of protection of the environment.

Claims (10)

1. the pre-hydro-peening water saving fixtures of a Coating Pretreatment, it is characterized in that: it comprises chamber body (1), be arranged at the pre-degreasing rinsing bowl (2) in described chamber body (1), connect the degreasing rinsing bowl (3) of described pre-degreasing rinsing bowl (2), connect the rill measuring tank (4) of described degreasing rinsing bowl (3), connect the hot water washing groove (5) of described rill measuring tank (4), be arranged at the pre-hydro-peening pipeline one (6) of described pre-degreasing rinsing bowl (2) top, be arranged at the pre-hydro-peening pipeline two (7) of described rill measuring tank (4) top, be arranged at the hot water wash hydro-peening pipeline (8) of described hot water washing groove (5) top, and connect described pre-degreasing rinsing bowl (2), described rill measuring tank (4), described hot water washing groove (5), described pre-hydro-peening pipeline one (6), the pipeline (9) of described pre-hydro-peening pipeline two (7) and described hot water wash hydro-peening pipeline (8),
Described pipeline (9) comprises the first pipeline (91) that connects described pre-hydro-peening pipeline one (6) and described rill measuring tank (4), connect second pipeline (92) of described pre-hydro-peening pipeline two (7), described hot water wash hydro-peening pipeline (8) and described hot water washing groove (5), and be arranged at the blowoff line (93) on described pre-degreasing rinsing bowl (2) top;
On described the first pipeline (91), be provided with water pump one (911), on first pipeline (91) of described water pump one (911) rear and front end, be also provided with stop valve one (912) and stop valve two (913);
Described the second pipeline (92) comprises main line (921) and auxiliary pipeline (922), described main line (921) comprises the water pump two (9211) and the bag filter (9212) that are arranged on described main line (921), be arranged at stop valve three (9213) and stop valve four (9214) on the main pipeline (921) of described water pump two (9211) rear and front ends, and be arranged at stop valve five (9215) and stop valve six (9216) on the main pipeline (921) of described bag filter (9212) rear and front end.
2. the pre-hydro-peening water saving fixtures of a kind of Coating Pretreatment according to claim 1, is characterized in that: described chamber body (1) top has slotted hole along its length, is provided with hairbrush in slotted hole.
3. the pre-hydro-peening water saving fixtures of a kind of Coating Pretreatment according to claim 1, is characterized in that: described pre-degreasing rinsing bowl (2) top end opening is set to horn-like.
4. the pre-hydro-peening water saving fixtures of a kind of Coating Pretreatment according to claim 3, it is characterized in that: described degreasing rinsing bowl (3) top end opening is set to horn-like, described degreasing rinsing bowl (3) top is connected with described pre-degreasing rinsing bowl (2) top.
5. the pre-hydro-peening water saving fixtures of a kind of Coating Pretreatment according to claim 4, is characterized in that: described rill measuring tank (4) top end opening is set to horn-like, and described rill measuring tank (4) top is connected with described degreasing rinsing bowl (3) top.
6. the pre-hydro-peening water saving fixtures of a kind of Coating Pretreatment according to claim 5, is characterized in that: described hot water washing groove (5) top end opening is set to horn-like, and described hot water washing groove (5) top is connected with described rill measuring tank (4) top.
7. the pre-hydro-peening water saving fixtures of a kind of Coating Pretreatment according to claim 1, is characterized in that: on described pre-hydro-peening pipeline one (6) and described pre-hydro-peening pipeline two (7), be provided with spray-hole.
8. the pre-hydro-peening water saving fixtures of a kind of Coating Pretreatment according to claim 1, is characterized in that: described hot water wash hydro-peening pipeline (8) comprises two or more injection units, on described injection unit, is provided with spray-hole.
9. the pre-hydro-peening water saving fixtures of a kind of Coating Pretreatment according to claim 1, is characterized in that: on described pre-hydro-peening pipeline two (7), be provided with stop valve seven (71).
10. the pre-hydro-peening water saving fixtures of a kind of Coating Pretreatment according to claim 1, it is characterized in that: described auxiliary pipeline (922) comprises the stop valve eight (9221) being arranged on described auxiliary pipeline (922), described auxiliary pipeline (922) one end is connected on the main line (921) between described stop valve four (9214) and described stop valve five (9215), and the other end is connected on described stop valve six (9216) main line (921) afterwards.
CN201521101665.8U 2015-12-28 2015-12-28 Water saving fixtures of spray rinsing in advance that before painting handled Active CN205236348U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521101665.8U CN205236348U (en) 2015-12-28 2015-12-28 Water saving fixtures of spray rinsing in advance that before painting handled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521101665.8U CN205236348U (en) 2015-12-28 2015-12-28 Water saving fixtures of spray rinsing in advance that before painting handled

Publications (1)

Publication Number Publication Date
CN205236348U true CN205236348U (en) 2016-05-18

Family

ID=55935427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521101665.8U Active CN205236348U (en) 2015-12-28 2015-12-28 Water saving fixtures of spray rinsing in advance that before painting handled

Country Status (1)

Country Link
CN (1) CN205236348U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105413992A (en) * 2015-12-28 2016-03-23 浙江明泉工业涂装有限公司 Pre-spraying water saving device for coating pretreatment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105413992A (en) * 2015-12-28 2016-03-23 浙江明泉工业涂装有限公司 Pre-spraying water saving device for coating pretreatment

Similar Documents

Publication Publication Date Title
CN203411822U (en) Washing machine circulation water purification and water-saving device
CN203265136U (en) Energy-saving cleaning machine
CN205236348U (en) Water saving fixtures of spray rinsing in advance that before painting handled
CN204953421U (en) Grind cleaning equipment sewage online processing retrieval and utilization device
CN2869046Y (en) Pure water circulating apparatus for cleaning workpiece for electro phoresis coating
CN205236340U (en) Guide slot water saving fixtures that before painting handled
CN206015784U (en) A kind of kitchen waste water retracting device
CN205236339U (en) Before painting handles contrary process moisturizing water saving fixtures
CN204491747U (en) A kind of domestic waste water reclaims, processes and classified use system
CN104959337A (en) Coating workpiece reverse backflow cleaning method
CN103058416B (en) Before-coating treatment and recycling method for zirconium treatment process waste water
CN202175863U (en) Large-scale washing machine water circle device
CN105457862A (en) Coating pretreatment water-replenishing water-saving device through inverse process
CN205587338U (en) Water -saving before painting handles belt cleaning device
CN204866651U (en) Water -saving before painting handles belt cleaning device
CN204690380U (en) A kind of water-conservation washing machine
CN105413992A (en) Pre-spraying water saving device for coating pretreatment
CN105436058A (en) Guide groove water-saving device for pretreatment before coating
CN201950039U (en) Water saving and emission reduction system used for coating production line phosphorus-free pre-treatment process
CN105414092A (en) Wave-saved coating pretreatment cleaning device
CN204842300U (en) Hot water wiper mechanism
CN201091869Y (en) Spraying purifier
CN104907277B (en) Cleaning by degreasing mechanism
CN201588097U (en) Tunnel type washing device
CN205907384U (en) Electroplate and produce line washing water system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant