CN205236340U - Guide slot water saving fixtures that before painting handled - Google Patents
Guide slot water saving fixtures that before painting handled Download PDFInfo
- Publication number
- CN205236340U CN205236340U CN201521101676.6U CN201521101676U CN205236340U CN 205236340 U CN205236340 U CN 205236340U CN 201521101676 U CN201521101676 U CN 201521101676U CN 205236340 U CN205236340 U CN 205236340U
- Authority
- CN
- China
- Prior art keywords
- washing tank
- water
- rinsing bowl
- pipeline
- water saving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Details Or Accessories Of Spraying Plant Or Apparatus (AREA)
Abstract
本实用新型公开了一种涂装前处理的导槽节水装置,它包括室体,设置于所述室体内的第一水洗槽和第二水洗槽,设置于所述第二水洗槽上方并连接所述第二水洗槽的喷射管,以及连接所述第一水洗槽或所述第二水洗槽的管路,本实用新型结构简单,通过支设管路,使得在更换水洗槽中的清洗液时,只需将最前道工序的水洗槽中的污染程度高的清洗液排掉,再通过水泵将后道工序污染程度低的清洗液送到前道工序的水洗槽中,将新鲜清洗液加到后道工序的水洗槽中,便可以达到少排污水,节约用水的目的。
The utility model discloses a guide groove water-saving device for pre-painting treatment, which comprises a chamber body, a first water washing tank and a second water washing tank arranged in the chamber body, arranged above the second water washing tank and The spray pipe connecting the second washing tank, and the pipeline connecting the first washing tank or the second washing tank, the utility model has a simple structure, and the cleaning in the replacement washing tank is achieved by branching the pipeline. When cleaning liquid, it is only necessary to drain the highly polluted cleaning solution in the washing tank of the first process, and then send the cleaning solution with low pollution level in the subsequent process to the washing tank of the previous process through the water pump, and put the fresh cleaning solution Adding it to the washing tank in the subsequent process can achieve the purpose of reducing sewage discharge and saving water.
Description
技术领域 technical field
本实用新型涉及涂装前处理装置,特别涉及一种涂装前处理的导槽节水装置。 The utility model relates to a pre-painting treatment device, in particular to a guide groove water-saving device for the pre-painting treatment.
背景技术 Background technique
涂装生产线由于存在很多化学处理工序和水洗工序,是大量消耗水的工艺过程。作为涂装前处理技术来说,最初前处理的传统方式为槽浸式,按工艺流程逐槽浸渍。随着工艺的改进和发展,出现了二合一,即除油、除锈二合一,和三合一即除油、除锈、钝化三合一的工艺。目前,国外及国内的家电行业多采用喷淋式前处理,其特点是生产效率高,操作简便,易于实现生产自动化或半自动化,脱脂效果好,磷化膜致密均匀。但是不管怎么发展,表面处理的前处理工艺都是必须的,传统的涂装前处理清洗工艺为:预脱脂水洗→沥液→脱脂水洗→沥液→热水洗A→沥液→热水洗B。例如公告号为CN103357560B(2014-12-10)公开的具有槽浸和喷淋功能的涂装前处理模拟装置,各道工序也是相互独立,分别拥有各自的水洗槽和补水、溢流排污管路。各水洗槽单独补加新鲜自来水、通过溢流排放,耗水量很大,水利用率低,既浪费水、能源和清洗药剂,也大大增加了污水处理量。另一方面,我国大范围的水资源短缺状况在不断加剧,水资源的短缺越来越成为制约我国经济和社会发展的重要因素。随着我国环保法规、污水排放法规的日臻完善,环境保护问题受到了高度重视,污水排放标准日益提高,污水处理费用也随之日渐上升。如何设计和制定合理的涂装生产工艺,在保证产品质量的前提下,合理用水、节约用水,最大程度地降低水消耗量和污水排放量,不仅关系到企业的生存与发展,也是国计民生的大问题。 The coating production line is a process that consumes a lot of water due to the existence of many chemical treatment processes and water washing processes. As a pre-painting treatment technology, the traditional method of initial pre-treatment is tank immersion, which is dipped tank by tank according to the process flow. With the improvement and development of the process, two-in-one, that is, oil removal and rust removal, and three-in-one technology, that is, oil removal, rust removal, and passivation, have emerged. At present, domestic and foreign home appliance industries mostly use spray pretreatment, which is characterized by high production efficiency, easy operation, easy to realize automatic or semi-automatic production, good degreasing effect, and dense and uniform phosphating film. But no matter how it develops, the pre-treatment process of surface treatment is necessary. The traditional pre-painting cleaning process is: pre-degreasing water washing → draining liquid → degreasing water washing → draining liquid → hot water washing A → draining liquid → hot water washing B. For example, the announcement number is CN103357560B (2014-12-10), which discloses a pre-painting simulation device with tank immersion and spraying functions. Each process is also independent of each other, and each has its own water washing tank, water replenishment, and overflow sewage pipeline. . Each washing tank is supplemented with fresh tap water separately and discharged through the overflow, which consumes a lot of water and has a low water utilization rate, which not only wastes water, energy and cleaning agents, but also greatly increases the amount of sewage treatment. On the other hand, the large-scale shortage of water resources in my country is intensifying, and the shortage of water resources has increasingly become an important factor restricting my country's economic and social development. As my country's environmental protection regulations and sewage discharge regulations are becoming more and more perfect, environmental protection issues have been highly valued, sewage discharge standards are increasing, and sewage treatment costs are also increasing. How to design and formulate a reasonable coating production process, under the premise of ensuring product quality, use water rationally, save water, and minimize water consumption and sewage discharge are not only related to the survival and development of enterprises, but also a major factor in the national economy and people's livelihood. question.
实用新型内容 Utility model content
本实用新型的目的是解决上述问题,提供一种涂装前处理的导槽节水装置,可以将后一道工序使用的水为前一道工序所用,减少了水资源的浪费的同时,也保护了环境。 The purpose of this utility model is to solve the above problems and provide a water-saving device for guide grooves before painting, which can use the water used in the next process for the previous process, reducing the waste of water resources and protecting the environment. environment.
本实用新型的上述技术目的是通过以下技术方案得以实现的: The above-mentioned technical purpose of the utility model is achieved through the following technical solutions:
一种涂装前处理的导槽节水装置,它包括室体,设置于所述室体内的第一水洗槽和第二水洗槽,设置于所述第二水洗槽上方并连接所述第二水洗槽的喷射管,以及连接所述第一水洗槽或所述第二水洗槽的管路; A guide tank water-saving device for pre-painting treatment, which includes a chamber body, a first washing tank and a second washing tank arranged in the chamber, arranged above the second washing tank and connected to the second washing tank The spray pipe of the washing tank, and the pipeline connecting the first washing tank or the second washing tank;
所述管路包括连接所述第一水洗槽的排污管道,连接所述第一水洗槽和第二水洗槽的主管道,以及连接所述主管道和所述喷射管的喷射管道; The pipeline includes a sewage pipeline connecting the first washing tank, a main pipeline connecting the first washing tank and the second washing tank, and a spray pipeline connecting the main pipeline and the spray pipe;
所述主管道包括设置于所述主管道水泵,以及设置于所述水泵前后两端的主管道上的截止阀一和截止阀二; The main pipeline includes a water pump in the main pipeline, and stop valves 1 and 2 on the main pipeline at both ends of the pump;
所述主管道靠近所述第一水洗槽的一端还设置有截止阀三,所述喷射管道连接于所述截止阀二与所述截止阀三之间的主管道。 The end of the main pipeline close to the first washing tank is also provided with a shut-off valve three, and the injection pipeline is connected to the main pipeline between the shut-off valve two and the shut-off valve three.
本方案通过在第一水洗槽和第二水洗槽之间设置主管道,使得在更换第一水洗槽和所述第二水洗槽中的清洗液时,只将第一水洗槽中的污染程度高的清洗液排掉,再通过水泵将第二水洗槽污染程度低的清洗液送到第一水洗槽中,只将新鲜清洗液加到第二水洗槽中,达到少排污水,节约用水的目的。 In this solution, the main pipeline is arranged between the first washing tank and the second washing tank, so that when the cleaning liquid in the first washing tank and the second washing tank is replaced, only the high pollution level in the first washing tank The cleaning solution is drained, and then the cleaning solution with low pollution degree in the second washing tank is sent to the first washing tank through the water pump, and only the fresh cleaning solution is added to the second washing tank to achieve the purpose of reducing sewage discharge and saving water .
作为优选,所述喷射管包括两个或两个以上的喷射单元,所述喷射单元上设置有喷射孔。所述喷射单元的设置为了方便喷射工件,清洗的更加干净,而所述喷射孔的设置则是为了实现喷射管的喷射功能。 Preferably, the spray pipe includes two or more spray units, and spray holes are arranged on the spray units. The setting of the spraying unit is for the convenience of spraying the workpiece and cleaning it more cleanly, and the setting of the spraying hole is for realizing the spraying function of the spraying pipe.
作为优选,所述室体顶部沿长度方向开有槽形孔,槽形孔内设置有毛刷。所述槽形孔的设置是用于悬链通过工件,而所述毛刷的设置是为了密封槽形孔,防止雾气外溢。 Preferably, the top of the chamber body is provided with a slot-shaped hole along the length direction, and a brush is arranged in the slot-shaped hole. The setting of the slot-shaped hole is used for the catenary to pass through the workpiece, and the setting of the brush is for sealing the slot-shaped hole and preventing the mist from overflowing.
作为优选,所述第一水洗槽顶端连接于所述第二水洗槽,所述第一水洗槽顶端开口设置为喇叭状。所述第一水洗槽顶端设置为喇叭状是为了方便液体流向第一水洗槽内,主要起导流作用。 Preferably, the top of the first water washing tank is connected to the second water washing tank, and the opening at the top of the first water washing tank is arranged in a trumpet shape. The top of the first water washing tank is set in a trumpet shape to facilitate the flow of liquid into the first water washing tank, which mainly plays a role of diversion.
作为优选,所述第二水洗槽顶端连接于所述第一水洗槽,所述第二水洗槽顶端开口设置为喇叭状。所述第二水洗槽顶端设置为喇叭状是为了方便液体流向第二水洗槽内,主要起导流作用。 Preferably, the top of the second washing tank is connected to the first washing tank, and the opening at the top of the second washing tank is arranged in a horn shape. The top of the second washing tank is set in a trumpet shape to facilitate the flow of liquid into the second washing tank, which mainly serves as a flow guide.
作为优选,所述排污管道上设置有截止阀四。所述截止阀的设置是为了用于排放第一水洗槽内的污染程度高的清洗液。 As a preference, a cut-off valve 4 is arranged on the sewage discharge pipe. The cut-off valve is set to discharge the highly polluted cleaning liquid in the first washing tank.
作为优选,所述喷射管道包括第一喷射管道,以及与所述第一喷射管道并联的第二喷射管道。所述第一喷射管道的设置用于喷射管的喷射,而所述第二喷射管道的设置则是为了防止所述第一喷射管道的机械故障,预留位置,方便维修管道。 Preferably, the injection pipeline includes a first injection pipeline, and a second injection pipeline connected in parallel with the first injection pipeline. The setting of the first spraying pipe is used for the spraying of the spraying pipe, and the setting of the second spraying pipe is to prevent the mechanical failure of the first spraying pipe, reserve a position, and facilitate maintenance of the pipe.
作为优选,所述第一喷射管道包括设置在所述第一喷射管道上的袋式过滤器,以及设置于所述袋式过滤器前后两端第一喷射管道上的截止阀五。所述袋式过滤器的设置是为了对清洗液进行过滤,有效的去除水中的颗粒杂质,保证管道内清洗液的清洁度。 Preferably, the first injection pipeline includes a bag filter arranged on the first injection pipeline, and stop valves five arranged on the first injection pipeline at both ends of the bag filter. The setting of the bag filter is to filter the cleaning solution, effectively remove particulate impurities in the water, and ensure the cleanliness of the cleaning solution in the pipeline.
作为优选,所述第二喷射管道上设置有截止阀六。所述第二喷射管道上设置截止阀六,目的是方便维修所述第一喷射管道和正常运行设备,而在所述第一喷射管道正常工作时,截止阀六关闭,以保证所述第一喷射管道的正常工作。 As a preference, a shut-off valve six is arranged on the second injection pipe. The shut-off valve six is set on the second injection pipeline, the purpose is to facilitate the maintenance of the first injection pipeline and normal operation equipment, and when the first injection pipeline is working normally, the shut-off valve six is closed to ensure that the first injection pipeline The normal operation of the injection pipe.
综上所述,本实用新型具有以下有益效果: In summary, the utility model has the following beneficial effects:
本实用新型提供的一种涂装前处理的导槽节水装置,在更换水洗槽中的清洗液时,只将最前道工序的水洗槽中的污染程度高的清洗液排掉,再通过水泵将后道工序污染程度低的清洗液送到前道工序的水洗槽中,只将新鲜清洗液加到后道工序的水洗槽中,达到少排污水,节约用水的目的,也保护了环境。 The utility model provides a guide tank water-saving device for pre-painting treatment. When replacing the cleaning liquid in the washing tank, only the cleaning liquid with a high pollution degree in the washing tank in the first process is drained, and then the cleaning liquid is discharged through the water pump. The cleaning solution with low pollution degree in the subsequent process is sent to the washing tank of the previous process, and only the fresh cleaning solution is added to the washing tank of the subsequent process, so as to achieve the purpose of reducing sewage discharge, saving water and protecting the environment.
附图说明 Description of drawings
图1是本实用新型的结构示意图; Fig. 1 is a structural representation of the utility model;
图中1-室体,2-第一水洗槽,3-第二水洗槽,4-喷射管,5-管路,7-水泵,51-排污管道,52-主管道,53-喷射管道,61-截止阀一,62-截止阀二,63-截止阀三,64-截止阀四,65-截止阀五,66-截止阀六,531-第一喷射管道,532-第二喷射管道,5311-袋式过滤器。 In the figure, 1-chamber body, 2-first washing tank, 3-second washing tank, 4-jet pipe, 5-pipeline, 7-water pump, 51-sewage pipeline, 52-main pipeline, 53-jet pipeline, 61-stop valve one, 62-stop valve two, 63-stop valve three, 64-stop valve four, 65-stop valve five, 66-stop valve six, 531-first injection pipeline, 532-second injection pipeline, 5311 - Bag filter.
具体实施方式 detailed description
以下结合附图对本实用新型作进一步详细说明。 Below in conjunction with accompanying drawing, the utility model is described in further detail.
本具体实施例仅仅是对本实用新型的解释,其并不是对本实用新型的限制,本领域技术人员在阅读完本说明书后可以根据需要对本实施例做出没有创造性贡献的修改,但只要在本实用新型的权利要求范围内都受到专利法的保护。 This specific embodiment is only an explanation of the utility model, and it is not a limitation of the utility model. After reading this description, those skilled in the art can make modifications to the embodiment without creative contribution according to needs, but as long as it is within the utility model All new claims are protected by patent law.
如图1所示,一种涂装前处理的导槽节水装置,它包括室体1,设置于室体1内的第一水洗槽2和第二水洗槽3,设置于第二水洗槽3上方并连接第二水洗槽3的喷射管4,以及连接第一水洗槽2或第二水洗槽3的管路5; As shown in Figure 1, a channel water-saving device for pre-painting treatment, it includes a chamber body 1, a first water washing tank 2 and a second water washing tank 3 arranged in the chamber body 1, and a second water washing tank installed in the second water washing tank 3 above and connected to the spray pipe 4 of the second washing tank 3, and the pipeline 5 connected to the first washing tank 2 or the second washing tank 3;
管路5包括连接第一水洗槽2的排污管道51,连接第一水洗槽2和第二水洗槽3的主管道52,以及连接主管道52和喷射管4的喷射管道53; The pipeline 5 includes a sewage discharge pipeline 51 connecting the first washing tank 2, a main pipeline 52 connecting the first washing tank 2 and the second washing tank 3, and a spray pipeline 53 connecting the main pipeline 52 and the spray pipe 4;
主管道52包括设置于主管道52水泵7,以及设置于水泵7前后两端的主管道52上的截止阀一61和截止阀二62; The main pipeline 52 includes a shut-off valve 1 61 and a shut-off valve 2 62 arranged on the main pipeline 52, the water pump 7, and the main pipeline 52 at both ends of the water pump 7;
主管道52靠近第一水洗槽2的一端还设置有截止阀三63,喷射管道53连接于截止阀二62与截止阀三63之间的主管道52。 One end of the main pipe 52 close to the first water washing tank 2 is also provided with a stop valve three 63 , and the injection pipe 53 is connected to the main pipe 52 between the stop valve two 62 and the stop valve three 63 .
本方案通过在第一水洗槽2和第二水洗槽3之间设置主管道52,使得在更换第一水洗槽2和第二水洗槽3中的清洗液时,只将第一水洗槽2中的污染程度高的清洗液排掉,再通过水泵7将第二水洗槽3污染程度低的清洗液送到第一水洗槽2中,只将新鲜清洗液加到第二水洗槽3中,达到少排污水,节约用水的目的。 This scheme is by arranging main pipeline 52 between the first washing tank 2 and the second washing tank 3, so that when replacing the cleaning liquid in the first washing tank 2 and the second washing tank 3, only the first washing tank 2 The cleaning solution with high pollution degree is drained, and then the cleaning solution with low pollution degree in the second washing tank 3 is sent to the first washing tank 2 by water pump 7, and only fresh cleaning solution is added in the second washing tank 3 to reach The purpose of reducing sewage discharge and saving water.
喷射管4包括两个或两个以上的喷射单元,喷射单元上设置有喷射孔。喷射单元的设置为了方便喷射工件,清洗的更加干净,而喷射孔的设置则是为了实现喷射管4的喷射功能。 The injection pipe 4 includes two or more injection units, and the injection units are provided with injection holes. The setting of the spraying unit is for the convenience of spraying the workpiece, and the cleaning is cleaner, and the setting of the spraying hole is for realizing the spraying function of the spraying pipe 4 .
室体1顶部沿长度方向开有槽形孔,槽形孔内设置有毛刷。槽形孔的设置是用于悬链通过工件,而毛刷的设置是为了密封槽形孔,防止雾气外溢。 The top of the chamber body 1 is provided with slot-shaped holes along the length direction, and brushes are arranged in the slot-shaped holes. The setting of the slotted hole is used for the catenary to pass through the workpiece, and the setting of the brush is for sealing the slotted hole and preventing the mist from overflowing.
第一水洗槽2顶端连接于第二水洗槽3,第一水洗槽2顶端开口设置为喇叭状。第一水洗槽2顶端设置为喇叭状是为了方便液体流向第一水洗槽2内,主要起导流作用。 The top of the first water washing tank 2 is connected to the second water washing tank 3 , and the top opening of the first water washing tank 2 is set in a trumpet shape. The top of the first washing tank 2 is set in the shape of a trumpet to facilitate the flow of liquid into the first washing tank 2, which mainly plays a diversion role.
第二水洗槽3顶端连接于第一水洗槽2,第二水洗槽3顶端开口设置为喇叭状。第二水洗槽3顶端设置为喇叭状是为了方便液体流向第二水洗槽3内,主要起导流作用。 The top of the second washing tank 3 is connected to the first washing tank 2 , and the opening at the top of the second washing tank 3 is set in a trumpet shape. The top of the second washing tank 3 is set in the shape of a trumpet in order to facilitate the flow of liquid into the second washing tank 3, which mainly plays a diversion role.
排污管道51上设置有截止阀四64。截止阀64的设置是为了用于排放第一水洗槽2内的污染程度高的清洗液。 The sewage pipe 51 is provided with a shut-off valve 464. The cut-off valve 64 is provided for discharging the highly polluted cleaning liquid in the first washing tank 2 .
喷射管道53包括第一喷射管道531,以及与第一喷射管道531并联的第二喷射管道532。第一喷射管道531的设置用于喷射管4的喷射,而第二喷射管道532的设置则是为了防止第一喷射管道531的机械故障,预留位置,方便维修管道。 The injection pipeline 53 includes a first injection pipeline 531 and a second injection pipeline 532 connected in parallel with the first injection pipeline 531 . The setting of the first spraying pipe 531 is used for the spraying of the spraying pipe 4, and the setting of the second spraying pipe 532 is to prevent the mechanical failure of the first spraying pipe 531, reserve a position, and facilitate maintenance of the pipe.
第一喷射管道531包括设置在第一喷射管道531上的袋式过滤器5311,以及设置于袋式过滤器5311前后两端第一喷射管道531上的截止阀五65。袋式过滤器的设置是为了对清洗液进行过滤,有效的去除水中的颗粒杂质,保证管道内清洗液的清洁度。 The first injection pipeline 531 includes a bag filter 5311 arranged on the first injection pipeline 531 , and a stop valve 565 arranged on the first injection pipeline 531 at both ends of the bag filter 5311 . The setting of the bag filter is to filter the cleaning liquid, effectively remove the particulate impurities in the water, and ensure the cleanliness of the cleaning liquid in the pipeline.
第二喷射管道532上设置有截止阀六66。第二喷射管道532上设置截止阀六66,目的是方便维修第一喷射管道531和正常运行设备,而在第一喷射管道531正常工作时,截止阀六66关闭,以保证第一喷射管道531的正常工作。 A shut-off valve 66 is arranged on the second injection pipe 532 . Stop valve six 66 is set on the second injection pipeline 532, the purpose is to facilitate the maintenance of the first injection pipeline 531 and normal operation equipment, and when the first injection pipeline 531 works normally, the stop valve six 66 is closed to ensure that the first injection pipeline 531 normal work.
在使用本装置时,工件通过室体1逐步经过第一水洗槽2和第二水洗槽3,而本装置中管道的设置,使得第二水洗槽3内使用的水可以通过主管道52流向第一水洗槽2内,为第一水洗槽2所使用,从而实现了后一道工序使用的水资源为前一道工序所使用的目的,节约了用水,减少了污水的排放,保护了环境。 When using this device, the workpiece passes through the chamber body 1 step by step through the first washing tank 2 and the second washing tank 3, and the setting of the pipeline in the device makes the water used in the second washing tank 3 flow to the first washing tank 3 through the main pipe 52. The first washing tank 2 is used by the first washing tank 2, so that the water resources used in the latter process are used in the previous process, saving water, reducing sewage discharge, and protecting the environment.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521101676.6U CN205236340U (en) | 2015-12-28 | 2015-12-28 | Guide slot water saving fixtures that before painting handled |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521101676.6U CN205236340U (en) | 2015-12-28 | 2015-12-28 | Guide slot water saving fixtures that before painting handled |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205236340U true CN205236340U (en) | 2016-05-18 |
Family
ID=55935419
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201521101676.6U Expired - Lifetime CN205236340U (en) | 2015-12-28 | 2015-12-28 | Guide slot water saving fixtures that before painting handled |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205236340U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105436058A (en) * | 2015-12-28 | 2016-03-30 | 浙江明泉工业涂装有限公司 | Guide groove water-saving device for pretreatment before coating |
-
2015
- 2015-12-28 CN CN201521101676.6U patent/CN205236340U/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105436058A (en) * | 2015-12-28 | 2016-03-30 | 浙江明泉工业涂装有限公司 | Guide groove water-saving device for pretreatment before coating |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203599162U (en) | A slot type belt cleaning device for steel pipe | |
| CN205236340U (en) | Guide slot water saving fixtures that before painting handled | |
| CN203265136U (en) | Energy-saving cleaning machine | |
| CN205236348U (en) | Water saving fixtures of spray rinsing in advance that before painting handled | |
| CN203030179U (en) | Exhaust treatment device for controlling waste electroplating acid and alkali by waste | |
| CN205236339U (en) | Before painting handles contrary process moisturizing water saving fixtures | |
| CN205587338U (en) | Water -saving before painting handles belt cleaning device | |
| CN204866651U (en) | Water -saving before painting handles belt cleaning device | |
| CN108854212A (en) | A kind of online detachable large flow filter | |
| CN204842300U (en) | Hot water wiper mechanism | |
| CN204544674U (en) | A kind of painting pre-processing device | |
| CN204817308U (en) | Degrease wiper mechanism | |
| CN204544867U (en) | Etched foil cleaning water saving fixtures | |
| CN105414092A (en) | Wave-saved coating pretreatment cleaning device | |
| CN201932962U (en) | Metal wastewater treatment device | |
| CN107971308A (en) | A kind of portable pipe steam fog cleaning machine | |
| CN202490756U (en) | Spray and dip combined automatic pretreatment equipment | |
| CN201091869Y (en) | Spraying purifier | |
| CN210340416U (en) | A sewage softening device | |
| CN204866425U (en) | Hot water washs contrary process moisturizing mechanism | |
| CN208213860U (en) | A kind of sea water desalting equipment water tank cleaning device | |
| CN208245316U (en) | A kind of liquid separation CIP cleaning system | |
| CN202343501U (en) | Rinse tank of pretreatment board brushing machine | |
| CN201940387U (en) | High-pressure washing system for the presensitized plate version continuous production | |
| CN204544840U (en) | Spray treatment water circulation system before painting |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160518 |