Sopwith staff is measured in colliery surrouding rock deformation in pit Download PDF

Info

Publication number
CN205228368U
CN205228368U CN201521075956.4U CN201521075956U CN205228368U CN 205228368 U CN205228368 U CN 205228368U CN 201521075956 U CN201521075956 U CN 201521075956U CN 205228368 U CN205228368 U CN 205228368U
Authority
CN
China
Prior art keywords
sopwith staff
sopwith
staff
measured
rock deformation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521075956.4U
Other languages
Chinese (zh)
Inventor
洪紫杰
贾丽杰
邢燚
刘旭锋
李东华
张建锋
陈兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201521075956.4U priority Critical patent/CN205228368U/en
Application granted granted Critical
Publication of CN205228368U publication Critical patent/CN205228368U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a sopwith staff is measured in colliery surrouding rock deformation in pit, including upper portion sopwith staff and lower part sopwith staff, upper portion sopwith staff and lower part sopwith staff cup joint the constitution by the at least three section sopwith staff festival, and the bottom integrated into one piece of upper portion sopwith staff and lower part sopwith staff, the junction of upper portion sopwith staff and lower part sopwith staff is rotated through the coupling bar and is installed rotatory sopwith staff, rotatory sopwith staff comprised through the spread groove connection the rotatory sopwith staff festival of at least three section, and the both sides of rotatory sopwith staff festival all are equipped with the trompil. This is novel can realize the fixed of third point through setting up under lower part sopwith staff and rotatory sopwith staff can realize only having the circumstances of portion of group static line through two fixed measurement stations, reduces artificial error, still realizes disposable all measurements of moving in top of roadway bottom plate and group position, has the measurement accuracy height, the operating procedure is few and advantage such as structure exquisiteness.

Description

Sopwith staff is measured in a kind of underground coal mine surrouding rock deformation
Technical field
The utility model relates to colliery engineering technical field, is specially a kind of underground coal mine surrouding rock deformation and measures Sopwith staff.
Background technology
The tunnel roof-to-floor convergence roadway's sides amount of shifting near is comprised in deformation of the surrounding rock in tunnel amount, the anchor pole of the present scene a gang of supporting in common way Shi Jiang lane and the anchor pole of back supporting are measurement point, monitor the roadway's sides amount of shifting near and roof-to-floor convergence respectively, when measuring, a cord is helped out with money side amount point in tunnel fixing, and tension is in tunnel, and another helps point of fixity to fix, the measuring point of back in kind fixes cord, and suspension heavy weight is stretching by it, ride on the fixing rope in portion of side, then be that benchmark props up roof station by bottom Sopwith staff with Sopwith staff with suspension wire, measure the distance of side portion's static line to top measuring point, then Sopwith staff shortened and measure the distance of base plate to side portion's static line by propping up roadway floor bottom it, finally measure anchor pole top, portion of side and the distance vertically between suspension wire by propping up side portion's anchor pole bottom Sopwith staff along side portion's static line, then the distance of point of fixity is helped with tape measure or anchor pole top, portion of tape measure side and another, due to underground coal mine bad environments and bottom tunnel, side portion's point position and base plate situation are very easily subject to impact that is artificial and action of underground, due to the chronicity that limitation and the roadway deformation of existing Sopwith staff are measured, often there will be base plate fragmentation and can not find original measuring position, Sopwith staff can not along phenomenons such as rope measurement and reading error, and existing Sopwith staff exists the shortcomings such as process is loaded down with trivial details, precision is wayward when roadway deformation is measured in a word, for this reason, proposes a kind of underground coal mine surrouding rock deformation and measures Sopwith staff.
Utility model content
The purpose of this utility model is to provide a kind of underground coal mine surrouding rock deformation to measure Sopwith staff, to solve the problem proposed in above-mentioned background technology.
For achieving the above object, the utility model provides following technical scheme: Sopwith staff is measured in a kind of underground coal mine surrouding rock deformation, comprise top Sopwith staff and bottom Sopwith staff, described top Sopwith staff and bottom Sopwith staff are formed by least three joint Sopwith staff joint sockets, and the bottom of top Sopwith staff and bottom Sopwith staff is one-body molded, the junction of described top Sopwith staff and bottom Sopwith staff is rotatablely equipped with rotation Sopwith staff by coupling bar, described rotation Sopwith staff is rotated Sopwith staff joint by least three joints and is connected and composed by link slot, and the both sides rotating Sopwith staff joint are equipped with perforate.
Preferably, be provided with spacing block set inside the two ends of described coupling bar, the junction of described top Sopwith staff and bottom Sopwith staff is provided with the spacing cell body mated with the spacing block set inside the two ends of coupling bar.
Preferably, the spacing block set surface inside the two ends of described coupling bar is cambered surface, and the spacing cell body of described top Sopwith staff and Sopwith staff junction, bottom is deep-slotted chip breaker.
Preferably, be equipped with damping fin between described top Sopwith staff and every two rotation Sopwith staff joints of bottom Sopwith staff, and the ratio of damping equivalent of damping fin increases.
Preferably, be equipped with damping fin between every two rotation Sopwith staff joints of described rotation Sopwith staff, and the ratio of damping equivalent of damping fin increases.
Compared with prior art, the beneficial effects of the utility model are: this novel by set up bottom Sopwith staff and rotate Sopwith staff can realize only there is side portion's static line when, can realize thirdly by two fixing measuring points fixing, reduce artificial error, also realize disposable whole measurement of tunnel roof and floor and side portion's displacement, have that measuring accuracy is high, operation steps is few and the advantage such as structure is exquisite.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
Structural representation when Fig. 2 is the utility model use.
In figure: 1 coupling bar, 2 bottom Sopwith staffs, 3 rotate Sopwith staff, 4 top Sopwith staffs, 5 perforates and 6 link slots.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Refer to Fig. 1 and Fig. 2, the utility model provides a kind of technical scheme: Sopwith staff is measured in a kind of underground coal mine surrouding rock deformation, comprise top Sopwith staff 4 and bottom Sopwith staff 2, described top Sopwith staff 4 and bottom Sopwith staff 2 are formed by least three joint Sopwith staff joint sockets, and the bottom of top Sopwith staff 4 and bottom Sopwith staff 2 is one-body molded, the junction of described top Sopwith staff 4 and bottom Sopwith staff 2 is rotatablely equipped with by coupling bar 1 and rotates Sopwith staff 3, described rotation Sopwith staff 3 is rotated Sopwith staff joint by least three joints and is connected and composed by link slot 6, and the both sides rotating Sopwith staff joint are equipped with perforate 5.
In order to improve stability during measurement, be provided with spacing block set inside the two ends of described coupling bar 1, the junction of described top Sopwith staff 4 and bottom Sopwith staff 2 is provided with the spacing cell body mated with the spacing block set inside the two ends of coupling bar 1.
Furthermore, the spacing block set surface inside the two ends of described coupling bar 1 is cambered surface, and the spacing cell body of described top Sopwith staff 4 and bottom Sopwith staff 2 junction is deep-slotted chip breaker.
Conveniently longitudinal measurement and the reading of data, be equipped with damping fin, and the ratio of damping equivalent of damping fin increases between described top Sopwith staff 4 and every two rotation Sopwith staff joints of bottom Sopwith staff 2.
Conveniently horizontal measurement and the reading of data, be equipped with damping fin, and the ratio of damping equivalent of damping fin increases between every two rotation Sopwith staff joints of described rotation Sopwith staff 3.
During use, the cord being fixed on portion of side is strained and is fixed on the point of fixity of another side, the close side having measuring point is screwed into by rotating Sopwith staff 3, being extracted out by top Sopwith staff 4 makes bottom withstand back measuring point, adjustment Sopwith staff, make top Sopwith staff 4 and rotate Sopwith staff 3 place along side portion's static line and top board suspension line and withstand side portion's measuring point by often saving along link slot pull-out, finally bottom Sopwith staff 2 is extracted out, prop up roadway floor, record the data of three Sopwith staffs respectively, convert and show that roof and floor and two helps the amount of shifting near.
Although illustrate and described embodiment of the present utility model, for the ordinary skill in the art, be appreciated that and can carry out multiple change, amendment, replacement and modification to these embodiments when not departing from principle of the present utility model and spirit, scope of the present utility model is by claims and equivalents thereof.

Claims (5)

1. Sopwith staff is measured in a underground coal mine surrouding rock deformation, it is characterized in that: comprise top Sopwith staff (4) and bottom Sopwith staff (2), described top Sopwith staff (4) and bottom Sopwith staff (2) are formed by least three joint Sopwith staff joint sockets, and the bottom of top Sopwith staff (4) and bottom Sopwith staff (2) is one-body molded, the junction of described top Sopwith staff (4) and bottom Sopwith staff (2) is rotatablely equipped with by coupling bar (1) and rotates Sopwith staff (3), described rotation Sopwith staff (3) is rotated Sopwith staff joint by least three joints and is connected and composed by link slot (6), and the both sides rotating Sopwith staff joint are equipped with perforate (5).
2. Sopwith staff is measured in a kind of underground coal mine surrouding rock deformation according to claim 1, it is characterized in that: be provided with spacing block set inside the two ends of described coupling bar (1), the junction of described top Sopwith staff (4) and bottom Sopwith staff (2) is provided with the spacing cell body mated with the spacing block set inside the two ends of coupling bar (1).
3. Sopwith staff is measured in a kind of underground coal mine surrouding rock deformation according to claim 2, it is characterized in that: the spacing block set surface inside the two ends of described coupling bar (1) is cambered surface, and the spacing cell body of described top Sopwith staff (4) and bottom Sopwith staff (2) junction is deep-slotted chip breaker.
4. Sopwith staff is measured in a kind of underground coal mine surrouding rock deformation according to claim 1, it is characterized in that: be equipped with damping fin between described top Sopwith staff (4) and every two rotation Sopwith staff joints of bottom Sopwith staff (2), and the ratio of damping equivalent of damping fin increases.
5. Sopwith staff is measured in a kind of underground coal mine surrouding rock deformation according to claim 1, it is characterized in that: be equipped with damping fin between every two rotation Sopwith staff joints of described rotation Sopwith staff (3), and the ratio of damping equivalent of damping fin increases.
CN201521075956.4U 2015-12-21 2015-12-21 Sopwith staff is measured in colliery surrouding rock deformation in pit Expired - Fee Related CN205228368U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521075956.4U CN205228368U (en) 2015-12-21 2015-12-21 Sopwith staff is measured in colliery surrouding rock deformation in pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521075956.4U CN205228368U (en) 2015-12-21 2015-12-21 Sopwith staff is measured in colliery surrouding rock deformation in pit

Publications (1)

Publication Number Publication Date
CN205228368U true CN205228368U (en) 2016-05-11

Family

ID=55903425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521075956.4U Expired - Fee Related CN205228368U (en) 2015-12-21 2015-12-21 Sopwith staff is measured in colliery surrouding rock deformation in pit

Country Status (1)

Country Link
CN (1) CN205228368U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502700A (en) * 2020-04-24 2020-08-07 哈尔滨龙源河矿山机械技术开发有限公司 Tunnel sealing surrounding rock arch and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502700A (en) * 2020-04-24 2020-08-07 哈尔滨龙源河矿山机械技术开发有限公司 Tunnel sealing surrounding rock arch and construction method thereof
CN111502700B (en) * 2020-04-24 2022-03-25 哈尔滨龙源河矿山机械技术开发有限公司 Tunnel sealing surrounding rock arch and construction method thereof

Similar Documents

Publication Publication Date Title
CN205957972U (en) Novel survey and drawing sighting rod fixing balance support
CN114857434B (en) Urban and rural planning engineering measuring equipment convenient to leveling
CN205228368U (en) Sopwith staff is measured in colliery surrouding rock deformation in pit
CN101187268B (en) Height adjustable transmission iron tower capable of even precipitation
CN202719341U (en) Tripod for coal mine survey
CN205402164U (en) Surveying instrument support convenient to altitude mixture control
CN208205968U (en) One kind being used for field ground fractures measuring device
CN213177392U (en) Special safety protection frame for coal mine geological measurement
CN203375120U (en) Fixing device for measuring apparatus
CN108731859A (en) A kind of photoelastic finder charge bringing device of plane
CN205012378U (en) Basic borer is used in building construction
CN203684259U (en) Flange type foundation for outgoing line framework of 500-kV transformer substation
CN208155301U (en) A kind of monitoring device of subgrade settlement
CN206638373U (en) A kind of photoelastic test load bringing device that can adjust loading frame size
CN208025041U (en) A kind of engineering mapping shock mount
CN206818205U (en) A kind of subway station foundation ditch connection survey GPS supports
CN211527457U (en) Mine safety measuring device
CN206223159U (en) A kind of measurement apparatus of well lane engineering
CN204831087U (en) Take size location's scraper blade inclined plane special measuring
CN211875575U (en) Connection structure of total powerstation
CN217786022U (en) Coal rock layer thickness measuring tool of fully mechanized coal mining face
CN211717450U (en) A sighting rod for engineering survey
CN218972337U (en) Measuring equipment based on GPS control measuring technology
CN215831558U (en) Pin-connected panel steel foot rest
CN220582160U (en) Measurement auxiliary vertical structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160511

Termination date: 20161221

CF01 Termination of patent right due to non-payment of annual fee