CN205224623U - Construction platform device of unloading - Google Patents

Construction platform device of unloading Download PDF

Info

Publication number
CN205224623U
CN205224623U CN201521004350.1U CN201521004350U CN205224623U CN 205224623 U CN205224623 U CN 205224623U CN 201521004350 U CN201521004350 U CN 201521004350U CN 205224623 U CN205224623 U CN 205224623U
Authority
CN
China
Prior art keywords
guide
fixed
bar
platform
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521004350.1U
Other languages
Chinese (zh)
Inventor
李海尤
张东海
吴兵
成安发
蒋奎
闵成中
毛红贺
陈媛媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Anjian investment and Construction Co.,Ltd.
Anhui Water Resources Development Co Ltd
Original Assignee
Anhui Water Resources Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Water Resources Development Co Ltd filed Critical Anhui Water Resources Development Co Ltd
Priority to CN201521004350.1U priority Critical patent/CN205224623U/en
Application granted granted Critical
Publication of CN205224623U publication Critical patent/CN205224623U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a construction platform device of unloading, including platform subassembly and protection component, the platform subassembly includes a plurality of crossbeams and a plurality of longeron, and a plurality of crossbeams and a plurality of longeron be fixed connection each other, and protection component includes a plurality of bracing pieces and a plurality of protection network, still including the direction subassembly, the direction subassembly includes guide holder and guide bar, and the guide bar includes two slide bars and head rod, through head rod fixed connection between two slide bars, open in the guide holder have with guide bar complex spout, still be equipped with a plurality of and the slide bar complex pulley guide bar in the guide holder, a plurality of guide holders interval arrangement in proper order on the movement track of guide bar, it is fixed between platform subassembly and the guide bar. Constitute the fixed platform of unloading with platform subassembly and protection component, the platform of unloading is fixed on the wall body with the direction subassembly, this device independent setting, the installation, dismantle swift, safe convenience, labour saving and time saving need not be with the help of the tower crane etc. Can effectively accelerate the engineering construction progress.

Description

Building operations discharge platform device
Technical field
The utility model relates to a kind of discharging platform, particularly a kind of building operations discharge platform device.
Background technology
At present, widely, the building operations discharging platform used that matches with it also gets more and more, more and more important for high level, construction of super highrise building.But current building operations discharging platform normally overhanging unloading platform, installing/dismounting operation is more loaded down with trivial details, affects the construction period, also must rely on tower crane during use, reduces the efficiency of building operations.
Utility model content
Technical problem to be solved in the utility model is to provide the building operations discharge platform device of a kind of easy accessibility, safe ready.
For solving the problems of the technologies described above, the utility model provides a kind of building operations discharge platform device, comprise platform assembly and guard assembly, platform assembly comprises some crossbeams and some longerons, some crossbeams and some longerons are fixed to one another connection, and guard assembly comprises some support bars and some protective screenings;
Also comprise guidance set, guidance set comprises some guide holders and at least one guide peg, and described guide peg at least comprises two slide bars and some head rods, two parallel placements of slide bar, and is fixedly connected with by some head rods between two slide bars;
Have the chute coordinated with guide peg in described guide holder, in guide holder, be also provided with some pulleys coordinated with the slide bar of guide peg, some guide holders on the movement locus of guide peg successively interval arrange;
Fixing between platform assembly and guide peg.
After adopting such structure, the discharging platform fixed with platform assembly and guard assembly composition, discharging platform is relative with body of wall fixing by guidance set, and combined and instant, use are simply;
For the technology drawback that original overhanging unloading platform exists, this building operations discharge platform device is independently arranged, and installs, dismantles simple and fast, safe ready, time saving and energy saving, does not need by tower crane etc., can effectively accelerate engineering construction progress.
This building operations discharge platform device can along with building storey synchronization lifting, avoid and be often elevated one deck dismounting, install once, and eliminate newly-built floor again set up install discharging platform trouble and potential safety hazard, main structure construction is guaranteed safely, effectively shortens the construction period.
In order to better understand the technical solution of the utility model, below by this building operations discharge platform device referred to as this device.
The guide peg of this device also comprises fixed bar and some second connecting rods, one end of described second connecting rod is fixedly connected with in the middle part of corresponding head rod, the other end of described second connecting rod is fixedly connected with fixed bar, the trend of fixed bar is consistent with the trend of described slide bar, fixing between platform assembly and fixed bar;
Guide holder also has the notch coordinated with the second connecting rod, notch is communicated with chute.
After adopting such structure, fixed bar is located at outside slide bar and head rod, facilitates fixed platform assembly, avoids interfering at this device guidance set and platform assembly when moving integrally.
Some support bars of this device guard assembly are fixed to one another formation shielded frame, and described protective screening is fixed in shielded frame;
Shielded frame and fixed bar are provided with pull bar, pull bar two ends respectively with shielded frame and fixed bar hinged.
After adopting such structure, pull bar pulls the support bar of guard assembly, and support bar gives platform assembly one pulling force upwards, and then pull bar can promote the safety between shielded frame and steady brace.
This device pull bar comprises two bodies of rod and double threaded screw, and described body of rod one end has the screwed hole coordinated with double threaded screw, and the described body of rod other end is provided with hinged seat; After adopting such structure, the more reasonable structure of pull bar, and the angle that can be according to job site environmental modulation discharging platform.
Accompanying drawing explanation
Fig. 1 is one of stereogram of this device embodiment.
Fig. 2 is the A portion enlarged drawing of Fig. 1.
Fig. 3 is the B portion enlarged drawing of Fig. 1.
Fig. 4 is the stereogram two of this device embodiment.
Fig. 5 is the structural representation of this device embodiment guide holder.
Fig. 6 is that Fig. 5 is along C-C to sectional view.
Detailed description of the invention
As shown in Figures 1 to 6 (in order to more clear and concise expression technology scheme, the guidance set in Fig. 1 and Fig. 4 is to a line two guide holders are shown, residue guide holder is not shown)
This device comprises platform assembly, guard assembly, guidance set and lifting subassembly.
Guidance set comprises multiple guide holder 12 and two guide pegs 11, each guide peg 11 comprises two slide bar 11a, fixed bar 11d, many second connecting rod 11c and Duo Gen head rod 11b, two vertical parallel placements of slide bar 11a, and be welded and fixed by many head rod 11b between two slide bar 11a, make two slide bar 11a and many head rod 11b be ladder shape;
Many second connecting rod 11c are for connecting many head rod 11b and fixed bar 11d, one end of every root second connecting rod 11c is welded with in the middle part of corresponding head rod 11b, its other end welds with fixed bar 11d, makes the trend of fixed bar 11d consistent with the trend of described slide bar 11a;
The chute 12a coordinated with guide peg 11 is had in each guide holder 12, chute 12a is extended with the notch 12d coordinated with the second connecting rod 11c outside guide holder, eight pulley 12b coordinated with two slide bar 11a of guide peg 11 respectively are also provided with in guide holder 12, every four of eight pulley 12b are one group and coordinate with a corresponding slide bar 11a, often organize four pulley 12b to distribute up and down between two, between two the pulley 12b often gone, leave the gap 12c coordinated with slide bar 11a;
Multiple guide holders 12 of guidance set are vertically arranged on wall body structure for a line by every two, often the chute 12a center line of row guide holder 12 on the same line, the trend of chute 12a center line is consistent with the trend of guide peg 11, and the chute 12a of multiple guide holder 12 forms the hoist trunk that whole device moves up and down.
Platform assembly comprises two crossbeams 21 and 12 longerons, 22, two crossbeams 21 and 12 longerons 22 and is welded to one another the discharging platform base plate connecing formation, and discharging platform floor level is welded on the fixed bar of guidance set.
Guard assembly comprises many support bars 31 and many fan protective screenings 32, weld between the discharging platform base plate that many support bars 31 and platform assembly are formed, many support bars 31 are built into can the support frame of fixed protection net 32, support frame is vertically arranged on discharging platform base plate, many fans protective screening 32 is fixed in support frame, is impaled by discharging platform bottom edge.
Many pull bars 4 are hinged with between shielded frame and fixed bar 11d, every root pull bar 4 two ends respectively with the support bar 31 of shielded frame and fixed bar 11d hinged, pull bar 4 comprises two bodies of rod 41 and double threaded screw 42, the described body of rod 41 one end has screwed hole, the described body of rod 41 other end is provided with hinged seat 43, two bodies of rod 41 by screwed hole respectively with double threaded screw 42 two ends threaded engagement.
Before the mounting, pre-buried boxing out is carried out at positions such as agent structure girder, shear walls in advance.Reach after requirement until concrete strength, use through-wall bolt that attached wall guide holder 12 is fixed on the positions such as agent structure girder, shear wall, then guide peg 11 is arranged on attached wall fixed guide seat 12, and then whole discharging platform is all connected with guide holder 12.
During use, be connected with the second connecting rod 11c of this device by the lifting appliance of outside, lifting appliance controls this device entirety and moves back and forth along hoist trunk is upper and lower.
Lifting appliance can select the lifting means such as tower crane or electric block.
Above-described is only a kind of embodiment of the present utility model; it should be pointed out that for the person of ordinary skill of the art, under the prerequisite not departing from the utility model principle; can also make some modification and improvement, these also should be considered as belonging to protection domain of the present utility model.

Claims (4)

1. a building operations discharge platform device, comprises platform assembly and guard assembly, and platform assembly comprises some crossbeams and some longerons, and some crossbeams and some longerons are fixed to one another connection, and guard assembly comprises some support bars and some protective screenings;
It is characterized by:
Also comprise guidance set, guidance set comprises some guide holders and at least one guide peg, and described guide peg at least comprises two slide bars and some head rods, two parallel placements of slide bar, and is fixedly connected with by some head rods between two slide bars;
Have the chute coordinated with guide peg in described guide holder, in guide holder, be also provided with some pulleys coordinated with the slide bar of guide peg, some guide holders on the movement locus of guide peg successively interval arrange;
Fixing between platform assembly and guide peg.
2. building operations discharge platform device according to claim 1, is characterized in that:
Described guide peg also comprises fixed bar and some second connecting rods, one end of described second connecting rod is fixedly connected with in the middle part of corresponding head rod, the other end of described second connecting rod is fixedly connected with fixed bar, and the trend of fixed bar is consistent with the trend of described slide bar;
Guide holder also has the notch coordinated with the second connecting rod, notch is communicated with chute.
3. building operations discharge platform device according to claim 2, is characterized in that:
Some support bars of described guard assembly are fixed to one another formation shielded frame, and described protective screening is fixed in shielded frame;
Shielded frame and fixed bar are provided with pull bar, pull bar two ends respectively with shielded frame and fixed bar hinged.
4. building operations discharge platform device according to claim 3, is characterized in that:
Described pull bar comprises two bodies of rod and double threaded screw, and described body of rod one end has the screwed hole coordinated with double threaded screw, and the described body of rod other end is provided with hinged seat.
CN201521004350.1U 2015-12-02 2015-12-02 Construction platform device of unloading Active CN205224623U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521004350.1U CN205224623U (en) 2015-12-02 2015-12-02 Construction platform device of unloading

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521004350.1U CN205224623U (en) 2015-12-02 2015-12-02 Construction platform device of unloading

Publications (1)

Publication Number Publication Date
CN205224623U true CN205224623U (en) 2016-05-11

Family

ID=55899698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521004350.1U Active CN205224623U (en) 2015-12-02 2015-12-02 Construction platform device of unloading

Country Status (1)

Country Link
CN (1) CN205224623U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350789A (en) * 2015-12-02 2016-02-24 安徽水利开发股份有限公司 Building construction unloading platform device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350789A (en) * 2015-12-02 2016-02-24 安徽水利开发股份有限公司 Building construction unloading platform device

Similar Documents

Publication Publication Date Title
JP6986892B2 (en) Cantilever overhang work vehicle removal method
JP6503716B2 (en) Demolition system and demolition method
CN105350760B (en) A kind of construction method of suspending scaffold
CN103352559A (en) Hanging type movable working platform for storage tank maintenance
CN205224623U (en) Construction platform device of unloading
CN105752826A (en) Movable lifting platform and construction method thereof
JP5596834B1 (en) Gas holder repair method
CN105350789A (en) Building construction unloading platform device
CN204040438U (en) Wall-hanging adjustable inspection platform
CN205680927U (en) Switch cabinet frame structure and include the switch cubicle of this switch cabinet frame structure
CN201567160U (en) Detachable combined high-level crane boom
CN204001751U (en) Super high steel structure construction overhanging unloading platform
CN105346687A (en) Dock docking block
CN206013426U (en) A kind of full-automatic unloading machine shelf
CN101560826A (en) Elevation type tail water overhauling platform and manufacturing method and application thereof
CN205476377U (en) Skin construction scaffold convenient to installation
CN208749114U (en) A kind of splicing apparatus of discharging platform
CN210947630U (en) Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble
CN203905435U (en) Multilayer lifting platform for installation of combustor
CN209620551U (en) A kind of multi-functional mounting platform of high voltage power cable
CN203373661U (en) Movable operation platform device below cantilever arm of steel-structure bridge
CN105257966A (en) Rack of power transmission and distribution equipment
JP5948828B2 (en) Lifting device used for assembling cargo lift for building demolition work, cargo lift for building demolition work, and assembling method thereof
CN105155832A (en) Hanging basket device and moving method thereof
CN204711557U (en) Auxiliary device for assembling screw system of large-scale vertical mill

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190628

Address after: 233010 No. 5183 Donghai Avenue, Bengbu City, Anhui Province

Patentee after: Anhui Water Resources Development Co., Ltd.

Address before: 233010 South of Zhanggongshan Road, Donghai Avenue, Bengbu City, Anhui Province

Patentee before: Anhui Water Resources Development Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210429

Address after: 233010 No. 5183 Donghai Avenue, Bengbu City, Anhui Province

Patentee after: Anhui Water Resources Development Co.,Ltd.

Patentee after: Shaanxi Anjian investment and Construction Co.,Ltd.

Address before: 233010 No. 5183 Donghai Avenue, Bengbu City, Anhui Province

Patentee before: Anhui Water Resources Development Co.,Ltd.

TR01 Transfer of patent right