CN203905435U - Multilayer lifting platform for installation of combustor - Google Patents
Multilayer lifting platform for installation of combustor Download PDFInfo
- Publication number
- CN203905435U CN203905435U CN201420302498.2U CN201420302498U CN203905435U CN 203905435 U CN203905435 U CN 203905435U CN 201420302498 U CN201420302498 U CN 201420302498U CN 203905435 U CN203905435 U CN 203905435U
- Authority
- CN
- China
- Prior art keywords
- platform
- fixed
- movable
- fixed platform
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model provides a multilayer lifting platform for installation of a combustor. The multilayer lifting platform comprises a fixed platform, a plurality of layers of movable platforms movably fixed under the fixed platform through a locking device, a plurality of lifting lugs fixed to the fixed platform and a winch fixed above the fixed platform. A reel is arranged over the fixed platform. A steel wire rope of the winch is fixed to the lifting lugs after being wound around the reel. In the using process, the winch is started firstly to lift the movable platforms to a proper position, and the fixed platform is fixed to the lower portion of a platform unit through the locking device. According to the combination mode of the fixed platform and the movable platforms, the movable platforms can continue to be combined as needed. After combination of the movable platforms is completed, the winch is started, all the platforms are lifted to the position of a nozzle of the combustor or another proper construction position, and then workers can carry out construction conveniently. When the lifting height of the lifting platform needs changing, the lifting height of the lifting platform can be changed at will by starting the winch.
Description
Technical field
The utility model relates to a kind of lift platform.
Background technology
Power boiler breeze burner is installed the existing two kinds of modes of inside staging, and a kind of is full hall scaffold operating platform in stove, and another kind is the large lift platform of individual layer in stove, and the first platform labor intensive and putting up platform belong to high-risk work items; The second platform device takies many, and expense is high and use dumbly, can only, in the work of same absolute altitude face, cause the waste of resource.
Summary of the invention
The utility model is in order to overcome the deficiency of above technology, the multiple layer up-down platform that provides a kind of burner flexible for installation, can multiple benches to install.
The utility model overcomes the technical scheme that its technical problem adopts:
The multiple layer up-down platform that this burner is installed, comprise fixed platform, by locking system activity, be fixed on some layers of movable platform of fixed platform below, the hoist engine that is fixed on the some hangers in fixed platform and is arranged at fixed platform top, directly over described fixed platform, be provided with reel, the wire rope of described hoist engine is fixed on each hanger after walking around reel.
Above-mentioned locking system comprise be arranged at fixed platform and movable platform below some fixed covers, be fixed on some inserted links of movable platform top, on described fixed cover, fixed head is installed, on described fixed head, be provided with two down-side tilt slotted holes, two pin slide are arranged in slotted hole and it is positioned at fixed cover, described inserted link two ends are respectively arranged with some draw-in grooves from top to bottom, under Action of Gravity Field, pin slide is during to slotted hole lower end, and described bearing pin is placed in the draw-in groove of inserted link.
For prevent from that platform from rocking, also comprise being arranged at fixed platform and or each movable platform on some hook II.
For convenient construction personnel arrive other layer of platform, also comprise the fixed bar and the cat ladder that are arranged in fixed platform and each movable platform, described cat ladder is placed on the fixed bar of fixed platform and movable platform by hook I.
In order to improve safety, also comprise the manhole excessively that is arranged at close cat ladder place in fixed platform and each movable platform.
The beneficial effects of the utility model are: during use, first start hoist engine movable platform is risen to suitable position, fixed platform is fixed to the bottom of platform unit by locking system.According to the combination of fixed platform and movable platform, can continue as required combined moving platform.After treating platform combination, start hoist engine, all platforms are risen to burner nozzle position or other suitable construction locations, can facilitate staff to carry out constructing operation.While needing the adjustable height of conversion lift platform, starting hoist engine can arbitrarily change.The multiple layer up-down platform that this burner is installed is installed combined and instant, and volume is small and exquisite can multilayer work flexibly simultaneously, has improved operating efficiency, has saved resource.
Accompanying drawing explanation
Fig. 1 is perspective view of the present utility model;
Fig. 2 is fixed platform structural representation of the present utility model;
Fig. 3 is movable platform structure schematic diagram of the present utility model;
Fig. 4 is locking system structural representation of the present utility model;
In figure, 1. hoist engine 2. reel 3. wire rope 4. fixed platform 5. movable platform 6. hanger 7. cat ladder 8. hook I 9. hook II 10. are crossed manhole 11. fixed bar 12. fixed cover 13. inserted link 14. fixed head 15. slotted hole 16. draw-in groove 17. bearing pins.
The specific embodiment
Below in conjunction with accompanying drawing 1 to 4 pairs of the utility model of accompanying drawing, be described further.
As shown in Figure 1, the multiple layer up-down platform that this burner is installed, comprise fixed platform 4, by locking system activity, be fixed on the some layers of movable platform 5 of fixed platform 4 belows, the hoist engine 1 that is fixed on the some hangers 6 in fixed platform 4 and is arranged at fixed platform 4 tops, directly over fixed platform 4, be provided with reel 2, the wire rope 3 of hoist engine 1 is fixed on each hanger 6 after walking around reel 2.During use, first start hoist engine 1 movable platform 5 is risen to suitable position, fixed platform 4 is fixed to the bottom of platform unit 1 by locking system.Combination according to fixed platform 4 with movable platform 5, can continue combined moving platform 5 as required.After treating platform combination, start hoist engine 3, all platforms are risen to burner nozzle position or other suitable construction locations, can facilitate staff to carry out constructing operation.While needing the adjustable height of conversion lift platform, starting hoist engine 1 can arbitrarily change.The multiple layer up-down platform that this burner is installed is installed combined and instant, and volume is small and exquisite can multilayer work flexibly simultaneously, has improved operating efficiency, has saved resource.
As shown in accompanying drawing 2, accompanying drawing 3 and accompanying drawing 4, above-mentioned locking system comprise be arranged at fixed platform 4 and movable platform 5 belows some fixed covers 12, be fixed on some inserted links 13 of movable platform 12 tops, fixed head 14 is installed on fixed cover 12, on fixed head 14, be provided with two down-side tilt slotted holes 15, two bearing pins 17 slide and are arranged in slotted hole 15 and it is positioned at fixed cover 12, inserted link 13 two ends are respectively arranged with some draw-in grooves from top to bottom, under Action of Gravity Field, when bearing pin 17 slides into slotted hole 15 lower end, bearing pin 17 is placed in the draw-in groove 16 of inserted link 13.When needs carry out Fast Installation by each platform, inserted link 13 is inserted in the endoporus of fixed cover 12, inserted link 13 can be pushed along slotted hole 15 bearing pin 17 open when inserting to both sides, can conveniently adjust upper and lower both sides platform to suitable position.After adjusting to the right place, bearing pin 17 glides and drops down onto slotted hole 15 bottom in the effect of gravity, and now inserted link 13 draw-in groove on it under Action of Gravity Field is stuck on bearing pin 17, therefore realizes the Fast Installation of levels and fixes.When needs are dismantled, by bearing pin 17 is manually pulled to both sides along slotted hole 15, inserted link 13 can be taken out from fixed cover 12.
Can also comprise be arranged at fixed platform 4 and or each movable platform 5 on some hook II 9.That this platform rise to after construction location, can by rope utilization hook II 9, be suspended to the firm position of building nearby, can effectively prevent that multiple layer up-down platform that this burner is installed from producing in use the situation of rocking and occurring.
As shown in Figure 2, also comprise the fixed bar 11 and the cat ladder 7 that are arranged in fixed platform 4 and each movable platform 5, cat ladder 7 is placed on the fixed bar 11 of fixed platform 4 and movable platform 5 by hook I 8.Therefore constructor can utilize cat ladder to arrive up and down on interlayer platform, convenient construction.Also comprise the manhole 10 excessively that is arranged at close cat ladder 7 places in fixed platform 4 and each movable platform 5.Constructor can pass through manhole 10 and be facilitated and arrive other layer of platform at any time by cat ladder 7 from the inside of the multiple layer up-down platform of this burner installation.Owing to climbing up and climbing down from inside, therefore improved greatly safety.
Claims (5)
1. the multiple layer up-down platform that a burner is installed, it is characterized in that: comprise fixed platform (4), by locking system activity, be fixed on the some layers of movable platform (5) of fixed platform (4) below, the hoist engine (1) that is fixed on the some hangers (6) in fixed platform (4) and is arranged at fixed platform (4) top, directly over described fixed platform (4), be provided with reel (2), the wire rope (3) of described hoist engine (1) is fixed on each hanger (6) after walking around reel (2).
2. the multiple layer up-down platform that burner according to claim 1 is installed, it is characterized in that: described locking system comprises the some fixed covers (12) that are arranged at fixed platform (4) and movable platform (5) below, be fixed on some inserted links (13) of movable platform (12) top, fixed head (14) is installed on described fixed cover (12), on described fixed head (14), be provided with two down-side tilt slotted holes (15), two bearing pins (17) slide and to be arranged in slotted hole (15) and it is positioned at fixed cover (12), described inserted link (13) two ends are respectively arranged with some draw-in grooves from top to bottom, under Action of Gravity Field, when bearing pin (17) slides into slotted hole (15) lower end, described bearing pin (17) is placed in the draw-in groove (16) of inserted link (13).
3. the multiple layer up-down platform that burner according to claim 1 is installed, is characterized in that: also comprise be arranged at fixed platform (4) and or each movable platform (5) on some hook II (9).
4. the multiple layer up-down platform of installing according to the burner described in claim 1 or 2 or 3, it is characterized in that: also comprise the fixed bar (11) and the cat ladder (7) that are arranged in fixed platform (4) and each movable platform (5), described cat ladder (7) is placed on the fixed bar (11) of fixed platform (4) and movable platform (5) by hook I (8).
5. the multiple layer up-down platform that burner according to claim 4 is installed, is characterized in that: also comprise and be arranged at the manhole (10) excessively of locating near cat ladder (7) in fixed platform (4) and each movable platform (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420302498.2U CN203905435U (en) | 2014-06-09 | 2014-06-09 | Multilayer lifting platform for installation of combustor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420302498.2U CN203905435U (en) | 2014-06-09 | 2014-06-09 | Multilayer lifting platform for installation of combustor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203905435U true CN203905435U (en) | 2014-10-29 |
Family
ID=51779723
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420302498.2U Withdrawn - After Issue CN203905435U (en) | 2014-06-09 | 2014-06-09 | Multilayer lifting platform for installation of combustor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203905435U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104005549A (en) * | 2014-06-09 | 2014-08-27 | 山东电力建设第一工程公司 | Multi-layer lift platform mounted on combustor |
CN112096048A (en) * | 2020-09-14 | 2020-12-18 | 中国建筑第八工程局有限公司 | Double-layer integral lifting operation platform for high-rise building construction |
-
2014
- 2014-06-09 CN CN201420302498.2U patent/CN203905435U/en not_active Withdrawn - After Issue
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104005549A (en) * | 2014-06-09 | 2014-08-27 | 山东电力建设第一工程公司 | Multi-layer lift platform mounted on combustor |
CN104005549B (en) * | 2014-06-09 | 2015-12-23 | 山东电力建设第一工程公司 | The multiple layer up-down platform that a kind of burner is installed |
CN112096048A (en) * | 2020-09-14 | 2020-12-18 | 中国建筑第八工程局有限公司 | Double-layer integral lifting operation platform for high-rise building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101553966B1 (en) | Wall-mounted Tower Crane Climbing Device | |
CN201268937Y (en) | Double-layer hanging cradle for working aloft | |
EP3077666B1 (en) | An internal tower structure for a wind turbine generator | |
US10753110B2 (en) | Rack structure for an in-field 3D construction printer | |
CN204057851U (en) | Performance stage booth lifting mechanism | |
CN105226560B (en) | A kind of crossing frame and its construction method | |
CN104358336A (en) | Unit type curtain wall installation system and installation method thereof | |
CN106136561A (en) | Electrician can backpack Self-unlocking lifting tool bag | |
KR20120131710A (en) | Cage rail climbing system | |
CN205429566U (en) | Crossing structure | |
CN106150057B (en) | A kind of split blade type hydraulic pressure lift climbing frame | |
CN203905435U (en) | Multilayer lifting platform for installation of combustor | |
CN103422662A (en) | Integral mobile construction platform for cast-in-place of elevator shaft and method for using same | |
CN207647152U (en) | Tower lifts constructing device certainly | |
CN104016243B (en) | Boiler cable shaft hanging apparatus | |
CN201541085U (en) | Lifting device for rotary insulated platform | |
CN104005549B (en) | The multiple layer up-down platform that a kind of burner is installed | |
CN104150393A (en) | Micro power electric equipment rotating and hoisting device | |
CN107487423B (en) | Marine suspension scaffold and construction method thereof | |
CN206784958U (en) | A kind of encorbelmented across metal greatly decorates prefabricated roof and air translation splicing structure | |
CN105544957A (en) | Mobile scaffold for horizontal overhead pipeline construction and construction method thereof | |
CN202731270U (en) | Movable platform for high-altitude installation operation of space steel structure | |
JP6554610B2 (en) | Assembly method for a DC converter valve | |
CN107060347A (en) | A kind of big encorbelmented across metal decorates prefabricated roof and air translation splicing structure | |
CN103121629B (en) | Hoisting method of large support equipment for basement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20141029 Effective date of abandoning: 20151223 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |