Prior art keywords
roofing
view
foundation structure
concrete
concrete pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520839357.9U
Other languages
Chinese (zh)
Inventor
田其宁
顾建兵
张庆昱
刘相涛
何娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201520839357.9U priority Critical patent/CN205206029U/en
Application granted granted Critical
Publication of CN205206029U publication Critical patent/CN205206029U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a ground plate structure of view roofing and pavement foundation structure who is used for this view roofing, wherein, the pavement foundation structure include: prop up a plurality of concrete pier on the basis of locating the view roofing, concrete pier include the sleeve pipe with pour in the intraductal concrete of cover, side walk slab lays in a plurality of concrete pier is last, plain concrete kan tai has been built respectively to the below at side walk slab both ends. The utility model discloses the pavement foundation structure of view roofing, direct standing on the basis of view roofing after making level the sleeve pipe, then directly at the intraductal concreting of cover formation concrete pier, as side walk slab's fossil fragments basis, saved the trouble of building brick pillar by laying bricks or stones, practiced thrift the time limit for a project greatly. And concrete pier can shift and have enough to meet the need the use, has practiced thrift construction cost.

Description

Flooring structure and the sidewalk foundation structure for this view roofing of view roofing
Technical field
The utility model relates to technical field of building construction, refers in particular to a kind of flooring structure of view roofing and the sidewalk foundation structure for this view roofing.
Background technology
View roofing can be interpreted as widely and enclose in all kinds of ancient and present architecture thing, structure, city, roof, balcony, balcony, balcony or the large-sized artificial artificial hillock massif of bridge (overpass bridge) etc. carry out landscape architecture, the general designation of plantation trees flowers.View roofing, to increase urban green space area, improves the environment for human survival space of increasingly worsening; Improve city high rise building mansion to stand in great numbers, the hard improving numerous road is mated formation and the present situation of the natural land replaced and plant; Improve overcut natural forest, various exhaust emission and the urban heat land effect formed, sandstorm etc. are to the harm of the mankind; Developing mankind green space, builds garden city, improve the habitat condition of the people, improve the quality of living, and to beautifying urban environment, improving ecological effect has extremely important meaning.
But the construction method on the sidewalk of traditional view roofing, basis, sidewalk adopts the piled bricks of 240mm to build by laying bricks or stones as material to form, and constructing operation is loaded down with trivial details and poor at northern freeze-thaw resistance, but also needs to consume a large amount of bricks, and cost is high, poor durability.
Utility model content
Because the problems referred to above, the utility model provides a kind of sidewalk foundation structure of view roofing, comprising:
Prop up the multiple concrete piers be located on the basis of view roofing, described concrete pier comprises sleeve pipe and builds the concrete in described sleeve pipe;
Side walk slab, is layed on multiple described concrete pier.
The sidewalk foundation structure of the utility model view roofing, by on levelling for the sleeve pipe rear basis directly standing in view roofing, then direct in sleeve pipe concreting formed concrete pier, as side walk slab keel basis, eliminate the trouble of building piled bricks by laying bricks or stones, greatly save the duration.And concrete pier can shift and carry out turnover use, has saved construction cost.
The further improvement of the sidewalk foundation structure of the utility model view roofing is, multiple described concrete pier is supported in the below in the middle part of described side walk slab equally spacedly, and the spacing between multiple described concrete pier is 550mm ~ 650mm.
The further improvement of the sidewalk foundation structure of the utility model view roofing is, described plain concrete Kan Tai is along the elongated setting of length direction of described side walk slab.
The further improvement of the sidewalk foundation structure of the utility model view roofing is, described sleeve pipe is the pvc pipe of diameter 150mm ~ 250mm.
The further improvement of the sidewalk foundation structure of the utility model view roofing is, described side walk slab is the artificial stone plate of thickness 250mm ~ 350mm.
The utility model additionally provides a kind of flooring structure of view roofing, comprising:
The sidewalk foundation structure of view roofing as above;
Be adjacent to the colored pond of described sidewalk foundation structure, be filled with planting soil and cobble in described colored pond, described cobble is layed in the surrounding of described planting soil.
The flooring structure of the view roofing of the utility model view roofing, adopt above-mentioned sidewalk foundation structure, by on levelling for the sleeve pipe rear basis directly standing in view roofing, then direct in sleeve pipe concreting formed concrete pier, as the keel basis of side walk slab, eliminate the trouble of building piled bricks by laying bricks or stones, greatly save the duration.And concrete pier can shift and carry out turnover use, has saved construction cost.In addition, planting soil and cobble have good draining effect, ensure that the planting effect of Hua Chi.
The further improvement of the flooring structure of the utility model view roofing is, the bottom in described colored pond is equipped with geotechnique and crosses wire screen, and the below that described geotechnique crosses wire screen is equipped with high drainage lug.
The further improvement of the flooring structure of the utility model view roofing is, the sidewall in described colored pond is provided with filter pipe.
The further improvement of the flooring structure of the utility model view roofing is, the quantity of described filter pipe is multiple, and the sidewall in described colored pond is located at equally spacedly by multiple described filter pipe, and the spacing between multiple described filter pipe is 450mm ~ 550mm.
Accompanying drawing explanation
Fig. 1 is the structural representation of the sidewalk foundation structure of the utility model view roofing.
Fig. 2 is the structural representation of the flooring structure of the utility model view roofing.
Fig. 3 is the enlarged diagram of the connected node in sidewalk foundation structure and flower pond in Fig. 2.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
Coordinate referring to shown in Fig. 1, Fig. 1 is the structural representation of the sidewalk foundation structure of the utility model view roofing.As shown in Figure 1, the sidewalk foundation structure 1 of the utility model view roofing, comprising:
Prop up the multiple concrete piers 10 be located on the basis 2 of view roofing, concrete pier 10 comprises sleeve pipe 110 and builds the concrete 120 in sleeve pipe 110.Preferably, sleeve pipe 110 adopts the pvc pipe of diameter 150mm ~ 250mm, be more preferably diameter 200mm pvc pipe, concrete 120 is C20 concrete.The basis 2 of view roofing comprises the thick polyvinyl chloride plastic film separation layer of reinforced concrete floor, the DS mortar levelling layer that 15mm is thick, SBS modified asphalt waterproof coiled material layer that two-layer 3mm is thick, 0.4mm and the thick C20 pea gravel concreten of 40mm from bottom to top, and C20 pea gravel concreten is with beating with floating with 1:1 cement sand.
Side walk slab 20, are layed on multiple concrete pier 10, and the below at side walk slab 20 two ends has built plain concrete bank platform 30 respectively.Preferably, side walk slab 20 is the artificial stone plate of thickness 250mm ~ 350mm, is more preferably the artificial stone plate of thickness 300mm.
In a preferred embodiment of the sidewalk foundation structure of the utility model view roofing, multiple concrete pier 10 is supported in the below in the middle part of side walk slab 20 equally spacedly, and the spacing between multiple concrete pier 10 is 550mm ~ 650mm, is more preferably 600mm.Preferably, plain concrete bank platform 30 is along the elongated setting of length direction of side walk slab 20.Further, side walk slab 20 divides plate 210 to be spliced by two pieces of side walk slabs, and every block side walk slab divides the two ends of plate 210 to be erected at plain concrete bank platform 30 respectively with on concrete pier 10.
The sidewalk foundation structure of the utility model view roofing, by on levelling for the sleeve pipe rear basis directly standing in view roofing, then direct in sleeve pipe concreting formed concrete pier, as side walk slab keel basis, eliminate the trouble of building piled bricks by laying bricks or stones, greatly save the duration.And concrete pier can shift and carry out turnover use, has saved construction cost.
Shown in Figure 2, Fig. 2 is the structural representation of the flooring structure of the utility model view roofing.The flooring structure of the utility model view roofing, comprising:
The sidewalk foundation structure 1 of view roofing as above.
Be filled with planting soil 50 and cobble 60 in the colored pond 40, Hua Chi 40 being adjacent to sidewalk foundation structure 1, cobble 60 is layed in the surrounding of planting soil 50.Preferably, in the embodiment shown in Figure 2, the quantity of sidewalk foundation structure 1 is two, and Hua Chi 40 is positioned at the centre of two sidewalk foundation structures 1, and the particle diameter of cobble 60 is less than or equal to 50mm.
Further, shown in composition graphs 3, Fig. 3 is the enlarged diagram of the connected node in sidewalk foundation structure and flower pond in Fig. 2.The bottom in flower pond 40 is equipped with geotechnique and crosses wire screen 70, and geotechnique crosses the below of wire screen 70 and is equipped with 20 thick high drainage lugs 80, and high drainage lug 80 is positioned at the top of the thick C20 pea gravel concreten of the 40mm on the basis 2 of view roofing.The sidewall in flower pond 40 is provided with the filter pipe 90 that diameter is 50mm500, and the quantity of filter pipe 90 is multiple, and the sidewall of Hua Chi 40 is located at equally spacedly by multiple filter pipes 90, and the spacing between multiple filter pipe 90 is 450mm ~ 550mm, is more preferably 500mm.
The flooring structure of the view roofing of the utility model view roofing, adopt above-mentioned sidewalk foundation structure, by on levelling for the sleeve pipe rear basis directly standing in view roofing, then direct in sleeve pipe concreting formed concrete pier, as the keel basis of side walk slab, eliminate the trouble of building piled bricks by laying bricks or stones, greatly save the duration.And concrete pier can shift and carry out turnover use, has saved construction cost.In addition, planting soil, cobble, geotechnique cross wire screen, high drainage lug and filter pipe and can play good draining effect, ensure that the planting effect of Hua Chi.
The above is only preferred embodiment of the present utility model, not any pro forma restriction is done to the utility model, although the utility model discloses as above with preferred embodiment, but and be not used to limit the utility model, any those skilled in the art, not departing from the scope of technical solutions of the utility model, make a little change when the technology contents of above-mentioned announcement can be utilized or be modified to the Equivalent embodiments of equivalent variations, in every case be the content not departing from technical solutions of the utility model, according to any simple modification that technical spirit of the present utility model is done above embodiment, equivalent variations and modification, all still belong in the scope of technical solutions of the utility model.

Claims (9)

1. a sidewalk foundation structure for view roofing, is characterized in that, comprising:
Prop up the multiple concrete piers be located on the basis of view roofing, described concrete pier comprises sleeve pipe and builds the concrete in described sleeve pipe;
Side walk slab, be layed on multiple described concrete pier, the below at described side walk slab two ends has built plain concrete Kan Tai respectively.
2. the sidewalk foundation structure of view roofing as claimed in claim 1, it is characterized in that, multiple described concrete pier is supported in the below in the middle part of described side walk slab equally spacedly, and the spacing between multiple described concrete pier is 550mm ~ 650mm.
3. the sidewalk foundation structure of view roofing as claimed in claim 1, it is characterized in that, described plain concrete Kan Tai is along the elongated setting of length direction of described side walk slab.
4. the sidewalk foundation structure of view roofing as claimed in claim 1, it is characterized in that, described sleeve pipe is the pvc pipe of diameter 150mm ~ 250mm.
5. the sidewalk foundation structure of view roofing as claimed in claim 1, it is characterized in that, described side walk slab is the artificial stone plate of thickness 250mm ~ 350mm.
6. a flooring structure for view roofing, is characterized in that, comprising:
The sidewalk foundation structure of the view roofing according to any one of Claims 1 to 5;
Be adjacent to the colored pond of described sidewalk foundation structure, be filled with planting soil and cobble in described colored pond, described cobble is layed in the surrounding of described planting soil.
7. the flooring structure of view roofing as claimed in claim 6, is characterized in that, the bottom in described colored pond is equipped with geotechnique and crosses wire screen, and the below that described geotechnique crosses wire screen is equipped with high drainage lug.
8. the flooring structure of view roofing as claimed in claims 6 or 7, it is characterized in that, the sidewall in described colored pond is provided with filter pipe.
9. the flooring structure of view roofing as claimed in claim 8, it is characterized in that, the quantity of described filter pipe is multiple, and the sidewall in described colored pond is located at equally spacedly by multiple described filter pipe, and the spacing between multiple described filter pipe is 450mm ~ 550mm.
CN201520839357.9U 2015-10-27 2015-10-27 Ground plate structure of view roofing and pavement foundation structure who is used for this view roofing Expired - Fee Related CN205206029U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520839357.9U CN205206029U (en) 2015-10-27 2015-10-27 Ground plate structure of view roofing and pavement foundation structure who is used for this view roofing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520839357.9U CN205206029U (en) 2015-10-27 2015-10-27 Ground plate structure of view roofing and pavement foundation structure who is used for this view roofing

Publications (1)

Publication Number Publication Date
CN205206029U true CN205206029U (en) 2016-05-04

Family

ID=55843755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520839357.9U Expired - Fee Related CN205206029U (en) 2015-10-27 2015-10-27 Ground plate structure of view roofing and pavement foundation structure who is used for this view roofing

Country Status (1)

Country Link
CN (1) CN205206029U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114033108A (en) * 2021-12-08 2022-02-11 中建八局第四建设有限公司 Building and roofing subassembly thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114033108A (en) * 2021-12-08 2022-02-11 中建八局第四建设有限公司 Building and roofing subassembly thereof

Similar Documents

Publication Publication Date Title
CN106049217B (en) Fabricated permeable paving method and block and paving structure
CN104313967B (en) Row's water-seepage type is mated formation combining structure
CN104878678A (en) Construction method for water-permeable and water-retaining water-permeable pavement structure
CN106193066B (en) A kind of Loess landslide administering method based on restoration of the ecosystem
CN106638918A (en) Construction method for sponge city rainwater collection system
CN106192907B (en) Add the construction method of 150m~300m grade high concrete panel rock-fill dams of cement sand and gravel structure sheaf
CN203295913U (en) Novel ecological permeable road structure
CN204875442U (en) Pavement ceramic tile and pavement
CN204125814U (en) A kind of garden path structure
CN204039856U (en) Row's water-seepage type is mated formation combining structure
CN202627166U (en) Novel water-discharging ecological zone for town road
CN107152012A (en) Sluice construction technique
CN105484132B (en) A kind of construction method that novel water permeable pavement is mated formation
CN205206029U (en) Ground plate structure of view roofing and pavement foundation structure who is used for this view roofing
CN206438465U (en) A kind of ecological self-purification type landscape revetment reconstruction structure
CN107724201A (en) A kind of novel water permeable brick structure and method for paving
CN205206156U (en) Ground plate structure of view roofing with be used for colored pond of this view roofing to enclose fender structure
CN108086459A (en) A kind of construction method of sponge urban green space water storage system
CN104594155A (en) Permeable pavement laying method
CN202787015U (en) Landscape ecology framework
CN206971040U (en) A kind of special discharge structure in walking road surface
CN108677998A (en) A kind of corner type reinforced earth retaining wall structure and production method
CN206070485U (en) Assembled ecological revetment
CN108179677A (en) Sponge urban water-through pavement
CN211848696U (en) Type bituminous paving structure permeates water

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160504

Termination date: 20201027