CN205189418U - Device is pour fast to constructional column - Google Patents
Device is pour fast to constructional column Download PDFInfo
- Publication number
- CN205189418U CN205189418U CN201520835544.XU CN201520835544U CN205189418U CN 205189418 U CN205189418 U CN 205189418U CN 201520835544 U CN201520835544 U CN 201520835544U CN 205189418 U CN205189418 U CN 205189418U
- Authority
- CN
- China
- Prior art keywords
- constructional column
- pump
- concrete placement
- concrete
- concreting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a constructional column pour the device, relates to the architectural engineering technology field. Including concrete placement pump (3), characterized in that including support (1) of placing concrete placement pump (3), installs electric block (4) that support (1) top is connected with concrete placement pump (3) to and the hard tube concrete conveying pipe way (5) that links to each other with concrete placement pump (3), controller (2) that link to each other with concrete placement pump (3). The utility model discloses device is pour fast to constructional column when construction, operation electric block control switch rises to the required height of concreting construction with the concrete placement pump, opens the concrete placement pump, says through hard tube concrete conveying pipe and pours into the concrete toward the constructional column in into.
Description
Technical field
The utility model relates to construction engineering technical field, and what particularly belong to a kind of constructional column builds device.
Background technology
The raising of constructional column to building structure aseismatic performance plays a part can not be ignored, masonry structure is made to form stable stressed entirety with reliable connection of collar tie beam, Vierendeel girder, the expansion of restriction bond structure crack, delays or stops collapse of masonry and clearly enhance the anti-seismic performance of building.But it is unstable that existing Constructional Col-umn Construction exists concrete appearance Forming Quality, structure capital is connected leakiness with beam, and the many people's cooperations of constructional column site operation need complete jointly builds, the problems such as efficiency of construction is low.
Summary of the invention
The utility model is just to provide a kind of constructional column fast pouring device, improves Constructional Col-umn Construction quality to reach, and reduces construction cost of labor, improves the object of efficiency of construction.
Constructional column fast pouring device of the present utility model, comprise concreting pump, it is characterized by, include the support placing concreting pump, be arranged on the electric block that described cantilever tip is connected with concreting pump, and the hard tube concrete conveying pipe be connected with concreting pump; The controller be connected with concreting pump.
During the construction of the utility model constructional column fast pouring device, operation electric hoist control switch, rises to pouring construction desired height by concreting pump, opens concreting pump, injects concrete by hard tube concrete conveying pipe in constructional column.Whole work progress is controlled by a people, and constructional column speed of perfusion is fast, steady quality, reduces construction cost and labour intensity, improves efficiency of construction.
Accompanying drawing explanation
Fig. 1 is the utility model constructional column fast pouring device side schematic perspective view.
Detailed description of the invention
As shown in Figure 1, the utility model constructional column fast pouring device, comprise concreting pump 3, place the support 1 of concreting pump 3, be arranged on the electric block 4 that described support 1 top is connected with concreting pump 3, and the hard tube concrete conveying pipe 5 be connected with concreting pump 3; The controller 2 be connected with concreting pump 3.Described electric block 4 controls concreting pump 3 along support about 1 vertically movement, when concreting pump 3 moves to the construction desired location of support 1, the gauge tap of the concreting pump 3 in start-up connector 2, concreting pump 3 is to constructional column inner chamber concreting.The concrete conveying pipe of existing concreting pump is flexible pipe, mouth is built from slippage in constructional column for what prevent this flexible pipe conveyance conduit in constructional column pouring construction, what often hold on this flexible pipe conveyance conduit by workman builds mouth, and other people operate the switch board of concreting pump.Described concreting pump 3 is provided with hard tube concrete conveying pipe 5, avoids the above problem in existing constructional column pouring construction, without the need to many people compounding practice, reduces cost of labor.Bottom described support 1, running roller is housed, facilitates the movement of unitary construction post fast pouring device.
During the construction of the utility model constructional column fast pouring device, the construction location of the constructional column of building needed for this device is moved to, after concreting pump 3 is risen to desired location of constructing by the gauge tap starting electric block 4, press the switch of the concreting pump 3 on controller 2, concreting pump 3 is started working, toward constructional column inner chamber concreting, fill up after constructional column until concrete, close described concreting pump 3 switch, stop pouring construction, concreting pump 3 is dropped to support 1 bottom by the gauge tap of operation electric block 4, whole work progress is by one man operation.
Claims (2)
1. a constructional column fast pouring device, comprise concreting pump (3), it is characterized by, include the support (1) placing concreting pump (3), be arranged on the electric block (4) that described support (1) top is connected with concreting pump (3), and the hard tube concrete conveying pipe (5) be connected with concreting pump (3); The controller (2) be connected with concreting pump (3).
2. constructional column fast pouring device according to claim 1, is characterized by, and the bottom of support (1) is provided with running roller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520835544.XU CN205189418U (en) | 2015-10-27 | 2015-10-27 | Device is pour fast to constructional column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520835544.XU CN205189418U (en) | 2015-10-27 | 2015-10-27 | Device is pour fast to constructional column |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205189418U true CN205189418U (en) | 2016-04-27 |
Family
ID=55782419
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520835544.XU Expired - Fee Related CN205189418U (en) | 2015-10-27 | 2015-10-27 | Device is pour fast to constructional column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205189418U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110630018A (en) * | 2019-09-11 | 2019-12-31 | 李素梅 | Template construction device and construction method for visual construction of stand column |
-
2015
- 2015-10-27 CN CN201520835544.XU patent/CN205189418U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110630018A (en) * | 2019-09-11 | 2019-12-31 | 李素梅 | Template construction device and construction method for visual construction of stand column |
CN110630018B (en) * | 2019-09-11 | 2021-04-02 | 李素梅 | Template construction device and construction method for visual construction of stand column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103669655B (en) | Deformation joint both walls body concrete pouring construction process | |
CN106639336A (en) | Prefabricated concrete wall panel installation and emplacement orientation adjustment device and construction method thereof | |
CN201962944U (en) | Hydraulic climbing formwork for building construction | |
CN206233596U (en) | Building block exterior wall constructional column concrete casting device | |
CN106638947A (en) | Prefabricated frame structure and cascaded prefabrication construction method thereof | |
CN106088651A (en) | The ruggedized construction of concrete floor | |
CN205189418U (en) | Device is pour fast to constructional column | |
KR101889064B1 (en) | Construction method of a long span bridge main tower | |
CN104196248B (en) | Steel pipe column vertical locating device and construction method thereof is inserted after contrary sequence method | |
CN109457814A (en) | Towering and major diameter building top cover construction method based on Bailey bracket structure | |
CN203795865U (en) | Lifting tumbling barrel for super-high concrete casting | |
CN204282391U (en) | A kind of heel foundation formwork erecting structure | |
CN206616868U (en) | A kind of build concrete pours device | |
CN108005684A (en) | Separated steel mould trolley and its construction method | |
CN206913374U (en) | Precast T-Beam hydraulic formwork device | |
CN104404923A (en) | Arch dam bracket template device and construction method based on arch dam bracket template device | |
CN201794305U (en) | Supporting device for elevator shaft mold | |
CN204040499U (en) | Steel pipe column vertical locating device is inserted after contrary sequence method | |
CN204780928U (en) | Major diameter bored concrete pile concrete first set groundwater increment controlling means | |
CN109653445B (en) | Thickness adjusting device and method for steel bar protection layer | |
CN204252082U (en) | Arch dam bracket plate device | |
CN207582431U (en) | A kind of construction platform for rock slope position toe slab grouting | |
CN105216095B (en) | A kind of concrete prefabricated building block multimode cavity forming machine | |
CN103334590B (en) | Large Steel tubing string concrete working device and construction method | |
CN203347110U (en) | Section steel stirrup applied to high-rise building raft foundation construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Hui Youxing Inventor before: Wei Haifeng Inventor before: Meng Lijun Inventor before: Duan Hui Inventor before: Shang Yingying Inventor before: Liu Yanmei |
|
COR | Change of bibliographic data | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160427 Termination date: 20161027 |
|
CF01 | Termination of patent right due to non-payment of annual fee |