CN205172038U - Interim stair - Google Patents

Interim stair Download PDF

Info

Publication number
CN205172038U
CN205172038U CN201520934307.9U CN201520934307U CN205172038U CN 205172038 U CN205172038 U CN 205172038U CN 201520934307 U CN201520934307 U CN 201520934307U CN 205172038 U CN205172038 U CN 205172038U
Authority
CN
China
Prior art keywords
girder
bracing frame
support frame
hinged
pedal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520934307.9U
Other languages
Chinese (zh)
Inventor
杨晓东
程毅
甄创城
陈鹏智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
China Construction Fifth Engineering Bureau Co Ltd Guangzhou Branch
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
China Construction Fifth Engineering Bureau Co Ltd Guangzhou Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd, China Construction Fifth Engineering Bureau Co Ltd Guangzhou Branch filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201520934307.9U priority Critical patent/CN205172038U/en
Application granted granted Critical
Publication of CN205172038U publication Critical patent/CN205172038U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Escalators And Moving Walkways (AREA)

Abstract

The utility model discloses an interim stair, two support frames that set up including the interval, along support frame length direction arrange in proper order and a plurality of footboard that is parallel to each other, with this two support frames one -to -one and be two bases of relative setting, the support frame is including the first girder and the second girder that are parallel to each other, the first girder of this two support frame is relative setting, and is parallel to each other, the second girder of this two support frame is relative setting, the footboard is located between this two support frame, the left and right sides of the front end of footboard articulates on the first girder of this two support frame respectively the one -to -one, the tip of the first girder of support frame, the tip of second girder do not articulate on the base that corresponds with this support frame. The utility model has the advantages of simple structure, simple manufacture is convenient, is favorable to reducing the cost of manufacture, and is in addition, still applicable in the building layer of co -altitude not to can enlarge its application scope.

Description

A kind of temporary stairways
Technical field
The utility model relates to a kind of temporary stairways.
Background technology
The temporary stairways of construction site mainly adopts the fixed stair of shaped steel welding or assembly production.Although and adopt shaped steel to weld or the fixed stair globality of assembly production better, cost of manufacture is higher, and, only can be applicable to the construction level of sustained height, thus far can not meet industrial requirement.
Utility model content
In order to overcome the deficiencies in the prior art, the purpose of this utility model is to provide a kind of temporary stairways, and its structure is simple, makes simple and convenient, is conducive to reducing cost of manufacture, and, be also applicable to the construction level of differing heights, thus its scope of application can be expanded.
For solving the problem, the technical scheme that the utility model adopts is as follows:
A kind of temporary stairways, comprise spaced two bracing frames, along bracing frame length direction be arranged in order and several pedals be parallel to each other, with this two bracing frames one_to_one corresponding and in two bases be oppositely arranged; Support frame as described above comprises the first girder and the second girder that are parallel to each other; First girder of this two bracing frame in being oppositely arranged, and is parallel to each other; Second girder of this two bracing frame is in being oppositely arranged; Described pedal is between this two bracing frame; The left and right sides of the rear end of described pedal is hinged on the second girder of this two bracing frame respectively correspondingly, and the left and right sides of the front end of described pedal is hinged on the first girder of this two bracing frame respectively correspondingly; The end of the first girder of support frame as described above, the end of the second girder are hinged on the base corresponding with this bracing frame respectively.
This temporary stairways also comprises two balustrade assemblies of the pedal left and right sides that is placed in; Described balustrade assemblies comprises cross bar, is arranged in order and several hinged with cross bar respectively montants along bracing frame length direction; The bottom of described montant is fixed on pedal.
Described balustrade assemblies comprises two cross bars of arranging successively from top to bottom, described montant is provided with first connecting portion hinged with a wherein cross bar, second connecting portion hinged with another cross bar.
The upper surface of described pedal is formed as trampling face in horizontally disposed.
Described base is arranged on the lower end of bracing frame, and the upper end of the second girder of support frame as described above is formed as link.
Compared to existing technology, the beneficial effects of the utility model are:
Structure of the present utility model is simple, makes simple and convenient, is conducive to reducing cost of manufacture, and, be also applicable to the construction level of differing heights, thus its scope of application can be expanded; In addition, its globality is good, it is simple and convenient to install, and is conducive to promoting.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is using state schematic diagram of the present utility model;
Wherein, 1, bracing frame; 11, the first girder; 12, the second girder; 2, pedal; 31, cross bar; 32, montant; 4, base.
Detailed description of the invention
Below, by reference to the accompanying drawings and detailed description of the invention, the utility model is described further:
As shown in Figure 1, 2, be a kind of temporary stairways of the present utility model, comprise spaced two bracing frames 1, along bracing frame 1 length direction be arranged in order and several pedals 2 be parallel to each other, with this two bracing frame 1 one_to_one corresponding in two bases 4 be oppositely arranged; Support frame as described above 1 comprises the first girder 11 and the second girder 12 be parallel to each other; First girder 11 of this two bracing frame 1 in being oppositely arranged, and is parallel to each other; Second girder 12 of this two bracing frame 1 is in being oppositely arranged; Described pedal 2 is between this two bracing frame 1; The left and right sides of the rear end of described pedal 2 is hinged on the second girder 12 of this two bracing frame 1 respectively correspondingly; The left and right sides of the front end of described pedal 2 is hinged on the first girder 11 of this two bracing frame 1 respectively correspondingly; The end of the first girder 11 of support frame as described above 1, the end of the second girder 12 are hinged on the base 4 corresponding with this bracing frame 1 respectively.
When reality uses, base 4 can be fixed on lower floor, and bracing frame 1 one end away from base 4 is fixed on upper strata, thus be convenient to constructor and move between upper strata and lower floor through this temporary stairways.The utility model is by simplifying structure, its structure can be made comparatively simple, make simple and convenient, be conducive to reducing cost of manufacture, and, because the end of the first girder 11 of bracing frame 1, the end of the second girder 12 are hinged on base 4 respectively, the first girder 11, second girder 12 can be rotated around base 4, thus be applicable to the construction level (such as H1 or the H2 height etc. of Fig. 2) of differing heights, to expand its scope of application.
Preferably, this temporary stairways also comprises two balustrade assemblies of pedal 2 left and right sides that is placed in; Described balustrade assemblies comprises cross bar 31, is arranged in order and several hinged with cross bar 31 respectively montants 32 along bracing frame 1 length direction; The bottom of described montant 32 is fixed on pedal 2.And by adopting the design of balustrade assemblies, the security performance of use can be improved.
Preferably, described balustrade assemblies comprises two cross bars 31 of arranging successively from top to bottom, described montant is provided with first connecting portion hinged with a wherein cross bar 31, second connecting portion hinged with another cross bar 31.
Preferably, the upper surface of described pedal 2 is formed as trampling face in horizontally disposed, tramples thereon for pedestrian.And due to by rationally arranging the first girder 11, second girder 12 and the annexation of pedal 2, when the first girder 11, second girder 12 respect thereto 4 rotates, make pedal 2 to keep level.
Wherein, described base 4 is arranged on the lower end of bracing frame 1, and the upper end of the second girder 12 of support frame as described above 1 is formed as link, is connected for the upper strata of construction level.
To one skilled in the art, according to technical scheme described above and design, other various corresponding change and deformation can be made, and all these change and deformation all should belong within the protection domain of the utility model claim.

Claims (5)

1. a temporary stairways, is characterized in that: comprise spaced two bracing frames, along bracing frame length direction be arranged in order and several pedals be parallel to each other, with this two bracing frames one_to_one corresponding in two bases be oppositely arranged; Support frame as described above comprises the first girder and the second girder that are parallel to each other; First girder of this two bracing frame in being oppositely arranged, and is parallel to each other; Second girder of this two bracing frame is in being oppositely arranged; Described pedal is between this two bracing frame; The left and right sides of the rear end of described pedal is hinged on the second girder of this two bracing frame respectively correspondingly, and the left and right sides of the front end of described pedal is hinged on the first girder of this two bracing frame respectively correspondingly; The end of the first girder of support frame as described above, the end of the second girder are hinged on the base corresponding with this bracing frame respectively.
2. temporary stairways as claimed in claim 1, is characterized in that: this temporary stairways also comprises two balustrade assemblies of the pedal left and right sides that is placed in; Described balustrade assemblies comprises cross bar, is arranged in order and several hinged with cross bar respectively montants along bracing frame length direction; The bottom of described montant is fixed on pedal.
3. temporary stairways as claimed in claim 2, is characterized in that: described balustrade assemblies comprises two cross bars of arranging successively from top to bottom, described montant is provided with first connecting portion hinged with a wherein cross bar, second connecting portion hinged with another cross bar.
4. temporary stairways as claimed in claim 1, is characterized in that: the upper surface of described pedal is formed as trampling face in horizontally disposed.
5. temporary stairways as claimed in claim 1, it is characterized in that: described base is arranged on the lower end of bracing frame, the upper end of the second girder of support frame as described above is formed as link.
CN201520934307.9U 2015-11-20 2015-11-20 Interim stair Expired - Fee Related CN205172038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520934307.9U CN205172038U (en) 2015-11-20 2015-11-20 Interim stair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520934307.9U CN205172038U (en) 2015-11-20 2015-11-20 Interim stair

Publications (1)

Publication Number Publication Date
CN205172038U true CN205172038U (en) 2016-04-20

Family

ID=55736041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520934307.9U Expired - Fee Related CN205172038U (en) 2015-11-20 2015-11-20 Interim stair

Country Status (1)

Country Link
CN (1) CN205172038U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331370A (en) * 2018-01-03 2018-07-27 广西建工集团第三建筑工程有限责任公司 A kind of turnover stair construction plank road
CN109853993A (en) * 2019-03-27 2019-06-07 中铁建工集团有限公司 A kind of adjustable foundation pit construction stair of regularization

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331370A (en) * 2018-01-03 2018-07-27 广西建工集团第三建筑工程有限责任公司 A kind of turnover stair construction plank road
CN108331370B (en) * 2018-01-03 2024-02-06 广西建工集团第三建筑工程有限责任公司 Reversible stair construction trestle
CN109853993A (en) * 2019-03-27 2019-06-07 中铁建工集团有限公司 A kind of adjustable foundation pit construction stair of regularization
CN109853993B (en) * 2019-03-27 2023-10-13 中铁建工集团有限公司 Finalized adjustable stairway for foundation pit construction

Similar Documents

Publication Publication Date Title
CN205172038U (en) Interim stair
CN203903754U (en) Novel escalator truss
CN203475658U (en) Connecting structure of curtain wall and high-level structural body
CN204081070U (en) A kind of large span steel frame beam cantilevered structure
CN205918081U (en) Outer curtain scaffold frame of arc building
CN201606010U (en) M-shaped headframe support system of sheave platform in shape of a ladder
CN201722619U (en) Mobile operating platform for eaves-hung cast-in-place concrete crash barrier of bridge
CN203452393U (en) Rhombic truss supporting jig frame
CN203742030U (en) Stone curtain wall keel structure
CN203160797U (en) Steel structure tower
CN203626392U (en) Glass fence
CN102767280A (en) Quick-dismounting system and installation method for top plate
CN203373661U (en) Movable operation platform device below cantilever arm of steel-structure bridge
CN207538481U (en) A kind of floor height changeable type input and output material platform
CN202577767U (en) Supporting spacer for reinforcing steel bars of shear wall
CN201679271U (en) Power triangular tower
CN205382411U (en) Be used for striding existing line or cross a river bridge fitment dolly
CN206386126U (en) A kind of constructing tunnel inverted arch trestle modular upside-down mounting moving structure
CN205421657U (en) Supporting structure of wood structure building roof modelled after an antique
CN203271193U (en) Large overhang stand with space structure
CN104343394B (en) A kind of pair of quadruple board platform construction open front churn derrick
CN204059392U (en) A kind of tower crane stood on steel column column cap
CN203034618U (en) Platy deformation device in frame structure
CN203271093U (en) Novel scaffold
CN203878739U (en) Lightweight steel structure building system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 410000 Changsha Yuhua District, Hunan Zhongyi Road, No. 158

Co-patentee after: GUANGZHOU BRANCH, CHINA CONSTRUCTION FIFTH ENGINEERING DIVISION Corp.,Ltd.

Patentee after: CHINA CONSTRUCTION FIFTH ENGINEERING DIVISION Corp.,Ltd.

Address before: 523000 Guangdong city of Guangzhou province Haizhuqu District Xingang Road No. 1088 Zhongzhou Trade Center 13 floor

Co-patentee before: CHINA CONSTRUCTION FIFTH ENGINEERING DIVISION Corp.,Ltd.

Patentee before: GUANGZHOU BRANCH, CHINA CONSTRUCTION FIFTH ENGINEERING DIVISION Corp.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160420