CN205152971U - 一种复合桩基桩顶抗震阻尼调节装置 - Google Patents
一种复合桩基桩顶抗震阻尼调节装置 Download PDFInfo
- Publication number
- CN205152971U CN205152971U CN201520928948.3U CN201520928948U CN205152971U CN 205152971 U CN205152971 U CN 205152971U CN 201520928948 U CN201520928948 U CN 201520928948U CN 205152971 U CN205152971 U CN 205152971U
- Authority
- CN
- China
- Prior art keywords
- deformation
- adjustment device
- foundation pile
- pile
- disobey
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
本实用新型公开了一种复合桩基桩顶抗震阻尼调节装置,它是在基桩的顶部通过二次混凝土浇筑加固有双层双向钢筋,在双层双向钢筋的顶部固定安装有支座板,在支座板上设置有变形调节器,在变形调节器的顶部铺设有盖板,所述的支座板与盖板的周边采用侧板包围形成一个变形空腔,在盖板上设置有两根以上的注浆管,在其中一根注浆管内设置有变形观测杆。本实用新型利用变形调节器伸缩变形来适应主体结构的沉降,当主体结构沉降稳定后,将变形调节器浇筑在基桩顶部,这样不仅能使基桩与地基土共同承受上部结构荷载,而且变形调节器此时变成了阻尼器,地震过程中可消耗部分能量,其抗震性能更强。
Description
技术领域
本实用新型涉及一种复合桩基桩顶抗震阻尼调节装置,属于建筑基础施工技术领域。
背景技术
我国南方大部分地区的浅层地基土具有较高的承载力,在常规的基础设计中,当天然地基不能满足要求时,往往直接采用桩基础,良好的地基土承载力弃之不用,造成很大的浪费。花岗岩残积土地基中常含有大量微风化的花岗岩孤石,给桩基础施工带来巨大困难,有时甚至导致无法施工。
随着我国基础建设的大力推进,桩基础这一古老的基础形式得到前所未有的广泛应用和发展,作为桩基础的主要表现形式之一的桩筏基础,近年来同样发展迅速。桩筏基础,顾名思义是指桩与承台共同承受上部结构荷载的基础形式,具有基础整体性好、抗弯刚度大、适应性广且便于实现桩土共同作用等优点。
常规的桩筏基础中桩-筏之间直接刚性连接,其整体刚度由筏板刚度和桩基支承刚度决定。如为某些原因需调节桩筏刚度,则筏板刚度可通过筏厚调整,但往往造价较高;桩基支承刚度则可通过改变桩长、桩径以及桩距等方法来调整,但不同桩径、不同桩长的布桩方式受上部结构形式和地质条件的影响较大,应用范围受到相当大的限制。
实用新型内容
本实用新型的目的在于提供一种结构简单、施工方便的复合桩基桩顶抗震阻尼调节装置,该装置能充分的发挥地基土的承载潜力,而且可人为地自由调节桩筏基础的整体刚度,大大降低了工程造价。
本实用新型的技术方案:一种复合桩基桩顶抗震阻尼调节装置,包括基桩,在基桩的顶部通过二次混凝土浇筑加固有双层双向钢筋,在双层双向钢筋的顶部固定安装有支座板,在支座板上设置有一个以上的变形调节器,在变形调节器的顶部铺设有盖板,所述的支座板与盖板的周边采用侧板包围形成一个变形空腔,在盖板上设置有两根以上的注浆管,在其中一根注浆管内设置有变形观测杆,所述的变形观测杆下端与支座板连接,其上端露出注浆管外。
进一步,在支座板上设置有定位孔,变形调节器安装在定位孔内,防止变形调节器发生移动,导致变形调节器分布不均匀,影响其承载能力。
进一步,在注浆管的口部设置有堵头,避免注浆管被混凝土封堵。
由于采用了上述技术方案,本实用新型的优点在于:本实用新型利用变形调节器伸缩变形来适应主体结构的沉降,当主体结构沉降稳定后,将变形调节器浇筑在基桩顶部,这样不仅能使基桩与地基土共同承受上部结构荷载,而且变形调节器此时变成了阻尼器,地震过程中可消耗部分能量,其抗震性能更强。因此,本实用新型不仅结构简单、施工方便,而且能充分的发挥地基土的承载潜力,在不改变基桩的尺寸的同时提高了基桩的支承刚度,节约工程造价。
附图说明
图1为本实用新型的结构示意图;
图2为本实用新型中支座板的结构示意图的俯视图。
附图标记说明:1-支座板,2-变形调节器,3-侧板,4-盖板,5-注浆管,6-变形观测杆,7-堵头,8-地下室底板,9-变形空腔,10-基桩,11-二次混凝土,12-双层双向钢筋,13-定位孔。
具体实施方式
为了使本实用新型的目的、技术方案和优点更加清楚,下面结合附图和实施例对本实用新型作进一步的详细说明。
本实用新型的实施例:复合桩基桩顶抗震阻尼调节装置的结构示意图如图1所示,包括基桩10,在基桩10的顶部通过二次混凝土11浇筑加固有双层双向钢筋12,在双层双向钢筋12的顶部固定安装有支座板1;参见图2,在支座板1上设置有三个定位孔13,三个变形调节器2分别安装在三个定位孔13内,在变形调节器2的顶部铺设有盖板4,所述的支座板1与盖板4的周边采用侧板3包围形成一个变形空腔9,在盖板4上设置有三根的注浆管5,在其中一根注浆管5内设置有变形观测杆6,所述的变形观测杆6下端与支座板1连接,其上端露出注浆管5外。在注浆管5的口部设置有堵头7,避免注浆管5被混凝土封堵。
施工时,首先在基桩10的顶部通过二次混凝土11浇筑加固有双层双向钢筋12,然后在双层双向钢筋12的顶部焊接支座板1,在支座板1上制作三个定位孔13,然后将三个变形调节器2分别安装在三个定位孔13内,并在变形调节器2的顶部铺设盖板4,此时在支座板1与盖板4的周边焊接侧板3包围形成一个变形空腔9,在盖板4上焊接三根与变形空腔9连通的注浆管5,在注浆管5的口部设置有堵头7,避免注浆管5被混凝土封堵。在其中一根注浆管5内设置变形观测杆6,所述的变形观测杆6下端与支座板1连接,其上端露出注浆管5外。此时进行地下室底板8施工,随着主体结构施工,主体沉降量增加,变形调节器2也相应沉降,从而地基土的承载力得到充分利用,待主楼封顶,观察变形观测杆6的沉降数据稳定后,通过注浆管5向变形空腔9进行注浆,此时变形空腔9被完全密实,这样不仅能使基桩1与地基土共同承受上部结构荷载,而起处于变形空腔9内的变形调节器2变成了阻尼器,在地震过程中能消耗部分能量,从而提高了主体结构的抗震能力。
Claims (3)
1.一种复合桩基桩顶抗震阻尼调节装置,包括基桩(10),其特征在于:在基桩(10)的顶部通过二次混凝土(11)浇筑加固有双层双向钢筋(12),在双层双向钢筋(12)的顶部固定安装有支座板(1),在支座板(1)上设置有一个以上的变形调节器(2),在变形调节器(2)的顶部铺设有盖板(4),所述的支座板(1)与盖板(4)的周边采用侧板(3)包围形成一个变形空腔(9),在盖板(4)上设置有两根以上的注浆管(5),在其中一根注浆管(5)内设置有变形观测杆(6),所述的变形观测杆(6)下端与支座板(1)连接,其上端露出注浆管(5)外。
2.根据权利要求1所述的复合桩基桩顶抗震阻尼调节装置,其特征在于:在支座板(1)上设置有定位孔(13),变形调节器(2)安装在定位孔(13)内。
3.根据权利要求1所述的复合桩基桩顶抗震阻尼调节装置,其特征在于:在注浆管(5)的口部设置有堵头(7)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520928948.3U CN205152971U (zh) | 2015-11-20 | 2015-11-20 | 一种复合桩基桩顶抗震阻尼调节装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520928948.3U CN205152971U (zh) | 2015-11-20 | 2015-11-20 | 一种复合桩基桩顶抗震阻尼调节装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205152971U true CN205152971U (zh) | 2016-04-13 |
Family
ID=55688683
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520928948.3U Expired - Fee Related CN205152971U (zh) | 2015-11-20 | 2015-11-20 | 一种复合桩基桩顶抗震阻尼调节装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205152971U (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109577317A (zh) * | 2018-04-13 | 2019-04-05 | 常熟理工学院 | 一种用于复合桩基础桩顶空腔封灌的施工装置 |
CN109629591A (zh) * | 2018-12-05 | 2019-04-16 | 南京工业大学 | 一种免二次浇筑的刚度可控式桩顶构造结构及其施工方法 |
CN110158667A (zh) * | 2019-03-08 | 2019-08-23 | 北京市劳动保护科学研究所 | 一种抗浮隔振结构及建筑物 |
CN115305939A (zh) * | 2022-08-24 | 2022-11-08 | 中冶集团武汉勘察研究院有限公司 | 一种主动式桩筏基础沉降协调结构及施工方法 |
-
2015
- 2015-11-20 CN CN201520928948.3U patent/CN205152971U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109577317A (zh) * | 2018-04-13 | 2019-04-05 | 常熟理工学院 | 一种用于复合桩基础桩顶空腔封灌的施工装置 |
CN109629591A (zh) * | 2018-12-05 | 2019-04-16 | 南京工业大学 | 一种免二次浇筑的刚度可控式桩顶构造结构及其施工方法 |
CN110158667A (zh) * | 2019-03-08 | 2019-08-23 | 北京市劳动保护科学研究所 | 一种抗浮隔振结构及建筑物 |
CN115305939A (zh) * | 2022-08-24 | 2022-11-08 | 中冶集团武汉勘察研究院有限公司 | 一种主动式桩筏基础沉降协调结构及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205152971U (zh) | 一种复合桩基桩顶抗震阻尼调节装置 | |
CN204023431U (zh) | 一种波纹钢管涵洞填筑结构 | |
CN203569579U (zh) | 一种建筑地基 | |
CN201722597U (zh) | 一种组合桩柱式桥台结构 | |
CN208472495U (zh) | 一种公路路基软弱土层的复合加固结构 | |
CN201722776U (zh) | 适用于方钢管柱的梁柱节点 | |
CN212714332U (zh) | 一种高速公路路基防沉降装置 | |
CN207959264U (zh) | 软粘土地基毗邻高填路基综合管廊 | |
CN108330958A (zh) | 一种用于复合桩基础桩顶空腔封灌的施工装置 | |
CN203238621U (zh) | 一种设置双层抗拉筋的灌注桩 | |
CN101314942A (zh) | 倒t型导管墙桩基防波堤 | |
CN206157792U (zh) | 桩筏互补纠倾加固结构 | |
CN208415290U (zh) | 室外变电站钢构架基础施工结构 | |
CN206784421U (zh) | 基坑用塔吊基础的支撑装置 | |
CN206090600U (zh) | 一种桥梁地基防沉降加固装置 | |
CN201169781Y (zh) | 一种盖挖基坑结构 | |
CN103726505B (zh) | 海上风电场风机基础 | |
CN203334347U (zh) | 箱涵式排水口结构 | |
CN203080540U (zh) | 一种输电线路铁塔基础 | |
CN205444180U (zh) | 适用于黄泛区的桩结构 | |
CN203307836U (zh) | 塔吊桩加固结构 | |
CN206815279U (zh) | 一种装配式高桩承台驳岸结构 | |
CN202090361U (zh) | 一种掏挖式输电线路铁塔基础 | |
CN206408660U (zh) | 旧建筑基础抗震加固结构 | |
CN201649067U (zh) | 一种减沉复合疏桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160413 Termination date: 20211120 |