CN203307836U - 塔吊桩加固结构 - Google Patents
塔吊桩加固结构 Download PDFInfo
- Publication number
- CN203307836U CN203307836U CN2013203592030U CN201320359203U CN203307836U CN 203307836 U CN203307836 U CN 203307836U CN 2013203592030 U CN2013203592030 U CN 2013203592030U CN 201320359203 U CN201320359203 U CN 201320359203U CN 203307836 U CN203307836 U CN 203307836U
- Authority
- CN
- China
- Prior art keywords
- tower crane
- crane pile
- stake
- anchor ear
- crane stake
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
本实用新型涉及一种建筑工程施工结构,尤其是涉及一种塔吊桩加固结构。塔吊桩加固结构,由两个塔吊桩打入基础底板构成,第一塔吊桩和第二塔吊桩上各设置有一对抱箍,抱箍成环形状且分别环抱在第一塔吊桩和第二塔吊桩上,抱箍上焊接有工字钢,工字钢的两端分别与第一塔吊桩和第二塔吊桩上的抱箍分别连接。本实用新型具有设计较合理,施工成本较低,抗倾覆性较好,抗扭曲性较好等特点。
Description
技术领域
本实用新型涉及一种建筑工程施工结构,尤其是涉及一种塔吊桩加固结构。
背景技术
随着城市人口的急剧增加,城市土地弥足珍贵,城市建筑物向着高层和超高层及大体量方向发展,地下部分越来越大,越来越深,原有的落地式塔吊基础施工已经不能适应某些工期了。落地式塔吊基础需土方开挖后施工,造成了工期周期延长的弊端。悬空式塔吊基础提前进行塔吊桩基础承台施工,对塔吊基础进行加固处理,加强抗倾覆性、抗扭曲性。
发明内容
本实用新型主要是针对现有技术所存在的结构复杂,施工成本较高,抗倾覆性较差,抗扭曲性较差等的技术问题,提供一种结构简单,施工成本较低,抗倾覆性较好,抗扭曲性较好的塔吊桩加固结构。
本实用新型的上述技术问题主要是通过下述技术方案得以解决的:塔吊桩加固结构,由两个塔吊桩打入基础底板构成,第一塔吊桩和第二塔吊桩上各设置有一对抱箍,抱箍成环形状且分别环抱在第一塔吊桩和第二塔吊桩上,抱箍上焊接有工字钢,工字钢的两端分别与第一塔吊桩和第二塔吊桩上的抱箍分别连接。抱箍之间焊接有斜和水平的工字钢,将第一塔吊桩和第二塔吊桩固定形成整体,加强稳定性。
作为优选,抱箍内侧填有水泥砂浆。
因此,本实用新型具有设计较合理,施工成本较低,抗倾覆性较好,抗扭曲性较好等特点。
附图说明
附图1是本实用新型的整体结构示意图。
具体实施方式
下面通过实施例,并结合附图,对本实用新型的技术方案作进一步具体的说明。
实施例1:塔吊桩加固结构由两个塔吊桩打入基础底板构成,第一塔吊桩1和第二塔吊桩2上各设置有一对抱箍3,抱箍3成环形状且分别环抱在第一塔吊桩1和第二塔吊桩2上,抱箍3上焊接有工字钢4,工字钢4的两端分别与第一塔吊桩1和第二塔吊桩2上的抱箍3分别连接。抱箍3内侧填有水泥砂浆(如图1所示)。
Claims (2)
1.一种塔吊桩加固结构,由两个塔吊桩打入基础底板构成,其特征在于第一塔吊桩(1)和第二塔吊桩(2)上各设置有一对抱箍(3),抱箍(3)成环形状且分别环抱在第一塔吊桩(1)和第二塔吊桩(2)上,抱箍(3)上焊接有工字钢(4),工字钢(4)的两端分别与第一塔吊桩(1)和第二塔吊桩(2)上的抱箍(3)分别连接。
2.根据权利要求1所述的塔吊桩加固结构,其特征在于所述抱箍(3)内侧填有水泥砂浆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013203592030U CN203307836U (zh) | 2013-06-13 | 2013-06-13 | 塔吊桩加固结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013203592030U CN203307836U (zh) | 2013-06-13 | 2013-06-13 | 塔吊桩加固结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203307836U true CN203307836U (zh) | 2013-11-27 |
Family
ID=49614053
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013203592030U Expired - Fee Related CN203307836U (zh) | 2013-06-13 | 2013-06-13 | 塔吊桩加固结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203307836U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114541464A (zh) * | 2022-03-24 | 2022-05-27 | 浙江省特种设备科学研究院 | 一种新型塔式起重机基础格构柱加固装置 |
-
2013
- 2013-06-13 CN CN2013203592030U patent/CN203307836U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114541464A (zh) * | 2022-03-24 | 2022-05-27 | 浙江省特种设备科学研究院 | 一种新型塔式起重机基础格构柱加固装置 |
CN114541464B (zh) * | 2022-03-24 | 2023-12-01 | 浙江省特种设备科学研究院 | 一种新型塔式起重机基础格构柱加固装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103437567A (zh) | 利用原有桩基础支撑既有建筑地下增层的方法 | |
CN103104102B (zh) | 一种地下增层改造施工方法 | |
CN202323962U (zh) | 疏排管桩与土钉墙复合支护结构 | |
CN103882869A (zh) | 一种用于基坑围护的斜向支撑桩结构及其施工方法 | |
CN201722776U (zh) | 适用于方钢管柱的梁柱节点 | |
CN202519697U (zh) | 钢抱箍桁架式高桩承台塔吊基础结构 | |
CN205152971U (zh) | 一种复合桩基桩顶抗震阻尼调节装置 | |
CN205501843U (zh) | 加固刚架拱桥 | |
CN204491649U (zh) | 一种风机桩墩基础 | |
CN203307836U (zh) | 塔吊桩加固结构 | |
CN202644543U (zh) | 一种组合式可回收的基坑支护内支撑立柱 | |
CN202730796U (zh) | 既有挡土墙肋板式卸荷加固结构 | |
CN204098058U (zh) | 输电塔用微型竖斜组合桩 | |
CN204510246U (zh) | 一种由既有建筑的独立基础加固成的承台桩基础结构 | |
CN103726505B (zh) | 海上风电场风机基础 | |
CN206941562U (zh) | 一种加强固定连接的土工格室 | |
CN206815278U (zh) | 一种软土地基上的装配整体式驳岸结构 | |
CN202298602U (zh) | 劲性复合桩 | |
CN204040033U (zh) | 锚杆静压桩压桩结构 | |
CN204875851U (zh) | 地下结构的抗震加固结构 | |
CN203080540U (zh) | 一种输电线路铁塔基础 | |
CN103362123A (zh) | 倒y形灌注桩及其施工方法 | |
CN203411988U (zh) | 独立中型桩基础 | |
CN203569559U (zh) | 园林用小型重物支撑柱 | |
CN204703185U (zh) | 一种预制钢筋混凝土构件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131127 Termination date: 20180613 |
|
CF01 | Termination of patent right due to non-payment of annual fee |