CN205152960U - Basement supporting construction of no concrete to propping - Google Patents

Basement supporting construction of no concrete to propping Download PDF

Info

Publication number
CN205152960U
CN205152960U CN201521027008.3U CN201521027008U CN205152960U CN 205152960 U CN205152960 U CN 205152960U CN 201521027008 U CN201521027008 U CN 201521027008U CN 205152960 U CN205152960 U CN 205152960U
Authority
CN
China
Prior art keywords
pile
basement
billet
waist rail
steel waist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521027008.3U
Other languages
Chinese (zh)
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201521027008.3U priority Critical patent/CN205152960U/en
Application granted granted Critical
Publication of CN205152960U publication Critical patent/CN205152960U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a basement supporting construction of no concrete to propping, a characterized by fender pile adopts the drilling bored concrete pile, set up the stagnant water curtain from the fender pile central point outside a 1.5~2m in orientation department, the stagnant water curtain adopts triaxial cement stirring stake, it sets up first steel waist rail to prop up the inboard orientation upper portion of fender pile, first steel waist rail top mark is high with to strut the pile bolck elevation the same, first steel waist rail is connected with the pre -buried welded steel who props up the fender pile, the anchor of prestressed anchorage cable is at first steel waist rail, 1.5~2.5m of the degree of depth of cutting the earth places the position billet on the engineering stake, engineering stake below the billet has 2~4, the basement is reinforced district's width by the livestock farm and for propping up 1m scope within the fender pile outward flange tangent line, is reinforced district's degree of depth and be the following 1.5m~2m of basement, set up steel shotcrete for the first time between first steel waist rail and the billet.

Description

A kind of without the basement supporting and protection structure of concrete to support
Technical field
The utility model relates to a kind of basement supporting and protection structure, particularly a kind of without the basement supporting and protection structure of concrete to support.
Background technology
Tradition basement support technology is that basement supporting is provided with concrete and maintains basement supporting to support and stablize, but concrete can increase basement support cost greatly to support, also causes very large impact to earthwork outward transport in addition, thus delays the construction period.If by the safe and orderly adjustment of stress in basement Bracing Process, transfer and reallocation, make basement supporting when significant economic benefit and duration benefit obviously can be obtained without when inner support.But how to avoid in basement supporting construction process without concrete to support situation under safety problem be the problem that engineering staff faces.
Utility model content
The utility model is to provide a kind of without the basement supporting and protection structure of concrete to support, solves the problem of prior art.
In the utility model, basement supporting and protection structure adopts as follows: soldier pile adopts bored pile, and bored pile diameter is 600 ~ 900mm.Arrange water-stop curtain from soldier pile central point lateral direction 1.5 ~ 2m place, water-stop curtain adopts three axle cement mixing piles, and three axle cement mixing pile stake footpaths are 600mm or 500mm, and adjacent three axle cement mixing piles are engaged mutually, and occlusion distance is 200mm or 150mm.Inside soldier pile, top, direction arranges first steel waist rail, first steel waist rail top mark is high identical with soldier pile top mark height, the embedded bar of first steel waist rail and soldier pile is welded to connect, prestressed cable anchorage is at first steel waist rail, digging depth 1.5 ~ 2.5m places billet in position on engineering pile, and the engineering pile below billet has 2 ~ 4.Billet thickness is 10 ~ 12cm, billet setting position is from basement edge 13 ~ 15m, fluted in the middle of billet, the recessed poor degree of depth is 8 ~ 12mm, length and width are 10 ~ 15cm, stabilization zone, basement passive area width is 1m scope within soldier pile outward flange tangent line, and the stabilization zone degree of depth is below basement substrate 1.5m ~ 2m.First time bracing members is set between first steel waist rail and billet.
The utility model construction speed is fast, and construction costs is low.
Accompanying drawing explanation
Fig. 1 is basement supporting schematic diagram.
In each accompanying drawing: 1, soldier pile, 2, first steel waist rail, 3, prestress anchorage cable, 4, water-stop curtain, 5, basement passive area, 6, first bracing members, 7, billet, 8, engineering pile.
Detailed description of the invention
In embodiment, basement supporting and protection structure adopts as follows: soldier pile 1 adopts bored pile, and bored pile diameter is 800mm.Arrange water-stop curtain 4 from soldier pile 1 central point lateral direction 1.8m place, water-stop curtain 4 adopts three axle cement mixing piles, and three axle cement mixing pile stake footpaths are 600mm, and adjacent three axle cement mixing piles are engaged mutually, and occlusion distance is 200mm.Inside soldier pile 1, top, direction arranges first steel waist rail 2, first steel waist rail 2 top mark is high identical with soldier pile 1 top mark height, first steel waist rail 2 is welded to connect with the embedded bar of soldier pile 1, prestress anchorage cable 3 is anchored at first steel waist rail 2, billet 7 is placed in digging depth 1.5 ~ 2.5m position on engineering pile 8, and the engineering pile 8 below billet 7 has 2 ~ 4.Billet 7 thickness is 10 ~ 12cm, billet 7 setting position is from basement edge 13 ~ 15m, fluted in the middle of billet 7, the recessed poor degree of depth is 8 ~ 12mm, length and width are 10 ~ 15cm, stabilization zone, basement passive area 5 width is 1m scope within soldier pile 1 outward flange tangent line, and the stabilization zone degree of depth is below basement substrate 1.5m ~ 2m.First time bracing members 6 is set between first steel waist rail 2 and billet 7.

Claims (4)

1. one kind without concrete to support basement supporting and protection structure, it is characterized in that soldier pile adopts bored pile, from soldier pile central point lateral direction 1.5 ~ 2m place, water-stop curtain is set, water-stop curtain adopts three axle cement mixing piles, inside soldier pile, top, direction arranges first steel waist rail, first steel waist rail top mark is high identical with soldier pile top mark height, the embedded bar of first steel waist rail and soldier pile is welded to connect, prestressed cable anchorage is at first steel waist rail, digging depth 1.5 ~ 2.5m places billet in position on engineering pile, engineering pile below billet has 2 ~ 4, stabilization zone, basement passive area width is 1m scope within soldier pile outward flange tangent line, and the stabilization zone degree of depth is below basement substrate 1.5m ~ 2m, first time bracing members is set between first steel waist rail and billet.
2. according to claim 1 without the basement supporting and protection structure of concrete to support, it is characterized in that bored pile diameter is 600 ~ 900mm.
3. according to claim 1 without the basement supporting and protection structure of concrete to support, it is characterized in that three axle cement mixing pile stake footpaths are 600mm or 500mm, adjacent three axle cement mixing piles are engaged mutually, and occlusion distance is 200mm or 150mm.
4. according to claim 1 without the basement supporting and protection structure of concrete to support, it is characterized in that billet thickness is 10 ~ 12cm, billet setting position is from basement edge 13 ~ 15m, fluted in the middle of billet, the recessed poor degree of depth is 8 ~ 12mm, and length and width are 10 ~ 15cm.
CN201521027008.3U 2015-11-24 2015-11-24 Basement supporting construction of no concrete to propping Expired - Fee Related CN205152960U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521027008.3U CN205152960U (en) 2015-11-24 2015-11-24 Basement supporting construction of no concrete to propping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521027008.3U CN205152960U (en) 2015-11-24 2015-11-24 Basement supporting construction of no concrete to propping

Publications (1)

Publication Number Publication Date
CN205152960U true CN205152960U (en) 2016-04-13

Family

ID=55688672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521027008.3U Expired - Fee Related CN205152960U (en) 2015-11-24 2015-11-24 Basement supporting construction of no concrete to propping

Country Status (1)

Country Link
CN (1) CN205152960U (en)

Similar Documents

Publication Publication Date Title
CN203741868U (en) Reinforced concrete retaining wall structure with combined anchor wire
CN105239586B (en) Method for supporting foundation pit by adopting support structure
CN104532868B (en) High abrupt change shape sloped region bridge anchor pull-type high cap pile group basis construction method
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN207633352U (en) A kind of slope reinforcement structure for rapid rescue construction
CN203034464U (en) Truss type foundation pit supporting structure
CN104612695A (en) Repairing and reinforcing method for vertical shaft wall collapsed fiercely
CN103216244B (en) Roadway soft and weak top plate anchoring beam-arch combined structure support system and support method
CN203905018U (en) Supporting and protecting system with combined double-row piles in combination with oblique anchors
CN103590408A (en) Novel double-row pile beam vertical anchor supporting system and construction method thereof
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN105421468A (en) Basement support without concrete diagonal brace
CN205205833U (en) Soil nail and stock combined type double row pile underground structure
CN203716046U (en) Steel trestle for earthwork transportation of foundation pit
CN204040041U (en) A kind of front close rear thin Double-row Piles Support system being provided with vertical anchor pole
CN202731938U (en) Super-soft rock stratum coal bunker well wall ring beam support device
CN205152959U (en) Structure is strutted to basement that props to no concrete
CN108179762A (en) A kind of retaining wall reinforcement device and reinforced construction method
CN205152960U (en) Basement supporting construction of no concrete to propping
CN204920983U (en) Pipe installation suitable for collapsible loess tunnel advance support
CN204370417U (en) A kind of for base pit engineering external corner or the road place of going along with sb. to guard him to drawing cable bolting structure
CN203684222U (en) Pile-anchor combined supporting structure with rotary jet enlarging head pre-stressed anchor rods
CN203420283U (en) Deep foundation pit in open cut section of tunnel
CN102943480A (en) Loess foundation pit supporting method
CN205977233U (en) Tunnel lock foot spouts pilework soon

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160413

Termination date: 20161124

CF01 Termination of patent right due to non-payment of annual fee