CN205152959U - Structure is strutted to basement that props to no concrete - Google Patents

Structure is strutted to basement that props to no concrete Download PDF

Info

Publication number
CN205152959U
CN205152959U CN201521027007.9U CN201521027007U CN205152959U CN 205152959 U CN205152959 U CN 205152959U CN 201521027007 U CN201521027007 U CN 201521027007U CN 205152959 U CN205152959 U CN 205152959U
Authority
CN
China
Prior art keywords
waist rail
pile
steel waist
basement
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521027007.9U
Other languages
Chinese (zh)
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201521027007.9U priority Critical patent/CN205152959U/en
Application granted granted Critical
Publication of CN205152959U publication Critical patent/CN205152959U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a structure is strutted to basement that props to no concrete, a characterized by fender pile adopts the drilling bored concrete pile, set up the stagnant water curtain from the fender pile central point outside a 1.5~2m in orientation department, the stagnant water curtain adopts triaxial cement stirring stake, it sets up first steel waist rail to prop up the inboard orientation upper portion of fender pile, first steel waist rail top mark is high with to strut the pile bolck elevation the same, first steel waist rail is connected with the pre -buried welded steel who props up the fender pile, the anchor of prestressed anchorage cable is at first steel waist rail, the inboard orientation middle part of fender pile sets up the second and says the steel waist rail, and the second says that the anchor of prestressed anchorage cable says the steel waist rail at the second, and engineering pile bolck elevation is the same with basement bottom plate basement elevation, and the engineering stake is above -mentioned to set up the billet, sets up the steel shotcrete between billet and first steel waist rail, sets up the steel shotcrete between billet and the second way steel waist rail.

Description

A kind of without the basement support structure of concrete to support
Technical field
The utility model relates to a kind of basement support structure, particularly a kind of without the basement support structure of concrete to support.
Background technology
Tradition basement support technology is that basement supporting is provided with concrete and maintains basement supporting to support and stablize, but concrete can increase basement support cost greatly to support, also causes very large impact to earthwork outward transport in addition, thus delays the construction period.If by the safe and orderly adjustment of stress in basement Bracing Process, transfer and reallocation, make basement supporting when significant economic benefit and duration benefit obviously can be obtained without when inner support.But how to avoid in basement supporting construction process without concrete to support situation under safety problem be the problem that engineering staff faces.
Utility model content
The utility model is to provide a kind of without the basement support structure of concrete to support, solves the problem of prior art.
In the utility model, basement support structure adopts as follows: soldier pile adopts bored pile, and bored pile diameter is 600 ~ 900mm.Arrange water-stop curtain from soldier pile central point lateral direction 1.5 ~ 2m place, water-stop curtain adopts three axle cement mixing piles, and three axle cement mixing pile stake footpaths are 600mm or 500mm, and adjacent three axle cement mixing piles are engaged mutually, and occlusion distance is 200mm or 150mm.Inside soldier pile, top, direction arranges first steel waist rail, and first steel waist rail top mark is high identical with soldier pile top mark height, and the embedded bar of first steel waist rail and soldier pile is welded to connect, and prestressed cable anchorage is at first steel waist rail.
Second steel waist rail is set in the middle part of direction inside soldier pile, second steel waist bottom elevation is the first time soil excavation degree of depth, the embedded bar of second steel waist rail and soldier pile is welded to connect, second prestressed cable anchorage is at second steel waist rail, engineering pile cuts when second time soil excavation, engineering pile top mark is high identical with basement bottom board substrate absolute altitude, above engineering pile, billet is set, between billet and first steel waist rail, bracing members is set, between billet and second steel waist rail, bracing members is set.The stabilization zone width of basement passive area is 1m scope within soldier pile outward flange tangent line, and the stabilization zone degree of depth is below basement substrate 1.5m ~ 2m.
The utility model construction speed is fast, and construction costs is low.
Accompanying drawing explanation
Fig. 1 is basement supporting schematic diagram.
In each accompanying drawing: 1, soldier pile, 2, first steel waist rail, 3, prestress anchorage cable, 4, water-stop curtain, 5, basement passive area, 6, bracing members, 7, billet, 8, engineering pile, 9, second steel waist rail.
Detailed description of the invention
In embodiment, basement support structure adopts as follows: soldier pile 1 adopts bored pile, and bored pile diameter is 800mm.Arrange water-stop curtain 4 from soldier pile 1 central point lateral direction 1.8m place, water-stop curtain 4 adopts three axle cement mixing piles, and three axle cement mixing pile stake footpaths are 600mm, and adjacent three axle cement mixing piles are engaged mutually, and occlusion distance is 200mm.Inside soldier pile 1, top, direction arranges first steel waist rail 2, and first steel waist rail 2 top mark is high identical with soldier pile 1 top mark height, and first steel waist rail 2 is welded to connect with the embedded bar of soldier pile 1, and prestress anchorage cable 3 is anchored at first steel waist rail 2.
Inside soldier pile 1, second steel waist rail 9 is set in the middle part of direction, second steel waist rail 9 end absolute altitude is the first time soil excavation degree of depth, second steel waist rail 9 is welded to connect with the embedded bar of soldier pile 1, second prestress anchorage cable 3 is anchored at second steel waist rail 9, engineering pile 8 cuts when second time soil excavation, engineering pile 8 top mark is high identical with basement bottom board substrate absolute altitude, engineering pile 8 arranges billet 7 above, between billet 7 and first steel waist rail 2, bracing members 6 is set, between billet 7 and second steel waist rail 9, bracing members 6 is set.The stabilization zone width of basement passive area 5 is 1m scope within soldier pile outward flange tangent line, and the stabilization zone degree of depth is below basement substrate 1.5m ~ 2m.

Claims (3)

1. one kind without concrete to support basement support structure, it is characterized in that soldier pile adopts bored pile, from soldier pile central point lateral direction 1.5 ~ 2m place, water-stop curtain is set, water-stop curtain adopts three axle cement mixing piles, inside soldier pile, top, direction arranges first steel waist rail, first steel waist rail top mark is high identical with soldier pile top mark height, and the embedded bar of first steel waist rail and soldier pile is welded to connect, and prestressed cable anchorage is at first steel waist rail; Second steel waist rail is set in the middle part of direction inside soldier pile, second steel waist bottom elevation is the first time soil excavation degree of depth, the embedded bar of second steel waist rail and soldier pile is welded to connect, second prestressed cable anchorage is at second steel waist rail, engineering pile top mark is high identical with basement bottom board substrate absolute altitude, above engineering pile, billet is set, between billet and first steel waist rail, bracing members is set, between billet and second steel waist rail, bracing members is set; The stabilization zone width of basement passive area is 1m scope within soldier pile outward flange tangent line, and the stabilization zone degree of depth is below basement substrate 1.5m ~ 2m.
2. according to claim 1 without the basement support structure of concrete to support, it is characterized in that bored pile diameter is 600 ~ 900mm.
3. according to claim 1 without the basement support structure of concrete to support, it is characterized in that three axle cement mixing pile stake footpaths are 600mm or 500mm, adjacent three axle cement mixing piles are engaged mutually, and occlusion distance is 200mm or 150mm.
CN201521027007.9U 2015-11-24 2015-11-24 Structure is strutted to basement that props to no concrete Expired - Fee Related CN205152959U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521027007.9U CN205152959U (en) 2015-11-24 2015-11-24 Structure is strutted to basement that props to no concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521027007.9U CN205152959U (en) 2015-11-24 2015-11-24 Structure is strutted to basement that props to no concrete

Publications (1)

Publication Number Publication Date
CN205152959U true CN205152959U (en) 2016-04-13

Family

ID=55688671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521027007.9U Expired - Fee Related CN205152959U (en) 2015-11-24 2015-11-24 Structure is strutted to basement that props to no concrete

Country Status (1)

Country Link
CN (1) CN205152959U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503355A (en) * 2017-07-20 2017-12-22 广东省建筑工程集团有限公司 Shaped steel formula double-row pile foundation pit supporting system and its construction method are inserted after outer row

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503355A (en) * 2017-07-20 2017-12-22 广东省建筑工程集团有限公司 Shaped steel formula double-row pile foundation pit supporting system and its construction method are inserted after outer row
CN107503355B (en) * 2017-07-20 2023-10-13 广东省建筑工程集团有限公司 Externally-arranged rear-inserted steel type double-row pile foundation pit supporting system and construction method thereof

Similar Documents

Publication Publication Date Title
CN104047613B (en) Baseboard of coal mine roadway anchoring process
CN103774675B (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN203741868U (en) Reinforced concrete retaining wall structure with combined anchor wire
CN203034464U (en) Truss type foundation pit supporting structure
CN104612695A (en) Repairing and reinforcing method for vertical shaft wall collapsed fiercely
CN207633352U (en) A kind of slope reinforcement structure for rapid rescue construction
CN104532868B (en) High abrupt change shape sloped region bridge anchor pull-type high cap pile group basis construction method
CN103216244B (en) Roadway soft and weak top plate anchoring beam-arch combined structure support system and support method
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN103485363A (en) Three-dimensional continuous frame type reinforced concrete structure retaining wall
CN103898916A (en) Mini-pile combined support structure and construction method thereof
CN104790408A (en) Irregular foundation pit construction method
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN203716046U (en) Steel trestle for earthwork transportation of foundation pit
CN205152959U (en) Structure is strutted to basement that props to no concrete
CN202731938U (en) Super-soft rock stratum coal bunker well wall ring beam support device
CN111101526A (en) Vertical excavation supporting system based on miniature steel pipe piles for red clay foundation pit
CN108951655A (en) Basement construction method for supporting in the case of prestressed stretch-draw
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile
CN205776258U (en) A kind of Pile-Anchor Supporting for Deep Excavation system
CN205152960U (en) Basement supporting construction of no concrete to propping
CN105156111A (en) Supporting method for mining large high roadway type fill strips
CN203846517U (en) Vertical anchor bolt supporting structure
CN203684222U (en) Pile-anchor combined supporting structure with rotary jet enlarging head pre-stressed anchor rods

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160413

Termination date: 20161124

CF01 Termination of patent right due to non-payment of annual fee