CN205135085U - Integral structure of chimney and clean water basin and effluent water sump - Google Patents

Integral structure of chimney and clean water basin and effluent water sump Download PDF

Info

Publication number
CN205135085U
CN205135085U CN201520881955.2U CN201520881955U CN205135085U CN 205135085 U CN205135085 U CN 205135085U CN 201520881955 U CN201520881955 U CN 201520881955U CN 205135085 U CN205135085 U CN 205135085U
Authority
CN
China
Prior art keywords
chimney
clear water
water reserviors
sewage reservoir
integral structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520881955.2U
Other languages
Chinese (zh)
Inventor
宋波
王真龙
孙首鹏
梁文栋
宋晓丽
丁百龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC urban energy research and Design Institute Co.,Ltd.
Original Assignee
Cccc Gas & Heat Research And Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cccc Gas & Heat Research And Design Institute Co Ltd filed Critical Cccc Gas & Heat Research And Design Institute Co Ltd
Priority to CN201520881955.2U priority Critical patent/CN205135085U/en
Application granted granted Critical
Publication of CN205135085U publication Critical patent/CN205135085U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to an industrial structures, specifically speaking are integral structure of chimney and clean water basin and effluent water sump, including chimney body, clean water basin, effluent water sump and chimney basis, wherein install on the chimney basis chimney body's bottom, and the outside on chimney basis be equipped with with chimney body connects clean water basin and effluent water sump as an organic whole, last the opening of chimney body has at least one floss hole to be equipped with testing platform, signal bridge respectively on this chimney body, the last ladder that is used for connecting ground and testing platform and signal bridge of installing of chimney body. The utility model discloses utilizing chimney basis bottom space, having designed chimney and clean water basin, the sewage body into the integral structure, merge the land use area, save the area of clean water basin, effluent water sump structures, reduce project cost shortens engineering construction cycle, effectively subtracting the recovery of short secondary and recycling the hydrologic cycle circuit, improve utilization efficiency shortens the water treatment time.

Description

The integral structure of a kind of chimney and clear water reserviors and sewage reservoir
Technical field
The utility model relates to industrial structure, specifically the integral structure of a kind of chimney and clear water reserviors and sewage reservoir.
Background technology
Chimney is a kind of conventional industrial structure, is mainly used in civil heating project, as heating plant, boiler room etc., and the inner heating system in part industrial working.Adopt brick chimney to divide into reinforced concrete foundation in general 60 meters of height, more than 60 meters adopt reinforced concrete chimney to divide into RC Circular shell-type basis.Sewage reservoir, clear water reserviors are water treatment structure, for the treatment of the sewage produced in manufacturing process, mostly are steel concrete underground pond body structure, are divided into and have Gai Chiti and uncovered pond body.Owing to taking up an area the restriction in space, current chimney and sewage reservoir, clear water reserviors cannot exist simultaneously, cause the waste in land use.
Utility model content
The purpose of this utility model is the integral structure providing a kind of chimney and clear water reserviors and sewage reservoir.This industrial chimney solves part industry or domestic heating user exists chimney and sewage reservoir, the simultaneous situation of clear water reserviors.
The purpose of this utility model is achieved through the following technical solutions:
The utility model comprises chimney body, clear water reserviors, sewage reservoir and chimney raft, and wherein the bottom of chimney body is arranged on chimney raft, and is provided with the clear water reserviors and sewage reservoir that connect as one with described chimney body in the outside of described chimney raft; Described chimney body having at least one floss hole, and be respectively equipped with detection platform, signal bridge on this chimney body, described chimney body being provided with the ladder for connecting ground and detection platform and signal bridge.
Wherein: the both sides of described chimney body axial cross section are all symmetrically arranged with clear water reserviors, sewage reservoir, and these clear water reserviors, sewage reservoir are arranged from inside to outside, and are provided with core wall at connecting portion; The degree of depth of described clear water reserviors and sewage reservoir is identical with the degree of depth of chimney raft, is wrapped in the outside of described chimney raft; Described floss hole is located at the position on the lower side, middle part of chimney body; Described detection platform is located at the medium position of chimney body; The position of chimney body near top be located at by described signal bridge; The top of described chimney body is provided with lightning rod.
Advantage of the present utility model and good effect are:
1. the utility model utilizes chimney raft bottom space, and chimney and clear water reserviors, sewage body have been designed to integral structure, merges Land_use change area, saves the floor space of clear water reserviors, sewage reservoir structure, reduces construction costs, shortens the engineering construction cycle; Effectively shorten secondary recovery recycling water circulation circuit, improve utilization ratio and shorten treatment time of water.
2. the utility model concentric stack steel concrete underground circular foundation wall and sewage reservoir, clear water reserviors pool wall, reduces concrete and amount of reinforcement.
3. the utility model reduces place earthwork excavation area and volume, reduces environment pollution, saves manpower and mechanical usage quantity, shortens construction period.
4. the utility model shortens water treatment recycle circuit, improves water treatment efficiency, settling time.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model;
Wherein: 1 is chimney body, 2 is floss hole, and 3 is detection platform, and 4 is signal bridge, and 5 is ladder, and 6 is lightning rod, and 7 is clear water reserviors, and 8 is sewage reservoir, and 9 is chimney raft.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1, the utility model comprises chimney body 1, clear water reserviors 7, sewage reservoir 8 and chimney raft 9, wherein the bottom of chimney body 1 is fixed on chimney raft 9, and is provided with clear water reserviors 7 that connect as one with chimney body 1, that be positioned at underground and sewage reservoir 8 in the outside of chimney raft 9.Clear water reserviors 7 of the present utility model and sewage reservoir 8 are respectively two, are symmetrically distributed in the outside of chimney raft 9, to reduce differential settlement; Namely, the both sides of chimney body 1 axial cross section are all symmetrically arranged with clear water reserviors 7, sewage reservoir 8, and these clear water reserviors 7, sewage reservoir 8 are arranged from inside to outside, are wrapped in the outside of chimney raft 9, and be provided with core wall at the common part connected, be connected by pipeline between clear water reserviors 7 with sewage reservoir 8.The degree of depth of clear water reserviors 7 and sewage reservoir 8 is identical with the degree of depth of chimney raft 9.Periodic cleaning worked as by chimney body 1, clear water reserviors 7 and sewage reservoir 8, requires that time restriction is within 24 hours, and strictly monitors sedimentation mark during this period.
Chimney body 1 has at least one floss hole 2, the present embodiment is that position on the lower side the middle hypomere barrel of epimere () is provided with two floss holes 2 in the middle part of chimney body 1.Chimney body 1 is respectively equipped with detection platform 3, signal bridge 4, the present embodiment is provided with two detection platform 3 at the chimney body 1 medium position middle epimere of epimere (), is provided with two signal bridges 4 at chimney body 1 near the position at top.At the steel ladder 5 of arranged outside for connecting ground and detection platform 3 and signal bridge 4 of chimney body 1.Lightning rod 6 is provided with at the top of chimney body 1.
Chimney body 1 of the present utility model is reinforced concrete structure with clear water reserviors 7, sewage reservoir 8, chimney raft 9, and during site operation, monobloc cast together.Be production waste in sewage reservoir 8, water internal contamination thing is mainly the desulfurization wastewater produced in flue gas desulfurization manufacturing process, and its main component is dust and desulfurization product (CaSO 4and CaSO 3), the chloride containing solubility and fluoride, nitrate etc. are deep-etching to reinforcing bar in steel concrete pool wall and pool wall, and take measures as adopting high grade steel concrete, reinforcing bar adopts Epoxy Rebar.Strengthen the corrosion-resistant measures such as Minimum Concrete Protective Coating Thickness.
Clear water reserviors 7 of the present utility model, sewage reservoir 8 are open type pond body, if their location is that concrete permeability resistance and frost resistance then should be improved in severe cold and cold district.Treatment measures are as follows: adopt frost-resistant concrete, freeze proof grade is not less than F200.Improve concrete permeability resistance, seepage-resistant grade is not less than P6.
In sewage reservoir 8 use procedure, sediment increases gradually, and reaching setting thickness needs timing desilting, now needs the water blow-down pit body drained in pond.Be generally side and carry out desilting, opposite side is still normally produced.Now left and right sides load is asymmetric, and the sedimentation of chimney both sides can be caused uneven.Treatment measures are as follows: pool wall side plate is buried sedimentation mark underground, and emptying time is no more than 24 hours, tightly monitors differential settlement.

Claims (7)

1. the integral structure of a chimney and clear water reserviors and sewage reservoir, it is characterized in that: comprise chimney body (1), clear water reserviors (7), sewage reservoir (8) and chimney raft (9), wherein the bottom of chimney body (1) is arranged on chimney raft (9), and is provided with the clear water reserviors (7) and sewage reservoir (8) that connect as one with described chimney body (1) in the outside of described chimney raft (9); Described chimney body (1) has at least one floss hole (2), and on this chimney body (1), be respectively equipped with detection platform (3), signal bridge (4), described chimney body (1) is provided with the ladder (5) for connecting ground and detection platform (3) and signal bridge (4).
2. press the integral structure of chimney and clear water reserviors and sewage reservoir described in claim 1, it is characterized in that: the both sides of described chimney body (1) axial cross section are all symmetrically arranged with clear water reserviors (7), sewage reservoir (8), these clear water reserviors (7), sewage reservoir (8) arrange from inside to outside, and are provided with core wall at connecting portion.
3. press the integral structure of chimney and clear water reserviors and sewage reservoir described in claim 1 or 2, it is characterized in that: the degree of depth of described clear water reserviors (7) and sewage reservoir (8) is identical with the degree of depth of chimney raft (9), is wrapped in the outside of described chimney raft (9).
4. press the integral structure of chimney and clear water reserviors and sewage reservoir described in claim 1, it is characterized in that: described floss hole (2) is located at the position on the lower side, middle part of chimney body (1).
5. press the integral structure of chimney and clear water reserviors and sewage reservoir described in claim 1, it is characterized in that: described detection platform (3) is located at the medium position of chimney body (1).
6. press the integral structure of chimney and clear water reserviors and sewage reservoir described in claim 1, it is characterized in that: the position of chimney body (1) near top be located at by described signal bridge (4).
7. press the integral structure of chimney and clear water reserviors and sewage reservoir described in claim 1,2,4,5 or 6, it is characterized in that: the top of described chimney body (1) is provided with lightning rod (6).
CN201520881955.2U 2015-11-06 2015-11-06 Integral structure of chimney and clean water basin and effluent water sump Active CN205135085U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520881955.2U CN205135085U (en) 2015-11-06 2015-11-06 Integral structure of chimney and clean water basin and effluent water sump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520881955.2U CN205135085U (en) 2015-11-06 2015-11-06 Integral structure of chimney and clean water basin and effluent water sump

Publications (1)

Publication Number Publication Date
CN205135085U true CN205135085U (en) 2016-04-06

Family

ID=55620892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520881955.2U Active CN205135085U (en) 2015-11-06 2015-11-06 Integral structure of chimney and clean water basin and effluent water sump

Country Status (1)

Country Link
CN (1) CN205135085U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107780696A (en) * 2016-08-30 2018-03-09 辽宁埃勒蒙新能源技术有限公司 Spliced wind-force Full-automatic dust removal chimney

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107780696A (en) * 2016-08-30 2018-03-09 辽宁埃勒蒙新能源技术有限公司 Spliced wind-force Full-automatic dust removal chimney

Similar Documents

Publication Publication Date Title
CN203080517U (en) Steel formwork for combination of manual hole digging piles
CN101906797A (en) Plastic module combination water pool
CN203173911U (en) Precipitation device
CN205135085U (en) Integral structure of chimney and clean water basin and effluent water sump
CN204352649U (en) Construction rainwater-collecting cyclic utilization system
CN203654270U (en) Combined steel reinforcement cage
CN204898831U (en) Novel plastic check well
CN209975580U (en) Prefabricated assembled anticorrosive concrete inspection shaft
CN108999140A (en) A kind of dirty system in the face in river section
CN202289846U (en) Convex ridge guide plate arranged in wet sulfur removal process chimney
CN204876021U (en) High pressure -bearing safety type plastic check well
CN206428763U (en) A kind of mountain area cistern
CN206233254U (en) A kind of underground captation
CN207062995U (en) Hoisting port
CN201180308Y (en) Plastic hydraulic drop inspection shaft
CN204850003U (en) Rainwater sinks mud inspection shaft
CN204225257U (en) A kind of environment-friendly type prefabricated pair of case deep hole type catch pit
CN205189102U (en) Plastic inspection well
CN105507376B (en) A kind of rectangle frame precast concrete reservoir
CN204266345U (en) Single-drum chimney zero meter of surface drainage system
CN204212123U (en) Large volume concrete structural
CN202450614U (en) Precast concrete inspection shaft
CN202745184U (en) Ecological pool for rainwater utilization
CN207846537U (en) A kind of assembled water fetching device
CN214513222U (en) Filtration type multistage sedimentation tank suitable for construction site

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 110021 No. 33, Zhaogong North Street, Tiexi District, Shenyang City, Liaoning Province

Patentee after: CCCC urban energy research and Design Institute Co.,Ltd.

Address before: 110026 No.33, Zhaogong street, Tiexi District, Shenyang City, Liaoning Province

Patentee before: CCCC GAS & HEAT RESEARCH AND DESIGN INSTITUTE Co.,Ltd.