CN205116038U - Basket is hung to wave form steel web bearing formula - Google Patents
Basket is hung to wave form steel web bearing formula Download PDFInfo
- Publication number
- CN205116038U CN205116038U CN201520918547.XU CN201520918547U CN205116038U CN 205116038 U CN205116038 U CN 205116038U CN 201520918547 U CN201520918547 U CN 201520918547U CN 205116038 U CN205116038 U CN 205116038U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- basket
- construction
- wavelike steel
- steel webplate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a basket is hung to wave form steel web bearing formula is by bridge structures wave form steel web, falsework, simply hang the basket and constitute, the simple and easy basket of hanging comprises front beam, rear frame member, suspension, traction system and end platform, wave form steel web, falsework, simply hangs the outstanding section of watering of the common forming space roof beam check system of basket construction. The utility model discloses to hang the construction of staggering of the top, the bottom plate that water section, and hang in the basket fulcrum sets up the recess between wave form steel web top flange perfobond strip, when hanging the basket walking, hydraulic system pulls and hangs the basket walking on acting on wave form steel web, not only simplifies and hangs a basket structure, alleviates construction load, still increases the construction operation face, simplifies the construction, accelerates construction speed, and economic benefits and social are obvious.
Description
Technical field
The utility model relates to Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs sections cantilever casting construction, specifically a kind of Wavelike steel webplate bearing type Hanging Basket.
Background technology
Adopting has conventional cradle construction easily to occur such problem: (1), from construction technology, shaped steel quantity needed for Hanging Basket is large, and working load is large, unfavorable to structure; (2) from duration standard, cradle construction is followed the prescribed order, continuous productive process, and construction period is longer, and antinode plate is installed and sections stretch-draw, mud jacking take construction period; (3) from safety index, Hanging Basket is cantilever system, and construction process stability is poor; Top, base plate be overlapping construction up and down, and the cross-operation time is long, poor stability; (4) from difficulty of construction, affect by cradle structure, top, base plate Active workings is narrow and small, and difficulty of construction is large; (5) from economic indicator and construction technology, shaped steel quantity needed for Hanging Basket is large, material, labour cost are high, economic benefit and social benefit poor; As for construction technology, because be that scheme is carried out routinely, technical maturity, also only has this point to be dominant, but comprehensively sees long construction period, poor stability, and difficulty of construction is large, less economical, needs to improve.
Utility model content
The purpose of this utility model overcomes above-mentioned shortcoming, there is provided a kind of and simplify cradle structure, alleviate working load, increase operation side, simplify construction, good, the short construction period of security performance, improve the economic and social benefits obvious Wavelike steel webplate bearing type Hanging Basket.
The utility model is achieved in that a kind of Wavelike steel webplate bearing type Hanging Basket of structure, it is characterized in that: be made up of Wavelike steel webplate, falsework, simple and easy Hanging Basket; Wavelike steel webplate is Hanging Basket load-carrying members, Wavelike steel webplate, falsework, simple and easy Hanging Basket common Special composition beam lattice system construction cantilever sections; Described simple and easy Hanging Basket is made up of front beam and rear cross beam, suspension, trailer system, Hanging Basket fulcrum and end platform; Hanging Basket fulcrum is arranged in the groove between the open pore steel plate of Wavelike steel webplate top flange, and described trailer system comprises bracket, jack, steel pin; Hanging Basket changes freely supported structure into by cantilever construction; During Hanging Basket walking, jack one end is anchored on bracket, and the other end is anchored on the open pore steel plate of Wavelike steel webplate top flange by steel pin, the walking of traction Hanging Basket.
According to Wavelike steel webplate bearing type Hanging Basket described in the utility model; it is characterized in that: described Wavelike steel webplate is Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs structure web; segmented making in factory; when being transported to on-site consolidation; adopt bolt to be connected between sections with sections temporarily, adopt the welding of carbon dioxide gas arc welding Double-face adhesive pin.
According to Wavelike steel webplate bearing type Hanging Basket described in the utility model, it is characterized in that: Hanging Basket fulcrum comprises column, walking deck of boat two parts.
According to Wavelike steel webplate bearing type Hanging Basket described in the utility model, it is characterized in that: falsework and simple and easy Hanging Basket are conventional shaped steel in field, adopt tower crane directly assembled, by being welded to connect between component.
The utility model has the advantage of: the utility model eliminates the main longitudinal grider of conventional Hanging Basket, rear anchor system, walking system, becoming cantilever is system of simple supporting, and greatly simplify cradle structure, the Hanging Basket set-up time is short.Staggered by the roof and floor of sections construction, cross-operation is few, and safety is better.Can shift to an earlier date the Wavelike steel webplate of next sections assembled when constructing sections, after sections is built and reached some strength, Hanging Basket directly enters the stretch-draw that next sections carries out a upper sections again, short construction period.Economic benefit and social benefit obvious.
Accompanying drawing illustrates:
Fig. 1 is the utility model structural representation
Fig. 2 is Wavelike steel webplate bearing type Hanging Basket elevational schematic view
Fig. 3 is Hanging Basket fulcrum structure schematic diagram
Fig. 4 is trailer system schematic diagram
Fig. 5 is the utility model implementing procedure figure
In figure: 1, Wavelike steel webplate; 2, falsework; 3, front beam; 4, rear cross beam; 5, suspension; 6, trailer system; 6.1, bracket; 6.2, jack; 6.3, steel pin; 7, fulcrum; 7.1, column; 7.2, the walking deck of boat; 8, end platform; 9, N sections top board; 10, N+1 sections base plate.
Detailed description of the invention
Be described in detail to the utility model below in conjunction with accompanying drawing 1-5, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
The utility model provides a kind of Wavelike steel webplate bearing type Hanging Basket by improvement, as shown in the figure, can be implemented in the following manner; Be made up of Wavelike steel webplate 1, falsework 2, simple and easy Hanging Basket; Described Wavelike steel webplate 1 is Hanging Basket load-carrying members, Wavelike steel webplate 1, falsework 2, simple and easy Hanging Basket common Special composition beam lattice system construction cantilever sections; Described simple and easy Hanging Basket is made up of front beam 3 and rear cross beam 4, suspension 5, trailer system 6, Hanging Basket fulcrum 7 and end platform 8; Hanging Basket fulcrum 7 is arranged in the groove between the open pore steel plate of Wavelike steel webplate 1 top flange, and described trailer system 6 comprises bracket 6.1, jack 6.2, steel pin 6.3; Hanging Basket changes freely supported structure into by cantilever construction; During Hanging Basket walking, jack 6.2 one end is anchored on bracket 6.1, and the other end is anchored on the open pore steel plate of Wavelike steel webplate top flange by steel pin 6.3, the walking of traction Hanging Basket.The top of cantilever sections, base plate stagger construction by the utility model, Hanging Basket fulcrum is arranged in the groove between the open pore steel plate of Wavelike steel webplate top flange, during Hanging Basket walking, hydraulic system acts on Wavelike steel webplate, the walking of traction Hanging Basket, not only simplifies cradle structure, alleviates working load, also increase operation side, simplify construction, accelerate speed of application, economic benefit and social benefit obvious.
Wherein, described Wavelike steel webplate 1 is Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs structure web, segmented making in factory, when being transported to on-site consolidation, adopts bolt to be connected between sections with sections temporarily, adopts the welding of carbon dioxide gas arc welding Double-face adhesive pin.Falsework 2 and simple and easy Hanging Basket are conventional shaped steel in field, adopt tower crane directly assembled, by being welded to connect between component.
As shown in Fig. 1-5: Wavelike steel webplate bearing type Hanging Basket described in the utility model, by bridge construction Wavelike steel webplate, falsework, simple and easy Hanging Basket common Special composition beam lattice system construction cantilever sections.Simple and easy Hanging Basket is made up of front beam, rear cross beam, suspension, trailer system and end platform.Hanging Basket fulcrum is arranged in the groove between the open pore steel plate of Wavelike steel webplate top flange, and during Hanging Basket walking, hydraulic system acts on Wavelike steel webplate, the walking of traction Hanging Basket.Described Wavelike steel webplate is Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs structure, segmented making in factory, when being transported to on-site consolidation, adopts bolt to be connected between sections with sections temporarily, adopts the welding of carbon dioxide gas arc welding Double-face adhesive pin.Falsework and simple and easy Hanging Basket are conventional shaped steel in field, adopt tower crane directly assembled, by being welded to connect between component.
Described Wavelike steel webplate 1 is Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs structure web, segmented making in factory, when being transported to on-site consolidation, adopts bolt to be connected between sections with sections temporarily, adopts the welding of carbon dioxide gas arc welding Double-face adhesive pin.Falsework 2 and simple and easy Hanging Basket are conventional shaped steel in field, adopt tower crane directly assembled, by being welded to connect between component.6.1,6.2,6.3,7.1,7.2,8,9,10 be that the utility model needs zero, portion, block part.(9, N sections top board; 10, N+1 sections base plate: be object of mainly constructing, the utility model is exactly the construction in order to complete it).
Fig. 5 is the utility model implementing procedure figure,
Construction process one:
1, Hanging Basket runs to N sections.
2, formwork, colligation N sections base plate, N-1 sections roof steel bar.
Construction process two:
1, concrete placings, health.
2, N+1 sections Wavelike steel webplate is installed.
Construction process three:
1, Hanging Basket runs to N+1 sections, enters next circulation.
2, N-1 sections top board lashing, stretch-draw, mud jacking.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the utility model.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein when not departing from spirit or scope of the present utility model, can realize in other embodiments.Therefore, the utility model can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.
Claims (4)
1. a Wavelike steel webplate bearing type Hanging Basket, is characterized in that: be made up of Wavelike steel webplate (1), falsework (2), simple and easy Hanging Basket; Wavelike steel webplate (1) is Hanging Basket load-carrying members, Wavelike steel webplate (1), falsework (2), simple and easy Hanging Basket common Special composition beam lattice system construction cantilever sections; Described simple and easy Hanging Basket is made up of front beam (3) and rear cross beam (4), suspension (5), trailer system (6), Hanging Basket fulcrum (7) and end platform (8); Hanging Basket fulcrum (7) is arranged in the groove between the open pore steel plate of Wavelike steel webplate (1) top flange, and described trailer system (6) comprises bracket (6.1), jack (6.2), steel pin (6.3); Hanging Basket changes freely supported structure into by cantilever construction; During Hanging Basket walking, jack (6.2) one end is anchored on bracket (6.1), and the other end is anchored on the open pore steel plate of Wavelike steel webplate top flange by steel pin (6.3), the walking of traction Hanging Basket.
2. Wavelike steel webplate bearing type Hanging Basket according to claim 1; it is characterized in that: described Wavelike steel webplate (1) is Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs structure web; segmented making in factory; when being transported to on-site consolidation; adopt bolt to be connected between sections with sections temporarily, adopt the welding of carbon dioxide gas arc welding Double-face adhesive pin.
3. Wavelike steel webplate bearing type Hanging Basket according to claim 1, is characterized in that: Hanging Basket fulcrum (7) comprises column (7.1), the walking deck of boat (7.2) two parts.
4. Wavelike steel webplate bearing type Hanging Basket according to claim 1, is characterized in that: falsework (2) and simple and easy Hanging Basket are conventional shaped steel in field, adopt tower crane directly assembled, by being welded to connect between component.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520918547.XU CN205116038U (en) | 2015-11-18 | 2015-11-18 | Basket is hung to wave form steel web bearing formula |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520918547.XU CN205116038U (en) | 2015-11-18 | 2015-11-18 | Basket is hung to wave form steel web bearing formula |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205116038U true CN205116038U (en) | 2016-03-30 |
Family
ID=55571659
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520918547.XU Active CN205116038U (en) | 2015-11-18 | 2015-11-18 | Basket is hung to wave form steel web bearing formula |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205116038U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107401125A (en) * | 2017-08-04 | 2017-11-28 | 苏交科集团股份有限公司 | Traveling device of mobile trolley and using method |
CN109930496A (en) * | 2019-04-04 | 2019-06-25 | 河北曲港高速公路开发有限公司 | The segment Cantilever Construction Method of Wavelike steel webplate prestressed concrete combined box beam bridge |
-
2015
- 2015-11-18 CN CN201520918547.XU patent/CN205116038U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107401125A (en) * | 2017-08-04 | 2017-11-28 | 苏交科集团股份有限公司 | Traveling device of mobile trolley and using method |
CN107401125B (en) * | 2017-08-04 | 2022-12-09 | 苏交科集团股份有限公司 | Traveling device of mobile trolley and using method |
CN109930496A (en) * | 2019-04-04 | 2019-06-25 | 河北曲港高速公路开发有限公司 | The segment Cantilever Construction Method of Wavelike steel webplate prestressed concrete combined box beam bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201614738U (en) | Support device for mould board assembly of steel reinforced concrete transfer beams | |
CN201635012U (en) | Bridge box girder erection machine | |
CN103184722B (en) | Large-span double-layer Bailey truss structure and construction method thereof | |
CN204125899U (en) | A kind of long piled wharf super large framed bent cast-in-situ pile cap bed die support system | |
CN101839070A (en) | Construction method for temporarily supporting and strengthening reinforced concrete structured beam by using steel column | |
CN201506952U (en) | Temporary cable matched hanging basket building concrete cable stayed bridge without supporting frame | |
CN202164546U (en) | High pier bridge construction platform | |
CN205116038U (en) | Basket is hung to wave form steel web bearing formula | |
CN207451463U (en) | A kind of gate-type hoisting sling for being used in hard rock mole hole tear machine open | |
CN211498526U (en) | Self-lifting type corrugated steel web cast-in-situ box girder hanging basket | |
CN103410101A (en) | Tower crane conversion method for construction of parabola-shaped ultrahigh pier | |
CN104120659A (en) | Descending type suspended scaffold | |
CN205636521U (en) | Basket is hung in construction of truss -like cantilever | |
CN102926330B (en) | Installation method of hanging basket suitable for bridge construction | |
CN201132941Y (en) | Self floating lower carrying pole beam of moveable formwork | |
CN211498483U (en) | Hollow wall pier tie beam formwork system | |
CN204644878U (en) | A kind of transom pier steel truss girder lifting construction device | |
CN209353211U (en) | A kind of abutment suitable for Through Steel suspension bridge | |
CN217781749U (en) | Hanging basket counter-force pre-pressing device | |
CN207277197U (en) | A kind of operating platform suitable for the installation of high pier Wavelike steel webplate cantilever | |
CN212669031U (en) | Novel split type jib loading boom of tower machine | |
CN213062938U (en) | Hang mould system structure | |
CN203855879U (en) | Novel high-pier turnout continuous beam support | |
CN201141203Y (en) | Guiding-rail attached lifting scaffold | |
CN103306202B (en) | Steel panel used in fabricated Bailey truss in matching manner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |