CN205104846U - A supplementary strutting arrangement for pole overhead earth wire and OPGW optical cable - Google Patents

A supplementary strutting arrangement for pole overhead earth wire and OPGW optical cable Download PDF

Info

Publication number
CN205104846U
CN205104846U CN201520878645.5U CN201520878645U CN205104846U CN 205104846 U CN205104846 U CN 205104846U CN 201520878645 U CN201520878645 U CN 201520878645U CN 205104846 U CN205104846 U CN 205104846U
Authority
CN
China
Prior art keywords
overhead ground
wire
ground wire
support arm
optical cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520878645.5U
Other languages
Chinese (zh)
Inventor
蔺承亮
戴思昊
彭小东
杨胜林
周宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Chuan Dong Power Group Ltd
State Grid Corp of China SGCC
Original Assignee
Chongqing Chuan Dong Power Group Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Chuan Dong Power Group Ltd, State Grid Corp of China SGCC filed Critical Chongqing Chuan Dong Power Group Ltd
Priority to CN201520878645.5U priority Critical patent/CN205104846U/en
Application granted granted Critical
Publication of CN205104846U publication Critical patent/CN205104846U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型涉及一种用于电杆架空地线及OPGW光缆的辅助支撑装置,包括支撑杆,在支撑杆的中下部设有用于套在电杆顶部的安装帽,在安装帽的上方铰接有左右对称的支撑臂,在支撑臂的伸出端和支撑杆顶端之间设有使支撑臂移动的提升机构,在支撑臂的伸出端上设有提升钩。该装置将架空地线支撑起为架空地线安装提供较大的操作空间,其结构简单、操作方便、减少工作人员数量,消除了作业过程中的安全隐患,提高了工作效率。

The utility model relates to an auxiliary supporting device for overhead ground wires of electric poles and OPGW optical cables. The left-right symmetrical support arm is provided with a lifting mechanism to move the support arm between the extended end of the support arm and the top of the support rod, and a lifting hook is provided on the extended end of the support arm. The device supports the overhead ground wire to provide a large operating space for the installation of the overhead ground wire. It has a simple structure, convenient operation, reduces the number of workers, eliminates hidden dangers in the operation process, and improves work efficiency.

Description

用于电杆架空地线及OPGW光缆的辅助支撑装置Auxiliary support device for pole overhead ground wire and OPGW optical cable

技术领域technical field

本实用新型涉及电力施工辅助工具技术领域,具体涉及一种用于电杆架空地线及OPGW光缆的辅助支撑装置。The utility model relates to the technical field of auxiliary tools for electric power construction, in particular to an auxiliary supporting device for overhead ground wires of electric poles and OPGW optical cables.

背景技术Background technique

在架空地线架设的电力施工过程中,需要进行放线、架空地线连接、挂线和紧线等操作,传统的架设方式是将放线滑车固定在每根电杆或铁塔上,再将线盘上的架空地线依次牵引到每根电杆或铁塔上,架空地线牵引完成后,需将每根电杆或铁塔上的架空地线进行挂线、紧线等操作,以完成架空地线架设,在紧线之前还会在架空地线上绕制护线,起到保护架空地线的作用。由于放线滑车两侧的架空地线未作支撑,架空地线在自重下会向下弧垂,为了使护线绕制规范及固定架空地线方便,需要一位辅助人员将放线滑车一侧的架空地线支撑处于水平状态,另一位操作人员就对处于水平状态下的架空地线进行护线的绕制,当该侧的护线绕制完后,所述辅助人员再更换位置将放线滑车另一侧的架空地线支撑处于水平状态,所述操作人员再将该侧的架空地线进行护线的绕制,同样在紧线时,也需要辅助人员将架空地线支撑处于水平状态,再通过线夹将架空地线紧固在电杆或铁塔上,上述传统的架空地线架设方式存在以下不足:架空地线的重量较重,所需的支撑力较大,在高空作业下,支撑架空地线的辅助人员的体力消耗较大,容易极快的产生疲劳,劳动强度大;在电杆或铁塔上操作的人员较多,不便于操作,存在安全隐患,特别是在护线绕制或紧固过程中,架空地线始终是支撑在放线滑车上,放线滑车占具了较大的操作空间位置,绕制护线时,需将护线穿过放线滑车的架空地线经过位置,放线滑车上架空地线经过的位置较狭窄,不便于护线的绕制操作,在紧固架空地线时需一边支撑架空地线一边取下放线滑车,取下放线滑车后,才能固定线夹,因为线夹固定点与放线滑车所在电杆或铁塔上的固定点位置相同,从而增加了操作难度。During the electric power construction process of overhead ground wire erection, operations such as setting out wires, connecting overhead ground wires, hanging wires, and tightening wires are required. The traditional erection method is to fix the wire pulley on each pole or iron tower, and then The overhead ground wires on the reel are pulled to each pole or iron tower in turn. After the overhead ground wires are pulled, the overhead ground wires on each pole or iron tower need to be hung and tightened to complete the overhead. For the erection of the ground wire, a guard wire will be wound on the overhead ground wire before the wire is tightened to protect the overhead ground wire. Since the overhead ground wires on both sides of the pay-off block are not supported, the overhead ground wire will sag downward under its own weight. In order to make the protection wire winding standard and fix the overhead ground wire convenient, an auxiliary person is required to move the pay-off block The support of the overhead ground wire on the side is in a horizontal state, and another operator will wind the protective wire on the horizontal overhead ground wire. When the protective wire on this side is wound, the assistant will change the position. Support the overhead ground wire on the other side of the pay-off block in a horizontal state, and then the operator will wind the wire protection on the overhead ground wire on this side. Also, when tightening the wire, auxiliary personnel are also required to support the overhead ground wire In the horizontal state, the overhead ground wire is fastened to the pole or iron tower through the clamp. The above-mentioned traditional overhead ground wire erection method has the following disadvantages: the weight of the overhead ground wire is heavy, and the required supporting force is large. Under high-altitude operations, the physical strength of the auxiliary personnel supporting the overhead ground wire is relatively large, and they are prone to fatigue very quickly, and the labor intensity is high. During the winding or fastening process of the protective wire, the overhead ground wire is always supported on the pay-off block, which occupies a large operating space. When winding the protective wire, the protective wire needs to pass through the pay-off The passing position of the overhead ground wire on the pulley, and the passing position of the overhead ground wire on the pay-off block is relatively narrow, which is not convenient for the winding operation of the guard wire. When tightening the overhead ground wire, it is necessary to remove the pay-off block while supporting the overhead ground wire. After taking off the pay-off block, the wire clamp can be fixed, because the fixed point of the wire clamp is the same as the fixed point on the pole or iron tower where the pay-off block is located, which increases the difficulty of operation.

实用新型内容Utility model content

本实用新型的目的是提供一种用于电杆架空地线及OPGW光缆的辅助支撑装置,该装置将架空地线支撑起为架空地线安装提供较大的操作空间,其结构简单、操作方便、减少工作人员数量,消除了作业过程中的安全隐患,提高了工作效率。The purpose of this utility model is to provide an auxiliary support device for overhead ground wires and OPGW optical cables. The device supports the overhead ground wires to provide a large operating space for the installation of overhead ground wires. Its structure is simple and easy to operate. , Reduce the number of staff, eliminate potential safety hazards in the operation process, and improve work efficiency.

本实用新型的目的是采用以下技术方案实现的,一种用于电杆架空地线及OPGW光缆的辅助支撑装置,包括支撑杆,在支撑杆的中下部设有用于套在电杆顶部的安装帽,在安装帽的上方铰接有左右对称的支撑臂,在支撑臂的伸出端和支撑杆顶端之间设有使支撑臂移动的提升机构,在支撑臂的伸出端上设有提升钩。The purpose of this utility model is achieved by adopting the following technical scheme, an auxiliary support device for the overhead ground wire of the electric pole and the OPGW optical cable, including a support rod, and the middle and lower part of the support rod is provided with a mounting bracket for being sleeved on the top of the electric pole. A left-right symmetrical support arm is hinged above the mounting cap, a lifting mechanism for moving the support arm is provided between the extended end of the support arm and the top of the support rod, and a lifting hook is provided on the extended end of the support arm .

本实用新型在电杆上是这样使用的:当架空地线牵引完成后,先将安装帽套在电杆顶部,通过操作提升机构,使左、右两条支撑臂的伸出端均向下摆动使其远离支撑杆,使提升钩位于电杆的两侧,至使支撑臂上的提升钩能钩住电杆两侧的架空地线,再通过操作提升机构,使支撑臂的伸出端向支撑杆方向摆动,将架空地线向上移动一定距离,至使两提升钩之间的架空地线处于水平状态,并由提升钩支撑住架空地线保持水平状态,再将此电杆上的放线滑车取下,再进行护线绕制及紧线操作,架空地线紧固完成后,操作提升机构使左、右两条支撑臂的伸出端均向下摆动,支撑臂上的提升钩向下移动,使提升钩与架空地线分离,再收起本实用新型,最后将本实用新型从电杆上取下,以完成单根电杆上的紧线操作。采用本实用新型后,在护线绕制及紧线的过程中电杆上均没有了放线滑车,使得操作空间大,避免了放线滑车对操作位置的干涉,提高了操作的方便性,保证了护线绕制及紧线能达到规范要求,而且只需一人就可以操作,减少了辅助人员对架空地线的支撑,消除了安全隐患,降低了劳动强度及成本。The utility model is used on the electric pole in this way: after the overhead ground wire is pulled, first put the installation cap on the top of the electric pole, and by operating the lifting mechanism, the protruding ends of the left and right support arms are all downward Swing to keep it away from the support rod, so that the lifting hook is located on both sides of the pole, so that the lifting hook on the support arm can hook the overhead ground wire on both sides of the pole, and then by operating the lifting mechanism, the extended end of the support arm Swing in the direction of the support pole, move the overhead ground wire upward for a certain distance until the overhead ground wire between the two lifting hooks is in a horizontal state, and the overhead ground wire is supported by the lifting hooks to maintain a horizontal state, and then the pole on the pole Take off the pay-off block, and then carry out wire protection winding and wire tightening operations. After the overhead ground wire is tightened, operate the lifting mechanism to make the extending ends of the left and right support arms swing downwards, and the lift on the support arms The hook moves down to separate the lifting hook from the overhead ground wire, then the utility model is put away, and finally the utility model is taken off from the pole to complete the wire tightening operation on a single pole. After adopting the utility model, there is no pay-off block on the electric pole during the process of winding and tightening the protective wire, so that the operation space is large, the interference of the pay-off block on the operating position is avoided, and the convenience of operation is improved. It ensures that the winding and tightening of the protection wire can meet the specification requirements, and only one person can operate it, which reduces the support of the auxiliary personnel for the overhead ground wire, eliminates potential safety hazards, and reduces labor intensity and cost.

由于采用了上述技术方案,本实用新型具有以下优点:它将架空地线支撑起为架空地线安装提供较大的操作空间,其结构简单、操作方便、减少工作人员数量,消除了作业过程中的安全隐患,提高了工作效率。Due to the adoption of the above technical scheme, the utility model has the following advantages: it supports the overhead ground wire to provide a large operating space for the installation of the overhead ground wire, and its structure is simple, easy to operate, reduces the number of workers, and eliminates the potential safety hazards and improve work efficiency.

附图说明Description of drawings

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

图2为图1的第一种左视图。Fig. 2 is the first left view of Fig. 1 .

图3为图1的第二种左视图。Fig. 3 is a second left side view of Fig. 1 .

图4为本实用新型的工作状态图之一。Fig. 4 is one of working status figure of the utility model.

图5为本实用新型的工作状态图之二。Fig. 5 is the second working state figure of the utility model.

图6为本实用新型的工作状态图之三。Fig. 6 is the third working state diagram of the utility model.

具体实施方式detailed description

为了使本实用新型实现的技术手段、创作特征、达成目的与作用更加清楚及易于了解,下面结合附图和具体实施方式对本实用新型作进一步阐述:In order to make the technical means, creative features, purpose and effect of the utility model realized clearer and easier to understand, the utility model will be further elaborated below in conjunction with the accompanying drawings and specific implementation methods:

如图1-3所示,一种用于电杆架空地线及OPGW光缆的辅助支撑装置,包括支撑杆1,在支撑杆1的中下部设有用于套在电杆顶部的安装帽2,在安装帽2的上方铰接有左右对称的支撑臂3,在支撑臂3的伸出端和支撑杆1顶端之间设有使支撑臂3移动的提升机构4,在支撑臂3的伸出端上设有提升钩5。As shown in Figure 1-3, an auxiliary supporting device for overhead ground wires of electric poles and OPGW optical cables includes a support rod 1, and a mounting cap 2 for covering on the top of the electric pole is provided at the middle and lower part of the support rod 1, A left-right symmetrical support arm 3 is hinged on the top of the mounting cap 2, and a lifting mechanism 4 for moving the support arm 3 is provided between the extended end of the support arm 3 and the top end of the support rod 1. There is a lifting hook 5 on it.

本实用新型在电杆上是这样使用的:当架空地线牵引完成后,先将安装帽2套在电杆顶部,通过操作提升机构4,使左、右两条支撑臂3的伸出端均向下摆动使其远离支撑杆1,使提升钩5位于电杆的两侧,至使支撑臂3上的提升钩5能钩住电杆两侧的架空地线,再通过操作提升机构4,使支撑臂3的伸出端向支撑杆1方向摆动,将架空地线向上移动一定距离,至使两提升钩5之间的架空地线处于水平状态,并由提升钩5支撑住架空地线保持水平状态,再将此电杆上的放线滑车取下,再进行护线绕制及紧线操作,架空地线紧固完成后,操作提升机构4使左、右两条支撑臂3的伸出端均向下摆动,支撑臂3上的提升钩5向下移动,使提升钩5与架空地线分离,再收起本实用新型,最后将本实用新型从电杆上取下,以完成单根电杆上的紧线操作。The utility model is used on the electric pole in this way: when the overhead ground wire is pulled, first set the installation cap 2 on the top of the electric pole, and by operating the lifting mechanism 4, the protruding ends of the left and right support arms 3 Swing down to keep it away from the support pole 1, so that the lifting hook 5 is located on both sides of the pole, so that the lifting hook 5 on the support arm 3 can hook the overhead ground wires on both sides of the pole, and then by operating the lifting mechanism 4 , make the protruding end of the support arm 3 swing toward the direction of the support rod 1, move the overhead ground wire upward for a certain distance, until the overhead ground wire between the two lifting hooks 5 is in a horizontal state, and the lifting hook 5 supports the overhead ground wire Keep the line in a horizontal state, and then take off the pay-off pulley on the pole, and then perform wire protection winding and wire tightening operations. After the overhead ground wire is fastened, operate the lifting mechanism 4 to make the left and right support arms 3 The protruding ends of all swing downwards, and the lifting hook 5 on the support arm 3 moves downward, so that the lifting hook 5 is separated from the overhead ground wire, and then the utility model is put away, and finally the utility model is taken off from the electric pole. To complete the tight line operation on a single pole.

支撑臂3的横截面为L型或H型。The cross section of the support arm 3 is L-shaped or H-shaped.

如图4所示,提升机构4的可以包括拉线41和双钩紧线器42,双钩紧线器42的一端通过拉线41与支撑臂3的伸出端连接,其另一端通过拉线41与支撑杆1顶端连接,如图5所示,通过调节双钩紧线器42上的旋转手柄,调节支撑臂3的伸出端与支撑杆1之间的间距,从而控制提升钩5上升或者下降,最终提升支撑架空地线,以便后续作业。As shown in Figure 4, the lifting mechanism 4 can include a backguy 41 and a double-hook wire tensioner 42, one end of the double-hook wire tensioner 42 is connected with the extended end of the support arm 3 through the backguy 41, and its other end is connected with the support rod through the backguy 41 1 top connection, as shown in Figure 5, by adjusting the rotary handle on the double hook tensioner 42, adjust the distance between the extended end of the support arm 3 and the support rod 1, thereby controlling the lifting hook 5 to rise or fall, and finally lift Support overhead ground wires for subsequent work.

如图6所示,提升机构4可以包括收线器43及钢丝绳44,收线器43固定在支撑杆1的顶部,钢丝绳44绕在收线器43上,钢丝绳44端头由收线器43的出线端伸出固定在支撑臂3的伸出端,通过收线器43控制钢丝绳44伸出长度,调节支撑臂3的伸出端与支撑杆1之间的间距,从而控制提升钩5上升或者下降,最终提升支撑架空地线,以便后续作业。As shown in Figure 6, the lifting mechanism 4 can include a wire take-up 43 and a wire rope 44, the wire take-up 43 is fixed on the top of the support rod 1, the wire rope 44 is wound on the wire take-up 43, and the end of the wire rope 44 is connected by the wire take-up 43 The outgoing line end of the support arm 3 extends out and is fixed on the extension end of the support arm 3, and the extension length of the steel wire rope 44 is controlled by the wire take-up device 43, and the distance between the extension end of the support arm 3 and the support rod 1 is adjusted, thereby controlling the lift hook 5 to rise Or descend, and finally lift to support the overhead ground wire for subsequent operations.

在安装帽2的外壁设有与安装帽2内腔相通的螺孔21,螺孔21内螺纹连接有紧固螺杆22,将安装帽2套在电杆顶部后旋紧紧固螺杆22进而将电杆抵紧,以保证本装置安装的稳定性。The outer wall of the mounting cap 2 is provided with a screw hole 21 communicating with the inner cavity of the mounting cap 2, and the screw hole 21 is internally threaded with a fastening screw 22. After the mounting cap 2 is placed on the top of the pole, the fastening screw 22 is tightened and then the The pole is tight to ensure the stability of the installation of the device.

在支撑臂3的伸出端设有过孔31,支撑杆1顶端设有与过孔31相对应的销孔11,将支撑臂3提起并将其伸出端上的过孔31对准支撑杆1顶端的销孔11,通过螺杆或者插销等其他工件穿过过孔31和销孔11将支撑臂3锁紧收拢,使得本装置体积变小,便于收放和携带。A via hole 31 is provided at the extended end of the support arm 3, and a pin hole 11 corresponding to the via hole 31 is provided at the top of the support rod 1. Lift the support arm 3 and align the via hole 31 on the extended end with the support The pin hole 11 at the top of the rod 1 passes through the through hole 31 and the pin hole 11 through the screw rod or latch and other workpieces to lock and close the support arm 3, so that the volume of the device becomes smaller, and it is convenient to pack and carry.

在支撑杆1的底部设有抱箍6,抱箍6紧固在电杆上,进一步提高本装置安装的稳定性和可靠性。A hoop 6 is arranged at the bottom of the support pole 1, and the hoop 6 is fastened on the electric pole to further improve the stability and reliability of the installation of the device.

在提升钩5上套设有橡皮胶垫,减小在提升过程中架空地线与提升钩5之间的摩擦。A rubber pad is sheathed on the lifting hook 5 to reduce the friction between the overhead ground wire and the lifting hook 5 during the lifting process.

以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in the Within the protection scope of the present utility model.

Claims (7)

1. the auxiliary support apparatus for electric pole overhead ground wire and OPGW optical cable, comprise support bar, it is characterized in that: be provided with the mounting cap for being enclosed within the head of the mast in the middle and lower part of support bar, symmetrical support arm is hinged with above mounting cap, between the external part and supporting bar top of support arm, be provided with the hoisting mechanism making support arm movement, the external part of support arm is provided with hoist hook.
2. the auxiliary support apparatus for electric pole overhead ground wire and OPGW optical cable according to claim 1, it is characterized in that: described hoisting mechanism comprises bracing wire and double-hook wire grip, one end of double-hook wire grip is connected with the external part of support arm by bracing wire, and its other end is connected with supporting bar top by bracing wire.
3. the auxiliary support apparatus for electric pole overhead ground wire and OPGW optical cable according to claim 1, it is characterized in that: described hoisting mechanism comprises spooler and steel wire rope, spooler is fixed on the top of support bar, steel wire rope is around on spooler, and steel wire rope end head is stretched out the external part being fixed on support arm by the leading-out terminal of spooler.
4. the auxiliary support apparatus for electric pole overhead ground wire and OPGW optical cable according to claim 1,2 or 3, is characterized in that: be provided with the screw communicated with mounting cap inner chamber at the outer wall of mounting cap, screw internal thread is connected with fastening screw.
5. the auxiliary support apparatus for electric pole overhead ground wire and OPGW optical cable according to claim 4, it is characterized in that: be provided with via hole at the external part of support arm, supporting bar top is provided with the pin-and-hole corresponding with via hole.
6. the auxiliary support apparatus for electric pole overhead ground wire and OPGW optical cable according to claim 5, is characterized in that: be provided with anchor ear in the bottom of support bar.
7. the auxiliary support apparatus for electric pole overhead ground wire and OPGW optical cable according to claim 6, is characterized in that: on hoist hook, be arranged with rubber rubber cushion.
CN201520878645.5U 2015-11-05 2015-11-05 A supplementary strutting arrangement for pole overhead earth wire and OPGW optical cable Withdrawn - After Issue CN205104846U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520878645.5U CN205104846U (en) 2015-11-05 2015-11-05 A supplementary strutting arrangement for pole overhead earth wire and OPGW optical cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520878645.5U CN205104846U (en) 2015-11-05 2015-11-05 A supplementary strutting arrangement for pole overhead earth wire and OPGW optical cable

Publications (1)

Publication Number Publication Date
CN205104846U true CN205104846U (en) 2016-03-23

Family

ID=55520602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520878645.5U Withdrawn - After Issue CN205104846U (en) 2015-11-05 2015-11-05 A supplementary strutting arrangement for pole overhead earth wire and OPGW optical cable

Country Status (1)

Country Link
CN (1) CN205104846U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105262005A (en) * 2015-11-05 2016-01-20 国家电网公司 Auxiliary supporting device for pole overhead ground wire and OPGW optical cable
CN108512129A (en) * 2018-06-25 2018-09-07 国网江苏省电力公司太仓市供电公司 A kind of cable wiring device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105262005A (en) * 2015-11-05 2016-01-20 国家电网公司 Auxiliary supporting device for pole overhead ground wire and OPGW optical cable
CN105262005B (en) * 2015-11-05 2018-01-02 国家电网公司 For electric pole aerial earth wire and the auxiliary support apparatus of OPGW optical cables
CN108512129A (en) * 2018-06-25 2018-09-07 国网江苏省电力公司太仓市供电公司 A kind of cable wiring device

Similar Documents

Publication Publication Date Title
CN105390990B (en) One kind crosses over wire laying device
CN103613031B (en) Voltage transformer simple and easy hoisting device
CN103269036A (en) Tensioning resistant cross arm lifting machine
CN102659043B (en) An improved device for dismantling the buttress pole of the tower crane
CN205104846U (en) A supplementary strutting arrangement for pole overhead earth wire and OPGW optical cable
CN202550405U (en) Special ladder for maintenance of strain insulator
CN105262005B (en) For electric pole aerial earth wire and the auxiliary support apparatus of OPGW optical cables
CN203998746U (en) Portable suspension installation
CN102761077B (en) Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line
CN105375389B (en) Wire fixing device
CN203289011U (en) Tension cross arm hoisting device
CN105186387B (en) A kind of electric cable with large cross-section tunnel lays uses device
CN104836156A (en) Synthetic insulator simple ladder
CN204349336U (en) Overhead-groundwire lifter
CN201336516Y (en) Device for manually installing pole top switch
CN107585695A (en) A kind of hoist engine rope guide
JP2014241688A (en) Scaffold for work
CN203491607U (en) Overhead line cross wiring device
CN217555571U (en) Multifunctional hoisting device for hoisting materials on electric pole
CN104505771A (en) Overhead ground wire lifter
CN106429935B (en) A kind of lifting device
CN205141526U (en) Lead wire fixing device
CN201975727U (en) Adjustable payoff stand
CN202474699U (en) Portable heavy object transmitter for telegraph pole
CN110374489B (en) Power maintenance ladder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160323

Effective date of abandoning: 20180102