CN105262005B - For electric pole aerial earth wire and the auxiliary support apparatus of OPGW optical cables - Google Patents
For electric pole aerial earth wire and the auxiliary support apparatus of OPGW optical cables Download PDFInfo
- Publication number
- CN105262005B CN105262005B CN201510745599.6A CN201510745599A CN105262005B CN 105262005 B CN105262005 B CN 105262005B CN 201510745599 A CN201510745599 A CN 201510745599A CN 105262005 B CN105262005 B CN 105262005B
- Authority
- CN
- China
- Prior art keywords
- wire
- support arm
- electric pole
- optical cables
- overhead ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Electric Cable Installation (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本发明涉及一种用于电杆架空地线及OPGW光缆的辅助支撑装置,包括支撑杆,在支撑杆的中下部设有用于套在电杆顶部的安装帽,在安装帽的上方铰接有左右对称的支撑臂,在支撑臂的伸出端和支撑杆顶端之间设有使支撑臂移动的提升机构,在支撑臂的伸出端上设有提升钩。该装置将架空地线支撑起为架空地线安装提供较大的操作空间,其结构简单、操作方便、减少工作人员数量,消除了作业过程中的安全隐患,提高了工作效率。
The invention relates to an auxiliary supporting device for overhead ground wires of electric poles and OPGW optical cables. A symmetrical support arm is provided with a lifting mechanism for moving the support arm between the extended end of the support arm and the top end of the support rod, and a lifting hook is provided on the extended end of the support arm. The device supports the overhead ground wire to provide a large operating space for the installation of the overhead ground wire. It has a simple structure, convenient operation, reduces the number of workers, eliminates hidden dangers in the operation process, and improves work efficiency.
Description
技术领域technical field
本发明涉及电力施工辅助工具技术领域,具体涉及一种用于电杆架空地线及OPGW光缆的辅助支撑装置。The invention relates to the technical field of electric power construction auxiliary tools, in particular to an auxiliary supporting device for overhead ground wires of electric poles and OPGW optical cables.
背景技术Background technique
在架空地线架设的电力施工过程中,需要进行放线、架空地线连接、挂线和紧线等操作,传统的架设方式是将放线滑车固定在每根电杆或铁塔上,再将线盘上的架空地线依次牵引到每根电杆或铁塔上,架空地线牵引完成后,需将每根电杆或铁塔上的架空地线进行挂线、紧线等操作,以完成架空地线架设,在紧线之前还会在架空地线上绕制护线,起到保护架空地线的作用。由于放线滑车两侧的架空地线未作支撑,架空地线在自重下会向下弧垂,为了使护线绕制规范及固定架空地线方便,需要一位辅助人员将放线滑车一侧的架空地线支撑处于水平状态,另一位操作人员就对处于水平状态下的架空地线进行护线的绕制,当该侧的护线绕制完后,所述辅助人员再更换位置将放线滑车另一侧的架空地线支撑处于水平状态,所述操作人员再将该侧的架空地线进行护线的绕制,同样在紧线时,也需要辅助人员将架空地线支撑处于水平状态,再通过线夹将架空地线紧固在电杆或铁塔上,上述传统的架空地线架设方式存在以下不足:架空地线的重量较重,所需的支撑力较大,在高空作业下,支撑架空地线的辅助人员的体力消耗较大,容易极快的产生疲劳,劳动强度大;在电杆或铁塔上操作的人员较多,不便于操作,存在安全隐患,特别是在护线绕制或紧固过程中,架空地线始终是支撑在放线滑车上,放线滑车占具了较大的操作空间位置,绕制护线时,需将护线穿过放线滑车的架空地线经过位置,放线滑车上架空地线经过的位置较狭窄,不便于护线的绕制操作,在紧固架空地线时需一边支撑架空地线一边取下放线滑车,取下放线滑车后,才能固定线夹,因为线夹固定点与放线滑车所在电杆或铁塔上的固定点位置相同,从而增加了操作难度。During the electric power construction process of overhead ground wire erection, operations such as setting out wires, connecting overhead ground wires, hanging wires, and tightening wires are required. The traditional erection method is to fix the wire pulley on each pole or iron tower, and then The overhead ground wires on the reel are pulled to each pole or iron tower in turn. After the overhead ground wires are pulled, the overhead ground wires on each pole or iron tower need to be hung and tightened to complete the overhead. For the erection of the ground wire, a guard wire will be wound on the overhead ground wire before the wire is tightened to protect the overhead ground wire. Since the overhead ground wires on both sides of the pay-off block are not supported, the overhead ground wire will sag downward under its own weight. In order to make the protection wire winding standard and fix the overhead ground wire convenient, an auxiliary person is required to move the pay-off block The support of the overhead ground wire on the side is in a horizontal state, and another operator will wind the protective wire on the horizontal overhead ground wire. When the protective wire on this side is wound, the assistant will change the position. Support the overhead ground wire on the other side of the pay-off block in a horizontal state, and then the operator will wind the wire protection on the overhead ground wire on this side. Also, when tightening the wire, auxiliary personnel are also required to support the overhead ground wire In the horizontal state, the overhead ground wire is fastened to the pole or iron tower through the clamp. The above-mentioned traditional overhead ground wire erection method has the following disadvantages: the weight of the overhead ground wire is heavy, and the required supporting force is large. Under high-altitude operations, the physical strength of the auxiliary personnel supporting the overhead ground wire is relatively large, and they are prone to fatigue very quickly, and the labor intensity is high. During the winding or fastening process of the protective wire, the overhead ground wire is always supported on the pay-off block, which occupies a large operating space. When winding the protective wire, the protective wire needs to pass through the pay-off The passing position of the overhead ground wire on the pulley, and the passing position of the overhead ground wire on the pay-off block is relatively narrow, which is not convenient for the winding operation of the guard wire. When tightening the overhead ground wire, it is necessary to remove the pay-off block while supporting the overhead ground wire. After taking off the pay-off block, the wire clamp can be fixed, because the fixed point of the wire clamp is the same as the fixed point on the pole or iron tower where the pay-off block is located, which increases the difficulty of operation.
发明内容Contents of the invention
本发明的目的是提供一种用于电杆架空地线及OPGW光缆的辅助支撑装置,该装置将架空地线支撑起为架空地线安装提供较大的操作空间,其结构简单、操作方便、减少工作人员数量,消除了作业过程中的安全隐患,提高了工作效率。The object of the present invention is to provide an auxiliary supporting device for overhead ground wires and OPGW optical cables. The device supports the overhead ground wires to provide a large operating space for the installation of the overhead ground wires. It has a simple structure and is easy to operate. Reduce the number of staff, eliminate potential safety hazards in the operation process, and improve work efficiency.
本发明的目的是采用以下技术方案实现的,一种用于电杆架空地线及OPGW光缆的辅助支撑装置,包括支撑杆,在支撑杆的中下部设有用于套在电杆顶部的安装帽,在安装帽的上方铰接有左右对称的支撑臂,在支撑臂的伸出端和支撑杆顶端之间设有使支撑臂移动的提升机构,在支撑臂的伸出端上设有提升钩。The object of the present invention is achieved by adopting the following technical solutions, an auxiliary support device for the overhead ground wire of the electric pole and the OPGW optical cable, including a support rod, and a mounting cap for being sleeved on the top of the electric pole is provided at the middle and lower part of the support rod A left-right symmetrical support arm is hinged above the mounting cap, a lifting mechanism for moving the support arm is provided between the extended end of the support arm and the top of the support rod, and a lifting hook is provided on the extended end of the support arm.
本发明在电杆上是这样使用的:当架空地线牵引完成后,先将安装帽套在电杆顶部,通过操作提升机构,使左、右两条支撑臂的伸出端均向下摆动使其远离支撑杆,使提升钩位于电杆的两侧,至使支撑臂上的提升钩能钩住电杆两侧的架空地线,再通过操作提升机构,使支撑臂的伸出端向支撑杆方向摆动,将架空地线向上移动一定距离,至使两提升钩之间的架空地线处于水平状态,并由提升钩支撑住架空地线保持水平状态,再将此电杆上的放线滑车取下,再进行护线绕制及紧线操作,架空地线紧固完成后,操作提升机构使左、右两条支撑臂的伸出端均向下摆动,支撑臂上的提升钩向下移动,使提升钩与架空地线分离,再收起本发明,最后将本发明从电杆上取下,以完成单根电杆上的紧线操作。采用本发明后,在护线绕制及紧线的过程中电杆上均没有了放线滑车,使得操作空间大,避免了放线滑车对操作位置的干涉,提高了操作的方便性,保证了护线绕制及紧线能达到规范要求,而且只需一人就可以操作,减少了辅助人员对架空地线的支撑,消除了安全隐患,降低了劳动强度及成本。The present invention is used on the electric pole in this way: after the overhead ground wire is pulled, first put the installation cap on the top of the electric pole, and by operating the lifting mechanism, the protruding ends of the left and right support arms are both swung downward Keep it away from the support pole, make the lifting hooks on both sides of the pole, until the lifting hooks on the support arm can hook the overhead ground wires on both sides of the pole, and then operate the lifting mechanism to make the extended end of the support arm Swing the support rod in the direction, move the overhead ground wire upwards for a certain distance until the overhead ground wire between the two lifting hooks is in a horizontal state, and the overhead ground wire is supported by the lifting hooks to maintain a horizontal state, and then put the ground wire on the pole Remove the wire pulley, and then carry out wire protection winding and wire tightening operations. After the overhead ground wire is tightened, operate the lifting mechanism to make the extending ends of the left and right support arms swing downward, and the lifting hook on the support arm Move downwards to separate the lifting hook from the overhead ground wire, then put away the present invention, and finally remove the present invention from the electric pole to complete the wire tightening operation on the single electric pole. After adopting the present invention, there is no pay-off block on the electric pole during the process of winding and tightening the protective wire, so that the operation space is large, the interference of the pay-off block on the operating position is avoided, the convenience of operation is improved, and the operation is ensured. It ensures that the winding and tightening of the protection wire can meet the specification requirements, and only one person can operate it, which reduces the support of the auxiliary personnel for the overhead ground wire, eliminates potential safety hazards, and reduces labor intensity and cost.
由于采用了上述技术方案,本发明具有以下优点:它将架空地线支撑起为架空地线安装提供较大的操作空间,其结构简单、操作方便、减少工作人员数量,消除了作业过程中的安全隐患,提高了工作效率。Due to the adoption of the above technical solution, the present invention has the following advantages: it supports the overhead ground wire to provide a large operating space for the installation of the overhead ground wire, and its structure is simple, easy to operate, reduces the number of workers, and eliminates the safety hazards and improve work efficiency.
附图说明Description of drawings
图1为本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.
图2为图1的第一种左视图。Fig. 2 is the first left view of Fig. 1 .
图3为图1的第二种左视图。Fig. 3 is a second left side view of Fig. 1 .
图4为本发明的工作状态图之一。Fig. 4 is one of the working status diagrams of the present invention.
图5为本发明的工作状态图之二。Fig. 5 is the second working state diagram of the present invention.
图6为本发明的工作状态图之三。Fig. 6 is the third working state diagram of the present invention.
具体实施方式detailed description
为了使本发明实现的技术手段、创作特征、达成目的与作用更加清楚及易于了解,下面结合附图和具体实施方式对本发明作进一步阐述:In order to make the technical means, creative features, goals and functions achieved by the present invention clearer and easier to understand, the present invention will be further elaborated below in conjunction with the accompanying drawings and specific embodiments:
如图1-3所示,一种用于电杆架空地线及OPGW光缆的辅助支撑装置,包括支撑杆1,在支撑杆1的中下部设有用于套在电杆顶部的安装帽2,在安装帽2的上方铰接有左右对称的支撑臂3,在支撑臂3的伸出端和支撑杆1顶端之间设有使支撑臂3移动的提升机构4,在支撑臂3的伸出端上设有提升钩5。As shown in Figure 1-3, an auxiliary supporting device for overhead ground wires of electric poles and OPGW optical cables includes a support rod 1, and a mounting cap 2 for covering on the top of the electric pole is provided at the middle and lower part of the support rod 1, A left-right symmetrical support arm 3 is hinged on the top of the mounting cap 2, and a lifting mechanism 4 for moving the support arm 3 is provided between the extended end of the support arm 3 and the top end of the support rod 1. There is a lifting hook 5 on it.
本发明在电杆上是这样使用的:当架空地线牵引完成后,先将安装帽2套在电杆顶部,通过操作提升机构4,使左、右两条支撑臂3的伸出端均向下摆动使其远离支撑杆1,使提升钩5位于电杆的两侧,至使支撑臂3上的提升钩5能钩住电杆两侧的架空地线,再通过操作提升机构4,使支撑臂3的伸出端向支撑杆1方向摆动,将架空地线向上移动一定距离,至使两提升钩5之间的架空地线处于水平状态,并由提升钩5支撑住架空地线保持水平状态,再将此电杆上的放线滑车取下,再进行护线绕制及紧线操作,架空地线紧固完成后,操作提升机构4使左、右两条支撑臂3的伸出端均向下摆动,支撑臂3上的提升钩5向下移动,使提升钩5与架空地线分离,再收起本发明,最后将本发明从电杆上取下,以完成单根电杆上的紧线操作。The present invention is used on the electric pole like this: after the overhead ground wire traction is completed, first put the installation cap 2 on the top of the electric pole, and by operating the lifting mechanism 4, the protruding ends of the left and right support arms 3 are aligned. Swing down to keep it away from the support pole 1, so that the lifting hook 5 is located on both sides of the pole, so that the lifting hook 5 on the support arm 3 can hook the overhead ground wires on both sides of the pole, and then by operating the lifting mechanism 4, Make the extended end of the support arm 3 swing toward the direction of the support rod 1, move the overhead ground wire upward for a certain distance, until the overhead ground wire between the two lifting hooks 5 is in a horizontal state, and the lifting hook 5 supports the overhead ground wire Keep it in a horizontal state, then remove the pay-off tackle on the pole, and then perform wire protection winding and wire tightening operations. After the overhead ground wire is fastened, operate the lifting mechanism 4 to make the left and right support arms 3 The protruding ends all swing downwards, and the lifting hook 5 on the support arm 3 moves downward, so that the lifting hook 5 is separated from the overhead ground wire, and then the present invention is put away, and finally the present invention is taken off from the electric pole to complete the unit. Tight wire operation on a pole.
支撑臂3的横截面为L型或H型。The cross section of the support arm 3 is L-shaped or H-shaped.
如图4所示,提升机构4的可以包括拉线41和双钩紧线器42,双钩紧线器42的一端通过拉线41与支撑臂3的伸出端连接,其另一端通过拉线41与支撑杆1顶端连接,如图5所示,通过调节双钩紧线器42上的旋转手柄,调节支撑臂3的伸出端与支撑杆1之间的间距,从而控制提升钩5上升或者下降,最终提升支撑架空地线,以便后续作业。As shown in Figure 4, the lifting mechanism 4 can include a backguy 41 and a double-hook wire tensioner 42, one end of the double-hook wire tensioner 42 is connected with the extended end of the support arm 3 through the backguy 41, and its other end is connected with the support rod through the backguy 41 1 top connection, as shown in Figure 5, by adjusting the rotary handle on the double hook tensioner 42, adjust the distance between the extended end of the support arm 3 and the support rod 1, thereby controlling the lifting hook 5 to rise or fall, and finally lift Support overhead ground wires for subsequent work.
如图6所示,提升机构4可以包括收线器43及钢丝绳44,收线器43固定在支撑杆1的顶部,钢丝绳44绕在收线器43上,钢丝绳44端头由收线器43的出线端伸出固定在支撑臂3的伸出端,通过收线器43控制钢丝绳44伸出长度,调节支撑臂3的伸出端与支撑杆1之间的间距,从而控制提升钩5上升或者下降,最终提升支撑架空地线,以便后续作业。As shown in Figure 6, the lifting mechanism 4 can include a wire take-up 43 and a wire rope 44, the wire take-up 43 is fixed on the top of the support rod 1, the wire rope 44 is wound on the wire take-up 43, and the end of the wire rope 44 is connected by the wire take-up 43 The outgoing line end of the support arm 3 extends out and is fixed on the extension end of the support arm 3, and the extension length of the steel wire rope 44 is controlled by the wire take-up device 43, and the distance between the extension end of the support arm 3 and the support rod 1 is adjusted, thereby controlling the lift hook 5 to rise Or descend, and finally lift to support the overhead ground wire for subsequent operations.
在安装帽2的外壁设有与安装帽2内腔相通的螺孔21,螺孔21内螺纹连接有紧固螺杆22,将安装帽2套在电杆顶部后旋紧紧固螺杆22进而将电杆抵紧,以保证本装置安装的稳定性。The outer wall of the mounting cap 2 is provided with a screw hole 21 communicating with the inner cavity of the mounting cap 2, and the screw hole 21 is internally threaded with a fastening screw 22. After the mounting cap 2 is placed on the top of the pole, the fastening screw 22 is tightened and then the The pole is tight to ensure the stability of the installation of the device.
在支撑臂3的伸出端设有过孔,支撑杆1顶端设有与过孔相对应的销孔11,将支撑臂3提起并将其伸出端上的过孔对准支撑杆1顶端的销孔11,通过螺杆或者插销等其他工件穿过过孔和销孔11将支撑臂3锁紧收拢,使得本装置体积变小,便于收放和携带。A via hole is provided at the protruding end of the support arm 3, and a pin hole 11 corresponding to the via hole is provided at the top of the support rod 1. Lift the support arm 3 and align the via hole on the protruding end of the support rod 1 with the top of the support rod 1. The pin holes 11 are used to lock and close the support arm 3 through other workpieces such as screw rods or latches through the through holes and the pin holes 11, so that the volume of the device becomes small, and it is convenient to pack and carry.
在支撑杆1的底部设有抱箍6,抱箍6紧固在电杆上,进一步提高本装置安装的稳定性和可靠性。A hoop 6 is arranged at the bottom of the support pole 1, and the hoop 6 is fastened on the electric pole to further improve the stability and reliability of the installation of the device.
在提升钩5上套设有橡皮胶垫,减小在提升过程中架空地线与提升钩5之间的摩擦。A rubber pad is sheathed on the lifting hook 5 to reduce the friction between the overhead ground wire and the lifting hook 5 during the lifting process.
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the scope of the present invention. within the scope of protection.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510745599.6A CN105262005B (en) | 2015-11-05 | 2015-11-05 | For electric pole aerial earth wire and the auxiliary support apparatus of OPGW optical cables |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510745599.6A CN105262005B (en) | 2015-11-05 | 2015-11-05 | For electric pole aerial earth wire and the auxiliary support apparatus of OPGW optical cables |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105262005A CN105262005A (en) | 2016-01-20 |
| CN105262005B true CN105262005B (en) | 2018-01-02 |
Family
ID=55101563
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510745599.6A Active CN105262005B (en) | 2015-11-05 | 2015-11-05 | For electric pole aerial earth wire and the auxiliary support apparatus of OPGW optical cables |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105262005B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110729666A (en) * | 2019-10-22 | 2020-01-24 | 国网辽宁省电力有限公司辽阳供电公司 | An installation and pay-off device for overhead ground wire |
| CN112018660B (en) * | 2020-09-07 | 2021-06-08 | 绍兴柯桥皓悦纺织科技有限公司 | Installation and maintenance device of pole frame lifting type electric equipment with safety mechanism |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2000070382A1 (en) * | 1999-05-12 | 2000-11-23 | Scc Special Communication Cables Gmbh & Co Kg | High-voltage overhead line comprising an optical cable that is placed on an overhead conductor or on an overhead ground wire |
| CN101969183A (en) * | 2010-09-16 | 2011-02-09 | 四川电力送变电建设公司 | Saddle-type line-lifting device and construction method thereof |
| CN201766313U (en) * | 2010-09-07 | 2011-03-16 | 福建省电力有限公司福州电业局 | Insulation cross-arm for dual circuit |
| CN203205772U (en) * | 2013-04-28 | 2013-09-18 | 国家电网公司 | Overhead ground wire lifter |
| CN103545751A (en) * | 2013-10-16 | 2014-01-29 | 国家电网公司 | Overhead transmission line ground wire optical cable fittings replacement bracket |
| CN205104846U (en) * | 2015-11-05 | 2016-03-23 | 国家电网公司 | A supplementary strutting arrangement for pole overhead earth wire and OPGW optical cable |
-
2015
- 2015-11-05 CN CN201510745599.6A patent/CN105262005B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2000070382A1 (en) * | 1999-05-12 | 2000-11-23 | Scc Special Communication Cables Gmbh & Co Kg | High-voltage overhead line comprising an optical cable that is placed on an overhead conductor or on an overhead ground wire |
| CN201766313U (en) * | 2010-09-07 | 2011-03-16 | 福建省电力有限公司福州电业局 | Insulation cross-arm for dual circuit |
| CN101969183A (en) * | 2010-09-16 | 2011-02-09 | 四川电力送变电建设公司 | Saddle-type line-lifting device and construction method thereof |
| CN203205772U (en) * | 2013-04-28 | 2013-09-18 | 国家电网公司 | Overhead ground wire lifter |
| CN103545751A (en) * | 2013-10-16 | 2014-01-29 | 国家电网公司 | Overhead transmission line ground wire optical cable fittings replacement bracket |
| CN205104846U (en) * | 2015-11-05 | 2016-03-23 | 国家电网公司 | A supplementary strutting arrangement for pole overhead earth wire and OPGW optical cable |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105262005A (en) | 2016-01-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105502223B (en) | A kind of Aloft work platform for line construction | |
| CN105390990B (en) | One kind crosses over wire laying device | |
| CN103269036A (en) | Tensioning resistant cross arm lifting machine | |
| CN105896379A (en) | Hot-line work platform used for overhead transmission line | |
| CN102659043B (en) | An improved device for dismantling the buttress pole of the tower crane | |
| CN202550405U (en) | Special ladder for maintenance of strain insulator | |
| JP5559592B2 (en) | Gripping bracket, tension device replacement tool using gripping bracket, and tension device replacement method | |
| CN205104846U (en) | A supplementary strutting arrangement for pole overhead earth wire and OPGW optical cable | |
| CN106099747B (en) | Livewire work conduction wire riser | |
| CN108551009B (en) | A ground wire suspension device | |
| CN105262005A (en) | Auxiliary supporting device for pole overhead ground wire and OPGW optical cable | |
| CN206712333U (en) | A kind of line line lifter of Portable power transmission line six | |
| CN102761077B (en) | Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line | |
| CN109252733B (en) | Attached self-climbing holding pole lifting system | |
| CN204737645U (en) | Hoisting accessory | |
| CN203289011U (en) | Tension cross arm hoisting device | |
| CN105186387B (en) | A kind of electric cable with large cross-section tunnel lays uses device | |
| CN204349336U (en) | Overhead-groundwire lifter | |
| CN201336516Y (en) | Device for manually installing pole top switch | |
| CN113725778A (en) | Insulation formula wire lifting means on pole | |
| CN107585695A (en) | A kind of hoist engine rope guide | |
| CN104505771A (en) | Overhead ground wire lifter | |
| CN204474228U (en) | Hoist ceiling crane inhibiting device | |
| CN202474699U (en) | Portable heavy object transmitter for telegraph pole | |
| CN110374489B (en) | Power maintenance ladder |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |