CN205100109U - Combined bridge crane in adaptation district rate radius tunnel - Google Patents

Combined bridge crane in adaptation district rate radius tunnel Download PDF

Info

Publication number
CN205100109U
CN205100109U CN201520839622.3U CN201520839622U CN205100109U CN 205100109 U CN205100109 U CN 205100109U CN 201520839622 U CN201520839622 U CN 201520839622U CN 205100109 U CN205100109 U CN 205100109U
Authority
CN
China
Prior art keywords
girder
tunnel
utility
bridge crane
supporting leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520839622.3U
Other languages
Chinese (zh)
Inventor
黄光者
柳宜添
肖浩
张晓晔
耿爱荣
闫玉坤
林后宽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI CHINA METALLURGICAL HEAVY MACHINERY Co Ltd
Original Assignee
ANHUI CHINA METALLURGICAL HEAVY MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI CHINA METALLURGICAL HEAVY MACHINERY Co Ltd filed Critical ANHUI CHINA METALLURGICAL HEAVY MACHINERY Co Ltd
Priority to CN201520839622.3U priority Critical patent/CN205100109U/en
Application granted granted Critical
Publication of CN205100109U publication Critical patent/CN205100109U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a combined bridge crane in adaptation district rate radius tunnel, including the girder with install the landing leg in girder bottom, the girder is equipped with vertical pinhole and installs vertical round pin axle including head and the tail looks articulated multisection crossbeam in proper order, the coupling point between two sections adjacent crossbeams, the one end of two section adjacent crossbeams is equipped with horizontal pinhole respectively and installs the transverse bolt axle in coupling point's both sides, is in the same place two section adjacent crossbeam fixed connection. The utility model discloses can erect one section roof beam, prepare under the condition in tunnel the adjustment of bending of a bridge crane's girder, comply with the curvature radius in tunnel, when having solved frame bridge crane and crossing the tunnel transition, need the difficult problem of large -scale hoisting equipment and dismouting girder, simultaneously the utility model discloses practice thrift the reerection time, also reduced the cost of dismouting on a large scale and workman's intensity of labour, and made simple, low cost, strong adaptability, safe and reliable.

Description

Adapt to the bridging machine for both highway and railway in rate radius tunnel, community
Technical field
The utility model relates to Bridge Erector field, specifically a kind of bridging machine for both highway and railway adapting to rate radius tunnel, community.
Background technology
Along with the construction of highway in China, railway construction bridge is more and more general, the continuous change of Construction unit construction plant, environment and equipment requirement for Multiple tunnel requirement when adaptation highway, railway are set a roof beam in place: (1), because the size of beam block is different, the girder length of Bridge Erector is different; (2) tunnel face sectional dimension change; (3) length in tunnel and the change of curvature reducing.Above three kinds of situations, when public affairs, railway bridge erecting machine via hole, need to use Large-scale Hoisting equipment, carry out dismounting on a large scale; Labour intensity is large, and cost is high, length consuming time.
For meeting needs of setting a roof beam in place, Bridge Erector needs to carry out operation by tunnel, and when crossing tunnel, because tunnel face diameter is little, radius of curvature is little, and crane ' s major girder itself is oversize, long, when by tunnel, interferes, directly can not pass through tunnel with tunnel wall.
Utility model content
The purpose of this utility model is to provide a kind of bridging machine for both highway and railway adapting to rate radius tunnel, community, Bridge Erector is when crossing small curve tunnel, crane ' s major girder can carry out horizontal bending, to solve Bridge Erector when crossing tunnel, because girder is oversize, long, be not easy to the problem re-assemblying tunnel.
The technical solution of the utility model is as follows:
A kind of bridging machine for both highway and railway adapting to rate radius tunnel, community, include girder and be arranged on the supporting leg bottom girder, it is characterized in that: described girder includes the more piece crossbeam that head and the tail are hinged successively, hinge point between adjacent two joint crossbeams is provided with vertical pin-and-hole and is provided with vertical bearing pin, one end of adjacent two joint crossbeams is respectively equipped with horizontal pin-and-hole in the both sides of hinge point and is provided with horizontal bearing pin, is fixed together by adjacent two joint crossbeams.
The bridging machine for both highway and railway in described rate radius tunnel, adaptation community, is characterized in that: described supporting leg includes the interim supporting leg in front portion, front leg strut, middle supporting leg and the tail supporting leg that are arranged on successively from front to back bottom described girder.
The bridging machine for both highway and railway in described rate radius tunnel, adaptation community, is characterized in that: the top of described girder is provided with hoisting overhead travelling crane.
When building a bridge, horizontal bearing pin and vertical bearing pin are all in installment state, and now transverse bolt bearing is by load when setting a roof beam in place; When crossing tunnel, take out horizontal bearing pin, vertical pinned connection, adjacent two joint crossbeams can be rotated a certain angle by vertical bearing pin, make whole girder form and tunnel radius of curvature form similar, can tunnel excessively safely.
The beneficial effects of the utility model:
The utility model can set up one section of beam, carried out bending adjustment, and complied with the radius of curvature in tunnel when preparing tunnel to the girder of Bridge Erector, solves Bridge Erector when crossing tunnel transition, needs a difficult problem for large lifting equipment and dismounting girder; Simultaneously the utility model has been saved and has been re-assemblied the time, also reduces the cost of dismounting on a large scale and the labour intensity of workman, and manufactures simple, with low cost, strong adaptability, safe and reliable.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Fig. 2 is the structural representation of the utility model middle girder.
Fig. 3 is the syndeton schematic diagram of adjacent two joint crossbeams in the utility model.
Detailed description of the invention
See accompanying drawing, a kind of bridging machine for both highway and railway adapting to rate radius tunnel, community, the supporting leg including girder 1 and be arranged on bottom girder 1, girder 1 includes the more piece crossbeam that head and the tail are hinged successively, hinge point between adjacent two joint crossbeams is provided with vertical pin-and-hole and is provided with vertical bearing pin 2, one end of adjacent two joint crossbeams is respectively equipped with horizontal pin-and-hole in the both sides of hinge point and is provided with horizontal bearing pin 3, is fixed together by adjacent two joint crossbeams.
In the utility model, supporting leg includes the interim supporting leg in front portion 4, front leg strut 5, middle supporting leg 6 and the tail supporting leg 7 that are arranged on successively from front to back bottom girder 1.
The top of girder 1 is provided with hoisting overhead travelling crane 8.
Below in conjunction with accompanying drawing, the utility model is further described:
When building a bridge, horizontal bearing pin 3 and vertical bearing pin 2 are all in installment state, and now horizontal bearing pin 3 bears load when setting a roof beam in place; When crossing tunnel, horizontal bearing pin 3 takes out, and vertical bearing pin 2 connects, and adjacent two joint crossbeams can be rotated a certain angle by vertical bearing pin 2, and namely girder 1 can carry out horizontal bending, makes girder 1 form and tunnel radius of curvature form similar, can tunnel excessively safely.
In sum, the utility model, when not needing large-scale lifting appliance to assist, can adjust the carrying out of large-span girder, adjusts the form between tunnel, safety tunnel, is a kind of novel device of safe and reliable, easy and simple to handle, low cost.

Claims (3)

1. one kind adapts to the bridging machine for both highway and railway in rate radius tunnel, community, include girder and be arranged on the supporting leg bottom girder, it is characterized in that: described girder includes the more piece crossbeam that head and the tail are hinged successively, hinge point between adjacent two joint crossbeams is provided with vertical pin-and-hole and is provided with vertical bearing pin, one end of adjacent two joint crossbeams is respectively equipped with horizontal pin-and-hole in the both sides of hinge point and is provided with horizontal bearing pin, is fixed together by adjacent two joint crossbeams.
2. the bridging machine for both highway and railway in rate radius tunnel, adaptation community according to claim 1, is characterized in that: described supporting leg includes the interim supporting leg in front portion, front leg strut, middle supporting leg and the tail supporting leg that are arranged on successively from front to back bottom described girder.
3. the bridging machine for both highway and railway in rate radius tunnel, adaptation community according to claim 1, is characterized in that: the top of described girder is provided with hoisting overhead travelling crane.
CN201520839622.3U 2015-10-27 2015-10-27 Combined bridge crane in adaptation district rate radius tunnel Expired - Fee Related CN205100109U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520839622.3U CN205100109U (en) 2015-10-27 2015-10-27 Combined bridge crane in adaptation district rate radius tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520839622.3U CN205100109U (en) 2015-10-27 2015-10-27 Combined bridge crane in adaptation district rate radius tunnel

Publications (1)

Publication Number Publication Date
CN205100109U true CN205100109U (en) 2016-03-23

Family

ID=55515899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520839622.3U Expired - Fee Related CN205100109U (en) 2015-10-27 2015-10-27 Combined bridge crane in adaptation district rate radius tunnel

Country Status (1)

Country Link
CN (1) CN205100109U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109750605A (en) * 2019-03-05 2019-05-14 冯丛 A kind of compound main beam of civil engineering bridge construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109750605A (en) * 2019-03-05 2019-05-14 冯丛 A kind of compound main beam of civil engineering bridge construction
CN109750605B (en) * 2019-03-05 2020-05-08 冯丛 Duplex girder for civil engineering bridge construction

Similar Documents

Publication Publication Date Title
CN203373664U (en) Foldable rear supporting leg of tunnel-through bridge girder erection machine
CN103321156B (en) Foldable through-tunnel bridge girder erection machine rear support leg and application thereof
CN209686443U (en) One kind can formwork composed bogie in early demoulding gallery
CN205100109U (en) Combined bridge crane in adaptation district rate radius tunnel
CN203394540U (en) Suspension overturning inverted arch formwork trolley for tunnels
CN207920632U (en) Formwork jumbo for pipe gallery of constructing
CN204848023U (en) Braced system that climbing tower hung in external
CN204532049U (en) Novel iron tower cat ladder structure
CN104372923B (en) Scaffolding
CN206986644U (en) A kind of tunnel track simply removes device
CN203441069U (en) Outer wall dangling working platform capable of overturning
CN205669313U (en) A kind of Universal adjustable hangs template system
CN205243530U (en) Light -section tunnel concrete lining platform truck
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN204356663U (en) The rear support leg of novel large-tonnage Bridge Erector
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN203361021U (en) Double-spliced type truss hanging basket
CN105297634A (en) Horizontal moving and jacking mechanism of beam transporting vehicle
CN202967874U (en) Overall girder transporting vehicle lifting spreader
CN204570396U (en) D type is the traversing door frame of beam just
CN105200926A (en) Highway-railway dual-purpose bridge erecting machine suitable for small-curvature-radius tunnel
CN204823804U (en) Bridge crane platform of walking
CN204551277U (en) Tunnel Bridge Erector telescopic support leg device
CN204325944U (en) Intercity track cable stayed bridge Diamond-Shape Form Traveler
CN204389761U (en) Lightguide cable link emergency maintenance lift rack

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160323

Termination date: 20211027