CN205035769U - Geomembrane core -wall pond on a hill embankment dam - Google Patents

Geomembrane core -wall pond on a hill embankment dam Download PDF

Info

Publication number
CN205035769U
CN205035769U CN201520800515.XU CN201520800515U CN205035769U CN 205035769 U CN205035769 U CN 205035769U CN 201520800515 U CN201520800515 U CN 201520800515U CN 205035769 U CN205035769 U CN 205035769U
Authority
CN
China
Prior art keywords
geomembrane
dam
core
hill
clinosol
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520800515.XU
Other languages
Chinese (zh)
Inventor
秦鹏
秦植海
曹鑫
张喆瑜
王海波
夏日风
尚晋辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Water Resources and Electric Power
Original Assignee
Zhejiang University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Water Resources and Electric Power filed Critical Zhejiang University of Water Resources and Electric Power
Priority to CN201520800515.XU priority Critical patent/CN205035769U/en
Application granted granted Critical
Publication of CN205035769U publication Critical patent/CN205035769U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a geomembrane core -wall pond on a hill embankment dam comprises dam body, geomembrane, residual soil, clinosol, silty clay. The geomembrane is construct in the middle of the dam body, and the width of cloth about geomembrane earth rockfill dam with central core is laid to residual soil, clinosol, the compaction in layers, and silty clay thickness is greater than 20cm, lays about the geomembrane, and the protection geomembrane is not punctureed by residual soil, clinosol edges and corners at embankment dam construction, run duration. The utility model discloses a geomembrane core -wall pond on a hill embankment dam utilizes the geomembrane to replace the precious clay in mountain area to make the core -wall, reduces engineering cost. Because of the geomembrane has good water -resisting property, ductility, durability, use the geomembrane to construct with low costs, the construction convenience of earth rockfill dam with central core, construction speed is fast. Service life increases, and geomembrane water tightness can not reduce.

Description

Geomembrane core-wall pond on a hill earth and rockfill dam
Technical field
The utility model relates to hydraulic engineering technical field, specifically a kind of geomembrane core-wall pond on a hill earth and rockfill dam.
Background technology
Along with the development of science and technology, large and middle reservoirs generally all makes concrete gravity dam or arched concrete dam, and spreads all over the place in the middle-size and small-size pond on a hill in mountain area, because water retention capacity is little, reserve-water-level is low, the harm caused after destruction is little, generally continues to use traditional way, gather materials on the spot, make earth and rockfill dam.First residual soil, clinosol have just become gathers materials on the spot, and occurrence condition determines residual soil, clinosol particle diameter is large, corner angle clearly demarcated, and transmission coefficient is large.In order to reduce dam body seepage, generally make clay earth rockfill dam with central core or clay earth dam with inclined core by code requirement.The Formation rule of soil determines, and the clay made required for core-wall is mainly present in plains region, and mountain area exactly lacks clay.Make to build clay earth rockfill dam with central core cost greatly to improve.And clay earth rockfill dam with central core difficulty of construction is large, construction quality is difficult to control, and increases, again and again occur the problems such as dam body seepage with service life.
Utility model content
In order to solve the above-mentioned technical problem existed in prior art, the utility model provides a kind of geomembrane core-wall pond on a hill earth and rockfill dam, be made up of dam body, geomembrane, residual soil, clinosol, silty clay, described geomembrane is built in the middle of dam body, residual soil, clinosol are laid on geomembrane earth rockfill dam with central core left and right width, compaction in layers.
Further, described silty clay thickness is greater than 20cm, and about being laid on geomembrane, protection geomembrane is not punctured by residual soil, clinosol corner angle at rock fill dam construction, run duration.
Geomembrane core-wall pond on a hill earth and rockfill dam disclosed in the utility model, is utilize geomembrane to replace the clay of mountain area preciousness to make core-wall, reduces engineering cost.Because geomembrane has good water-resisting property, ductility, durability, earth rockfill dam with central core cost is low, easy construction to use geomembrane to build, and speed of application is fast.Service life increases, and geomembrane water isolating can not reduce.
Accompanying drawing explanation
Fig. 1 is geomembrane core-wall pond on a hill earth and rockfill dam sectional schematic diagram;
Fig. 2 is clay earth rockfill dam with central core sectional schematic diagram;
Fig. 3 is width on the right side of geomembrane core-wall pond on a hill earth and rockfill dam, left side width first floor sequence of construction schematic diagram;
Fig. 4 is width second layer sequence of construction schematic diagram on the right side of this earth and rockfill dam.
Detailed description of the invention
Below in conjunction with accompanying drawing, utility model is described further.
As Figure 1-4; geomembrane core-wall pond on a hill earth and rockfill dam of the present utility model is made up of dam body 1, geomembrane 2, residual soil, clinosol 3, silty clay 4; described geomembrane 2 is built in the middle of dam body 1; residual soil, clinosol 3 are laid on geomembrane earth rockfill dam with central core left and right width; compaction in layers; described silty clay 4 thickness is greater than 20cm, is laid on geomembrane about 2, and protection geomembrane 2 is not punctured by residual soil, clinosol 3 corner angle at rock fill dam construction, run duration.
During geomembrane core-wall pond on a hill rock fill dam construction of the present utility model, by specification laying depth, compaction requirement, lay right side width residual soil, clinosol, finishing overlapping part is domatic, laying is greater than 20cm thickness silty clay, is laid on silty clay by geomembrane coiled material, and is rolled to residual soil, the clinosol surface of compacting, lay on geomembrane and be greater than 20cm thickness silty clay (the domatic position of overlapping part), a construction cell completes.By width on the left of the earth and rockfill dam of construction cell construction above, left and right sides width is alternately constructed to dam crest.After geomembrane core-wall pond on a hill earth and rockfill dam main body completes, upstream and downstream Slope Treatment is identical with conventional method.

Claims (2)

1. geomembrane core-wall pond on a hill earth and rockfill dam, be made up of dam body (1), geomembrane (2), residual soil, clinosol (3), silty clay (4), it is characterized in that: described geomembrane (2) is built in the middle of dam body (1), residual soil, clinosol (3) are laid on geomembrane earth rockfill dam with central core left and right width, compaction in layers.
2. geomembrane core-wall pond on a hill earth and rockfill dam as claimed in claim 1; it is characterized in that: described silty clay (4) thickness is greater than 20cm; be laid on geomembrane (2) left and right, protection geomembrane (2) is not punctured by residual soil, clinosol (3) corner angle at rock fill dam construction, run duration.
CN201520800515.XU 2015-10-13 2015-10-13 Geomembrane core -wall pond on a hill embankment dam Expired - Fee Related CN205035769U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520800515.XU CN205035769U (en) 2015-10-13 2015-10-13 Geomembrane core -wall pond on a hill embankment dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520800515.XU CN205035769U (en) 2015-10-13 2015-10-13 Geomembrane core -wall pond on a hill embankment dam

Publications (1)

Publication Number Publication Date
CN205035769U true CN205035769U (en) 2016-02-17

Family

ID=55294681

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520800515.XU Expired - Fee Related CN205035769U (en) 2015-10-13 2015-10-13 Geomembrane core -wall pond on a hill embankment dam

Country Status (1)

Country Link
CN (1) CN205035769U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297683A (en) * 2015-10-13 2016-02-03 浙江水利水电学院 Geomembrane core wall hilly pond earth-rock dam and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297683A (en) * 2015-10-13 2016-02-03 浙江水利水电学院 Geomembrane core wall hilly pond earth-rock dam and construction method thereof

Similar Documents

Publication Publication Date Title
CN103643656B (en) High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body
CN103031836B (en) A kind of method of building road on new hydraulically filled sludge ground fast
CN102660936A (en) Method for realizing seepage prevention of bridge wall by means of polyvinyl chloride film
CN104878739A (en) Drainage material assembly capable of being transversely connected with plastic drainage boards and method for constructing drainage material assembly
CN109024458A (en) A kind of coal mine subsidence land landscape revetment and the construction method of water-bed antiseepage
CN102168430A (en) Method for reducing soil pressure on retaining wall in expansive rock-soil area
CN104594297B (en) A kind of double face slab rock-fill dams and construction method thereof
CN104060619A (en) Construction method and structure of hydraulic core-wall rockfill dam without cofferdams
CN104652492A (en) Seepage draining system of tailing pond cohesive soil initial dam
CN103938583A (en) Earth and rockfill dam revetment and construction method thereof
CN111593742A (en) Construction method for rectifying and improving tailing pond based on rubble silt squeezing method
CN205035768U (en) Enrockment concrete permeable dike
CN207469269U (en) A kind of hydraulic engineering High strength geogrid structure class ecological revetment
CN205035769U (en) Geomembrane core -wall pond on a hill embankment dam
CN203741889U (en) Blind drainage floating reduction structure
CN102677704A (en) Method for preventing seepage of dam foundations of silt-rich rivers by means of natural coverage
CN105804045A (en) Equipment for strengthening deep soft soil foundation by vacuum preloading of filter well and method
CN212052626U (en) Concrete panel rock-fill dam with multiple anti-seepage structure
CN108532543B (en) Auxiliary anti-seepage layer-paving structure for foundation pit on upstream of dam
CN201746923U (en) Tailings drainage engineering structure
CN104929081A (en) Enrockment concrete permeable dike and construction method thereof
CN203383193U (en) Core-wall rockfill dam structure without cofferdams
CN205421297U (en) Slope reinforcement software structure
CN206204970U (en) A kind of high fill foundation weeper drain
CN114525755A (en) Seepage-proofing structure of ecological river channel and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160217

Termination date: 20171013

CF01 Termination of patent right due to non-payment of annual fee