CN102677704A - Method for preventing seepage of dam foundations of silt-rich rivers by means of natural coverage - Google Patents

Method for preventing seepage of dam foundations of silt-rich rivers by means of natural coverage Download PDF

Info

Publication number
CN102677704A
CN102677704A CN2012101658118A CN201210165811A CN102677704A CN 102677704 A CN102677704 A CN 102677704A CN 2012101658118 A CN2012101658118 A CN 2012101658118A CN 201210165811 A CN201210165811 A CN 201210165811A CN 102677704 A CN102677704 A CN 102677704A
Authority
CN
China
Prior art keywords
dam
silt
loam
bedding
seepage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101658118A
Other languages
Chinese (zh)
Inventor
林秀山
高广淳
景来红
孙胜利
李治明
韩秋茸
段世超
姜苏阳
曹国利
王新奇
代巧枝
田华祥
杨永叶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN2012101658118A priority Critical patent/CN102677704A/en
Publication of CN102677704A publication Critical patent/CN102677704A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a method for preventing seepage of dam foundations of silt-rich rivers by means of natural coverage. The method includes firstly stacking a dam model by loess loam center-deviated walls according to terrain and engineering geological conditions of a dam location and the integral arrangement requirements of pivotal projects and buildings; building the loess loam center-deviated walls by silt-rich loam in the thickness of 0.25m; secondly, paving climbing type inner coverage on a downstream slope of an upstream cofferdam in the vertical thickness of 6.0m, paving a filter material protecting layer in horizontal width of 4.0m and a transitional material protecting layer in horizontal width of 4.0m on two sides of the upstream cofferdam; and thirdly, building a cofferdam seepage-prevention structure of the upstream cofferdam serving the main part of the dam by the loam center-deviated walls, wherein the upstream slope gradient is 1:3.5 so that the dam can be directly conveniently tightly connected with the natural coverage formed by silt in front of the dam. In the method, the advantage that silt of the silt-rich rivers can form natural coverage in front of the dam is sufficiently utilized for design of the shape of the dam and the seepage-prevention design of the dam foundations, and accordingly, construction amount and construction investment of the dam foundations can be reduced evidently.

Description

Fully-loaded stream utilizes the seepage prevention of dam founda method of natural bedding
Technical field
The present invention relates to fully-loaded stream seepage prevention of dam founda method, especially relate to the seepage prevention of dam founda method that fully-loaded stream utilizes natural bedding.
Background technology
For preventing dam foundation infiltration and seepage stability, when building the dam, must carry out antiseepage and handle the dam foundation.At present, the seepage prevention of dam founda processing method mainly comprised build concrete cut, basement rock grouting (curtain and consolidation grouting), or bedding etc. is set.But; For on fully-loaded stream, building the dam, how to utilize the silt of fully-loaded stream before the dam, to form these characteristics of natural bedding, the dam type and the seepage prevention of dam founda that carry out dam are optimized design; Reach and reduce dam foundation treatment project amount, reduction operating expenses, also be not seen in relevant report at present.
Summary of the invention
The object of the invention is to provide a kind of fully-loaded stream that reduces operating expenses, shortening construction period to utilize the seepage prevention of dam founda method of natural bedding.
For realizing above-mentioned purpose, the present invention takes following technical proposals:
Fully-loaded stream according to the invention utilizes the seepage prevention of dam founda method of natural bedding,
The first step, according to Dam Site landform and engineering geological conditions, hinge and each building general arrangement requirement, adopt loess class soil soil sloping core loose rock dam dam type; The loam sloping core adopts heavy silt loam to fill, and fills layer thickness 0.25m, adopts 17t projection vibratory roller vibroroller cmpacting, and degree of compaction is 100%;
Second goes on foot, on slope, upstream cofferdam downstream, lays bedding in the formula of swashing, the interior bedding vertical thickness 6.0m of the formula of swashing, and it respectively is filter material and the transition region material topping of 4.0m that horizontal width is laid in both sides; The interior bedding of the said formula of swashing adopts manual work to mix the gravelly soil of joining and fills; The percentage by weight of gravelly soil is mixed mixing ratio: heavy silt loam 30% and 70% maximum particle diameter are that the sand gravel fusion of the continuous grading of 60mm forms; Fill bed thickness 0.25m, adopt 17t projection vibratory roller vibroroller cmpacting, degree of compaction is 100%;
The 3rd step, the dam upstream cofferdam is the ingredient of dam dam body, adopts the leakage preventing structure of loam sloping core form as the weir body, its upper reaches gradient 1: 3.5 so that directly with the dam before the natural bedding of shoal materials formation closely be connected; So just, constituted bedding → one complete dam foundation auxiliary seepage proof system of loam sloping core in the natural bedding → upstream cofferdam sloping core → formula of swashing that forms by the silt alluvial, as the defence line, second road of seepage prevention of dam founda.
The present invention forms natural bedding owing to make full use of the silt of fully-loaded stream before the dam, carry out the dam type and the seepage prevention of dam founda design of dam, makes all purposes of remarkable minimizing of dam foundation treatment project amount and corresponding engineering investment thereby reach.
Simultaneously; The present invention can also utilize silt carrying flow that rock cranny is carried out shutoff; When silt carrying flow was oozed to the downstream, dam through the joint fissure in the rock mass, because joint fissure is very small in the rock mass, the silt in the infiltration current can be deposited in the slit gradually; It is stifled that leakage passage is become silted up, and causes water percolating capacity to reduce gradually.And along with the increase of deposition thickness before the dam, the permeable stratum leading edge is become silted up stifled gradually, thereby anti-seepage effect also will improve constantly.
Description of drawings
Fig. 1 is dam dam body, the seepage prevention of dam founda body generalized section of building according to the present invention.
The specific embodiment
As shown in Figure 1, fully-loaded stream according to the invention utilizes the seepage prevention of dam founda method of natural bedding, carries out according to following step:
The first step, according to Dam Site landform and engineering geological conditions, hinge and each building general arrangement requirement, adopt loess class soil soil sloping core loose rock dam dam type; The loam sloping core adopts heavy silt loam to fill, and fills layer thickness 0.25m, adopts 17t projection vibratory roller vibroroller cmpacting, and degree of compaction is 100%;
Second goes on foot, on slope, upstream cofferdam downstream, lays bedding in the formula of swashing, the interior bedding vertical thickness 6.0m of the formula of swashing, and it respectively is filter material and the transition region material topping of 4.0m that horizontal width is laid in both sides; The interior bedding of the said formula of swashing adopts manual work to mix the gravelly soil of joining and fills; The percentage by weight of gravelly soil is mixed mixing ratio: heavy silt loam 30% and 70% maximum particle diameter are that the sand gravel fusion of the continuous grading of 60mm forms; Fill bed thickness 0.25m, adopt 17t projection vibratory roller vibroroller cmpacting, degree of compaction is 100%; In the formula of swashing bedding overcome bedding in the existing employing level in the dam bottom artificial form that weak face causes slow down upstream dam slope, increase dam reclamation work amount and influence the problem of hinge general arrangement;
The 3rd step, the dam upstream cofferdam is the ingredient of dam dam body, adopts the leakage preventing structure of loam sloping core form as the weir body, its upper reaches gradient 1: 3.5 so that directly with the dam before the natural bedding of shoal materials formation closely be connected; So just, constituted bedding → one complete dam foundation auxiliary seepage proof system of loam sloping core in the natural bedding → upstream cofferdam sloping core → formula of swashing that forms by the silt alluvial; As the defence line, second road of seepage prevention of dam founda, the safety operating of guaranteeing dam has been increased insurance together again.

Claims (1)

1. a fully-loaded stream utilizes the seepage prevention of dam founda method of natural bedding, it is characterized in that:
The first step, according to Dam Site landform and engineering geological conditions, hinge and each building general arrangement requirement, adopt loess class soil soil sloping core loose rock dam dam type; The loam sloping core adopts heavy silt loam to fill, and fills layer thickness 0.25m, adopts 17t projection vibratory roller vibroroller cmpacting, and degree of compaction is 100%;
Second goes on foot, on slope, upstream cofferdam downstream, lays bedding in the formula of swashing, the interior bedding vertical thickness 6.0m of the formula of swashing, and it respectively is filter material and the transition region material topping of 4.0m that horizontal width is laid in both sides; The interior bedding of the said formula of swashing adopts manual work to mix the gravelly soil of joining and fills; The percentage by weight of gravelly soil is mixed mixing ratio: heavy silt loam 30% and 70% maximum particle diameter are that the sand gravel fusion of the continuous grading of 60mm forms; Fill bed thickness 0.25m, adopt 17t projection vibratory roller vibroroller cmpacting, degree of compaction is 100%;
The 3rd step, the dam upstream cofferdam is the ingredient of dam dam body, adopts the leakage preventing structure of loam sloping core form as the weir body, its upper reaches gradient 1: 3.5 so that directly with the dam before the natural bedding of shoal materials formation closely be connected; So just, constituted bedding → one complete dam foundation auxiliary seepage proof system of loam sloping core in the natural bedding → upstream cofferdam sloping core → formula of swashing that forms by the silt alluvial, as the defence line, second road of seepage prevention of dam founda.
CN2012101658118A 2012-05-25 2012-05-25 Method for preventing seepage of dam foundations of silt-rich rivers by means of natural coverage Pending CN102677704A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101658118A CN102677704A (en) 2012-05-25 2012-05-25 Method for preventing seepage of dam foundations of silt-rich rivers by means of natural coverage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101658118A CN102677704A (en) 2012-05-25 2012-05-25 Method for preventing seepage of dam foundations of silt-rich rivers by means of natural coverage

Publications (1)

Publication Number Publication Date
CN102677704A true CN102677704A (en) 2012-09-19

Family

ID=46810223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101658118A Pending CN102677704A (en) 2012-05-25 2012-05-25 Method for preventing seepage of dam foundations of silt-rich rivers by means of natural coverage

Country Status (1)

Country Link
CN (1) CN102677704A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864782A (en) * 2012-10-22 2013-01-09 安蓉建设总公司 Construction method for fast filling clay core rock-fill dam body
CN102979061A (en) * 2012-12-04 2013-03-20 合肥工业大学 Oblique membrane core wall earth and rockfill dam and anti-seepage body construction method thereof
CN106934169A (en) * 2017-03-21 2017-07-07 中国电建集团成都勘测设计研究院有限公司 A kind of method that natural impervious blanket layer Thickness Analysis are carried out using GOCAD
CN108193648A (en) * 2018-03-19 2018-06-22 黄河勘测规划设计有限公司 Plasticity panel homogeneous dam
CN108193649A (en) * 2018-03-19 2018-06-22 黄河勘测规划设计有限公司 Core-wall homogeneous dam

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
梁会圃等: "小浪底大坝防渗土料质量指标及现场质量控制 ", 《岩土工程技术》 *
梁会圃等: "小浪底大坝防渗土料质量指标及现场质量控制", 《岩土工程技术》, no. 06, 10 December 2002 (2002-12-10), pages 326 - 328 *
王琳等: "小浪底水利枢纽工程大坝防渗效果分析 ", 《水电能源科学》 *
王琳等: "小浪底水利枢纽工程大坝防渗效果分析", 《水电能源科学》, vol. 29, no. 10, 31 October 2011 (2011-10-31), pages 36 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864782A (en) * 2012-10-22 2013-01-09 安蓉建设总公司 Construction method for fast filling clay core rock-fill dam body
CN102864782B (en) * 2012-10-22 2014-10-29 安蓉建设总公司 Construction method for fast filling clay core rock-fill dam body
CN102979061A (en) * 2012-12-04 2013-03-20 合肥工业大学 Oblique membrane core wall earth and rockfill dam and anti-seepage body construction method thereof
CN106934169A (en) * 2017-03-21 2017-07-07 中国电建集团成都勘测设计研究院有限公司 A kind of method that natural impervious blanket layer Thickness Analysis are carried out using GOCAD
CN108193648A (en) * 2018-03-19 2018-06-22 黄河勘测规划设计有限公司 Plasticity panel homogeneous dam
CN108193649A (en) * 2018-03-19 2018-06-22 黄河勘测规划设计有限公司 Core-wall homogeneous dam
CN108193648B (en) * 2018-03-19 2023-08-22 黄河勘测规划设计研究院有限公司 Plastic panel homogenizing dam
CN108193649B (en) * 2018-03-19 2023-11-03 黄河勘测规划设计研究院有限公司 Core wall homogenizing dam

Similar Documents

Publication Publication Date Title
CN104131575B (en) A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation
CN104153380B (en) A kind of antiseepage cofferdam structure and construction technology
CN102383413B (en) Method for constructing strengthened saturated-flow plastic silt soft soil foundation
CN102817366B (en) Prevention and treatment method for full-mechanized caving mining collapse trap area water disaster for shallow-buried ultra-thick coal seam
CN102704364B (en) Clay serging tailings subgrade structure and construction method thereof
CN101672026A (en) Face plate rock-fill dam structure of reasonably utilizing sand gravel material and construction method thereof
CN207846349U (en) A kind of water blocking earth dam
CN102080381B (en) Method for managing landslip of side slope landslide for transformer substation
CN102677704A (en) Method for preventing seepage of dam foundations of silt-rich rivers by means of natural coverage
CN106049379B (en) Interim electricity-generating method and enrockment self bursting dam during the construction hysteresis of spillway downstream
CN106836244A (en) A kind of method of friction pile dative guest barricade joint protection steep slope subgrade high
CN103696416A (en) Novel foundation treatment method
CN206693140U (en) A kind of protection slope
CN201598610U (en) Face plate rock-fill dam structure reasonably utilizing gravel sand
CN104594297B (en) A kind of double face slab rock-fill dams and construction method thereof
CN209338948U (en) A kind of water-permeable pavement structure
CN113818402A (en) Reinforcing and reinforcing structure of clay core rockfill dam and construction method thereof
CN107881987A (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN107034848A (en) A kind of water storage concrete dam construction stitches the construction method of flexible leak stoppage
CN103993609B (en) The multi-functional fast hard concrement manual repair foundation pit waterproof curtain of silicon ash sand guide drainage
CN101603298B (en) Dam joint structure and construction method thereof
CN102561368B (en) Pre-compacted reinforced soil block flexible supporting structure
CN206298869U (en) A kind of concrete guard wall structure of free drainage
CN205369167U (en) Back -up sand gravel material weir dam body is thrown to aquatic
CN205088528U (en) Cause of a quarrel height piece of smooth land concrete roadbed structure that fills is abandoned to soft ground

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120919