CN205020737U - Production line of large -scale nut of forge hot - Google Patents

Production line of large -scale nut of forge hot Download PDF

Info

Publication number
CN205020737U
CN205020737U CN201520702769.8U CN201520702769U CN205020737U CN 205020737 U CN205020737 U CN 205020737U CN 201520702769 U CN201520702769 U CN 201520702769U CN 205020737 U CN205020737 U CN 205020737U
Authority
CN
China
Prior art keywords
die
slide block
punch
forcing press
press
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520702769.8U
Other languages
Chinese (zh)
Inventor
许明中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haining Zhongda Fastener Co Ltd
Original Assignee
Haining Zhongda Fastener Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haining Zhongda Fastener Co Ltd filed Critical Haining Zhongda Fastener Co Ltd
Priority to CN201520702769.8U priority Critical patent/CN205020737U/en
Application granted granted Critical
Publication of CN205020737U publication Critical patent/CN205020737U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forging (AREA)

Abstract

The utility model particularly relates to a production line of large -scale nut of forge hot, including reason material device, induction heater, straight side press, material collecting device, wherein, the stock in proper order from reason material device through the conveyer deliver to induction heater, straight side press reachs material collecting device after carrying out the machine -shaping, through the setting of conveyer for transmission speed between each process improves the production efficiency of the large -scale nut of forge hot.

Description

A kind of production line of forge hot large-scale nut
Technical field
The utility model relates to hot forging equipment field, particularly relates to a kind of production line of forge hot large-scale nut.
Background technology
Forging is that one utilizes metal forming machinery to apply pressure to metal stock, makes it produce plastic deformation to obtain the processing method with certain mechanical performance, definite shape and size forging.Can eliminate the defects such as cast condition that metal produces in smelting process is loose by forging, optimize heterogeneous microstructure, owing to saving complete metal streamline, the mechanical performance of forging is generally better than the foundry goods of same material.Meanwhile, forge and be divided into forge hot, cold forging and warm forging according to the temperature difference of metal plastic deformation.
Forge hot is that METAL HEATING PROCESS is carried out plastic forming to what not yet produce burning or overheating defect at the temperature of 800 degree.Hot forging equipment domestic is at present generally that middle-size and small-size bolt or nut forge, for the large-scale nut of more than M30, by adopting turning process, or carrying out turning process after some processes is processed by forge hot, the above-mentioned practice wastes the production efficiency of forge hot large-scale nut greatly, needs to spend a large amount of human costs, simultaneously, forge hot nut process need forcing press carries out punching press to the stock of high temperature, to the serious wear of equipment.
Utility model content
In view of the above, the purpose of this utility model is the production line providing a kind of forge hot large-scale nut, improves the production efficiency of forge hot large-scale nut.
A kind of production line of forge hot large-scale nut, comprise material arranging apparatus, induction heating apparatus, straight side press, material collecting device, wherein, stock delivers to induction heating apparatus from material arranging apparatus by conveying arrangement successively, straight side press arrives material collecting device after carrying out machine-shaping, described straight side press comprises the forcing press one for just forging and the forcing press two for finish-forging, conveying device is provided with between described forcing press one and forcing press two, and described forcing press one front end is also provided with workbench, wherein, described forcing press one and forcing press two include frame, described frame inside casing is equipped with the forging stage arranged below slide block and slide block, described slide block both sides are provided with the connecting portion matched with frame inside casing track, described upper end of slide block is connected with power set by connecting rod, described slide block lower end stationary rivet die, the described forging stage position corresponding with punch die is provided with backform, wherein, described punch die comprises punch, described punch is provided with punch pad near slide block side, described punch and punch pad are fixed on described slide block by retainer plate, described backform comprises die, described die is arranged on die holder, described die holder inside is provided with red needle, die supporter is provided with below described red needle, spring is provided with below described die supporter, described die and die holder are fixed on described backform by retainer ring.
The production line of a kind of forge hot large-scale nut that the utility model provides, preferably, described workbench is also provided with baffle plate near the conveying arrangement exit between induction heating apparatus and straight side press, described baffle plate is U-shaped, and U-shaped opening direction is towards close conveying arrangement exit between induction heating apparatus and straight side press.
Preferential and beneficial effect of the present utility model is: the production line of a kind of forge hot large-scale nut that the utility model provides, can guarantee that stock delivers to induction heating apparatus from material arranging apparatus by conveying arrangement successively, straight side press arrives material collecting device after carrying out machine-shaping, conveying arrangement accelerates the connection between each operation, accelerate the speed of production of nut, and adopt two step forgings can guarantee the quality of nut finished product, simultaneously, punch pad is set up respectively at punch die and backform inside, die supporter, make straight side press when forging, there is some buffering in punch die and backform collision, the wearing and tearing of punch die and backform can be effectively reduced.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is just preferably described, wherein,
The front view of the production line of a kind of forge hot large-scale nut that Fig. 1 provides for the utility model;
The top view of the production line of a kind of forge hot large-scale nut that Fig. 2 provides for the utility model;
Fig. 3 is the enlarged drawing at A place in Fig. 1;
Fig. 4 is the top view of B place workbench in Fig. 2.
Detailed description of the invention
Referring to figs. 1 through Fig. 4, the production line embodiment of a kind of forge hot large-scale nut of the utility model is described further.
A kind of production line of forge hot large-scale nut in Fig. 1 and Fig. 2, comprise material arranging apparatus 1, induction heating apparatus 2, straight side press 3, material collecting device 4, wherein, stock delivers to induction heating apparatus 2 from material arranging apparatus 1 by conveying arrangement 5 successively, material collecting device 4 is arrived after straight side press 3 carries out machine-shaping, described straight side press 3 comprises the forcing press 1 for just forging and the forcing press 2 32 for finish-forging, conveying device 33 is provided with between described forcing press 1 and forcing press 2 32, and described forcing press 1 front end is also provided with workbench 311, wherein, described forcing press 1 and forcing press 2 32 include frame 34, described frame 34 inside casing is equipped with the forging stage 38 arranged below slide block 35 and slide block 35, described slide block 35 both sides are provided with the connecting portion 351 matched with frame 34 inside casing track, described slide block 35 upper end is connected with power set by connecting rod 352, described slide block 35 lower end stationary rivet die 36, described forging stage 38 position corresponding with punch die 36 is provided with backform 37.
Punch die 36 described in Fig. 3 comprises punch 361, described punch 361 is provided with punch pad 362 near slide block 35 side, described punch 361 and punch pad 362 are fixed on described slide block 35 by retainer plate 363, described backform 37 comprises die 371, described die 371 is arranged on die holder 372, described die holder 372 inside is provided with red needle 373, die supporter 374 is provided with below described red needle 373, be provided with spring 375 below described die supporter 374, described die 371 and die holder 372 are fixed on described backform 37 by retainer ring 376.
Workbench 311 described in Fig. 4 is also provided with baffle plate 312 near conveying arrangement 5 exit between induction heating apparatus 2 and straight side press 3, described baffle plate 312 is U-shaped, and U-shaped opening direction is towards close conveying arrangement 5 exit between induction heating apparatus 2 and straight side press 3.
Last it is noted that the foregoing is only preferred embodiment of the present utility model; be not limited to the utility model; although be described in detail the utility model with reference to previous embodiment; for a person skilled in the art; it still can be modified to the technical scheme described in foregoing embodiments; or equivalent replacement is carried out to wherein portion of techniques feature; all within spirit of the present utility model and principle; any amendment of doing, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (2)

1. the production line of a forge hot large-scale nut, comprise material arranging apparatus, induction heating apparatus, straight side press, material collecting device, wherein, stock delivers to induction heating apparatus from material arranging apparatus by conveying arrangement successively, straight side press arrives material collecting device after carrying out machine-shaping, described straight side press comprises the forcing press one for just forging and the forcing press two for finish-forging, conveying device is provided with between described forcing press one and forcing press two, and described forcing press one front end is also provided with workbench, wherein, described forcing press one and forcing press two include frame, described frame inside casing is equipped with the forging stage arranged below slide block and slide block, described slide block both sides are provided with the connecting portion matched with frame inside casing track, described upper end of slide block is connected with power set by connecting rod, described slide block lower end stationary rivet die, the described forging stage position corresponding with punch die is provided with backform, wherein, described punch die comprises punch, described punch is provided with punch pad near slide block side, described punch and punch pad are fixed on described slide block by retainer plate, described backform comprises die, described die is arranged on die holder, described die holder inside is provided with red needle, die supporter is provided with below described red needle, spring is provided with below described die supporter, described die and die holder are fixed on described backform by retainer ring.
2. the production line of a kind of forge hot large-scale nut as claimed in claim 1, it is characterized in that, described workbench is also provided with baffle plate near the conveying arrangement exit between induction heating apparatus and straight side press, described baffle plate is U-shaped, and U-shaped opening direction is towards the exit of the conveying arrangement between induction heating apparatus and straight side press.
CN201520702769.8U 2015-09-11 2015-09-11 Production line of large -scale nut of forge hot Expired - Fee Related CN205020737U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520702769.8U CN205020737U (en) 2015-09-11 2015-09-11 Production line of large -scale nut of forge hot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520702769.8U CN205020737U (en) 2015-09-11 2015-09-11 Production line of large -scale nut of forge hot

Publications (1)

Publication Number Publication Date
CN205020737U true CN205020737U (en) 2016-02-10

Family

ID=55253304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520702769.8U Expired - Fee Related CN205020737U (en) 2015-09-11 2015-09-11 Production line of large -scale nut of forge hot

Country Status (1)

Country Link
CN (1) CN205020737U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111069507A (en) * 2019-12-29 2020-04-28 江苏金源高端装备股份有限公司 Automatic forging line of big nut
CN111069505A (en) * 2019-12-29 2020-04-28 江苏金源高端装备股份有限公司 Automatic forging process for bearing ring

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111069507A (en) * 2019-12-29 2020-04-28 江苏金源高端装备股份有限公司 Automatic forging line of big nut
CN111069505A (en) * 2019-12-29 2020-04-28 江苏金源高端装备股份有限公司 Automatic forging process for bearing ring

Similar Documents

Publication Publication Date Title
CN203900350U (en) Forging device
CN205020712U (en) Production line of large -scale nut of forge hot
NZ707005A (en) Thermomechanical processing of high strength non-magnetic corrosion resistant material
CN105385816A (en) Forging waste heat normalizing process for hub bearing unit ferrule
CN104139147B (en) The forging method of T-shaped ring-type forge piece blank reheating in SB564 UNS N06690 alloy large-size
CN103706743A (en) Die-forging forming process of titanium-alloy forged drum piece
CN205020737U (en) Production line of large -scale nut of forge hot
CN104476145B (en) The manufacture method of pad
CN204353718U (en) A kind of forging and stamping steel ball production line for ball mill
MX2020006701A (en) Method for manufacturing press formed product.
CN104841792A (en) Molding process of reverse cylinder workpiece having flange at end
CN103949569A (en) Preparation method of structure steel forging
CN205020736U (en) Production line of large -scale nut of forge hot
CN104439986B (en) Method for continuously producing large long shaft type forged pieces through casting-forging heat
CN204934480U (en) A kind of production line of forge hot large-scale nut
CN103088193A (en) Quenching machine for rapid heat treatment
CN105750840A (en) Method for forging tee-joint forge piece
CN204934479U (en) A kind of production line of forge hot large-scale nut
CN205020735U (en) Production line of large -scale nut of forge hot
CN106270142A (en) A kind of aluminium alloy punching cold bulging method
CN202359159U (en) Rapid heat treatment quenching machine
RU2484915C1 (en) Method of making forged pieces shaped to hemisphere with throat
CN204934481U (en) A kind of production line of forge hot large-scale nut
CN105903871A (en) Arietinous piece forging method
CN204449042U (en) Reduce the separator of hot forming steel plate drift wearing and tearing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160210

Termination date: 20160911