CN205020736U - Production line of large -scale nut of forge hot - Google Patents
Production line of large -scale nut of forge hot Download PDFInfo
- Publication number
- CN205020736U CN205020736U CN201520702718.5U CN201520702718U CN205020736U CN 205020736 U CN205020736 U CN 205020736U CN 201520702718 U CN201520702718 U CN 201520702718U CN 205020736 U CN205020736 U CN 205020736U
- Authority
- CN
- China
- Prior art keywords
- slide block
- forcing press
- press
- feeding channel
- straight side
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forging (AREA)
Abstract
The utility model particularly relates to a production line of large -scale nut of forge hot, including reason material device, induction heater, straight side press, material collecting device, wherein, the stock is delivered to induction heater, straight side press from reason material device through the conveyer in proper order and is carried out reacing behind the machine -shaping material collecting device, the conveyer is including setting up pay -off passageway between reason material device and the induction heater no. 1, set up at the pay -off passageway between induction heater and the straight side press no. 2, set up the pay -off passageway no. 3 between straight side press and material collecting device, through the setting of conveyer for transmission speed between each process improves the production efficiency of the large -scale nut of forge hot, and through be equipped with orientation module on the press, ensures the accurate nature of die work.
Description
Technical field
The utility model relates to hot forging equipment field, particularly relates to a kind of production line of forge hot large-scale nut.
Background technology
Forging is that one utilizes metal forming machinery to apply pressure to metal stock, makes it produce plastic deformation to obtain the processing method with certain mechanical performance, definite shape and size forging.Can eliminate the defects such as cast condition that metal produces in smelting process is loose by forging, optimize heterogeneous microstructure, owing to saving complete metal streamline, the mechanical performance of forging is generally better than the foundry goods of same material.Meanwhile, forge and be divided into forge hot, cold forging and warm forging according to the temperature difference of metal plastic deformation.
Forge hot is that METAL HEATING PROCESS is carried out plastic forming to what not yet produce burning or overheating defect at the temperature of 800 degree.Hot forging equipment domestic is at present generally that middle-size and small-size bolt or nut forge, for the large-scale nut of more than M30, by adopting turning process, or carrying out turning process after some processes is processed by forge hot, the above-mentioned practice wastes the production efficiency of forge hot large-scale nut greatly, needs to spend a large amount of human costs, and in forging process, forcing press slides along track simultaneously, the accuracy at its punching press position cannot ensure, makes the yield rate of nut low.
Utility model content
In view of the above, the purpose of this utility model is the production line providing a kind of forge hot large-scale nut, improves the production efficiency of forge hot large-scale nut, provides the yield rate of large-scale nut.
A kind of production line of forge hot large-scale nut, comprise material arranging apparatus, induction heating apparatus, straight side press, material collecting device, wherein, stock delivers to induction heating apparatus from material arranging apparatus by conveying arrangement successively, straight side press arrives material collecting device after carrying out machine-shaping, described conveying arrangement comprises and is arranged on feeding channel one between described material arranging apparatus and induction heating apparatus, is arranged on feeding channel two between induction heating apparatus and straight side press, is arranged on feeding channel three between straight side press and material collecting device
Described material arranging apparatus inside is provided with vibrating disk, and described vibrating disk inwall is provided with along vibrating disk axle center in arrangement passage circumferentially, and the outlet of described arrangement passage is connected with the head of described feeding channel one,
Described induction heating apparatus comprises heater coil, main frame, and described heater coil inside is provided with transmission track, and the two ends of described transmission track are connected with the head of described feeding channel one afterbody, described feeding channel two respectively;
Described straight side press comprises the forcing press one for just forging and the forcing press two for finish-forging, conveying device is provided with between described forcing press one and forcing press two, and described forcing press one is also provided with the workbench be connected with feeding channel two afterbody, wherein, described forcing press one and forcing press two include frame, described frame inside casing is equipped with the forging stage arranged below slide block and slide block, described slide block both sides are provided with the connecting portion matched with frame inside casing track, described upper end of slide block is connected with power set by connecting rod, described slide block lower end stationary rivet die, the described forging stage position corresponding with punch die is provided with backform, also positioner is provided with between the slide block and forging stage of forcing press one, described positioner comprises backstay, positioning sleeve, described backstay is fixed in forging stage by fixed block, described positioning sleeve is fixed on described slide block, and slide block is slided up and down along backstay by positioning sleeve.
The production line of a kind of forge hot large-scale nut that the utility model provides, preferably, described workbench also has block near the end of forcing press two side, and described workbench also has buffer bar.
The production line of a kind of forge hot large-scale nut that the utility model provides, preferably, described buffer bar is arranged along the vertical direction of transporting direction on the table.
Preferential and beneficial effect of the present utility model is: the production line of a kind of forge hot large-scale nut that the utility model provides, can guarantee that stock delivers to induction heating apparatus from material arranging apparatus by conveying arrangement successively, straight side press arrives material collecting device after carrying out machine-shaping, conveying arrangement accelerates the connection between each operation, accelerate the speed of production of nut, simultaneously, positioner is set up between the slide block and forging stage of forcing press one, the accuracy that slide block moves downward can being ensured, making punch die more accurate when contacting with stock.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is just preferably described, wherein,
The front view of the production line of a kind of forge hot large-scale nut that Fig. 1 provides for the utility model;
The top view of the production line of a kind of forge hot large-scale nut that Fig. 2 provides for the utility model;
The enlarged drawing at A place in the production line of a kind of forge hot large-scale nut that Fig. 3 provides for the utility model.
Detailed description of the invention
Referring to figs. 1 through Fig. 3, the production line embodiment of a kind of forge hot large-scale nut of the utility model is described further.
A kind of production line of forge hot large-scale nut in Fig. 1 and Fig. 2, comprise material arranging apparatus 1, induction heating apparatus 2, straight side press 3, material collecting device 4, wherein, stock delivers to induction heating apparatus 2 from material arranging apparatus 1 by conveying arrangement 5 successively, material collecting device 4 is arrived after straight side press 3 carries out machine-shaping, described conveying arrangement 5 comprises the feeding channel 1 be arranged between described material arranging apparatus 1 and induction heating apparatus 2, be arranged on the feeding channel 2 52 between induction heating apparatus 2 and straight side press 3, be arranged on the feeding channel 3 53 between straight side press 3 and material collecting device 4, described material arranging apparatus 1 inside is provided with vibrating disk 11, described vibrating disk 11 inwall is provided with along vibrating disk 11 axle center in arrangement passage 12 circumferentially, the outlet of described arrangement passage 12 is connected with the head of described feeding channel 1, described induction heating apparatus 2 comprises heater coil 21, main frame 22, described heater coil 21 inside is provided with transmission track 23, the two ends of described transmission track 23 respectively with described feeding channel 1 afterbody, the head of described feeding channel 2 52 is connected, described straight side press 3 comprises the forcing press 1 for just forging and the forcing press 2 32 for finish-forging, conveying device 33 is provided with between described forcing press 1 and forcing press 2 32, and described forcing press 1 is also provided with the workbench 311 be connected with feeding channel 2 52 afterbody, wherein, described forcing press 1 and forcing press 2 32 include frame 34, described frame 34 inside casing is equipped with the forging stage 38 arranged below slide block 35 and slide block 35, described slide block 35 both sides are provided with the connecting portion 351 matched with frame 34 inside casing track, described slide block 35 upper end is connected with power set by connecting rod 352, described slide block 35 lower end stationary rivet die 36, described forging stage 38 position corresponding with punch die 36 is provided with backform 37, positioner 39 is also provided with between the slide block 35 and forging stage 38 of forcing press 1, described positioner 39 comprises backstay 391, positioning sleeve 392, described backstay 391 is fixed in forging stage 38 by fixed block 393, described positioning sleeve 392 is fixed on described slide block 35, and slide block 35 is slided up and down along backstay 391 by positioning sleeve 392.
Workbench 311 described in Fig. 3 also has block 312 near the end of forcing press 2 32 side, preventing the stock heated from dropping from workbench 311, described workbench 311 also having buffer bar 313 simultaneously by arranging block 312.And described buffer bar 313 is arranged along the vertical direction of transporting direction on workbench 311.The method of this layout buffer bar 313 effectively can slow down the sliding speed of stock at workbench 311 of heating, and handled easily personnel operate.
Last it is noted that the foregoing is only preferred embodiment of the present utility model; be not limited to the utility model; although be described in detail the utility model with reference to previous embodiment; for a person skilled in the art; it still can be modified to the technical scheme described in foregoing embodiments; or equivalent replacement is carried out to wherein portion of techniques feature; all within spirit of the present utility model and principle; any amendment of doing, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (3)
1. the production line of a forge hot large-scale nut, comprise material arranging apparatus, induction heating apparatus, straight side press, material collecting device, wherein, stock delivers to induction heating apparatus from material arranging apparatus by conveying arrangement successively, straight side press arrives material collecting device after carrying out machine-shaping, described conveying arrangement comprises and is arranged on feeding channel one between described material arranging apparatus and induction heating apparatus, is arranged on feeding channel two between induction heating apparatus and straight side press, is arranged on feeding channel three between straight side press and material collecting device, it is characterized in that
Described material arranging apparatus inside is provided with vibrating disk, and described vibrating disk inwall is provided with along vibrating disk axle center in arrangement passage circumferentially, and the outlet of described arrangement passage is connected with the head of described feeding channel one,
Described induction heating apparatus comprises heater coil, main frame, and described heater coil inside is provided with transmission track, and the two ends of described transmission track are connected with the head of described feeding channel one afterbody, described feeding channel two respectively;
Described straight side press comprises the forcing press one for just forging and the forcing press two for finish-forging, conveying device is provided with between described forcing press one and forcing press two, and described forcing press one is also provided with the workbench be connected with feeding channel two afterbody, wherein, described forcing press one and forcing press two include frame, described frame inside casing is equipped with the forging stage arranged below slide block and slide block, described slide block both sides are provided with the connecting portion matched with frame inside casing track, described upper end of slide block is connected with power set by connecting rod, described slide block lower end stationary rivet die, the described forging stage position corresponding with punch die is provided with backform, also positioner is provided with between the slide block and forging stage of forcing press one, described positioner comprises backstay, positioning sleeve, described backstay is fixed in forging stage by fixed block, described positioning sleeve is fixed on described slide block, and slide block is slided up and down along backstay by positioning sleeve.
2. the production line of a kind of forge hot large-scale nut as claimed in claim 1, it is characterized in that, described workbench also has block near the end of forcing press two side, and described workbench also has buffer bar.
3. the production line of a kind of forge hot large-scale nut as claimed in claim 2, is characterized in that, described buffer bar is arranged along the vertical direction of transporting direction on the table.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520702718.5U CN205020736U (en) | 2015-09-11 | 2015-09-11 | Production line of large -scale nut of forge hot |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520702718.5U CN205020736U (en) | 2015-09-11 | 2015-09-11 | Production line of large -scale nut of forge hot |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205020736U true CN205020736U (en) | 2016-02-10 |
Family
ID=55253303
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520702718.5U Expired - Fee Related CN205020736U (en) | 2015-09-11 | 2015-09-11 | Production line of large -scale nut of forge hot |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205020736U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106363340A (en) * | 2016-08-19 | 2017-02-01 | 天津森马机械制造有限公司 | Precision adjustment method and device for feed dog tooth grooves |
CN107598049A (en) * | 2017-10-18 | 2018-01-19 | 叶进军 | A kind of horizontal heated work pieces press |
-
2015
- 2015-09-11 CN CN201520702718.5U patent/CN205020736U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106363340A (en) * | 2016-08-19 | 2017-02-01 | 天津森马机械制造有限公司 | Precision adjustment method and device for feed dog tooth grooves |
CN106363340B (en) * | 2016-08-19 | 2018-11-20 | 天津森马机械制造有限公司 | A kind of feed dog alveolus precision regulation method and device |
CN107598049A (en) * | 2017-10-18 | 2018-01-19 | 叶进军 | A kind of horizontal heated work pieces press |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204035362U (en) | A kind of multi-station Die Used in Pressworking production line | |
CN205020712U (en) | Production line of large -scale nut of forge hot | |
CN103706743A (en) | Die-forging forming process of titanium-alloy forged drum piece | |
CN205020736U (en) | Production line of large -scale nut of forge hot | |
CN204018535U (en) | A kind of concave bottom bowl progressive die | |
CN205020737U (en) | Production line of large -scale nut of forge hot | |
CN205341701U (en) | Hydraulic press positioner that punches a hole | |
CN204564921U (en) | A kind of diel of five metals baffle plate | |
CN103949559B (en) | A kind of continuous operation punch press | |
CN103088193A (en) | Quenching machine for rapid heat treatment | |
CN202359159U (en) | Rapid heat treatment quenching machine | |
CN204934480U (en) | A kind of production line of forge hot large-scale nut | |
CN205020735U (en) | Production line of large -scale nut of forge hot | |
CN204934479U (en) | A kind of production line of forge hot large-scale nut | |
CN204934481U (en) | A kind of production line of forge hot large-scale nut | |
CN205362366U (en) | Can realize cut -out press of self -cooling | |
CN105880378A (en) | Stamping die | |
CN204912638U (en) | Tungsten apparatus for producing of swaging | |
CN103831593B (en) | The forming method of air-conditioning draught fan end circle | |
CN206702123U (en) | A kind of continuous punching device | |
CN205183396U (en) | Automatic trimmer of ring class work piece | |
CN206597841U (en) | Pressing equipment and its feeding device | |
CN204953562U (en) | Plank stuff bending machine | |
CN104438365B (en) | Extractor positioner | |
CN102950456A (en) | Mode embedding system for wire drawing mode and method for embedding mold by utilizing same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160210 Termination date: 20160911 |