CN205020735U - Production line of large -scale nut of forge hot - Google Patents
Production line of large -scale nut of forge hot Download PDFInfo
- Publication number
- CN205020735U CN205020735U CN201520702717.0U CN201520702717U CN205020735U CN 205020735 U CN205020735 U CN 205020735U CN 201520702717 U CN201520702717 U CN 201520702717U CN 205020735 U CN205020735 U CN 205020735U
- Authority
- CN
- China
- Prior art keywords
- straight side
- feeding channel
- side press
- press
- forge hot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forging (AREA)
Abstract
The utility model particularly relates to a production line of large -scale nut of forge hot, including reason material device, induction heater, straight side press, material collecting device, wherein, the stock is delivered to induction heater, straight side press from reason material device through the conveyer in proper order and is carried out reacing behind the machine -shaping material collecting device, the conveyer is including setting up pay -off passageway between reason material device and the induction heater no. 1, set up at the pay -off passageway between induction heater and the straight side press no. 2, set up the pay -off passageway no. 3 between straight side press and material collecting device, through the setting of conveyer for transmission speed between each process improves the production efficiency of the large -scale nut of forge hot.
Description
Technical field
The utility model relates to hot forging equipment field, particularly relates to a kind of production line of forge hot large-scale nut.
Background technology
Forging is that one utilizes metal forming machinery to apply pressure to metal stock, makes it produce plastic deformation to obtain the processing method with certain mechanical performance, definite shape and size forging.Can eliminate the defects such as cast condition that metal produces in smelting process is loose by forging, optimize heterogeneous microstructure, owing to saving complete metal streamline, the mechanical performance of forging is generally better than the foundry goods of same material.Meanwhile, forge and be divided into forge hot, cold forging and warm forging according to the temperature difference of metal plastic deformation.
Forge hot is that METAL HEATING PROCESS is carried out plastic forming to what not yet produce burning or overheating defect at the temperature of 800 degree.Hot forging equipment domestic is at present generally that middle-size and small-size bolt or nut forge, for the large-scale nut of more than M30, by adopting turning process, or carrying out turning process after some processes is processed by forge hot, the above-mentioned practice wastes the production efficiency of forge hot large-scale nut greatly, need to spend a large amount of human costs, simultaneously, because forge hot needs first to be carried out by nut being heated to high temperature, then punching press is carried out by forcing press, whole production process is more dangerous, and operation is artificial slightly careless just easily causes personal injury.
Utility model content
In view of the above, the purpose of this utility model is the production line providing a kind of forge hot large-scale nut, improves the production efficiency of forge hot large-scale nut.
A kind of production line of forge hot large-scale nut, comprise material arranging apparatus, induction heating apparatus, straight side press, material collecting device, wherein, stock delivers to induction heating apparatus from material arranging apparatus by conveying arrangement successively, straight side press arrives material collecting device after carrying out machine-shaping, and described conveying arrangement comprises and is arranged on feeding channel one between described material arranging apparatus and induction heating apparatus, is arranged on feeding channel two between induction heating apparatus and straight side press, is arranged on feeding channel three between straight side press and material collecting device;
Described material arranging apparatus inside is provided with vibrating disk, and described vibrating disk inwall is provided with along vibrating disk axle center in arrangement passage circumferentially, and the outlet of described arrangement passage is connected with the head of described feeding channel one;
Described induction heating apparatus comprises heater coil, main frame, described heater coil inside is provided with transmission track, and described heater coil outside is provided with and sets up attemperating unit, the two ends of described transmission track are connected with the head of described feeding channel one afterbody, described feeding channel two respectively;
Described straight side press comprises the forcing press one for just forging and the forcing press two for finish-forging, conveying device is provided with between described forcing press one and forcing press two, described forcing press one and forcing press two include frame, described frame inside casing is equipped with the forging stage arranged below slide block and slide block, described slide block both sides are provided with the connecting portion matched with frame inside casing track, described upper end of slide block is connected with power set by connecting rod, described slide block lower end stationary rivet die, the described forging stage position corresponding with punch die is provided with backform, described backform is other is provided with cooling device, cooling device comprises the water-cooled shower nozzle be arranged on backform and the storage tank be arranged on outside straight side press, described water-cooled shower nozzle is connected with storage tank by flexible pipe, and described storage tank inside is provided with supply-water pump.
The production line of a kind of forge hot large-scale nut that the utility model provides, preferably, described water-cooled shower nozzle is provided with sensor.
The production line of a kind of forge hot large-scale nut that the utility model provides, preferably, described flexible pipe is transparent hose.
Preferential and beneficial effect of the present utility model is: the production line of a kind of forge hot large-scale nut that the utility model provides, can guarantee that stock delivers to induction heating apparatus from material arranging apparatus by conveying arrangement successively, straight side press arrives material collecting device after carrying out machine-shaping, conveying arrangement accelerates the connection between each operation, accelerate the speed of production of nut, and the stock of forge hot temperatures as high 800 degree in the process of punching press, under long term high temperature, punching press liquidates the serious wear of mould and backform, therefore be provided with cooling device on backform side, by the setting of sensor, shower nozzle only can be lowered the temperature to backform and punch die after forging, to avoid in forging process water-cooled on the impact of stock.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is just preferably described, wherein,
The front view of the production line of a kind of forge hot large-scale nut that Fig. 1 provides for the utility model;
The top view of the production line of a kind of forge hot large-scale nut that Fig. 2 provides for the utility model.
Detailed description of the invention
Referring to figs. 1 through Fig. 2, the production line embodiment of a kind of forge hot large-scale nut of the utility model is described further.
The production line of a kind of forge hot large-scale nut of Fig. 1 and Fig. 2, comprise material arranging apparatus 1, induction heating apparatus 2, straight side press 3, material collecting device 4, wherein, stock delivers to induction heating apparatus 2 from material arranging apparatus 1 by conveying arrangement 5 successively, material collecting device 4 is arrived after straight side press 3 carries out machine-shaping, described conveying arrangement 5 comprises the feeding channel 1 be arranged between described material arranging apparatus 1 and induction heating apparatus 2, be arranged on the feeding channel 2 52 between induction heating apparatus 2 and straight side press 3, be arranged on the feeding channel 3 53 between straight side press 3 and material collecting device 4, described material arranging apparatus 1 inside is provided with vibrating disk 11, and described vibrating disk 11 inwall is provided with along vibrating disk 11 axle center in arrangement passage 12 circumferentially, and the outlet of described arrangement passage 12 is connected with the head of described feeding channel 1, described induction heating apparatus 2 comprises heater coil 21, main frame 22, described heater coil 21 inside is provided with transmission track 23, and described heater coil outside is provided with and sets up attemperating unit 24, the two ends of described transmission track 23 are connected with the head of described feeding channel 1 afterbody, described feeding channel 2 52 respectively, described straight side press 3 comprises the forcing press 1 for just forging and the forcing press 2 32 for finish-forging, conveying device 33 is provided with between described forcing press 1 and forcing press 2 32, described forcing press 1 and forcing press 2 32 include frame 34, described frame 34 inside casing is equipped with the forging stage 38 arranged below slide block 35 and slide block 35, described slide block 35 both sides are provided with the connecting portion 351 matched with frame 34 inside casing track, described slide block 35 upper end is connected with power set by connecting rod, described slide block 35 lower end stationary rivet die 36, described forging stage 38 position corresponding with punch die 36 is provided with backform 37, described backform 37 is other is provided with cooling device 39, cooling device 39 comprises the water-cooled shower nozzle 391 be arranged on backform 37 and the storage tank 392 be arranged on outside straight side press 3, described water-cooled shower nozzle 391 is connected with storage tank 392 by flexible pipe 393, and described storage tank 392 inside is provided with supply-water pump 394.Described water-cooled shower nozzle 391 is provided with sensor 395.Described flexible pipe 393 is transparent hose.
Last it is noted that the foregoing is only preferred embodiment of the present utility model; be not limited to the utility model; although be described in detail the utility model with reference to previous embodiment; for a person skilled in the art; it still can be modified to the technical scheme described in foregoing embodiments; or equivalent replacement is carried out to wherein portion of techniques feature; all within spirit of the present utility model and principle; any amendment of doing, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (3)
1. the production line of a forge hot large-scale nut, comprise material arranging apparatus, induction heating apparatus, straight side press, material collecting device, wherein, stock delivers to induction heating apparatus from material arranging apparatus by conveying arrangement successively, straight side press arrives material collecting device after carrying out machine-shaping, and described conveying arrangement comprises and is arranged on feeding channel one between described material arranging apparatus and induction heating apparatus, is arranged on feeding channel two between induction heating apparatus and straight side press, is arranged on feeding channel three between straight side press and material collecting device; It is characterized in that,
Described material arranging apparatus inside is provided with vibrating disk, and described vibrating disk inwall is provided with along vibrating disk axle center in arrangement passage circumferentially, and the outlet of described arrangement passage is connected with the head of described feeding channel one;
Described induction heating apparatus comprises heater coil, main frame, described heater coil inside is provided with transmission track, and described heater coil outside is provided with and sets up attemperating unit, the two ends of described transmission track are connected with the head of described feeding channel one afterbody, described feeding channel two respectively;
Described straight side press comprises the forcing press one for just forging and the forcing press two for finish-forging, conveying device is provided with between described forcing press one and forcing press two, described forcing press one and forcing press two include frame, described frame inside casing is equipped with the forging stage arranged below slide block and slide block, described slide block both sides are provided with the connecting portion matched with frame inside casing track, described upper end of slide block is connected with power set by connecting rod, described slide block lower end stationary rivet die, the described forging stage position corresponding with punch die is provided with backform, described backform is other is provided with cooling device, cooling device comprises the water-cooled shower nozzle be arranged on backform and the storage tank be arranged on outside straight side press, described water-cooled shower nozzle is connected with storage tank by flexible pipe, and described storage tank inside is provided with supply-water pump.
2. the production line of a kind of forge hot large-scale nut as claimed in claim 1, is characterized in that, described water-cooled shower nozzle is provided with sensor.
3. the production line of a kind of forge hot large-scale nut as claimed in claim 1, is characterized in that, described flexible pipe is transparent hose.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520702717.0U CN205020735U (en) | 2015-09-11 | 2015-09-11 | Production line of large -scale nut of forge hot |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520702717.0U CN205020735U (en) | 2015-09-11 | 2015-09-11 | Production line of large -scale nut of forge hot |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205020735U true CN205020735U (en) | 2016-02-10 |
Family
ID=55253302
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520702717.0U Expired - Fee Related CN205020735U (en) | 2015-09-11 | 2015-09-11 | Production line of large -scale nut of forge hot |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205020735U (en) |
-
2015
- 2015-09-11 CN CN201520702717.0U patent/CN205020735U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205020712U (en) | Production line of large -scale nut of forge hot | |
CN204148438U (en) | A kind of mold temperature regulating apparatus | |
UA117738C2 (en) | Thermomechanical processing of high strength non-magnetic corrosion resistant material | |
CN104148558A (en) | Manufacturing method for large internal T-shaped ring forge piece blank of SB564UNS N06690 alloy | |
CN103706743A (en) | Die-forging forming process of titanium-alloy forged drum piece | |
CN105385816A (en) | Forging waste heat normalizing process for hub bearing unit ferrule | |
CN204353718U (en) | A kind of forging and stamping steel ball production line for ball mill | |
CN104476145B (en) | The manufacture method of pad | |
CN205020737U (en) | Production line of large -scale nut of forge hot | |
CN104841792A (en) | Molding process of reverse cylinder workpiece having flange at end | |
CN205020736U (en) | Production line of large -scale nut of forge hot | |
CN103088193B (en) | Quenching machine for rapid heat treatment | |
CN205020735U (en) | Production line of large -scale nut of forge hot | |
CN102059272A (en) | Method for horizontal continuous casting, Pilger rolling and continuous drawing of copper alloy condenser tube | |
CN203960269U (en) | The how excellent process furnace of middle heating-type | |
CN204934480U (en) | A kind of production line of forge hot large-scale nut | |
CN202359159U (en) | Rapid heat treatment quenching machine | |
CN204934479U (en) | A kind of production line of forge hot large-scale nut | |
CN204934481U (en) | A kind of production line of forge hot large-scale nut | |
CN204075056U (en) | Quick cooling equipment after a kind of gear forging | |
CN203791359U (en) | Cooling bed waste heat recycling device | |
CN104492975B (en) | Die structure for reducing thermal forming steel plate punch wearing | |
CN203513743U (en) | Sucker rod pipe nipple heat treatment equipment of adjustable straightening device | |
CN207564953U (en) | A kind of four fluorine tube Quick flanging device | |
CN203804055U (en) | Drawing die capable of improving cooling effect |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160210 Termination date: 20160911 |
|
CF01 | Termination of patent right due to non-payment of annual fee |