CN204075056U - Quick cooling equipment after a kind of gear forging - Google Patents

Quick cooling equipment after a kind of gear forging Download PDF

Info

Publication number
CN204075056U
CN204075056U CN201420624977.6U CN201420624977U CN204075056U CN 204075056 U CN204075056 U CN 204075056U CN 201420624977 U CN201420624977 U CN 201420624977U CN 204075056 U CN204075056 U CN 204075056U
Authority
CN
China
Prior art keywords
cooling
cooling chamber
chamber
water inlet
several
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420624977.6U
Other languages
Chinese (zh)
Inventor
赵剑忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU YOUJIN METAL FORMING TECHNOLOGY Co Ltd
Original Assignee
SUZHOU YOUJIN METAL FORMING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU YOUJIN METAL FORMING TECHNOLOGY Co Ltd filed Critical SUZHOU YOUJIN METAL FORMING TECHNOLOGY Co Ltd
Priority to CN201420624977.6U priority Critical patent/CN204075056U/en
Application granted granted Critical
Publication of CN204075056U publication Critical patent/CN204075056U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forging (AREA)

Abstract

The utility model relates to gear forging processing technique field, in particular to the Quick cooling equipment after a kind of gear forging, comprise housing, housing is provided with charging aperture and discharging opening, housing separation is provided with cooling chamber one, cooling chamber two and air-dry cooling chamber, and the inner chamber of housing is provided with several rollers; The inner chamber of cooling chamber one is provided with the first cooling blower and several second cooling blowers along its length, cooling chamber one upper outer surface is provided with several first row fans, main water inlet tube and a water inlet pipe is provided with above the inner chamber of cooling chamber two, main water inlet tube is connected with water source and communicates, and the upper surface of air-dry cooling chamber is fixedly installed several cooling drying fans.When using the utility model, substep cools, and ensure that mould itself can not produce deformation, extends the mold use life-span, and the fine impurity decreased in mould exists, and improves the quality of product.It is simple that the utility model has structure, arranges rationally, the advantages such as cost of manufacture is low.

Description

Quick cooling equipment after a kind of gear forging
Technical field
The utility model relates to gear forging processing technique field, the Quick cooling equipment particularly after a kind of gear forging.
Background technology
Now more accurate mechanical gear assembly, generally all adopts forging mode to make.Its operating process is, uses forging processing machine to forge and press, is placed on by workpiece in forging die, is forged and pressed by the forging hammer forging processing machine.And forge die, due to heat conductivity, makes itself to be in the condition of high temperature in forging and stamping process, after once forging and pressing, need to cool mould.Traditional cooling means adopts hand-held spray gun, cool, but there are the following problems for the method to mould: one is directly adopt water to drench mode, easily makes mould itself produce deformation, thus causes mould to cancel, produce waste; Two is the fines or dust etc. that produce in forging and stamping process, owing to adopting the mode process of atomized water, can be trapped in mould, thus can reduce product quality.How solving above-mentioned phenomenon, is problem to be solved in the utility model.
Utility model content
The purpose of this utility model is defect for prior art and deficiency, provides a kind of structure simple, the Quick cooling equipment after gear forging reasonable in design, easy to use.
For achieving the above object, the technical solution adopted in the utility model is:
Quick cooling equipment after a kind of gear forging described in the utility model, comprise housing, described housing is provided with charging aperture and discharging opening, described housing is provided with cooling chamber one, cooling chamber two and air-dry cooling chamber by the first dividing plate and second partition separation, first dividing plate is provided with the first connected entrance for being communicated with cooling chamber one and cooling chamber two, and second partition is provided with the second connected entrance for being communicated with cooling chamber two and air-dry cooling chamber; The inner chamber of described housing is provided with several rollers along its length; The inner chamber of described cooling chamber one is provided with first cooling blower and several second cooling blowers along its length, and the air outlet of described first cooling blower is arranged vertically upward, and the air outlet of the second cooling blower becomes the angle of 40 ~ 50 degree with horizontal line; Described cooling chamber one upper outer surface is provided with several first row fans, and the upper surface of described cooling chamber one is provided with the exhaust outlet matched mutually with first row fan, and the first cooling blower and the second cooling blower are all positioned at immediately below roller; Be provided with main water inlet tube and a water inlet pipe above the inner chamber of described cooling chamber two, main water inlet tube is connected with water source and communicates, and the intermediate ends of a water inlet pipe is connected with main water inlet tube and communicates, and described water inlet pipe is provided with several shower nozzles along its length; The upper surface of described air-dry cooling chamber is fixedly installed several cooling drying fans by the 3rd fixed mount.
Further, the inner chamber of described cooling chamber two is provided with tank, and tank is positioned at immediately below roller.
Further, the quantity of described second cooling blower and first row fan is three.
Further, the quantity of described cooling drying fan is three.
After adopting said structure, the utility model beneficial effect is: the Quick cooling equipment after a kind of gear forging described in the utility model, comprise housing, described housing is provided with charging aperture and discharging opening, described housing is provided with cooling chamber one, cooling chamber two and air-dry cooling chamber by the first dividing plate and second partition separation, first dividing plate is provided with the first connected entrance for being communicated with cooling chamber one and cooling chamber two, and second partition is provided with the second connected entrance for being communicated with cooling chamber two and air-dry cooling chamber; The inner chamber of described housing is provided with several rollers along its length; The inner chamber of described cooling chamber one is provided with first cooling blower and several second cooling blowers along its length, and the air outlet of described first cooling blower is arranged vertically upward, and the air outlet of the second cooling blower becomes the angle of 40 ~ 50 degree with horizontal line; Described cooling chamber one upper outer surface is provided with several first row fans, and the upper surface of described cooling chamber one is provided with the exhaust outlet matched mutually with first row fan, and the first cooling blower and the second cooling blower are all positioned at immediately below roller; Be provided with main water inlet tube and a water inlet pipe above the inner chamber of described cooling chamber two, main water inlet tube is connected with water source and communicates, and the intermediate ends of a water inlet pipe is connected with main water inlet tube and communicates, and described water inlet pipe is provided with several shower nozzles along its length; The upper surface of described air-dry cooling chamber is fixedly installed several cooling drying fans by the 3rd fixed mount.When using the utility model, cooled by cooling chamber one, cooling chamber two and air-dry cooling chamber, substep cools, ensure that mould itself can not produce deformation, extend the mold use life-span, the fine impurity decreased in mould exists, and improves the quality of product.It is simple that the utility model has structure, arranges rationally, the advantages such as cost of manufacture is low.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Description of reference numerals:
1, housing; 1-1, charging aperture; 1-2, discharging opening; 1-3, cooling chamber one;
1-3a, exhaust outlet; 1-4, cooling chamber two; 1-5, air-dry cooling chamber;
2, the first dividing plate; 2-1, the first connected entrance; 3, second partition; 3-1, the second connected entrance;
4, roller; 51, the first cooling blower; 52, the first fixed mount; 61, the second cooling blower;
62, the second fixed mount; 71, first row fan; 81, main water inlet tube; 82, water inlet pipe is propped up;
83, shower nozzle; 84, tank; 91, the 3rd fixed mount; 92, drying fan is cooled.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is further described.
As shown in Figure 1, Quick cooling equipment after a kind of gear forging described in the utility model, comprise housing 1, described housing 1 is provided with charging aperture 1-1 and discharging opening 1-2, described housing 1 is provided with cooling chamber one 1-3, cooling chamber two 1-4 and air-dry cooling chamber 1-5 by the first dividing plate 2 and second partition 3 separation, first dividing plate 2 is provided with the first connected entrance 2-1 for being communicated with cooling chamber one 1-3 and cooling chamber two 1-4, and second partition 3 is provided with the second connected entrance 3-1 for being communicated with cooling chamber two 1-4 and air-dry cooling chamber 1-5;
The inner chamber of described housing 1 is provided with several rollers 4 along its length, and need the gear of cooling to be carried by roller 4, the type of drive of roller 4 and structure and prior art are without essential distinction.
The inner chamber of described cooling chamber one 1-3 is provided with one first cooling blower 51 and several second cooling blowers 61 along its length, the air outlet of described first cooling blower 51 is arranged vertically upward, and the air outlet of the second cooling blower 61 becomes the angle of 40 ~ 50 degree with horizontal line; Angle between the air outlet of the second cooling blower 61 of the present utility model and horizontal line is preferably 45 degree.
First cooling blower 51 is arranged on the bottom surface of cooling chamber one 1-3 by the first fixed mount 52, and the second cooling blower 61 is arranged on the bottom surface of cooling chamber one 1-3 by the second fixed mount 62.
Described cooling chamber one 1-3 upper outer surface is provided with several first row fans 71, the upper surface of described cooling chamber one 1-3 is provided with the exhaust outlet 1-3a matched mutually with first row fan 71, and the first cooling blower 51 and the second cooling blower 61 are all positioned at immediately below roller 4; The quantity of the second cooling blower 61 and first row fan 71 mainly decides according to the length of cooling chamber one 1-3, and the length of cooling chamber one 1-3 is again decide according to the output of this device process cooling gear.
Main water inlet tube 81 and a water inlet pipe 82 is provided with above the inner chamber of described cooling chamber two 1-4, main water inlet tube 81 is connected with water source and communicates, the intermediate ends of propping up water inlet pipe 82 is connected with main water inlet tube 81 and communicates, described water inlet pipe 82 is provided with several shower nozzles 83 along its length, and certain main water inlet tube 81 and a water inlet pipe 82 are also be fixed on above cooling chamber two 1-4 inner chamber by support.
The upper surface of described air-dry cooling chamber 1-5 is fixedly installed several cooling drying fans 92 by the 3rd fixed mount 91.
Further, the inner chamber of described cooling chamber two 1-4 is provided with tank 84, and tank 84 is positioned at immediately below roller 4.
Further, the quantity of described second cooling blower 61 and first row fan 71 is three.
Further, the quantity of described cooling drying fan 92 is three.
When using the utility model, cooled by cooling chamber one, cooling chamber two and air-dry cooling chamber, substep cools, ensure that mould itself can not produce deformation, extend the mold use life-span, the fine impurity decreased in mould exists, and improves the quality of product.In addition, this structure is simple, reasonable in design, low cost of manufacture.
The above is only better embodiment of the present utility model, therefore all equivalences done according to structure, feature and the principle described in the utility model patent claim change or modify, and are included in the utility model patent claim.

Claims (4)

1. the Quick cooling equipment after a gear forging, it is characterized in that: comprise housing (1), described housing (1) is provided with charging aperture (1-1) and discharging opening (1-2), described housing (1) is provided with cooling chamber one (1-3) by the first dividing plate (2) and second partition (3) separation, cooling chamber two (1-4) and air-dry cooling chamber (1-5), first dividing plate (2) is provided with the first connected entrance (2-1) for being communicated with cooling chamber one (1-3) and cooling chamber two (1-4), second partition (3) is provided with the second connected entrance (3-1) for being communicated with cooling chamber two (1-4) and air-dry cooling chamber (1-5), the inner chamber of described housing (1) is provided with several rollers (4) along its length, the inner chamber of described cooling chamber one (1-3) is provided with first cooling blower (51) and several the second cooling blowers (61) along its length, the air outlet of described first cooling blower (51) is arranged vertically upward, and the air outlet of the second cooling blower (61) becomes the angle of 40 ~ 50 degree with horizontal line,
Described cooling chamber one (1-3) upper outer surface is provided with several first row fans (71), the upper surface of described cooling chamber one (1-3) is provided with the exhaust outlet (1-3a) matched mutually with first row fan (71), and the first cooling blower (51) and the second cooling blower (61) are all positioned at immediately below roller (4);
Main water inlet tube (81) and a water inlet pipe (82) is provided with above the inner chamber of described cooling chamber two (1-4), main water inlet tube (81) is connected with water source and communicates, the intermediate ends of propping up water inlet pipe (82) is connected with main water inlet tube (81) and communicates, and described water inlet pipe (82) is provided with several shower nozzles (83) along its length;
The upper surface of described air-dry cooling chamber (1-5) is fixedly installed several coolings drying fan (92) by the 3rd fixed mount (91).
2. the Quick cooling equipment after a kind of gear forging according to claim 1, is characterized in that: the inner chamber of described cooling chamber two (1-4) is provided with tank (84), and tank (84) is positioned at immediately below roller (4).
3. the Quick cooling equipment after a kind of gear forging according to claim 1, is characterized in that: the quantity of described second cooling blower (61) and first row fan (71) is three.
4. the Quick cooling equipment after a kind of gear forging according to claim 1, is characterized in that: the quantity of described cooling drying fan (92) is three.
CN201420624977.6U 2014-10-27 2014-10-27 Quick cooling equipment after a kind of gear forging Withdrawn - After Issue CN204075056U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420624977.6U CN204075056U (en) 2014-10-27 2014-10-27 Quick cooling equipment after a kind of gear forging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420624977.6U CN204075056U (en) 2014-10-27 2014-10-27 Quick cooling equipment after a kind of gear forging

Publications (1)

Publication Number Publication Date
CN204075056U true CN204075056U (en) 2015-01-07

Family

ID=52167821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420624977.6U Withdrawn - After Issue CN204075056U (en) 2014-10-27 2014-10-27 Quick cooling equipment after a kind of gear forging

Country Status (1)

Country Link
CN (1) CN204075056U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104275434A (en) * 2014-10-27 2015-01-14 苏州优金金属成型科技有限公司 Rapid cooling equipment for forged gear
CN107135649A (en) * 2015-12-18 2017-09-05 日锻汽门株式会社 Forge the cooling means and device of valve

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104275434A (en) * 2014-10-27 2015-01-14 苏州优金金属成型科技有限公司 Rapid cooling equipment for forged gear
CN104275434B (en) * 2014-10-27 2016-08-24 苏州优金金属成型科技有限公司 A kind of Quick cooling equipment after gear forging
CN107135649A (en) * 2015-12-18 2017-09-05 日锻汽门株式会社 Forge the cooling means and device of valve
CN107135649B (en) * 2015-12-18 2018-11-16 日锻汽门株式会社 Forge the cooling means and device of valve

Similar Documents

Publication Publication Date Title
CN104275434A (en) Rapid cooling equipment for forged gear
CN201346567Y (en) Online accelerated-cooling device for steel pipes
CN205128642U (en) Aluminium alloy extrusion device
CN108145139A (en) A kind of more process cooling bodies of casting
CN204075056U (en) Quick cooling equipment after a kind of gear forging
CN204353718U (en) A kind of forging and stamping steel ball production line for ball mill
CN204404823U (en) A kind of energy-conserving and environment-protective aluminium alloy stock heater
CN203846061U (en) Quick-detachable normalizing furnace
CN106182542A (en) A kind of new type rubber circle shaped device
CN205020712U (en) Production line of large -scale nut of forge hot
CN104527013A (en) Waste heat recovering and utilizing system and method of plastic pipe production line
CN103088193A (en) Quenching machine for rapid heat treatment
CN204824983U (en) Normalizing air cooling system of long steel bar continuous heat treatment furnace
CN202359159U (en) Rapid heat treatment quenching machine
CN208230838U (en) One kind is for forming the cooling equipment of iron casting
CN203955747U (en) A kind of wire-drawing equipment auxiliary coolant system
CN213944850U (en) Cooling device for casting stainless steel forging
CN204824970U (en) Suspension type work piece fan cooler
CN205020736U (en) Production line of large -scale nut of forge hot
CN204309388U (en) There is the transfer interpreter of forced cooling device
CN203578727U (en) Portable aluminum wheel hub die heating tool
CN206692705U (en) Steel strand wires galvanizing energy-conserving and environment-protective streamline
CN206858620U (en) A kind of cable mechanical refining device
CN207386486U (en) A kind of nonmetallic casting drying tunnel heating zone dehydrating unit of drying
CN103736972A (en) Aluminum wheel hub mould heating tool convenient and rapid to use

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150107

Effective date of abandoning: 20160824

C25 Abandonment of patent right or utility model to avoid double patenting