A kind of wire-drawing equipment auxiliary coolant system Download PDFInfo
- Publication number
- CN203955747U CN203955747U CN201420326680.1U CN201420326680U CN203955747U CN 203955747 U CN203955747 U CN 203955747U CN 201420326680 U CN201420326680 U CN 201420326680U CN 203955747 U CN203955747 U CN 203955747U
- Authority
- CN
- China
- Prior art keywords
- wire
- water tank
- bosh
- cell body
- forced air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a kind of wire-drawing equipment auxiliary coolant system, on wire drawing bosh, be provided with cell body, on cell body, offer leaking hole, wire drawing bosh is connected with water tank by leaking hole, in water tank inside bottom, be provided with water pump, water pump is connected with main pipeline, main pipeline is connected with the lateral that is arranged on wire drawing bosh top, lateral is connected with horizontal pipeline, shower nozzle is installed below horizontal pipeline, spray is arranged on cell body central upper portion position, a side at cell body is provided with temperature inductor, the below of temperature inductor is provided with controller, controller is connected with water pump by wire, water tank inside above water pump is provided with forced air cooled tube, water tank outer setting has the blower fan matching with forced air cooled tube, utilize forced air cooled tube and blower fan air-supply to realize the cooling of the higher water resource of temperature is processed, play cooling rapidly and efficiently, efficiency is high.
Description
Technical field
The utility model relates to mechanical field, is specifically related to a kind of wire-drawing equipment auxiliary coolant system.
Background technology
Drawing process is a kind of metal working process.In stress metal processing.Make under external force metal by force by mould, metal cross section is long-pending compressed, and the technology processing method that obtains desired cross-sectional area shape and size is called metal wire-drawing technique.Wire drawing comprises cold drawn and hot drawn mode, and cold drawn is exactly at normal temperatures, and wire drawing is not heated, and by wire-drawing frame, carries out wire drawing; And hot drawn mode is that wire drawing is heated, then carry out wire drawing by wire-drawing frame, and then wire drawing is carried out to cooling annealing, the mode of annealing adopts cooling water to carry out cooling annealing, cooling water temperature after annealing rises, and as waste water, is just directly emitted, and causes the waste of water resource.Traditional wire drawing and annealing technique, because water temperature raises, can not meet the demand of cooling, can not, as cooling utilization again, cause water resource waste serious.
Therefore, produce a kind of simple in structure, easy to operate, energy-conserving and environment-protective, cooling rate is fast, saves water resource, work and the high wire-drawing equipment auxiliary coolant system of operational efficiency, have market prospects widely.
Summary of the invention
For the deficiencies in the prior art, it is a kind of simple in structure, easy to operate that the utility model provides, energy-conserving and environment-protective, and cooling rate is fast, saves water resource, work and the high wire-drawing equipment auxiliary coolant system of operational efficiency.
The technical solution of the utility model is achieved in that a kind of wire-drawing equipment auxiliary coolant system, comprise wire drawing bosh, be arranged on the water tank of wire drawing bosh below, on described wire drawing bosh, be provided with cell body, on cell body, offer leaking hole, wire drawing bosh is connected with water tank by leaking hole, in water tank inside bottom, be provided with water pump, water pump is connected with main pipeline, main pipeline is connected with the lateral that is arranged on wire drawing bosh top, lateral is connected with horizontal pipeline, shower nozzle is installed below horizontal pipeline, spray is arranged on cell body central upper portion position, a side at cell body is provided with temperature inductor, the below of temperature inductor is provided with controller, controller is connected with water pump by wire, water tank inside above water pump is provided with forced air cooled tube, water tank outer setting has the blower fan matching with forced air cooled tube.
Described main pipeline is arranged on water tank one side center, and the height of main pipeline is not less than the height of water tank, and main pipeline is fixedly mounted on the center of lateral below, and the length of described lateral equals the length of wire drawing bosh.
The both sides of described forced air cooled tube are provided with through hole, and forced air cooled tube is fixedly mounted on the middle part of water tank, on the outer wall of the both sides of water tank, offer the air vent being connected with forced air cooled tube.
The bottom of described blower fan is provided with bearing, and the center of blower fan and the center of water tank are in same level.
Described horizontal pipeline is at least three, and the below of three horizontal pipelines is all provided with shower nozzle, three horizontal pipeline equal distribution lateral one side above wire drawing bosh.
The bottom of described water tank is provided with sewage draining exit.
The utlity model has following good effect: first, this product structure is simple, easy to operate, in use, when having realized the material product coolings such as steel wire that water that shower nozzle sprays pulls out wire-drawing equipment or iron wire, water resource is recovered in water tank efficiently, utilize forced air cooled tube and blower fan air-supply to realize the cooling of the higher water resource of temperature is processed, play cooling rapidly and efficiently, water is in the process recycling, shower nozzle and air-cooled two heat sinks are lowered the temperature simultaneously, and efficiency is high; Secondly, this Realization of Product the circulation of water resource efficiently utilize, saved water resource, not only can realize recycling of water resource, and, guarantee the water cooling rapidly at short notice that temperature is higher, can repeat utilizing; In addition, this product is provided with temperature inductor, once supplied materials direction transports the material that temperature is higher, will start-up temperature inductor, and passing to controller, controller is realized the operation of water pump, has saved electric power resource, realize the Automatic Control of equipment, there is good society and economic benefit.
Accompanying drawing explanation
Fig. 1 is main TV structure schematic diagram of the present utility model.
Fig. 2 is backsight structural representation of the present utility model.
Fig. 3 is internal structure schematic diagram of the present utility model.
Fig. 4 is left TV structure schematic diagram of the present utility model.
Fig. 5 is right TV structure schematic diagram of the present utility model.
Fig. 6 is wire drawing bosh structural representation of the present utility model.
The specific embodiment
As Fig. 1, 2, 3, 4, 5, shown in 6, a kind of wire-drawing equipment auxiliary coolant system, comprise wire drawing bosh 2, be arranged on the water tank 1 of wire drawing bosh 2 belows, on described wire drawing bosh 2, be provided with cell body 3, on cell body 3, offer leaking hole 4, wire drawing bosh 2 is connected with water tank 1 by leaking hole 4, in water tank 1 inside bottom, be provided with water pump 15, water pump 15 is connected with main pipeline 13, main pipeline 13 is connected with the lateral 10 that is arranged on wire drawing bosh 2 tops, lateral 10 is connected with horizontal pipeline 11, shower nozzle 12 is installed below horizontal pipeline 11, shower nozzle 12 is arranged on cell body 3 central upper portion positions, a side at cell body 3 is provided with temperature inductor 5, the below of temperature inductor 5 is provided with controller 6, controller 6 is connected with water pump 15 by wire, water tank 1 inside above water pump 15 is provided with forced air cooled tube 14, water tank 1 outer setting has the blower fan 9 matching with forced air cooled tube 14.
Described main pipeline 13 is arranged on water tank 1 one side centers, the height of main pipeline 13 is not less than the height of water tank 1, main pipeline 13 is fixedly mounted on the center of lateral 10 belows, and the length of described lateral 10 equals the length of wire drawing bosh 2.The both sides of described forced air cooled tube 14 are provided with through hole, and forced air cooled tube 14 is fixedly mounted on the middle part of water tank 1, on the outer wall of the both sides of water tank 1, offer the air vent being connected with forced air cooled tube 14.The bottom of described blower fan 9 is provided with bearing 7, and the center of the center of blower fan 9 and water tank 1 is in same level.Described horizontal pipeline 11 is at least three, and the below of three horizontal pipelines 11 is all provided with lateral 10 one sides of 12, three horizontal pipeline 11 equal distribution of shower nozzle above wire drawing bosh 2.The bottom of described water tank 1 is provided with sewage draining exit 8.
This product in use, after wire-drawing equipment wire-drawing operation starts, this product brings into operation, temperature inductor 5 is arranged on a side of the cell body 3 of wire-drawing equipment feeding port one side, the supplied materials finished product that temperature is higher can trigger the sensing element of temperature inductor 5, temperature inductor 5 passes to controller 6 by information, controller 6 makes water pump 15 operations, water is drawn into main pipeline 13 from water pump 15, by main pipeline 13, be delivered to lateral 10 again, lateral 10 is further delivered to horizontal pipeline 11, and through shower nozzle 12 ejections, the water of ejection is above cell body 3 center lines, guarantee that water can spray the top of the finished product after wire drawing, play good cooling effect.The high-temperature water forming after finished product cooling after wire drawing is directly entered into water tank 1 through leaking hole 4 in cell body 3, in water tank 1, be provided with forced air cooled tube 14, forced air cooled tube 14, in the lasting air-supply operation process of blower fan 9, is implemented cooling operation to the water in water tank 1, realizes the cooling again of waste water and uses.The size of blower fan and power can be determined according to actual conditions, and meanwhile, the number of forced air cooled tube 14 also can be determined according to actual conditions, and the assurance air output of blower fan and the number of forced air cooled tube 14 can be realized the cooling effect again to higher temperature water.For the higher cooling-down effect of assurance equipment, the height between shower nozzle 12 and cell body 3 also can be adjusted as the case may be, and the water of shower nozzle 12 ejections also can be realized spraying cooling effect in the process of landing.
Claims (6)
1. a wire-drawing equipment auxiliary coolant system, comprise wire drawing bosh (2), be arranged on the water tank (1) of wire drawing bosh (2) below, it is characterized in that: on described wire drawing bosh (2), be provided with cell body (3), on cell body (3), offer leaking hole (4), wire drawing bosh (2) is connected with water tank (1) by leaking hole (4), in water tank (1) inside bottom, be provided with water pump (15), water pump (15) is connected with main pipeline (13), main pipeline (13) is connected with the lateral (10) that is arranged on wire drawing bosh (2) top, lateral (10) is connected with horizontal pipeline (11), in the below of horizontal pipeline (11), shower nozzle (12) is installed, shower nozzle (12) is arranged on cell body (3) central upper portion position, a side at cell body (3) is provided with temperature inductor (5), the below of temperature inductor (5) is provided with controller (6), controller (6) is connected with water pump (15) by wire, water tank (1) inside in water pump (15) top is provided with forced air cooled tube (14), water tank (1) outer setting has the blower fan (9) matching with forced air cooled tube (14).
2. wire-drawing equipment auxiliary coolant system according to claim 1, it is characterized in that: described main pipeline (13) is arranged on water tank (1) one side center, the height of main pipeline (13) is not less than the height of water tank (1), main pipeline (13) is fixedly mounted on the center of lateral (10) below, and the length of described lateral (10) equals the length of wire drawing bosh (2).
3. wire-drawing equipment auxiliary coolant system according to claim 1, it is characterized in that: the both sides of described forced air cooled tube (14) are provided with through hole, forced air cooled tube (14) is fixedly mounted on the middle part of water tank (1), offers the air vent being connected with forced air cooled tube (14) on the both sides outer wall of water tank (1).
4. wire-drawing equipment auxiliary coolant system according to claim 1, is characterized in that: the bottom of described blower fan (9) is provided with bearing (7), and the center of the center of blower fan (9) and water tank (1) is in same level.
5. wire-drawing equipment auxiliary coolant system according to claim 1, it is characterized in that: described horizontal pipeline (11) is at least three, the below of three horizontal pipelines (11) is all provided with shower nozzle (12), and three horizontal pipelines (11) equal distribution is in lateral (10) one sides of wire drawing bosh (2) top.
6. wire-drawing equipment auxiliary coolant system according to claim 1, is characterized in that: the bottom of described water tank (1) is provided with sewage draining exit (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420326680.1U CN203955747U (en) | 2014-06-19 | 2014-06-19 | A kind of wire-drawing equipment auxiliary coolant system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420326680.1U CN203955747U (en) | 2014-06-19 | 2014-06-19 | A kind of wire-drawing equipment auxiliary coolant system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203955747U true CN203955747U (en) | 2014-11-26 |
Family
ID=51916388
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420326680.1U Expired - Fee Related CN203955747U (en) | 2014-06-19 | 2014-06-19 | A kind of wire-drawing equipment auxiliary coolant system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203955747U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105903773A (en) * | 2016-02-25 | 2016-08-31 | 天津市福厚盈科技有限公司 | Preparation method of drawing machine cooling device |
CN112246895A (en) * | 2020-10-20 | 2021-01-22 | 芜湖巨科电气设备有限公司 | Copper wire multichannel substep wire drawing production line |
-
2014
- 2014-06-19 CN CN201420326680.1U patent/CN203955747U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105903773A (en) * | 2016-02-25 | 2016-08-31 | 天津市福厚盈科技有限公司 | Preparation method of drawing machine cooling device |
CN112246895A (en) * | 2020-10-20 | 2021-01-22 | 芜湖巨科电气设备有限公司 | Copper wire multichannel substep wire drawing production line |
CN112246895B (en) * | 2020-10-20 | 2022-07-22 | 芜湖巨科电气设备有限公司 | Copper wire multichannel substep wire drawing production line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101934309B (en) | Metal plate heating type roll bending forming method and device thereof | |
CN212042606U (en) | High-efficiency cooling device of multi-cavity die-casting die | |
CN209669292U (en) | A kind of superhard annealing device of alloy carbon steel fastener | |
CN201648461U (en) | Circulating water temperature controlling system | |
CN104275434A (en) | Rapid cooling equipment for forged gear | |
CN103320725B (en) | A kind of aluminium section bar combines quenching device online | |
CN203955747U (en) | A kind of wire-drawing equipment auxiliary coolant system | |
CN205258527U (en) | Laser hardening water refrigeration cycle device | |
CN103088193B (en) | Quenching machine for rapid heat treatment | |
CN206622559U (en) | A kind of full-automatic nut forging and forming device | |
CN204108018U (en) | Heat sink on tubing production line balance machine | |
CN203649278U (en) | Cooling device for forging line loading manipulator | |
CN202543048U (en) | Tempering cooling system | |
CN209292415U (en) | Gas-quenching vacuum furnace device | |
CN201618743U (en) | Water circulating system of a copper tube drawing device | |
CN201660670U (en) | Cooling system for heat treatment medium | |
CN206622593U (en) | A kind of quickly cooling device for high strength alloy steel die casting | |
CN105483741A (en) | Temperature control device for acid pickling tank for strip steels | |
CN202322929U (en) | Online water cooling or air cooling quenching device for accurate aluminum profiles | |
CN202359159U (en) | Rapid heat treatment quenching machine | |
CN203923282U (en) | The outlet cooling body of enameled machine annealing furnace | |
CN203928793U (en) | A kind of water circulation cooling tower | |
CN204075056U (en) | Quick cooling equipment after a kind of gear forging | |
CN207934114U (en) | A kind of water circulation system | |
CN218270236U (en) | Energy-saving metal smelting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141126 Termination date: 20160619 |