CN111069505A - Automatic forging process for bearing ring - Google Patents

Automatic forging process for bearing ring Download PDF

Info

Publication number
CN111069505A
CN111069505A CN201911386755.9A CN201911386755A CN111069505A CN 111069505 A CN111069505 A CN 111069505A CN 201911386755 A CN201911386755 A CN 201911386755A CN 111069505 A CN111069505 A CN 111069505A
Authority
CN
China
Prior art keywords
blank
water spray
forging
die
lower die
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911386755.9A
Other languages
Chinese (zh)
Inventor
葛艳明
彭振
袁志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jinyuan Forging Co ltd
Original Assignee
Jiangsu Jinyuan Forging Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jinyuan Forging Co ltd filed Critical Jiangsu Jinyuan Forging Co ltd
Priority to CN201911386755.9A priority Critical patent/CN111069505A/en
Publication of CN111069505A publication Critical patent/CN111069505A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/06Methods for forging, hammering, or pressing; Special equipment or accessories therefor for performing particular operations
    • B21J5/08Upsetting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21HMAKING PARTICULAR METAL OBJECTS BY ROLLING, e.g. SCREWS, WHEELS, RINGS, BARRELS, BALLS
    • B21H1/00Making articles shaped as bodies of revolution
    • B21H1/06Making articles shaped as bodies of revolution rings of restricted axial length
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J1/00Preparing metal stock or similar ancillary operations prior, during or post forging, e.g. heating or cooling
    • B21J1/06Heating or cooling methods or arrangements specially adapted for performing forging or pressing operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/002Hybrid process, e.g. forging following casting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/06Methods for forging, hammering, or pressing; Special equipment or accessories therefor for performing particular operations
    • B21J5/10Piercing billets

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)

Abstract

The invention discloses an automatic forging process of a bearing ring, which comprises the following steps: cutting off a blank from a precision bar, discharging the blank by an automatic discharging machine, automatically feeding the blank into an intermediate frequency furnace, heating to 1125 +/-5 ℃, preserving heat for 5 minutes, and then automatically pushing the blank into a hollow automatic feeding machine, wherein the hollow automatic feeding machine drives the blank to pass through the center of a spiral high-pressure water spray pipe, the spiral high-pressure water spray pipe is provided with water spray holes, all the water spray holes can form 360-degree water spray without dead angles and face the axial center of the spiral high-pressure water spray pipe, and the spiral high-pressure water spray pipe is provided with a water spray interlocking device; the automatic hollow-out feeding machine drives a blank to pass through the center of the spiral high-pressure water spray pipe and then is sent into a lower die upsetting die hole on the numerical control hydraulic forging machine by the forging manipulator 1, the blank is sent into a lower die flattening die hole by the forging manipulator 1 after upsetting, the blank is taken out by the forging manipulator 2 after forging and flattening and then is sent into a die stamping die hole for punching, and the blank is taken out by the forging manipulator 2 after finishing and is sent into a ring rolling machine for reaming.

Description

Automatic forging process for bearing ring
Technical Field
The invention belongs to the technical field of forging, and particularly relates to an automatic forging process for a bearing ring.
Background
The bearing ring is an annular part of a radial rolling bearing with one or more raceways, and the forging of the bearing ring is a more complicated process and often has the defects of burrs, pits, deformation and the like.
Disclosure of Invention
In order to solve the technical problems, the invention provides an automatic forging process for a bearing ring, which has the following technical scheme: the forging process comprises the following steps:
1) and casting a bar steel ingot with the following alloy components in percentage by weight: 0.18-0.25% of C, Mn: 0.85 to 1.2, Cr: 1.15 to 1.45, Si: 0.17 to 1.35, Mo: 0.18 to 0.28, Ni: 0.030 or less, S: less than or equal to 0.030 percent, P: less than or equal to 0.035, Cu: less than or equal to 0.030, and the balance being Fe;
2) cutting off a blank from the bar steel ingot obtained in the step 1) by a precision bar, then discharging the blank by an automatic discharging machine, automatically feeding the cut blank into an intermediate frequency furnace, heating the cut blank to 1125 +/-5 ℃, keeping the temperature for 5 minutes, and then automatically pushing the cut blank into a hollow automatic feeding machine, wherein the hollow automatic feeding machine drives the blank to pass through the center of a spiral high-pressure water spray pipe, the spiral high-pressure water spray pipe is provided with water spray holes, all the water spray holes can form water spray without dead angles of 360 degrees and face the axial center of the spiral high-pressure water spray pipe, and the spiral high-pressure water spray pipe is; the hollow automatic feeding machine is characterized in that a blank is driven to pass through the center of a spiral high-pressure water spray pipe and then is fed into a lower die upsetting die hole on a numerical control hydraulic forging machine by a forging manipulator 1, the blank is fed into a lower die flattening die hole by the forging manipulator 1 after upsetting, the blank is fed into the lower die flattening die hole by the forging manipulator 2 after forging and flattening, the blank is taken out and fed into a die stamping die hole for punching by the forging manipulator 2 after forging, the blank is taken out and fed into a ring rolling machine for reaming after finishing, the blank is taken out and fed into a carburizing furnace by the forging manipulator 2 for carburizing, salt bath heating quenching is carried out at 890-910 ℃, tempering is carried out at 250 ℃ for 1-1.5 hours, the lower die upsetting die hole, the lower die flattening die hole and the lower die stamping die hole are combined on a lower die, the lower die is fixed on the numerical control hydraulic forging machine, an upper die is also arranged on the numerical control hydraulic forging machine corresponding to the lower die, the, water spray nozzles are arranged around the cooling water pipe and used for cooling the upper module and the lower module; the hydraulic forging machine is also provided with a cooling liquid spray head and a water spray interlocking device.
Compared with the prior art, the invention has the advantages that: less oxidation, uniform crystal grains, reduced forging deformation force, improved metal plasticity, and reduced defects such as burr and pit.
Detailed Description
Example one
An automatic forging process for a bearing ring comprises the following steps:
1) and casting a bar steel ingot with the following alloy components in percentage by weight: c:0.18, Mn: 0.85, Cr: 1.15, Si: 0.17, Mo: 0.18, Ni: 0.010, S: 0.010, P: 0.015, Cu: 0.010, and the balance of Fe;
2) cutting off a blank from the bar steel ingot obtained in the step 1) by a precision bar, then discharging the blank by an automatic discharging machine, automatically feeding the cut blank into an intermediate frequency furnace, heating the cut blank to 1120 ℃, preserving the heat for 5 minutes, and then automatically pushing the cut blank into a hollow automatic feeding machine, wherein the hollow automatic feeding machine drives the blank to pass through the center of a spiral high-pressure water spray pipe, the spiral high-pressure water spray pipe is provided with water spray holes, all the water spray holes can form 360-degree water spray without dead angles and face the axial center of the spiral high-pressure water spray pipe, and the spiral high-pressure water spray pipe is; the hollow automatic feeding machine is characterized in that a blank is driven to pass through the center of a spiral high-pressure water spray pipe and then is fed into a lower die upsetting die hole on a numerical control hydraulic forging machine by a forging manipulator 1, the blank is fed into a lower die flattening die hole by the forging manipulator 1 after upsetting, the blank is taken out and fed into a die stamping die hole by the forging manipulator 2 after forging and flattening, the blank is taken out and fed into a ring rolling machine for reaming after being completed, the blank is taken out and fed into a carburizing furnace by the forging manipulator 2 for carburizing, salt bath heating quenching is carried out for 890 ℃, tempering is carried out at 250 ℃ for 1 hour, the lower die upsetting die hole, the lower die flattening die hole and the lower die stamping die hole are arranged on a lower die in a combined mode, the lower die is fixed on the numerical control hydraulic forging machine, an upper die is arranged on the numerical control hydraulic forging machine corresponding to the lower die, the upper die is provided with an upper die upsetting die head, the upper die flattening die, water spray nozzles are arranged around the cooling water pipe and used for cooling the upper module and the lower module; the hydraulic forging machine is also provided with a cooling liquid spray head and a water spray interlocking device.
Example two
An automatic forging process for a bearing ring comprises the following steps:
1) and casting a bar steel ingot with the following alloy components in percentage by weight: c: 0.20, Mn: 0.95, Cr: 1.35, Si: 1.15, Mo: 0.22, Ni: 0.020, S: 0.020, P: 0.025, Cu: 0.020%, and the balance Fe;
2) cutting off a blank from the bar steel ingot obtained in the step 1) by a precision bar, discharging the blank by an automatic discharging machine, automatically feeding the cut blank into an intermediate frequency furnace, heating the cut blank to 1125 ℃, keeping the temperature for 5 minutes, and then automatically pushing the cut blank into a hollow automatic feeding machine, wherein the hollow automatic feeding machine drives the blank to pass through the center of a spiral high-pressure water spray pipe, the spiral high-pressure water spray pipe is provided with water spray holes, all the water spray holes can form 360-degree water spray without dead angles and face the axial center of the spiral high-pressure water spray pipe, and the spiral high-pressure water spray pipe is provided; the hollow automatic feeding machine is characterized in that a blank is driven to pass through the center of a spiral high-pressure water spray pipe and then is fed into a lower die upsetting die hole on a numerical control hydraulic forging machine by a forging manipulator 1, the blank is fed into a lower die flattening die hole by the forging manipulator 1 after upsetting, the blank is taken out and fed into a die stamping die hole by the forging manipulator 2 after forging and flattening, the blank is taken out and fed into a ring rolling machine for reaming after being completed, the blank is taken out and fed into a carburizing furnace by the forging manipulator 2 for carburizing, salt bath heating quenching is carried out at 895 ℃ and tempering is carried out at 250 ℃ for 1.2 hours, the lower die upsetting die hole, the lower die flattening die hole and the lower die stamping die hole are arranged on a lower die in a combined mode, the lower die is fixed on the numerical control hydraulic forging machine, an upper die is also arranged on the numerical control hydraulic forging machine corresponding to the lower die, the upper die is provided with an upper die upsetting die head, the upper die, water spray nozzles are arranged around the cooling water pipe and used for cooling the upper module and the lower module; the hydraulic forging machine is also provided with a cooling liquid spray head and a water spray interlocking device.
EXAMPLE III
An automatic forging process for a bearing ring comprises the following steps:
1) and casting a bar steel ingot with the following alloy components in percentage by weight: c: 0.25, Mn: 1.2, Cr: 1.45, Si: 1.35, Mo: 0.28, Ni: 0.030, S: 0.030, P: 0.035, Cu: 0.030, and the balance Fe;
2) cutting off a blank from the bar steel ingot obtained in the step 1) by a precision bar, discharging the blank by an automatic discharging machine, automatically feeding the cut blank into an intermediate frequency furnace, heating to 1130 ℃, keeping the temperature for 5 minutes, and then automatically pushing the cut blank into a hollow automatic feeding machine, wherein the hollow automatic feeding machine drives the blank to pass through the center of a spiral high-pressure water spray pipe, the spiral high-pressure water spray pipe is provided with water spray holes, all the water spray holes can form 360-degree water spray without dead angles and face the axial center of the spiral high-pressure water spray pipe, and the spiral high-pressure water spray pipe is provided with a water; the hollow automatic feeding machine is characterized in that a blank is driven to pass through the center of a spiral high-pressure water spray pipe and then is fed into a lower die upsetting die hole on a numerical control hydraulic forging machine by a forging manipulator 1, the blank is fed into a lower die flattening die hole by the forging manipulator 1 after upsetting, the blank is taken out and fed into a die stamping die hole by the forging manipulator 2 after forging and flattening, the blank is taken out and fed into a ring rolling machine for reaming after being completed, the blank is taken out and fed into a carburizing furnace by the forging manipulator 2 for carburizing, salt bath heating quenching is carried out at 910 ℃ and tempering is carried out for 1.5 hours at 250 ℃, the lower die upsetting die hole, the lower die flattening die hole and the lower die stamping die hole are arranged on a lower die in a combined mode, the lower die is fixed on the numerical control hydraulic forging machine, an upper die is also arranged on the numerical control hydraulic forging machine corresponding to the lower die, the upper die is provided with an upper die upsetting die head, the upper die flattening, water spray nozzles are arranged around the cooling water pipe and used for cooling the upper module and the lower module; the hydraulic forging machine is also provided with a cooling liquid spray head and a water spray interlocking device.

Claims (1)

1. The automatic forging process of the bearing ring is characterized by comprising the following steps of:
1) and casting a bar steel ingot with the following alloy components in percentage by weight: 0.18-0.25% of C, Mn: 0.85 to 1.2, Cr: 1.15 to 1.45, Si: 0.17 to 1.35, Mo: 0.18 to 0.28, Ni: 0.030 or less, S: 0.030 or less, P: less than or equal to 0.035, Cu: less than or equal to 0.030, and the balance being Fe;
2) cutting off a blank from the bar steel ingot obtained in the step 1) by a precision bar, then discharging the blank by an automatic discharging machine, automatically feeding the cut blank into an intermediate frequency furnace, heating the cut blank to 1125 +/-5 ℃, keeping the temperature for 5 minutes, and then automatically pushing the cut blank into a hollow automatic feeding machine, wherein the hollow automatic feeding machine drives the blank to pass through the center of a spiral high-pressure water spray pipe, the spiral high-pressure water spray pipe is provided with water spray holes, all the water spray holes can form water spray without dead angles of 360 degrees and face the axial center of the spiral high-pressure water spray pipe, and the spiral high-pressure water spray pipe is; the hollow automatic feeding machine is characterized in that a blank is driven to pass through the center of a spiral high-pressure water spray pipe and then is fed into a lower die upsetting die hole on a numerical control hydraulic forging machine by a forging manipulator 1, the blank is fed into a lower die flattening die hole by the forging manipulator 1 after upsetting, the blank is fed into the lower die flattening die hole by the forging manipulator 2 after forging and flattening, the blank is taken out and fed into a die stamping die hole for punching by the forging manipulator 2 after forging, the blank is taken out and fed into a ring rolling machine for reaming after finishing, the blank is taken out and fed into a carburizing furnace by the forging manipulator 2 for carburizing, salt bath heating quenching is carried out at 890-910 ℃, tempering is carried out at 250 ℃ for 1-1.5 hours, the lower die upsetting die hole, the lower die flattening die hole and the lower die stamping die hole are combined on a lower die, the lower die is fixed on the numerical control hydraulic forging machine, an upper die is also arranged on the numerical control hydraulic forging machine corresponding to the lower die, the, water spray nozzles are arranged around the cooling water pipe and used for cooling the upper module and the lower module; the hydraulic forging machine is also provided with a cooling liquid spray head and a water spray interlocking device.
CN201911386755.9A 2019-12-29 2019-12-29 Automatic forging process for bearing ring Pending CN111069505A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911386755.9A CN111069505A (en) 2019-12-29 2019-12-29 Automatic forging process for bearing ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911386755.9A CN111069505A (en) 2019-12-29 2019-12-29 Automatic forging process for bearing ring

Publications (1)

Publication Number Publication Date
CN111069505A true CN111069505A (en) 2020-04-28

Family

ID=70319226

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911386755.9A Pending CN111069505A (en) 2019-12-29 2019-12-29 Automatic forging process for bearing ring

Country Status (1)

Country Link
CN (1) CN111069505A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112570633A (en) * 2020-10-14 2021-03-30 常熟缘阳机械制造有限公司 Bearing ring forging process capable of effectively removing impurities
CN114871695A (en) * 2022-04-24 2022-08-09 中国科学院金属研究所 M50 steel bearing ring, preparation method thereof and bearing

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102126136A (en) * 2011-01-04 2011-07-20 武汉理工大学 Automotive rear axle driven bevel gear blank forging production line
CN102601285A (en) * 2012-03-06 2012-07-25 浙江博雷重型机床制造有限公司 Forging production line
CN103551822A (en) * 2013-10-29 2014-02-05 临清市中航精工轴承有限公司 Full-automatic bearing ring forging line
CN205020737U (en) * 2015-09-11 2016-02-10 海宁市中达紧固件有限公司 Production line of large -scale nut of forge hot
CN205599836U (en) * 2016-05-10 2016-09-28 成都豪能科技股份有限公司 Synchronizer ring forges and presses production line
CN108273951A (en) * 2018-02-26 2018-07-13 常州市支点机器人科技有限公司 Bearing ring forging line and bearing ring production technology
CN108672626A (en) * 2018-07-18 2018-10-19 东莞辉科机器人自动化股份有限公司 A kind of full automatic bearing ring forging machining production line
CN110076579A (en) * 2019-04-18 2019-08-02 北京工业大学 A kind of full-automatic continuous circular shape forging production line

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102126136A (en) * 2011-01-04 2011-07-20 武汉理工大学 Automotive rear axle driven bevel gear blank forging production line
CN102601285A (en) * 2012-03-06 2012-07-25 浙江博雷重型机床制造有限公司 Forging production line
CN103551822A (en) * 2013-10-29 2014-02-05 临清市中航精工轴承有限公司 Full-automatic bearing ring forging line
CN205020737U (en) * 2015-09-11 2016-02-10 海宁市中达紧固件有限公司 Production line of large -scale nut of forge hot
CN205599836U (en) * 2016-05-10 2016-09-28 成都豪能科技股份有限公司 Synchronizer ring forges and presses production line
CN108273951A (en) * 2018-02-26 2018-07-13 常州市支点机器人科技有限公司 Bearing ring forging line and bearing ring production technology
CN108672626A (en) * 2018-07-18 2018-10-19 东莞辉科机器人自动化股份有限公司 A kind of full automatic bearing ring forging machining production line
CN110076579A (en) * 2019-04-18 2019-08-02 北京工业大学 A kind of full-automatic continuous circular shape forging production line

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112570633A (en) * 2020-10-14 2021-03-30 常熟缘阳机械制造有限公司 Bearing ring forging process capable of effectively removing impurities
CN114871695A (en) * 2022-04-24 2022-08-09 中国科学院金属研究所 M50 steel bearing ring, preparation method thereof and bearing
CN114871695B (en) * 2022-04-24 2024-02-09 中国科学院金属研究所 M50 steel bearing ring, preparation method thereof and bearing

Similar Documents

Publication Publication Date Title
CN106363352B (en) A kind of manufacturing process of high-strength aluminum alloy ring forging
US20230151474A1 (en) Metal rings formed from beryllium-copper alloys
CN111069505A (en) Automatic forging process for bearing ring
CN108246948B (en) Forging method for improving GH901 die forging structure
CN111069496A (en) Preparation method of GH4738 alloy crystal homogenizing ring forging
JP6678158B2 (en) Briquette roll and method for producing the same
CN106467931A (en) A kind of method of manufacturing technology of lifting bearer ring performance
CN102766803A (en) Free forging processing process of alloyed tool steel 5CrNiMo for footstep shaft
CN114990447B (en) Alloy material, hole expanding die and processing technology
CN114472776A (en) Die forging blank making and die ring rolling forming process for high-neck flange forging for wind tower
CN112536406B (en) Forging drawing method for avoiding surface cracking
CN111604642B (en) Preparation method of elastic wheel core
CN108660361A (en) Hot rolled seamless steel tube high speed steel roll collar and preparation method thereof
CN110592341A (en) Annealing softening heat treatment method for rock drilling tool steel
CN106048455B (en) A kind of processing method of mold materials for high intensity forging
CN110153186B (en) Method for preparing high alloy tool and die steel hollow pipe blank, hollow pipe blank and annular cutter
CN114657363A (en) Method for improving 42CrMoA crankshaft band-shaped structure
CN109207797A (en) A kind of forging technology of twin (double) screw extruder pressure roller
CN109622867B (en) Isothermal forging method of TC8-1 titanium alloy disc
CN112658605B (en) Machining process for oversized outer circular flange
CN116329465A (en) Isothermal forging method of titanium alloy disc
CN116000221A (en) Method for improving strength of IN625 alloy annular forging
WO2016189482A1 (en) A process for manufacture of crusher hammers by forging and a crusher hammer made using the process
CN106755771B (en) Softening method of CSS-42L gear steel forging stock
CN118028579A (en) Production method of wind power 42CrMo4 alloy steel gear box forging

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200428

WD01 Invention patent application deemed withdrawn after publication