CN205013012U - A steel mould trolley that is used for tunnel to add broadband construction - Google Patents

A steel mould trolley that is used for tunnel to add broadband construction Download PDF

Info

Publication number
CN205013012U
CN205013012U CN201520782907.8U CN201520782907U CN205013012U CN 205013012 U CN205013012 U CN 205013012U CN 201520782907 U CN201520782907 U CN 201520782907U CN 205013012 U CN205013012 U CN 205013012U
Authority
CN
China
Prior art keywords
bogie frame
platform
tunnel
template group
cat ladder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520782907.8U
Other languages
Chinese (zh)
Inventor
郭茂
刘罡
杨红健
孙永坤
彭念
刘健
邓明玉
陈家东
罗正广
刘民军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN201520782907.8U priority Critical patent/CN205013012U/en
Application granted granted Critical
Publication of CN205013012U publication Critical patent/CN205013012U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a steel mould trolley that is used for tunnel to add broadband construction aims at providing a steel mould trolley that is used for tunnel to add broadband construction that the efficiency of construction is high. It includes the bogie frame, set up the device in the clamping rail of bogie frame lower extreme, the driving motor of drive clamping rail device, set up in the lower part of bogie frame lower extreme vaulting pole, set up the tip platform on the bogie frame, set up the upper platform on the tip platform, a plurality of setting in the side platform of bogie frame both sides, set up in the lower part cat ladder of bogie frame side, set up the middle level cat ladder of connection ends platform on the bogie frame, set up the upper cat ladder of connecting upper platform on the tip platform, set up the hydraulic pressure station on the tip platform, the control cabinet, and support and organize in bogie frame outlying template, be provided with a plurality of windows in the template group, the outer wall equipartition of template group face is provided with a plurality of attached vibrators, the hydro -cylinder passes through the tube coupling with the hydraulic pressure station, hydraulic pressure station, attached vibrator, driving motor and control cabinet electric connection.

Description

A kind of steel form carrier widening belt construction for tunnel
Technical field
The utility model relates to highway tunnel construction equipment technical field, especially relates to a kind of steel form carrier widening belt construction for tunnel.
Background technology
Conventional road tunnel is widened belt construction and is generally adopted and set up scaffold, then assembled formwork forms a large mold system.Adopt conventional method, lining construction is difficult to realize that outline line is round and smooth, formwork assembling and disassembling is simple and easy, reduce the advantage of labour intensity, and the potential safety hazard existed in work progress is more.
Utility model content
The utility model overcomes shortcoming of the prior art, provide a kind of mobile fast, the high and steel form carrier widening belt construction for tunnel that safety is high of efficiency of construction.
In order to solve the problems of the technologies described above, the utility model is achieved through the following technical solutions:
A kind of steel form carrier widening belt construction for tunnel, it comprises the bogie frame connected and composed by left and right two parts support body, be arranged at the rail clamping device of bogie frame lower end, drive the drive motors of rail clamping device, be arranged at the lowermost strut of bogie frame lower end, the cuddy board on bogie frame is arranged at by travel mechanism, be arranged at the upper platform on cuddy board, multiple side platform being arranged at bogie frame both sides, be arranged at the bottom cat ladder of bogie frame side, be arranged at the middle level cat ladder of connecting end portion platform on bogie frame, be arranged at upper strata cat ladder cuddy board connecting upper platform, be arranged at the Hydraulic Station on cuddy board, console, and be supported on the template group of bogie frame periphery, described template group is made up of left and right two parts, is supported on left and right two parts support body of bogie frame respectively by many struts and multiple oil cylinder, described template group is provided with multiple window for detecting, the outside wall surface in described template group face is uniform is provided with multiple attached vibrator, described oil cylinder is connected by pipeline with Hydraulic Station, and described Hydraulic Station, attached vibrator, drive motors and console are electrically connected.
Preferably, left and right two parts support body of described bogie frame is with bolts.
Preferably, described template group is provided with the Chain block of Control architecture group bottom folding.
Preferably, described cuddy board is installed on bogie frame by upper strut.
Compared with prior art, the utility model tool has the following advantages:
(1) it is short and do not affect the advantage of other operations construction in process that band steel form carrier of the present utility model has form removable conveniently moving, measurement and positioning checks the time, is constructing tunnel quality, safety forms effective guarantee.
(2) the utility model has a little multiple, one is that walking is convenient, this steel form carrier adopts rail and roller and utilizes aggressive device to walk, and avoids because of the too small defect of main hole lining cutting boundary in tunnel in walking process, can split into two parts and walk by Yanzhong line position; Two is install very fast, and this steel form carrier is walked after assigned address and connected, and after measurement and positioning, utilizes power set to prop up template to lining design outline position; Three is safe and reliable, walks vehicle and has enough spaces, and be provided with reflecting sign and color lamp under this steel form carrier, can very clearly identification chassis position when vehicle travels.Four is time and labour saving, only needs 4-6 people to carry out collocation and can operate, only need 4-6 people to complete when trolley formwork supports during the walking of this steel form carrier; During use and main hole lining steel formwork jumbo does not interfere with each other, and adds more tunnel, broadband and uses in speciality and there is clear superiority.Five is that shaping lining cutting presentation quality is good, and this steel form carrier surfacing, splices smooth-going, not yielding, and after brushing release agent, mirror effect is comparatively obvious.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the sectional view of A-A in Fig. 1.
Fig. 3 is the floor map after template group is launched.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not paying the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Widen the steel form carrier of belt construction for tunnel shown in Fig. 1-3, it comprises the bogie frame 9 connected and composed by left and right two parts support body, be arranged at the rail clamping device 22 of bogie frame 9 lower end, drive the drive motors 24 of rail clamping device 22, be arranged at the lowermost strut 23 of bogie frame 9 lower end, the cuddy board 11 on bogie frame 9 is arranged at by travel mechanism 5, be arranged at the upper platform 3 on cuddy board 11, multiple side platform 15 being arranged at bogie frame 9 both sides, be arranged at the bottom cat ladder 25 of bogie frame 9 side, be arranged at the middle level cat ladder 12 of connecting end portion platform 11 on bogie frame 9, be arranged at the upper strata cat ladder 4 cuddy board 11 connecting upper platform 3, be arranged at the Hydraulic Station 29 on cuddy board 11, console 28, and be supported on the template group 1 of bogie frame 9 periphery, described template group 1 is made up of left and right two parts, is supported on left and right two parts support body of bogie frame 9 respectively by many struts 6 and multiple oil cylinder 10, described template group 1 is provided with multiple window 7 for detecting, the outside wall surface of described template group 1 is uniform is provided with multiple attached vibrator 13, described oil cylinder 10 is connected by pipeline with Hydraulic Station 29, and described Hydraulic Station 29, attached vibrator 13, drive motors 24 are electrically connected with console 28.
Wherein, left and right two parts support body of described bogie frame 9 is preferably with bolts.Described template group 1 is provided with the Chain block 19 of Control architecture group 1 bottom folding.Described cuddy board 11 is installed on bogie frame 9 by upper strut 8.
It is short and do not affect the advantage of other operations construction in process that band steel form carrier of the present utility model has form removable conveniently moving, measurement and positioning checks the time, is constructing tunnel quality, safety forms effective guarantee.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (4)

1. widen the steel form carrier of belt construction for tunnel for one kind, it is characterized in that: comprise the bogie frame connected and composed by left and right two parts support body, be arranged at the rail clamping device of bogie frame lower end, drive the drive motors of rail clamping device, be arranged at the lowermost strut of bogie frame lower end, the cuddy board on bogie frame is arranged at by travel mechanism, be arranged at the upper platform on cuddy board, multiple side platform being arranged at bogie frame both sides, be arranged at the bottom cat ladder of bogie frame side, be arranged at the middle level cat ladder of connecting end portion platform on bogie frame, be arranged at upper strata cat ladder cuddy board connecting upper platform, be arranged at the Hydraulic Station on cuddy board, console, and be supported on the template group of bogie frame periphery, described template group is made up of left and right two parts, is supported on left and right two parts support body of bogie frame respectively by many struts and multiple oil cylinder, described template group is provided with multiple window for detecting, the outside wall surface in described template group face is uniform is provided with multiple attached vibrator, described oil cylinder is connected by pipeline with Hydraulic Station, and described Hydraulic Station, attached vibrator, drive motors and console are electrically connected.
2. widen the steel form carrier of belt construction according to claim 1 for tunnel, it is characterized in that: left and right two parts support body of described bogie frame is with bolts.
3. according to claim 1 or 2, widen the steel form carrier of belt construction for tunnel, it is characterized in that: the Chain block described template group being provided with the bottom folding of Control architecture group.
4. widen the steel form carrier of belt construction according to claim 1 for tunnel, it is characterized in that: described cuddy board is installed on bogie frame by upper strut.
CN201520782907.8U 2015-10-10 2015-10-10 A steel mould trolley that is used for tunnel to add broadband construction Expired - Fee Related CN205013012U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520782907.8U CN205013012U (en) 2015-10-10 2015-10-10 A steel mould trolley that is used for tunnel to add broadband construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520782907.8U CN205013012U (en) 2015-10-10 2015-10-10 A steel mould trolley that is used for tunnel to add broadband construction

Publications (1)

Publication Number Publication Date
CN205013012U true CN205013012U (en) 2016-02-03

Family

ID=55211621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520782907.8U Expired - Fee Related CN205013012U (en) 2015-10-10 2015-10-10 A steel mould trolley that is used for tunnel to add broadband construction

Country Status (1)

Country Link
CN (1) CN205013012U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448217A (en) * 2017-09-25 2017-12-08 中铁十七局集团第工程有限公司 A kind of practical tunnel lining trolley vibrating system
CN108104838A (en) * 2017-11-01 2018-06-01 中铁隧道勘察设计研究院有限公司 A kind of automation control method of lining construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448217A (en) * 2017-09-25 2017-12-08 中铁十七局集团第工程有限公司 A kind of practical tunnel lining trolley vibrating system
CN108104838A (en) * 2017-11-01 2018-06-01 中铁隧道勘察设计研究院有限公司 A kind of automation control method of lining construction
CN108104838B (en) * 2017-11-01 2019-03-22 中铁隧道勘察设计研究院有限公司 A kind of automation control method of lining construction

Similar Documents

Publication Publication Date Title
CN105370298B (en) Loess tunnel once lining hydraulic template trolley
CN203961992U (en) Portable full framing chassis
CN105736016A (en) Tunnel secondary lining steel bar framework construction equipment and application thereof
CN103758541A (en) Trolley and method for laying tunnel waterproof plate
CN205013012U (en) A steel mould trolley that is used for tunnel to add broadband construction
CN110617070B (en) Tunnel construction method
CN207944955U (en) Tunnel widened section two serves as a contrast trolley
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN105041339B (en) Disengaging type formwork jumbo, chassis component and underpass concrete construction method
CN103982200A (en) Full-face inner sliding rail moving steel mould trolley
CN205936645U (en) A full liquid die plate system for culvert is pour
CN103615262B (en) A kind of agent structure can the overall steel form carrier by conventional section and its implementation
CN102852065B (en) Pavement paving equipment for mine roadways
CN207161095U (en) A kind of integral inside molding chassis for Urban Underground pipe gallery main structure construction
CN203515607U (en) Adjustable steel mould trolley of tunnel widening section
CN103615261B (en) A kind of Height-adjustable steel form jumbo and its implementation
CN105863686A (en) Invert formwork hosting traveling trolley
CN110656958B (en) Steady formula construction equipment
CN203570323U (en) Steel form carrier with main structure capable of passing through conventional cross sections integrally
CN205260050U (en) Lining cutting liquid die plate platform truck in loess tunnel
CN110645020B (en) Construction equipment walking method
CN208982056U (en) One kind being adapted to effluent tunnel synchronization lining device
CN106194208B (en) A kind of tunnel lining trolley with ventilation duct
CN210105880U (en) Alternate hydraulic lifting template ditch cable trough trolley device
CN211314233U (en) Tunnel is a concrete spray curing means just

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160203

Termination date: 20211010

CF01 Termination of patent right due to non-payment of annual fee