CN205012336U - Area is pile driver of feed bin down - Google Patents

Area is pile driver of feed bin down Download PDF

Info

Publication number
CN205012336U
CN205012336U CN201520707769.7U CN201520707769U CN205012336U CN 205012336 U CN205012336 U CN 205012336U CN 201520707769 U CN201520707769 U CN 201520707769U CN 205012336 U CN205012336 U CN 205012336U
Authority
CN
China
Prior art keywords
pile
pile driver
electric block
cement
cement admixtures
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520707769.7U
Other languages
Chinese (zh)
Inventor
王警
李平
李磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Li Jian
Li Lei
Zhang Fang
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520707769.7U priority Critical patent/CN205012336U/en
Application granted granted Critical
Publication of CN205012336U publication Critical patent/CN205012336U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to an area is pile driver of feed bin down, pile hammer's below is provided with the support connecting pipe, install on the support connecting pipe and load the cement admixtures stirring storehouse that has cement, cement admixtures stirring storehouse is connected with agitator motor through the (mixing) shaft, the top in cement admixtures stirring storehouse sets up electric block, electric block is connected with a pay -off section of thick bamboo through the rope, cement admixtures stirring storehouse below is linked together with the support connecting pipe, drive piles and pour the synchronous completion of realization, after piling operations accomplishes, in case the defect stake appears, can directly withdraw from the defect stake, utilize the material in the cement admixtures stirring storehouse to fill the pile body cavity, high efficiency and quickness, after solidifying, the material forms new pile body, and the resources are saved. The upper portion fixedly connected with horizontal pole of pile driver body, horizontal pole below are connected with the oblique pull rod that is connected with the pile driver body, and electric block movable mounting is on the horizontal pole, and the material loading that stirs the storehouse for cement admixtures provides convenient.

Description

A kind of pile driver with blanking bin
Technical field
The utility model relates to mechanical field, is specifically related to a kind of pile driving equipment, particularly a kind of pile driver with blanking bin.
Background technology
Pile driver is made up of pile monkey, pile frame and ancillary service etc.Pile monkey is attached to the parallel vertical guide rod in two, pile frame front portion, is commonly called as between gantry, hangs liter with lifting hook.Pile frame is a steelwork tower truss, is provided with hoist engine at its rear portion, in order to lift by crane stake and pile monkey.The leading truck be made up of two guide rods before pile frame, in order to control piling direction, makes stake according to design injection stratum exactly, orientation.Pile monkey by motion power resources can be divided into drop hammer, steam hammer, diesel hammer, hydraulic hammer etc.Pile driver utilizes impact force by the piling machinery on stake injection stratum.Pylon and leading truck can together with deflection, in order to batter piling.Pile frame can rotate, and also can divide a word with a hyphen at the end of a line.
No matter how type changes traditional pile driver, is all to utilize piling power source to be driven underground by pile body, and pile body is remained into the plant equipment of underground.This piling mode needs the more resource of waste and equipment.When piling work, be subject to the restriction of pile body diameter, after an operation that falls completes, pile body stays underground, and pile body diameter is unchanged, and stress point is all made up of pile body, and pile body accepts uneven from top to bottom, affects building of superstructure.Pile body stays the reservation member of underground as necessity, can not have enough to meet the need Reusability, waste resource.Further, easily there is Defect Piles in traditional pile driver in use, and traditional processing method has the multiple stake of expansion cushion cap, original position, pile extension, the sinking shaft of the stake heart, piling, boring to strengthen, change construction method or Amending design scheme.Some great pile accident difficult treatment, costly.Once there is Defect Piles, take above-mentioned examination & verification one method all can cause added cost, increase expenditure, and the defect problem after global design may be caused to change.Therefore, adopt traditional pile driver to reserve inconvenience that the mode of pile body in underground easily causes construction, once there is Defect Piles, can give and to produce and the duration bring delayed, and bring huge economic loss to construction party, bring potential safety hazard to superstructure.
Therefore, it is simple, easy to operate to produce a kind of structure, construction and operational efficiency high, energy-conserving and environment-protective, safety factor is high, and firmly stable, pile body pile rate is high, and saving cost, the pile driver of the band blanking bin of efficient quick, has wide market prospects.
Summary of the invention
For the deficiencies in the prior art, the utility model provides a kind of structure simple, easy to operate, construction and operational efficiency high, energy-conserving and environment-protective, safety factor is high, and firmly stable, pile body pile rate is high, saving cost, the pile driver of the band blanking bin of efficient quick.
The technical solution of the utility model is achieved in that a kind of pile driver with blanking bin, comprise pile driver body, be arranged on the hoist engine of pile driver body side, by the lower stake guide peg that line is connected with hoist engine, be arranged on the pile monkey below lower stake guide peg, the below of described pile monkey is provided with support and connection pipe, support and connection pipe is provided with the cement material stir storehouse being mounted with cement, cement material stir storehouse is connected with stirring motor by shaft, the top of cement material stir storehouse arranges electric block, electric block is connected with feed cylinder by rope, be connected with support and connection pipe below cement material stir storehouse.
The top of described pile driver body is fixedly connected with cross bar, and be connected with the diagonal member be connected with pile driver body below cross bar, electric block is movably arranged on cross bar.
The bottom of described pile driver body is provided with parametric controller, and parametric controller is connected with lower stake guide peg with hoist engine by wire, has control room in the arranged outside of parametric controller.
The side in described control room is provided with switching door, is provided with searchlight above switching door, and the below in control room is provided with crawler belt, and the side of crawler belt is provided with jack supporting seat.
The utility model has following good effect: first the utility model structure is simple, easy to operate, the below of pile monkey is provided with support and connection pipe, support and connection pipe is provided with the cement material stir storehouse being mounted with cement, cement material stir storehouse is connected with stirring motor by shaft, the top of cement material stir storehouse arranges electric block, electric block is connected with feed cylinder by rope, be connected with support and connection pipe below cement material stir storehouse, drive piles and build realization and synchronously complete, after piling work completes, once there is Defect Piles, Defect Piles directly can be exited, utilize the material bored pile body hole in cement material stir storehouse, efficient quick, material solidifies the new pile body of rear formation, save resource, the top of pile driver body is fixedly connected with cross bar, and be connected with the diagonal member be connected with pile driver body below cross bar, electric block is movably arranged on cross bar, and the material loading for cement material stir storehouse provides conveniently, the bottom of pile driver body is provided with parametric controller, parametric controller is connected with lower stake guide peg with hoist engine by wire, control room is had in the arranged outside of parametric controller, the side in control room is provided with switching door, is provided with searchlight above switching door, and the below in control room is provided with crawler belt, the side of crawler belt is provided with jack supporting seat, overall flexible, be convenient to mobile and support, being applicable to the stop operation of complicated landform.
Accompanying drawing explanation
Fig. 1 is main TV structure schematic diagram of the present utility model.
Fig. 2 is side-looking structural representation of the present utility model.
Detailed description of the invention
As Fig. 1, shown in 2, a kind of pile driver with blanking bin, comprise pile driver body 1, be arranged on the hoist engine 13 of pile driver body 1 side, the lower stake guide peg 10 be connected with hoist engine 13 by line 9, be arranged on the pile monkey 11 below lower stake guide peg 10, the below of described pile monkey 11 is provided with support and connection pipe 14, support and connection pipe 14 is provided with the cement material stir storehouse 6 being mounted with cement, cement material stir storehouse 6 is connected with stirring motor 8 by shaft 7, the top of cement material stir storehouse 6 arranges electric block 3, electric block 3 is connected with feed cylinder 12 by rope 5, be connected with support and connection pipe 14 below cement material stir storehouse 6.
The top of described pile driver body 1 is fixedly connected with cross bar 2, and be connected with the diagonal member 4 be connected with pile driver body 1 below cross bar 2, electric block 3 is movably arranged on cross bar 2.The bottom of described pile driver body 1 is provided with parametric controller 15, and parametric controller 15 is connected with lower stake guide peg 10 with hoist engine 13 by wire, has control room 20 in the arranged outside of parametric controller 15.The side in described control room 20 is provided with switching door 19, is provided with searchlight 18 above switching door 19, and the below in control room 20 is provided with crawler belt 16, and the side of crawler belt 16 is provided with jack supporting seat 17.
This product in use, is driven piles and builds realization and synchronously complete, after piling work completes, once there is Defect Piles, Defect Piles directly can be exited, utilize the material bored pile body hole in cement material stir storehouse, efficient quick, material solidifies the new pile body of rear formation, saves resource.Be provided with material lift equipment, the material loading for cement material stir storehouse provides conveniently simultaneously.Be provided with crawler belt and jack supporting seat, overall flexible, be convenient to mobile and support, being applicable to the stop operation of complicated landform.

Claims (4)

1. the pile driver with blanking bin, comprise pile driver body (1), be arranged on the hoist engine (13) of pile driver body (1) side, the lower stake guide peg (10) be connected with hoist engine (13) by line (9), be arranged on the pile monkey (11) of lower stake guide peg (10) below, it is characterized in that: the below of described pile monkey (11) is provided with support and connection pipe (14), support and connection pipe (14) is provided with the cement material stir storehouse (6) being mounted with cement, cement material stir storehouse (6) is connected with stirring motor (8) by shaft (7), the top of cement material stir storehouse (6) arranges electric block (3), electric block (3) is connected with feed cylinder (12) by rope (5), cement material stir storehouse (6) below is connected with support and connection pipe (14).
2. the pile driver of band blanking bin according to claim 1, it is characterized in that: the top of described pile driver body (1) is fixedly connected with cross bar (2), cross bar (2) below is connected with the diagonal member (4) be connected with pile driver body (1), and electric block (3) is movably arranged on cross bar (2).
3. the pile driver of band blanking bin according to claim 1, it is characterized in that: the bottom of described pile driver body (1) is provided with parametric controller (15), parametric controller (15) is connected with lower stake guide peg (10) with hoist engine (13) by wire, has control room (20) in the arranged outside of parametric controller (15).
4. the pile driver of band blanking bin according to claim 3, it is characterized in that: the side in described control room (20) is provided with switching door (19), switching door (19) top is provided with searchlight (18), the below of control room (20) is provided with crawler belt (16), and the side of crawler belt (16) is provided with jack supporting seat (17).
CN201520707769.7U 2015-09-14 2015-09-14 Area is pile driver of feed bin down Expired - Fee Related CN205012336U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520707769.7U CN205012336U (en) 2015-09-14 2015-09-14 Area is pile driver of feed bin down

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520707769.7U CN205012336U (en) 2015-09-14 2015-09-14 Area is pile driver of feed bin down

Publications (1)

Publication Number Publication Date
CN205012336U true CN205012336U (en) 2016-02-03

Family

ID=55210948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520707769.7U Expired - Fee Related CN205012336U (en) 2015-09-14 2015-09-14 Area is pile driver of feed bin down

Country Status (1)

Country Link
CN (1) CN205012336U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114150667A (en) * 2021-12-14 2022-03-08 叶大清 Building engineering ground pile device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114150667A (en) * 2021-12-14 2022-03-08 叶大清 Building engineering ground pile device

Similar Documents

Publication Publication Date Title
CN201801319U (en) Crane for pipe pile production
CN109555300A (en) Overhanging scaffold
CN109487955A (en) A kind of precast concrete column in-situ cast-in-place construction method
CN102102365B (en) Slurry protection wall bored pile concrete casting device
CN201459732U (en) Simple support guide device for pile casing sinking
CN202945798U (en) Overhanging type scaffold corner device
CN205012336U (en) Area is pile driver of feed bin down
CN209585576U (en) Overhanging scaffold
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN206090564U (en) Novel piling machine
CN201794305U (en) Supporting device for elevator shaft mold
CN201746830U (en) Long screw bored concrete pile post-inserted cage tool
CN202208922U (en) Impact hammer for pile pouring machine
CN204402496U (en) A kind of vertical shaft steel strand jack hangs slip-form lifting device
CN205012326U (en) A double -deck lower equipment
CN105178315A (en) Pouring type pile driver and pile driving method using pile driver
CN205012337U (en) Pour formula pile driver
CN205012339U (en) Pile driver
CN106567386A (en) Pouring type pile driver and pile driving method therefor
CN201793344U (en) Lifting equipment for manual hole digging piles
CN105256793B (en) A kind of double-deck lower stake equipment
CN201297131Y (en) A luffing mechanism of rotary dig drill machine mast top pulley support
CN102926383B (en) A kind of single shaft SMW engineering method stake machine
CN104564084B (en) Vertical shaft sliding formwork and grouting platform steel strand wires jack lifting construction equipment
CN205012340U (en) Piling machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Lei

Inventor after: Zhang Fang

Inventor after: Li Jian

Inventor before: Wang Jing

Inventor before: Li Ping

Inventor before: Li Lei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180117

Address after: Changle Wen Zhen Shi Bi Cun Xin CuO 350200 Fujian city of Fuzhou province No. 58

Co-patentee after: Zhang Fang

Patentee after: Li Lei

Co-patentee after: Li Jian

Address before: No. 106, Xinhua Zhong Road, ancient city street office of Dengzhou City, Nanyang, Henan

Co-patentee before: Li Ping

Patentee before: Wang Jing

Co-patentee before: Li Lei

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160203

Termination date: 20190914