CN205000648U - Concrete regularly automatic maintenance sprays facility - Google Patents
Concrete regularly automatic maintenance sprays facility Download PDFInfo
- Publication number
- CN205000648U CN205000648U CN201520604463.9U CN201520604463U CN205000648U CN 205000648 U CN205000648 U CN 205000648U CN 201520604463 U CN201520604463 U CN 201520604463U CN 205000648 U CN205000648 U CN 205000648U
- Authority
- CN
- China
- Prior art keywords
- water
- water supply
- shower
- concrete
- starter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a concrete regularly automatic maintenance sprays facility, is including spraying automatic control system, water supply system and spraying system, it includes block terminal, timing controllable switch, circuit breaker, earth -leakage protector and starter to spray automatic control system, the block terminal is connected through power cord and earth -leakage protector input, and the earth -leakage protector output is connected respectively with circuit breaker, timing controllable switch and starter, water supply system includes water supply water pump, water tank, water supply starter, the full -automatic water level protector of water shortage protection, water supply circuit breaker and water supply earth -leakage protector, spraying system holds water pump, multirow shower and shower support including the energy -conserving festival. The higher all -round gross area of open -air three -dimensional concrete of its mainly used water resource area in short supply, wind zone and building height gives the maintenance, has solved concrete gain in strength in earlier stage problem slow and thoughtlessly surface crack appearance with fixed attention, has guaranteed the engineering quality, not only construction cost has been practiced thrift but also avoided safe risk.
Description
Technical field
The utility model belongs to newly builds three-dimensional apparatus for concrete member curing field of engineering technology, a concrete timing automatic spray maintenance facility especially, is mainly used in the three-dimensional young concrete component conservation in the higher field of water shortage zone, wind district and building height.
Background technology
Concrete curing mainly contain plastic sheeting raise protect, cover watering maintenance, stream curing several types.The concrete curing mode of this several types all has some limitations, and the maintenance of plastic sheeting parcel is easy to be blown open to wind district film, destroys the effect closed and keep moisture evaporation, and when Bridge High-rise Pier and cantilever construction film to swathe task difficulty large; The higher little use of stream curing cost; Current engineering construction great majority adopt the concrete curing method covering watering, but the waste of this maintenance process to water water resource is larger, be difficult to grasp watering opportunity, a water constructor is often spilt to Bridge High-rise Pier and all will carry out a work high above the ground, there is certain security risk, and be difficult to ensure the side of stereoscopic member and the bottom coagulation surface wettability of hanging part, do not reach maintenance effect, cause the slow and surface of concrete gain in strength speed in early stage to occur crackle, cause concrete quality hidden danger.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of concrete timing automatic spray maintenance facility ensureing constructor's safety, the watering of timing spray.This facility is mainly used in the three-dimensional concrete component comprehensive gross area of body concrete that can oppose and gives maintenance.
It is as follows that the utility model solves the problems of the technologies described above the technical scheme taked: a kind of concrete timing automatic spray maintenance facility, is characterized in that: this maintenance facility comprises spray automatic control system, water system and spray system; Spray automatic control system comprises switchbox, timing gate-controlled switch, line breaker, earth leakage protective device and starter; Switchbox is connected with earth leakage protective device input through power line, and earth leakage protective device output is connected respectively with line breaker, timing gate-controlled switch and starter; Water system comprises water supply pump, water tank, water supply starter, excessive low water level protection automatic water level protector, water supply line breaker and water supply earth leakage protective device; Water supply pump is connected with water tank, it is cursory to be provided with in water tank, and power line is connected with water supply earth leakage protective device, and water supply earth leakage protective device is connected with water supply line breaker, water supply line breaker, cursory both be connected with excessive low water level protection automatic water level protector, water supply starter is connected with water supply pump; Spray system comprises energy-saving and holds water pump, many row's showers and shower support; Energy-saving appearance water pump one end is connected with water tank, the other end is connected with shower, and shower is fixed on shower support, and shower is provided with several shower nozzle, and energy-saving holds water pump and is connected with starter.
Shower row, shower nozzle number and shower support are arranged according to concrete structure size.
The utility model is mainly used in the three-dimensional concrete component comprehensive gross area of body concrete that can oppose and gives maintenance, its major advantage: first, the time interval of timing gate-controlled switch open and close can be set according to the evaporation capacity of local moisture, with regulate and control energy-saving hold pump working, ensure concrete curing time inner surface moistening; Secondly, the body concrete that can oppose carries out three-dimensional and sprays maintenance, solves the defect covering and be difficult to realize watering maintenance bottom watering maintenance opposition body concrete side and hanging part; Above 2 solve the slow and coagulation face crack produced problem of concrete gain in strength in early stage, ensure that workmanship; On the other hand the utility model terminates not need constructor to ascend a height operation from after installation to concrete curing, has both saved construction cost and turn avoid security risk.
The utility model is applied at Group construction capacity expansion revamping JTZQ-4 bid section platform river bridge, and platform river bridge is 10-32 rice double track railway bridge, and to being located in Chifeng and Tongliao intersection, summer climate is hot, and strong wind is continuous; Platform river bridge pier abutment body concrete curing area is larger and irregular, apply this spray maintenance method and solve the defect needing manual parcel in the concrete curing of wind district, cover maintenance of sprinkling water, after a bridge pier concrete curing phase terminates, this facility can also in other bridge pier concrete curing, engineering construction safety risk is reduced while cost-saving, and workmanship guarantee is played a significant role, particularly at water source, construction water in short supply needs this facility of the area of roping to cost-saving most important.
Accompanying drawing explanation
Fig. 1 is facade structures schematic diagram of the present utility model,
Fig. 2 is the top view of Fig. 1,
Fig. 3 is the lateral view of Fig. 1.
In figure: 1-energy-saving holds water pump, 2-shower, 3-shower nozzle; 4-shower support, 5-earth leakage protective device 1,6-line breaker; 7-timing gate-controlled switch, 8-starter, 9-water supply pump; 10-water supply starter, 11-excessive low water level protection automatic water level protector, 12-water supply line breaker; 13-water supply earth leakage protective device; 14-cursory, 15-water tank, 16-concrete structure.
Detailed description of the invention
As shown in Figure 1, Figure 2 with shown in Fig. 3: a kind of concrete timing automatic spray maintenance facility, this maintenance facility comprises spray automatic control system, water system and spray system; Spray automatic control system comprises switchbox, timing gate-controlled switch 7, line breaker 6, earth leakage protective device 5 and starter 8; Switchbox is connected with earth leakage protective device 5 input through power line, and earth leakage protective device 5 output is connected respectively with line breaker 6, timing gate-controlled switch 7 and starter 8; Water system comprises water supply pump 9, water tank 15, water supply starter 10, excessive low water level protection automatic water level protector 11, water supply line breaker 12 and water supply earth leakage protective device 13; Water supply pump 9 is connected with water tank 15, cursory 14 are provided with in water tank 15, power line is connected with water supply earth leakage protective device 13, water supply earth leakage protective device 13 is connected with water supply line breaker 12, both water supply line breakers 12, cursory 14 are connected with excessive low water level protection automatic water level protector 11, and water supply starter 10 is connected with water supply pump 9; Spray system comprises energy-saving and holds water pump 1, many row's showers 2 and shower support 4; Energy-saving appearance water pump 1 one end is connected with water tank 15, the other end is connected with shower 2, and shower 2 is fixed on shower support 4, and shower 2 is provided with several shower nozzle 3, and energy-saving holds water pump 1 and is connected with starter 8.
Under the water level arrival in water tank 15 arranges water level in limited time; the electromagnetic valve of excessive low water level protection automatic water level protector 11 is started working and water supply starter 10 is started; water supply pump 9 is to cistern water supply; when water level reaches in limited time; the electromagnetic valve of excessive low water level protection automatic water level protector is started working; water supply starter is quit work, and water supply pump stops supplying water, and back and forth ensures that the water in water tank meets water spray requirement successively.
Carry out design sprinkler spacing according to local daily evaporation amount and concrete structure size, shower nozzle 3 is connected with tee piece with shower 2, and shower 2 can select pvc pipe; Shower 2 is laid as many rows according to upper and lower orientation, Figure 3 shows that three rows, same level orientation be two rows; Arrange shower and head cartridge according to concrete structure size, head cartridge 4 can be the built-in fitting arranged on concrete structure 16.Calculate evaporation capacity per hour according to local daily evaporation amount during application, then the time interval of timing gate-controlled switch open and close is set according to evaporation capacity per hour.
Claims (4)
1. a concrete timing automatic maintenance spray facility, is characterized in that: this maintenance facility comprises spray automatic control system, water system and spray system; Spray automatic control system comprises switchbox, timing gate-controlled switch (7), line breaker (6), earth leakage protective device (5) and starter (8); Switchbox is connected with earth leakage protective device (5) input through power line, and earth leakage protective device (5) output is connected respectively with line breaker (6), timing gate-controlled switch (7) and starter (8); Water system comprises water supply pump (9), water tank (15), water supply starter (10), excessive low water level protection automatic water level protector (11), water supply line breaker (12) and water supply earth leakage protective device (13); Water supply pump (9) is connected with water tank (15), be provided with cursory (14) in water tank (15), power line is connected with water supply earth leakage protective device (13), water supply earth leakage protective device (13) is connected with water supply line breaker (12), both water supply line breaker (12), cursory (14) are connected with excessive low water level protection automatic water level protector (11), and water supply starter (10) is connected with water supply pump (9); Spray system comprises energy-saving and holds water pump (1), arranges shower (2) and shower support (4) more; Energy-saving appearance water pump (1) one end is connected with water tank (15), the other end is connected with shower (2), shower (2) is fixed on shower support (4), shower (2) is provided with several shower nozzle (3), and energy-saving holds water pump (1) and is connected with starter (8).
2. a kind of concrete as claimed in claim 1 timing automatic maintenance spray facility, is characterized in that: head cartridge (4) is at the upper built-in fitting arranged of concrete structure (16).
3. a kind of concrete as claimed in claim 1 or 2 timing automatic maintenance spray facility, is characterized in that: shower (2) is laid as many rows according to upper and lower orientation, same level orientation be two rows.
4. a kind of concrete as claimed in claim 3 timing automatic maintenance spray facility, is characterized in that: shower nozzle (3) is connected with tee piece with shower (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520604463.9U CN205000648U (en) | 2015-08-12 | 2015-08-12 | Concrete regularly automatic maintenance sprays facility |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520604463.9U CN205000648U (en) | 2015-08-12 | 2015-08-12 | Concrete regularly automatic maintenance sprays facility |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205000648U true CN205000648U (en) | 2016-01-27 |
Family
ID=55157544
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520604463.9U Withdrawn - After Issue CN205000648U (en) | 2015-08-12 | 2015-08-12 | Concrete regularly automatic maintenance sprays facility |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205000648U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105155849A (en) * | 2015-08-12 | 2015-12-16 | 中铁二十一局集团有限公司 | Regular automatic maintenance and sprinkling facility for concrete |
CN107642105A (en) * | 2017-09-29 | 2018-01-30 | 中铁上海工程局集团市政工程有限公司 | A kind of piping lane automatic spray dolly curing means and its spraying method |
CN110055970A (en) * | 2019-06-06 | 2019-07-26 | 中国葛洲坝集团第一工程有限公司 | Eulittoral zone panel conserves intelligence system and control and maintenance process |
-
2015
- 2015-08-12 CN CN201520604463.9U patent/CN205000648U/en not_active Withdrawn - After Issue
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105155849A (en) * | 2015-08-12 | 2015-12-16 | 中铁二十一局集团有限公司 | Regular automatic maintenance and sprinkling facility for concrete |
CN105155849B (en) * | 2015-08-12 | 2017-11-24 | 中铁二十一局集团有限公司 | The timing automatic maintenance spray facility of concrete |
CN107642105A (en) * | 2017-09-29 | 2018-01-30 | 中铁上海工程局集团市政工程有限公司 | A kind of piping lane automatic spray dolly curing means and its spraying method |
CN110055970A (en) * | 2019-06-06 | 2019-07-26 | 中国葛洲坝集团第一工程有限公司 | Eulittoral zone panel conserves intelligence system and control and maintenance process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105104010B (en) | Water and fertilizer automatic irrigation greening wall | |
CN203994187U (en) | A kind of precast beam automatic spray health preserving equipment | |
CN205000648U (en) | Concrete regularly automatic maintenance sprays facility | |
CN203937012U (en) | A kind of concrete wet curing device | |
CN108457274A (en) | A kind of moisturizing spray maintenance Intelligentized method for not removing plank sheathing pumping flow channel concrete | |
CN204163000U (en) | The automatic pier stud of SECO or king-post sprinkling curing system | |
CN206491003U (en) | A kind of spray irrigation system | |
CN105155849B (en) | The timing automatic maintenance spray facility of concrete | |
CN204929795U (en) | A kind of liquid manure automatic irrigation greening wall | |
CN205431292U (en) | Be used for trees to spray lime device | |
CN204032009U (en) | A kind of vertical greening device of soilless culture | |
CN203105240U (en) | Automatic irrigation system for green belts on flyover | |
CN203387977U (en) | Ecological afforesting device for outer wall of house | |
CN207022795U (en) | One kind energy-conservation sprinkling irrigation equipment | |
CN205865412U (en) | Gardens sprinkler irrigation system | |
CN206078391U (en) | Drip irrigation system for apple planting | |
CN209568362U (en) | Railroad bridge pier stud automatic spraying device | |
CN204929870U (en) | Sprinkling truck automatic irrigation system | |
CN206932868U (en) | A kind of agricultural irrigation device | |
CN208815921U (en) | A kind of Sarasota climbing form system construction automatic spray curing system | |
CN107175757A (en) | A kind of sprinkling curing system of prefabricated I-beam plate | |
CN207206708U (en) | Mining under railways spray maintenance device | |
CN204291861U (en) | A kind of water saving nursery | |
CN208009918U (en) | Tool-type energy-saving concrete wall curing system | |
CN203775835U (en) | Transformer substation road-greening irrigation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20160127 Effective date of abandoning: 20171124 |
|
AV01 | Patent right actively abandoned |