CN204982858U - Prestressing force frame diaphragm wall - Google Patents

Prestressing force frame diaphragm wall Download PDF

Info

Publication number
CN204982858U
CN204982858U CN201520501318.8U CN201520501318U CN204982858U CN 204982858 U CN204982858 U CN 204982858U CN 201520501318 U CN201520501318 U CN 201520501318U CN 204982858 U CN204982858 U CN 204982858U
Authority
CN
China
Prior art keywords
ater
casting
steel strand
wall
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520501318.8U
Other languages
Chinese (zh)
Inventor
查支祥
陈黎娅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Institute of Technology of ZJU
Original Assignee
Ningbo Institute of Technology of ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Institute of Technology of ZJU filed Critical Ningbo Institute of Technology of ZJU
Priority to CN201520501318.8U priority Critical patent/CN204982858U/en
Application granted granted Critical
Publication of CN204982858U publication Critical patent/CN204982858U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a prestressing force frame diaphragm wall, it is equipped with many stands (1), and crossbeam (2) are established on the top of whole stands (1), and per two adjacent stand (1), bottom plate (3) and crossbeam (2) constitute frame (4), and the concrete wall in every frame (4) and frame (4) constitutes frame wall body unit (5), be equipped with in every frame wall body unit (5) post -cast strip (7), every post -cast strip (7) both sides are equipped with two blocks roof pressure steel sheet (8), and the preformed hole on each roof pressure steel sheet (8) is passed to reinforcing bar (9) to the level of steel strand wires (6) and steel reinforcement cage, water line segment (10) after steel strand wires (6) segmentation of lieing in every post -cast strip (7) in the whole root steel strand wires (6) forms one, the both ends of watering line segment (10) after every are through ground tackle two roof pressure steel sheet (8) anchor with post -cast strip (7) both sides of corresponding. The regional bearing capacity that shears of elevation in the middle of this wall body can effectively improve.

Description

Prestressed frame diaphragm wall
Technical field
The utility model relates to the technical field of construction of prestressed frame diaphragm wall, is specifically a kind of structure of prestressed frame diaphragm wall.
Background technology
In engineering construction, the application of prestressed frame diaphragm wall is very general, the length of this prestressed frame diaphragm wall generally more than 35m, as underground garage, Large Underground Structure perimeter walls etc.The framework diaphragm wall of prior art is provided with a root post along its length at a certain distance, namely framework diaphragm wall comprises many root posts, the top of whole column is connected and fixed by a crossbeam, base plate between every two adjacent columns, two columns and that section of crossbeam between two columns form the framework of a load-bearing shearing resistance, each framework and the concrete wall being positioned at this framework form a framed wall unit, and whole connecting the multiple framed wall unit head and the tail of row constitutes whole framework diaphragm wall.
The work progress of the framework diaphragm wall of prior art, for have set up column and wall form on base plate, beam template has been set up by column and wall form, and the good reinforcing cage of colligation, overall time moulding by casting column, body of wall and crossbeam.
There is restriction from soleplate at absolute altitude place at the bottom of the framework diaphragm wall of prior art and top mark eminence has crossbeam to retrain, and the ability of the anti-deformation of its shearing resistance is all desirable, but the body of wall in middle absolute altitude region is owing to lacking, and its shear-carrying capacity of constraint is poor, the easily generation deformation when variations in temperature.Also someone proposes to carry out prestressed stretch-draw to the middle absolute altitude region of framework diaphragm wall, namely several levels are put into steel strand before cast, the head and the tail two ends of framework diaphragm wall are all protruded at the two ends of steel strand, cast wall, column and crossbeam concrete again, last from framework diaphragm wall two ends tension steel strand and by its anchoring, by the stretch-draw of steel strand by prestressing force acting in opposition in body of wall, provide constraint to absolute altitude region in the middle of body of wall.
But the construction method of above-mentioned Shi Hanzhang is difficult to carry out, because the prestressing force produced during tension steel strand and deformation, the overwhelming majority is born by column and framework and cannot be acted on the walls concrete in framework, between column at all in fact, so absolute altitude region arranges steel strand and carries out shearing resistance and the ability of anti-deformation that prestressed stretch-draw is difficult to improve this absolute altitude region body of wall in the middle of body of wall.
Utility model content
The technical problems to be solved in the utility model is, provides a kind of and effectively can improve the shear-carrying capacity in middle absolute altitude region and the prestressed frame diaphragm wall of non-deformability.
Technical solution of the present utility model is, a kind of prestressed frame diaphragm wall is provided, it is provided with a root post along its length at a certain distance, the top of whole column is connected and fixed by a crossbeam, base plate between every two adjacent columns, above-mentioned two columns and that section of crossbeam between above-mentioned two columns form a framework, each framework and the concrete wall being positioned at this framework form a framed wall unit, and whole framed wall unit head and the tail connect side by side and just constitute whole prestressed frame diaphragm wall; This prestressed frame diaphragm wall is also provided with horizontal direction steel strand, and steel strand two ends are fixed on the head and the tail two ends of prestressed frame diaphragm wall respectively by ground tackle; The mid-length of each framed wall unit is provided with a vertical ater-casting, top, ater-casting is concordant with crossbeam bottom surface, bottom, ater-casting is concordant with plate top surface, the both sides of every bar ater-casting are provided with two pieces and vertically push up laminated steel, each top laminated steel is provided with preformed hole, and the horizontal steel bar of steel strand and reinforcing cage is through the preformed hole on each top laminated steel; Water line segment after the steel strand segmentation being positioned at each ater-casting in whole steel strand forms one, the two ends of watering line segment after each push up laminated steel anchoring through ground tackle with two of corresponding both sides, ater-casting.
Implement the construction method of prestressed frame diaphragm wall of the present utility model, its step comprises:
A, assembling reinforcement cage, and set up column, body of wall and beam template, and by one of every bar ater-casting group two pieces top laminated steel installation in position, and shelving one piece of crossbeam soffit formwork with on two top laminated steels of group;
B, cast column, body of wall and crossbeam concrete, and an ater-casting is reserved on each framed wall unit;
C, jack is arranged on every bar ater-casting two top laminated steels between and top carried out to two top laminated steels press; After the pressure of top, laminated steel is pushed up with ground tackle and two respectively in the two ends of watering line segment after the steel strand in this ater-casting to fix;
D, jack release to be removed, now, the walls concrete of both sides, every bar ater-casting can to the reset deformation of direction, ater-casting, and steel strand segmentation in both walls body concrete can produce a reaction force to walls concrete because of walls concrete reset tension, this reaction force is walked around column and framework and is acted directly on walls concrete and provide constraint to it;
E, each ater-casting teeming concrete to be tamped.
The utility model prestressed frame diaphragm wall compared with prior art, has following remarkable advantage and beneficial effect:
The core of technique scheme is got around column and framework, does not directly carry out stretch-draw to whole body of wall two ends, but take a reserved ater-casting on each framed wall unit, be in fact to two ater-castings between body of wall carry out stretch-draw, like this, stretching force and deformation can not be fallen on column and framework, but directly drop on the walls concrete between two ater-castings, effectively improve the constraint in the middle of body of wall height, effectively improve shear-carrying capacity and the non-deformability in middle absolute altitude region, and, during concrete stretch-draw, consider the width as far as possible reducing ater-casting, therefore the form of the direct tension steel strand of the routine do not adopted, because routine directly use jack tension steel strand, need to reserve the space of being inserted in or extracting out steel strand for jack, it is very wide that such ater-casting must be arranged, and the not direct tension steel strand of the utility model, but to pressure two pieces top, top, both sides, ater-casting laminated steel, release makes concrete oppositely reset to direction, ater-casting with indirect tensioning steel strand again, like this, a width demand fulfillment of ater-casting can put into a jack, ater-casting width is effectively controlled, convenient follow-up benefit slurry process.
Accompanying drawing explanation
Fig. 1 be the utility model prestressed frame diaphragm wall face structural representation.
Shown in figure 1, column, 2, crossbeam, 3, base plate, 4, framework, 5, framed wall unit, 6, steel strand, 7, ater-casting, 8, top laminated steel, 9, horizontal steel bar, 10, after water line segment, 11, frontly water line segment.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As shown in Figure 1, the utility model prestressed frame diaphragm wall, it is provided with a root post 1 along its length at a certain distance, and this prestressed frame diaphragm wall is provided with many root posts 1.The top of whole column 1 is connected and fixed by a crossbeam 2, and the base plate 3 between every two adjacent columns 1, above-mentioned two columns 1 and that section of crossbeam 2 between above-mentioned two columns 1 form a framework 4.Each framework 4 and the concrete wall being positioned at this framework 4 form a framed wall unit 5, and whole multiple framed wall unit 5 head and the tail connect side by side and just constitute whole prestressed frame diaphragm wall.This prestressed frame diaphragm wall is also provided with horizontal direction steel strand 6, steel strand 6 two ends respectively by ground tackle as intermediate plate is fixed on the head and the tail two ends of prestressed frame diaphragm wall.
The mid-length of each framed wall unit 5 is provided with a vertical ater-casting 7, and namely this ater-casting 7 and two root posts 1 of this framed wall unit 5 are apart from equal.Top, ater-casting 7 is concordant with crossbeam 2 bottom surface, bottom, ater-casting 7 and base plate 3 either flush.The both sides of every bar ater-casting 7 are provided with two pieces of vertically top laminated steels 8, and each top laminated steel 8 is provided with preformed hole, and the horizontal steel bar 9 of the reinforcing cage of the concrete wall in steel strand 6 and framework 4 is through the preformed hole on each top laminated steel 8.Line segment 10 is watered after steel strand 6 segmentation being positioned at each ater-casting 7 in whole steel strand 6 forms one, and line segment 11 is watered in steel strand 6 segmentation being positioned at both sides, ater-casting 7 body of wall before being formed, after water line segment 10 and the front line segment 11 that waters is intervally arranged the complete steel strand 6 of common composition.The two ends of watering line segment 10 after each through ground tackle as intermediate plate and water after this line segment 10 place both sides, ater-casting 7 two push up laminated steel 8 anchoring.
As shown in Figure 1, implement the construction method of the utility model prestressed frame diaphragm wall, its step comprises.
A, assembling reinforcement cage, and set up column 1, body of wall and crossbeam 2 template, and by one of every bar ater-casting 7 group two pieces top laminated steel 8 installation in position, and shelving one piece of crossbeam 2 soffit formwork with on two top laminated steels 8 of group.
Specifically, the side template of the side template of each column 1, the side template of each body of wall and crossbeam 2 is installed in a conventional manner, but unlike the prior art, in each framed wall unit 5, need the position of reserved ater-casting 7 that two pieces of top laminated steels 8 are installed, above-mentioned two top laminated steels 8 are as the side template of ater-casting, and when being used for preventing cast wall, concrete flows in ater-casting 7; And concrete flows into ater-casting 7 when the soffit formwork of one piece of horizontal direction template as crossbeam 2 is shelved to prevent from pouring into a mould crossbeam 2 in above-mentioned two laminated steel 8 tops, top.
B, cast column 1, body of wall and crossbeam 2 concrete, and on each framed wall unit 5 a reserved ater-casting 7; And the two top laminated steels 8 that steel strand 6 in prestressed frame diaphragm wall and horizontal steel bar 9 have passed through every bar ater-casting 7 are exposed in ater-casting 7, the existence of this ater-casting 7 does not interfere with the continuous of steel strand 6 and horizontal steel bar 9.
C, jack is arranged on every bar ater-casting 7 two top laminated steels 8 between and top carried out to two top laminated steels 8 press; After the pressure of top, the two ends of watering line segment 10 after the steel strand 6 in this ater-casting 7 are fixed as intermediate plate and two pushes up laminated steel 8 with ground tackle respectively.In this step, the installation site of jack is in the middle of the height of body of wall, because this position is away from crossbeam 2 and base plate 3, needs jack Shi Hanzhang to retrain.
D, jack release to be removed, now, the walls concrete of both sides, every bar ater-casting 7 can to the reset deformation of direction, ater-casting 7, and water line segment 11 before steel strand 6 segmentation in both walls body concrete namely and can produce a reaction force to walls concrete because of walls concrete reset tension, this reaction force is walked around column 1 and framework 4 and is acted directly on walls concrete and provide constraint to it.
E, each ater-casting 7 teeming concrete to be tamped.
In fact, prestressed stretch-draw process is divided into two kinds of situations.Also to be modal situation be exactly carries out prestressed stretch-draw to the walls concrete between two adjacent ater-castings 7 for the first.There is a root post 1 between two ater-castings 7, the top laminated steel 8 on the right side of the left ater-casting 7 of the jack pair in the ater-casting 7 on the left side carries out top pressure, and the walls concrete between left ater-casting 7 and column 1 is compressed to column 1 direction, and the top laminated steel 8 in the left side of the right ater-casting 7 of jack pair in the ater-casting 7 on the right carries out top pressure, walls concrete between right ater-casting 7 and column 1 is compressed to column 1 direction, that is, the concrete of column 1 both sides is all compressed to column direction, column about 1 stress balance, therefore column 1 and framework 4 do not stress indeformable yet, and after jack release, the concrete of column 1 left and right sides all resets to both sides, and water line segment 11 two ends all by anchoring before the segmentation of steel strand 6 in concrete between two ater-castings 7 i.e. steel strand 6, namely on the left end watering line segment 11 before steel strand 6 is fixed on the right side of left ater-casting 7 top laminated steel 8 by ground tackle and the right-hand member watering line segment 11 before steel strand 6 is fixed on the top laminated steel 8 in the left side of right ater-casting 7 by ground tackle, so, when the concrete of column 1 left and right sides resets to both sides after jack release, the concrete constraint of concrete tensioning formation column 1 left and right sides that line segment 11 can be reset is watered before the steel strand 6 that two ends are fixed.
The second situation is, Far Left or a rightmost ater-casting 7, for leftmost ater-casting 7 analysis, top laminated steel 8 on the right of Far Left ater-casting 7 is stressed similar with the first situation, and the top laminated steel 8 on the left side, leftmost ater-casting 7 is leaned left by jack, after jack release, concrete between this ater-casting 7 and leftmost side column 1 resets to the right, but water before being anchored at the steel strand 6 in this part concrete line segment 11 one end be anchored at the other end on the left of column 1 be anchored at this ater-casting 7 left side top laminated steel 8 on, therefore water line segment 11 before this part of steel strand 6 provide constraint to the concrete between this ater-casting 7 and left side column 1 to the right after concrete resets.The second stressing conditions is only present in Far Left and rightmost two ater-castings 7, and both also reaches the stress balance of whole framework 4 after framework 4 entirety is stressed, therefore the prestressing force applied still acts on walls concrete instead of drops on framework 4.

Claims (1)

1. a prestressed frame diaphragm wall, it is provided with a root post (1) along its length at a certain distance, the top of whole column (1) is connected and fixed by a crossbeam (2), every two adjacent columns (1), base plate (3) between above-mentioned two columns (1) and that section of crossbeam (2) between above-mentioned two columns (1) form a framework (4), each framework (4) and the concrete wall being positioned at this framework (4) form a framed wall unit (5), whole framed wall unit (5) head and the tail connect side by side and just constitute whole prestressed frame diaphragm wall, this prestressed frame diaphragm wall is also provided with horizontal direction steel strand (6), steel strand (6) two ends are fixed on the head and the tail two ends of prestressed frame diaphragm wall respectively by ground tackle, it is characterized in that: the mid-length of each framed wall unit (5) is provided with a vertical ater-casting (7), ater-casting (7) top is concordant with crossbeam (2) bottom surface, (7) bottom, ater-casting and base plate (3) either flush, the both sides of every bar ater-casting (7) are provided with two pieces and vertically push up laminated steel (8), each top laminated steel (8) is provided with preformed hole, and the horizontal steel bar (9) of steel strand (6) and reinforcing cage is through the preformed hole on each top laminated steel (8), water line segment (10) after steel strand (6) segmentation being positioned at each ater-casting (7) in whole steel strand (6) forms one, the two ends of watering line segment (10) after each push up laminated steel (8) anchoring through ground tackle with two of corresponding ater-casting (7) both sides.
CN201520501318.8U 2015-07-10 2015-07-10 Prestressing force frame diaphragm wall Withdrawn - After Issue CN204982858U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520501318.8U CN204982858U (en) 2015-07-10 2015-07-10 Prestressing force frame diaphragm wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520501318.8U CN204982858U (en) 2015-07-10 2015-07-10 Prestressing force frame diaphragm wall

Publications (1)

Publication Number Publication Date
CN204982858U true CN204982858U (en) 2016-01-20

Family

ID=55117240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520501318.8U Withdrawn - After Issue CN204982858U (en) 2015-07-10 2015-07-10 Prestressing force frame diaphragm wall

Country Status (1)

Country Link
CN (1) CN204982858U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104988904A (en) * 2015-07-10 2015-10-21 浙江大学宁波理工学院 Prestress frame continuous wall and construction method thereof
CN106869520A (en) * 2017-04-12 2017-06-20 福州大学 A kind of reinforced beam bracing means and its installation method
CN110359483A (en) * 2019-08-22 2019-10-22 陈泽 A kind of sealing earth-retaining apparatus and system for environmentally friendly cut-pff wall

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104988904A (en) * 2015-07-10 2015-10-21 浙江大学宁波理工学院 Prestress frame continuous wall and construction method thereof
CN106869520A (en) * 2017-04-12 2017-06-20 福州大学 A kind of reinforced beam bracing means and its installation method
CN106869520B (en) * 2017-04-12 2023-04-28 福州大学 Reinforced concrete beam reinforcing device and installation method thereof
CN110359483A (en) * 2019-08-22 2019-10-22 陈泽 A kind of sealing earth-retaining apparatus and system for environmentally friendly cut-pff wall
CN110359483B (en) * 2019-08-22 2024-05-14 陈泽 Sealed soil retaining device and system for environment-friendly impervious wall

Similar Documents

Publication Publication Date Title
CN110397156B (en) Reinforced concrete prefabricated whole-cast house structure and construction method
CN203514336U (en) Embedded foundation of composite wallboard
CN101845792B (en) Method for constructing precast coping through multi-phase strain
CN204982858U (en) Prestressing force frame diaphragm wall
CN102418425B (en) Prefabrication integral casting building structure system with cast-in-site haunched beams, and construction method for prefabrication integral casting building structure system
CN109024298A (en) Construction method of bent cap
CN201785940U (en) Reinforced concrete prefabricated beam
CN201794161U (en) Prefabricated integrally cast building structure system with cast-in-place haunched beam
CN205630974U (en) Pre -tensioning system precast beam pedestal
CN202466431U (en) Bridge specific model vase pier construction device
CN104988904A (en) Prestress frame continuous wall and construction method thereof
CN105019645A (en) Template system for building concrete structure at earth-taking opening in top-down construction method, and construction method
CN102418400B (en) Pretensioning prestressed reinforced concrete precast beam
CN103850259B (en) The horizontal inner support at the capping beam absolute altitude place of foundation pit supporting system and construction method thereof
CN108678161B (en) Prestressed concrete row frame column and construction method
CN202689365U (en) Prefabricated reinforced concrete roof gutter
CN211775752U (en) Outer batter post template steel pipe scaffold support system
CN102650153B (en) Prefabricated reinforced concrete gutter
CN206267032U (en) Band gradient rectangular pier columns variable area formula hydraulic formwork
CN202559291U (en) U-typed aqueduct simulated test device
CN211473066U (en) Precast beam component
CN205438876U (en) Whole shaping design die carrier of plate -girder steel reinforcement cage
CN203729472U (en) GBF net core through hole box mold hollow floor anti-floating structure
CN204266478U (en) A kind of combination spike
CN215484623U (en) Exempt from to wear wall shear force wall template formwork device for tie rod

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160120

Effective date of abandoning: 20170412