CN204266478U CN201420567014.7U CN201420567014U CN204266478U CN 204266478 U CN204266478 U CN 204266478U CN 201420567014 U CN201420567014 U CN 201420567014U CN 204266478 U CN204266478 U CN 204266478U
Authority
CN
China
Prior art keywords
concrete
cross groove
knoll
thickness
steel mesh
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420567014.7U
Other languages
Chinese (zh)
Inventor
杨再进
甘学睿
杨兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Third Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority to CN201420567014.7U priority Critical patent/CN204266478U/en
Application granted granted Critical
Publication of CN204266478U publication Critical patent/CN204266478U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of combination spike, comprise concrete knoll, cross groove one is provided with at concrete knoll top, cross groove two is provided with bottom concrete knoll, concrete protective cushion block is placed in cross groove two, the utility model adopts combination spike, owing to being concrete element, save the reinforcing bar of the existing a few font steel bar horse-shaped bench of making, reduce the cost of manufacture of steel mesh reinforcement, fix without the need to colligation when concrete knoll is installed, install very convenient, Bars In Poured Concrete Slab concrete is directly built to concrete knoll end face absolute altitude, solve a difficult problem for Bars In Poured Concrete Slab THICKNESS CONTROL, concrete protective soil layer cushion block is positioned in concrete knoll cross groove two, concrete pier is directly placed in problem template directly solving the easy displacement of concrete protective layer pad, and can not topple over because of rocking of top mat, the utility model structure is simple, easy to make, highly versatile and control precision higher.

Description

A kind of combination spike
Technical field
The utility model relates to a kind of combination spike, belongs to building material field.
Background technology
Due to the using function variation of modern architecture, in cast-in-place structural plate, the use of double-layer double-direction steel mesh reinforcement is very extensive.Most often a few font steel bar horse-shaped benchs provided in " building operations handbook " are provided in current engineering.On a few font steel bar horse-shaped bench, horizontal reinforcement colligation is between lower row's muscle of top mat, the load of top mat reaches on the spacer bottom a few font steel bar horse-shaped bench by two sections of vertical lengths of rebar of a few font steel bar horse-shaped bench, spacer and a few font steel bar horse-shaped bench form support structure on underlay, to ensure that distance between upper and lower layer steel mesh reinforcement is in scope of design.But also there is following problem in a few font steel bar horse-shaped bench in implementation process: a few font steel bar horse-shaped bench stress point branch arranges on muscle under two of top mat, trampled rear because of two reinforcing steel bar bears uneven, easily cause a few font steel bar horse-shaped bench off normal to topple over; Mounted a few font steel bar horse-shaped bench, because of many with structural slab reinforcing bar binding tie point, easily loosen in work progress, is shifted, cause levels reinforcing bar apart from less than normal; Top reinforcement row's muscle off the net, the flexural deformation because of concentrated pressurized; A few font steel bar horse-shaped bench adopts bar bending to make, and bar material waste is larger; A few font steel bar horse-shaped bench need use thin wire and top mat colligation, and base plate need pad establishes two pieces of spacers, installs loaded down with trivial details; Spacer is easily shifted, and affects thickness of protection tier.
Utility model content
The purpose of this utility model is: provide a kind of combination spike, to solve existing a few font split heads because of poor stability, affect the problem of top mat topping; Easily be shifted to solve existing spacer, affect the problem of lower floor's steel mesh reinforcement topping; To solve the problem that prior art effectively cannot control Bars In Poured Concrete Slab thickness; The deficiencies in the prior art can be overcome.
The technical solution of the utility model
A kind of combination spike, comprise concrete knoll, be provided with cross groove one at concrete knoll top, be provided with cross groove two bottom concrete knoll, concrete protective cushion block is placed in cross groove two.
In aforesaid combination spike, column or the square structure of described concrete knoll to be vertical section be " convex " shape, in the middle part of concrete knoll, arrange waterstop, this structure makes concrete knoll can place stable and make to have water stopping function.
In aforesaid combination spike, the cross section of described cross groove one and cross groove two is inverted cone shape structure, and this structure makes the insertion of reinforcing bar and places can be more convenient.
In aforesaid combination spike, the actual Bars In Poured Concrete Slab consistency of thickness of the height of described concrete knoll and scene.
In aforesaid combination spike, the degree of depth=top mat thickness+top mat protection thickness of described cross groove one, the bottom width 2 ~ 10mm larger than the thickness of the lower placing of reinforcement of top mat of cross groove one.
In aforesaid combination spike; the degree of depth=lower floor's steel mesh reinforcement thickness+lower floor steel mesh reinforcement protection thickness+(5 ~ 10) mm of described cross groove two; bottom width 2 ~ the 10mm larger than the diameter of the upper placing of reinforcement of lower floor steel mesh reinforcement of cross groove two; by arranging surplus; can guarantee that cross recess two can be filled full by concrete; thus ensure that reinforcing steel bar bear is even.
In aforesaid combination spike, the thickness of concrete protective cushion block protects thickness consistent with lower floor steel mesh reinforcement.
Owing to have employed technique scheme, compared with prior art, support structure on the utility model adopt combination spike instead of underlay that existing spacer and a few font steel bar horse-shaped bench form, because combination spike is concrete element, save the reinforcing bar of the existing a few font steel bar horse-shaped bench of making, reduce the cost of manufacture of steel mesh reinforcement, fix without the need to colligation when concrete knoll is installed, install very convenient, because combination spike height equals thickness of slab, Bars In Poured Concrete Slab concrete is directly built to concrete knoll end face absolute altitude, compensate for the defect of the uncontrollable Bars In Poured Concrete Slab thickness of slab of existing a few font steel bar horse-shaped bench, concrete protective soil layer cushion block is positioned in concrete knoll cross groove two, concrete pier is directly placed in template, to solve on current concrete protective soil layer cushion block and a few font steel bar horse-shaped bench underlay in support structure, the problem of the easy displacement of concrete protective soil layer cushion block, because concrete knoll is up-small and down-big, can not topple over because of rocking of top mat, because concrete knoll is prefabrication, strictly can control its top cross groove degree of depth, solve in reinforcing bar rectification process because top mat disturbance causes a few font steel bar horse-shaped bench off normal, and affect the problem of top mat protective layer thickness, because combination spike can be prefabricated at factory's batch, greatly save the time of the existing a few font steel bar horse-shaped bench of field fabrication.
Accompanying drawing explanation
Accompanying drawing 1 is combination spike schematic diagram of the present invention;
Accompanying drawing 2 is combination spike phantom drawing of the present invention;
Accompanying drawing 3 is the method schematic diagram of combination spike bearing bar net of the present invention;
Accompanying drawing 4 is the parameter schematic diagram of the appearance in the present invention of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is further described in detail, but not as to any restriction of the present utility model.
Embodiment of the present utility model: a kind of combination spike; as shown in drawings, comprise concrete knoll 1, be provided with cross groove 1 at concrete knoll 1 top; bottom concrete knoll 1, be provided with cross groove 25, concrete protective cushion block 2 is placed in cross groove 25.
Wherein this concrete knoll 1 for vertical section be that (in the present embodiment, this concrete knoll 1 is column structure for the column of " convex " shape or square structure, and form a vertical section for " convex " shape structure with waterstop 4), waterstop 4 is set in the middle part of concrete knoll 1, the cross section of this cross groove 1 and cross groove 25 is inverted cone shape structure, the actual Bars In Poured Concrete Slab consistency of thickness of the height H of this concrete knoll 1 and scene, the degree of depth h1=top mat thickness b1+ top mat protection thickness c1 of this cross groove 1, the bottom width e1 2 ~ 10mm larger than the diameter of the lower placing of reinforcement 7 of top mat of cross groove 1, steel mesh reinforcement thickness b2+ lower floor of the degree of depth h2=lower floor steel mesh reinforcement protection thickness c2+5 ~ 10mm of this cross groove 25, the bottom width e2 2 ~ 10mm larger than the diameter of the upper placing of reinforcement 8 of lower floor steel mesh reinforcement of cross groove 25, the thickness h 3 of this concrete protective cushion block 2 protects thickness c2 consistent with lower floor steel mesh reinforcement, this concrete knoll 1 all adopts no slump concrete punching press to make with concrete protective layer pad 2, its concrete strength equals structural concrete strength.
A kind of construction method combining spike, when making Bars In Poured Concrete Slab, after lower floor's steel mesh reinforcement (lower floor's steel mesh reinforcement is made up of the upper placing of reinforcement 8 of lower floor's steel mesh reinforcement and the lower placing of reinforcement 9 of lower floor's steel mesh reinforcement) colligation is completed, immediately below crosspoint concrete protective layer pad being placed on lower floor's steel mesh reinforcement, concrete knoll to be placed on lower floor's steel mesh reinforcement and be positioned at concrete protective cushion block just on put the reinforcing bar making cross groove two can block lower floor's steel mesh reinforcement, the reinforcing bar of top mat (top mat is made up of the upper placing of reinforcement 6 of top mat and the lower placing of reinforcement 7 of top mat) to be placed on successively on concrete knoll and the reinforcing bar of top mat snaps in cross groove one, then colligation top mat, last monobloc cast plate mixes earth, square tube concordant concrete knoll end face is adopted to be caught up with by board concrete flat when building board concrete.
Detailed description of the invention
By the combination of processing shown in Fig. 1 and Fig. 2 spike.Processing technology is as follows: mixing no slump concrete → put into diel → punch forming → maintenance.
By installing combination spike shown in Fig. 3, erection sequence is as follows:
Directly over colligation lower floor steel mesh reinforcement → installation concrete protective soil layer cushion block 2 → concrete protective soil layer cushion block 2, concrete knoll 1 → colligation top mat → installation is installed.
The parameter declaration of the present embodiment
The top diameter of concrete knoll 1 is 80mm, and base diameter is 100mm, waterstop 4 width a=10mm.
Above-described embodiment is only the more specific embodiment of the present invention, describe the present invention in the foregoing embodiments and be used in utilization when the levels steel mesh reinforcement of Bars In Poured Concrete Slab is all square grid shape, the levels steel mesh reinforcement that right the present invention also can apply to Bars In Poured Concrete Slab is the utilization of other shapes, such as when the steel mesh reinforcement of Bars In Poured Concrete Slab is " rice " or " one " structure, only the groove shapes at bottom need simple change the present invention or top can realize, therefore applicant thinks, as long as any specific embodiments falls in creation principle of the present invention, all should be protection scope of the present invention.

Claims (7)

1. a combination spike; comprise concrete knoll (1); it is characterized in that: be provided with cross groove one (3) at concrete knoll (1) top; be provided with cross groove two (5) in concrete knoll (1) bottom, concrete protective cushion block (2) is placed in cross groove two (5).
2. combination spike according to claim 1, is characterized in that: described concrete knoll (1) is column or the square structure of " convex " shape for vertical section, arranges waterstop (4) at concrete knoll (1) middle part.
3. combination spike according to claim 1, is characterized in that: the cross section of described cross groove one (3) and cross groove two (5) is inverted cone shape structure.
4. combination spike according to claim 1, is characterized in that: height (H) and the actual Bars In Poured Concrete Slab consistency of thickness in scene of described concrete knoll (1).
5. combination spike according to claim 1; it is characterized in that: the degree of depth (h1)=top mat thickness (b1)+top mat protection thickness (c1) of described cross groove one (3), bottom width (e1) 2 ~ 10mm larger than the diameter of the lower placing of reinforcement (7) of top mat of cross groove one (3).
6. combination spike according to claim 1; it is characterized in that: the degree of depth (h2)=lower floor's steel mesh reinforcement thickness (b2)+lower floor's steel mesh reinforcement of described cross groove two (5) protects thickness (c2)+(5 ~ 10) mm, bottom width (e2) 2 ~ 10mm larger than the diameter of the upper placing of reinforcement (8) of lower floor steel mesh reinforcement of cross groove two (5).
7. combination spike according to claim 1, is characterized in that: the thickness (h3) of concrete protective cushion block (2) protects thickness (c2) consistent with lower floor steel mesh reinforcement.
CN201420567014.7U 2014-09-29 2014-09-29 A kind of combination spike Expired - Fee Related CN204266478U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420567014.7U CN204266478U (en) 2014-09-29 2014-09-29 A kind of combination spike

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420567014.7U CN204266478U (en) 2014-09-29 2014-09-29 A kind of combination spike

Publications (1)

Publication Number Publication Date
CN204266478U true CN204266478U (en) 2015-04-15

Family

ID=52801350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420567014.7U Expired - Fee Related CN204266478U (en) 2014-09-29 2014-09-29 A kind of combination spike

Country Status (1)

Country Link
CN (1) CN204266478U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105275154A (en) * 2014-09-29 2016-01-27 中建四局第三建筑工程有限公司 Combination brace and construction method therefor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105275154A (en) * 2014-09-29 2016-01-27 中建四局第三建筑工程有限公司 Combination brace and construction method therefor

Similar Documents

Publication Publication Date Title
CN203021923U (en) Big cantilever bent cap steel truss construction platform
CN202441060U (en) Construction structure of reinforced concrete frame beam columns
CN207228617U (en) A kind of concrete-pouring template float Structure for basement barricade single side formwork
CN102418425B (en) Prefabrication integral casting building structure system with cast-in-site haunched beams, and construction method for prefabrication integral casting building structure system
CN110965474A (en) Construction method of cable tower cross beam
CN201785940U (en) Reinforced concrete prefabricated beam
CN201794217U (en) Pretensioned prestressing reinforced concrete precast beam
CN102677895B (en) Suspended formwork pouring method for concrete foundation steps
CN206438529U (en) Beam and slab type raft foundation formwork support structure
CN201738597U (en) Sectional steel and steel pipe combined type support system of beam with high and large cross section
CN103615063A (en) Construction method for pouring pitched roof concrete and steel bar structure used in method
CN208052253U (en) A kind of positioning moulding bed prefabricated for T beam web reinforced frames
CN204266478U (en) A kind of combination spike
CN203808249U (en) Column stirrup cage assembly for beam-column joint core region
CN203320968U (en) Rectangular hanging split heads support
CN204687050U (en) A kind of mould of precast concrete rectangular beam
CN102418400B (en) Pretensioning prestressed reinforced concrete precast beam
CN204059420U (en) Late poured band support structure
CN105275154A (en) Combination brace and construction method therefor
CN201794215U (en) Pretensioning method prestress reinforced concrete prefabricated beam
CN103669566A (en) Steel reinforced concrete base of large-span net rack roof and construction method thereof
CN204899041U (en) Stool with upper and lower protection layer for controlling plate ribs
CN204282824U (en) Prefabricated setting prop rises beam composite frame structure
CN103526877B (en) A kind of precast concrete
CN209025324U (en) A kind of floor bar split heads

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150415

Termination date: 20210929