China
Prior art keywords
concrete
pile
cushion
pile body
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520706310.5U
Other languages
Chinese (zh)
Inventor
魏利金
雷阳
史炎升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING SUNLAY ARCHITECTURAL DESIGN Co Ltd
Original Assignee
BEIJING SUNLAY ARCHITECTURAL DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING SUNLAY ARCHITECTURAL DESIGN Co Ltd filed Critical BEIJING SUNLAY ARCHITECTURAL DESIGN Co Ltd
Priority to CN201520706310.5U priority Critical patent/CN204959784U/en
Application granted granted Critical
Publication of CN204959784U publication Critical patent/CN204959784U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides a safer uplift pile structure, including the concrete cushion, pass the concrete cushion and go deep into buried a plurality of longitudinal reinforcement, fix a plurality of lateral ties on a plurality of longitudinal reinforcements, the concrete pile body of pouring around longitudinal reinforcement and lateral tie, the lateral tie top is equipped with two slip casting pipes, slip casting is effective in the deposit concrete pile body, it has flexible polyurethane building sealer to fill between concrete pile body and the concrete cushion. The utility model discloses an uplift pile structure, through the mode of filling polyurethane building sealer between cushion cap and pile bolck, messenger anti -floating pile's atress is clearer and more definite to avoid main building and the too big differential settlement's of annex purpose, promoted the safety stock of pile foundation, have the practical meaning of extensive popularization.

Description

Uplift pile structure
Technical field
The utility model relates to a kind of uplift pile, especially a kind of uplift pile structure.
Background technology
At present, usually can run into place hydrostatic water table too high during selecting address on building, sometimes even close to the situation on earth's surface, and most of building is all with basement, and the basement number of plies of some highrise buildings reaches 4 layers more than.At present, more common measure of anti float has: increase structure weight, arrange uplift pile, anti-float anchor rod, discharge the measures such as water buoyancy under sole plate.And in Practical Project, when hydrostatic water table is higher, embedded depth of foundation is larger, select the mode increasing structure weight to become less feasible, even if feasible economy is also very poor; And anti-float anchor rod is larger by the impact of the adhesion strength between soil layer with anchoring body, when foundation soil is organic soil, liquid limit W lduring > 50% and relative density < 0.3, soil layer must not as the anchor layer of permanent anchor pole.Therefore, the feature such as uplift pile is high with its bearing capacity, strong adaptability, construction are simple, is widely used in all kinds of engineerings of Anti-floating design.
Main tower and annex is connected as a single entity, permanent settlement joint cannot be set again between the two, structure design must control the differential settlement problem between main building and annex for this reason, run into this situation usually to design and wish that the few sedimentation of main building is a little, the many sedimentations of annex are a little, but often because podium anti-floating problem is serious, have to adopt anti-floating pile, if but adopt traditional uplift pile certainly will when there is no underground water, the pressure that superstructure transmits is born in this meeting, the sedimentation of podium part will certainly be stoped like this, increase the relative settlement between main building and podium, potential safety hazard is brought to overall structure, must to be connected with cushion cap this kind of uplift pile for this reason and to improve.
Utility model content
The utility model provides a kind of safer uplift pile structure.
Realize the uplift pile structure of the utility model object, comprise concrete cushion, through concrete cushion in depth under multiple longitudinal reinforcements, be fixed on the multiple lateral ties on multiple longitudinal reinforcement, be cast in the concrete pile body around longitudinal reinforcement and lateral tie, be provided with two Grouting Pipe above described lateral tie, described Grouting Pipe is used for fluid concrete pile body; Flexible polyurethane construction sealant is filled with between described concrete pile body and concrete cushion.
The beneficial effect of uplift pile structure of the present utility model is as follows:
Uplift pile structure of the present utility model, by the mode of filled polyurethane construction sealant between cushion cap and stake top, make the definitely stressed of uplift pile, thus avoid the object of main building and the excessive relative settlement of annex, improve the safety stock of pile foundation, have and promote Practical significance widely.
Accompanying drawing explanation
Fig. 1 is the structural representation of uplift pile structure of the present utility model.
Detailed description of the invention
As shown in Figure 1, uplift pile structure of the present utility model, comprise concrete cushion 7, through concrete cushion 7 in depth under multiple longitudinal reinforcements 3, be fixed on the multiple lateral ties 4 on multiple longitudinal reinforcement 3, be cast in the concrete pile body 2 around longitudinal reinforcement 3 and lateral tie 4, be provided with two Grouting Pipe 6 above described lateral tie 4, described Grouting Pipe 6 is for fluid concrete pile body 2; Flexible polyurethane construction sealant 1 is filled with between described concrete pile body 2 and concrete cushion 7.
Embodiment recited above is only be described preferred embodiment of the present utility model; not scope of the present utility model is limited; do not departing under the utility model designs spiritual prerequisite; the various distortion that the common engineers and technicians in this area make technical solutions of the utility model and improvement, all should fall in protection domain that claims of the present utility model determine.

Claims (1)

1. uplift pile structure, it is characterized in that: comprise concrete cushion, through concrete cushion in depth under multiple longitudinal reinforcements, be fixed on the multiple lateral ties on multiple longitudinal reinforcement, be cast in the concrete pile body around longitudinal reinforcement and lateral tie, be provided with two Grouting Pipe above described lateral tie, described Grouting Pipe is used for fluid concrete pile body; Flexible polyurethane construction sealant is filled with between described concrete pile body and concrete cushion.
CN201520706310.5U 2015-09-14 2015-09-14 Uplift pile structure Expired - Fee Related CN204959784U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520706310.5U CN204959784U (en) 2015-09-14 2015-09-14 Uplift pile structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520706310.5U CN204959784U (en) 2015-09-14 2015-09-14 Uplift pile structure

Publications (1)

Publication Number Publication Date
CN204959784U true CN204959784U (en) 2016-01-13

Family

ID=55054859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520706310.5U Expired - Fee Related CN204959784U (en) 2015-09-14 2015-09-14 Uplift pile structure

Country Status (1)

Country Link
CN (1) CN204959784U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116289894A (en) * 2023-03-23 2023-06-23 兰州有色冶金设计研究院有限公司 Cast-in-situ reinforced concrete anti-pulling pile and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116289894A (en) * 2023-03-23 2023-06-23 兰州有色冶金设计研究院有限公司 Cast-in-situ reinforced concrete anti-pulling pile and construction method

Similar Documents

Publication Publication Date Title
CN202124865U (en) Quick plugging device for dewatering wellhead of sand-free cement pipe deep well
CN104805854B (en) A kind of Deep Water Ultra-long steel sheet pile cofferdam construction method under tide environment
CN102086645B (en) Socketed pile and construction method thereof
CN102776899B (en) Anti-floating structure of shallow-buried shield tunnel
CN105421500A (en) Basement anti-floating system based on low horizontal grout curtain and depressurization through water drawing
CN102852141A (en) Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN103015414A (en) Precast concrete post grouting pile and grouting process
CN102409674B (en) Cloth bag wall protection micro pile and construction method thereof
CN109183809A (en) A kind of construction method of Muddy Bottoms clay deep-foundation pit engineering composite support support replacement
CN106837340B (en) The construction method of wall clearance grouting waterproof and reinforcing shaft wall structure under frost wall protection
CN103410144B (en) Prestressed reinforcement piles set into rock and construction method
CN203654309U (en) Pile-caisson hydraulic structure
CN102995647B (en) Underground water control method used for grouting and seepage insulation of pile hole
CN102900093B (en) Plate-type double-cable foundation structure of transmission tower
CN103572770A (en) Pile box hydraulic structure object and building method thereof
CN204959784U (en) Uplift pile structure
CN206971247U (en) Concrete toe board foundation reinforcing structure arranged on unloading rock mass
CN205990655U (en) A kind of urban drainage pipe network defense sector sinking device
CN202000306U (en) All-straight-pile wharf structure
CN204311454U (en) A kind of pile end concrete placing device for foundation construction
CN204000856U (en) The anti-side changeable ridigity pile of inner support grouting formula level base
CN203583468U (en) Anti-floating pile with built-in non-metallic reinforcement
CN202989911U (en) Post-grouting pile of precast concrete
CN202755385U (en) Anti-floating structure of shallow-buried shield tunnel
CN104294859A (en) Stability judgment method of foundation pit basal-heave resistant system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113

Termination date: 20160914